J-2-6_Bidding_Chart.xls
XLS spreadsheet 859 KB Posted
- Solicitation number
- 19AQMM19R0005
About this file
J-2-6 Bidding Chart
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_19R0005_3.pdf | ||
| A004_SF30.pdf | ||
| QA_19R0005_2.pdf | ||
| A003_SF30.pdf | ||
| A003_Attachments.zip | ZIP file | |
| QA_19R0005.pdf | ||
| 19AQMM19R0005_A002.pdf | ||
| 19AQMM19R0005_A001.pdf | ||
| J-1-3_Past_Performance_and_References.xlsx | XLSX spreadsheet | |
| J-2-5_Submittal_Form.xlsx | XLSX spreadsheet | |
| 19AQMM19R0005.pdf | ||
| J-2-4_Exoneration_Form_(Tax_Exemption).pdf | ||
| J-2-3_Incident_Reports.docx | DOCX document | |
| J-2-1_Mat_Prod_Substitution_Form.pdf | ||
| J-3-1_Drawings.zip | ZIP file | |
| J-2-2__Firm_and_Project_Information.pdf | ||
| J-1-2_Past_Performance_Questionnaire_(PPQ).pdf | ||
| J-1-1_Statement_of_Work.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BREAKDOWN
| REMODELING OF THE WOMEN’S BARRACKS | |||||||||
| FOR THE POLICE ACADEMY AT MURCIELAGO | |||||||||
| COSTA RICA | |||||||||
| BREAKDOWN COST ESTIMATION | |||||||||
| ITEM | DESCRIPTION | UNIT | QTY. | LABOR COST | MATERIALS COST | TOTAL | REFERENCE SOURCE | ||
| UNIT COST | TOTAL COST | UNIT COST | TOTAL COST | ||||||
| C.1.1 | PRELIMINARY CONSTRUCTION WORK | - 0 | - 0 | - 0 | |||||
| 2.1 | Temporary facilities | glb | - 0 | - 0 | - 0 | ICD's Warehouse project | |||
| 2.2 | Dismounting of existing roof | glb | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| 2.3 | Demolitions of walls | m2 | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| 2.4 | Dismounting of door | u | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| 2.5 | Dismouting of windows | u | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| 2.6 | Demolition of floors | m2 | - 0 | - 0 | |||||
| 2.6 | Demolition of laundry | glb | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| C.1.2 | STRUCTURE FOR BATHROOM EXTENSION | - 0 | - 0 | - 0 | KM35 Project | ||||
| 3.1 | Foundations | m3 | - 0 | - 0 | - 0 | ||||
| 3.2 | Backfilling with granular material | m3 | - 0 | - 0 | - 0 | ||||
| 3.3 | Concrete floor | m2 | - 0 | - 0 | - 0 | ||||
| 3.4 | Concrete columns | m3 | - 0 | - 0 | - 0 | ||||
| 3.5 | Steel reinforcement | Kg | - 0 | - 0 | - 0 | ||||
| 3.5 | Concrete beams | m3 | - 0 | - 0 | - 0 | ||||
| 3.6 | Metallic structure for roof | kg | - 0 | - 0 | - 0 | ||||
| C.1.3 | CONSTRUCTION OF WALLS & FAÇADE COATINGS | - 0 | - 0 | - 0 | ICD's Warehouse project | ||||
| 4.1 | Foundation for walls | m3 | - 0 | - 0 | - 0 | ||||
| 4.2 | Concrete walls (CMU) | m2 | - 0 | - 0 | - 0 | ||||
| 4.3 | Reinforced concrete braces and lintels | m3 | - 0 | - 0 | - 0 | ||||
| 4.4 | Plastering & stucco | m2 | - 0 | - 0 | - 0 | ||||
| 4.5 | Stucco for existing walls | m2 | - 0 | - 0 | - 0 | ||||
| 4.6 | Aluminum panel | m2 | - 0 | - 0 | - 0 | ||||
| 4.7 | Gypsum panel | m2 | - 0 | - 0 | - 0 | ||||
| C.1.4 | FLOOR RENOVATION | m2 | - 0 | - 0 | - 0 | ||||
| 5.1 | Antiskid ceramic tile | m2 | - 0 | - 0 | - 0 | ||||
| 5.2 | Porcelain floor tile | m2 | - 0 | - 0 | - 0 | ||||
| 5.3 | Mop boards | m | - 0 | - 0 | - 0 | ||||
| 5.4 | Concrete floor for sidewalks | m2 | - 0 | - 0 | - 0 | ||||
| 5.5 | Electro-welded mesh | m2 | - 0 | - 0 | - 0 | ||||
| C.1.5 | ROOF & FASCIA | m2 | - 0 | - 0 | - 0 | ||||
| 6.1 | Thermal - Acoustic Roof | m2 | - 0 | - 0 | - 0 | ||||
| 6.2 | Fascia | m2 | - 0 | - 0 | - 0 | ||||
| 6.3 | Roof ridge | m | - 0 | - 0 | - 0 | ||||
| 6.4 | Roff valley | m | - 0 | - 0 | - 0 | ||||
| 6.5 | Paint of the existing structure | m2 | - 0 | - 0 | - 0 | ||||
| C.1.6 | FINISHING, WINDOWS & DOORS | - 0 | - 0 | - 0 | |||||
| 7.1 | Paint in walls | m2 | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| 7.2 | Ceramic tiles for walls | m2 | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| 7.3 | Doors type PMB070 | u | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| 7.4 | Doors type PM120 | u | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| 7.5 | Doors type PM090 | u | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| 7.6 | Doors type PMP100 | u | - 0 | - 0 | - 0 | ||||
| 7.7 | Windows type V001 | u | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| 7.8 | Windows type V002 | u | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| 7.9 | Windows type V003 | u | - 0 | - 0 | - 0 | ||||
| 7.10 | Windows type V004 | u | - 0 | - 0 | - 0 | ||||
| 7.11 | Windows type V005 | u | - 0 | - 0 | - 0 | ||||
| 7.12 | Windows type V006 | u | - 0 | - 0 | - 0 | ||||
| 7.13 | Windows type V007 | u | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| 7.14 | Granite counter tops | m2 | - 0 | - 0 | - 0 | Murcielago Barracks Project | |||
| C.1.7 | HYDRAULIC AND SANITARY SYSTEMS | - 0 | - 0 | - 0 | ICD's Warehouse project | ||||
| 8.1 | Excavations, demollitions and backfilling | m3 | - 0 | - 0 | - 0 | ||||
| 8.2 | 2" Potable water pipe | m | - 0 | - 0 | - 0 | ||||
| 8.3 | 1 1/2" Potable water pipe | m | - 0 | - 0 | - 0 | ||||
| 8.4 | 1" Potable water pipe | m | - 0 | - 0 | - 0 | ||||
| 8.5 | 3/4" Potable water pipe | m | - 0 | - 0 | - 0 | ||||
| 8.6 | 1/2" Potable water pipe | m | - 0 | - 0 | - 0 | ||||
| 8.7 | Potable water outlet (1/2)" | u | - 0 | - 0 | - 0 | ||||
| 8.8 | Valve 1 1/2" | u | - 0 | - 0 | - 0 | ||||
| 8.9 | Valve 1" | u | 4 | - 0 | - 0 | - 0 | |||
| 8.10 | Valve 3/4" | u | - 0 | - 0 | - 0 | ||||
| 8.11 | 200 mm PVC Sewage Pipe | m | - 0 | - 0 | - 0 | ||||
| 8.12 | 100 mm PVC Sewage Pipe | m | - 0 | - 0 | - 0 | ||||
| 8.13 | 50 mm PVC Sewage Pipe | m | - 0 | - 0 | - 0 | ||||
| 8.14 | 75 mm PVC Sewage Pipe | m | - 0 | - 0 | - 0 | ||||
| 8.15 | Sewage outlet 100mm | u | - 0 | - 0 | - 0 | ||||
| 8.16 | Sewage outlet 75mm | u | - 0 | - 0 | - 0 | ||||
| 8.17 | Sewage outlet 50mm | u | - 0 | - 0 | - 0 | ||||
| 8.18 | Sewer down points | u | - 0 | - 0 | - 0 | ||||
| 8.19 | Toiltet | u | - 0 | - 0 | - 0 | ||||
| 8.2 | Wash basings | u | - 0 | - 0 | - 0 | ||||
| 8.21 | Showers | u | - 0 | - 0 | - 0 | ||||
| 8.22 | laundry | u | - 0 | - 0 | - 0 | ||||
| 8.23 | Inspection boxes | u | - 0 | - 0 | - 0 | ||||
| C.1.8 | CONSTRUCTION OF THE ELECTRIC SYSTEM | - 0 | - 0 | - 0 | ICD's Warehouse project | ||||
| 9.1 | Main electric supply | m | - 0 | - 0 | - 0 | ||||
| 9.2 | Distribution boards and breakers | glb | - 0 | - 0 | - 0 | ||||
| 9.3 | Power outlets 2200V | u | - 0 | - 0 | - 0 | ||||
| 9.4 | Power outlets 110V | u | - 0 | - 0 | - 0 | ||||
| 9.5 | Outlet for ligth | u | - 0 | - 0 | - 0 | ||||
| 9.6 | Wiring | roll | - 0 | - 0 | - 0 | ||||
| 9.7 | EMT pipe | m | - 0 | - 0 | - 0 | ||||
| 9.8 | Wall monted lamps | u | - 0 | - 0 | - 0 | ||||
| 9.9 | Fluorecente lamps | u | - 0 | - 0 | - 0 | ||||
| 10 | Swiths, power outlets and sensors | u | - 0 | - 0 | - 0 | ||||
| C.1.9 | CONSTRUCTION OF SPECIAL SYSTEMS | - 0 | - 0 | - 0 | ICD's Warehouse project | ||||
| 10.1 | Central alarm panel & siren | glb | - 0 | - 0 | - 0 | ||||
| 10.2 | Wiring | roll | - 0 | - 0 | - 0 | ||||
| 10.3 | EMT pipe | m | - 0 | - 0 | - 0 | ||||
| 10.4 | Smoke detectors | u | - 0 | - 0 | - 0 | ||||
| 10.5 | Emergecsy lights | u | - 0 | - 0 | - 0 | ||||
| 10.6 | Fire hose cabinets | u | - 0 | - 0 | - 0 | ||||
| 10.7 | ABC Fire extinguisher | u | - 0 | - 0 | - 0 | ||||
| 10.8 | Stroboscopic lights | u | - 0 | - 0 | - 0 | ||||
| 10.9 | Split units (30000BTU) | u | - 0 | - 0 | - 0 | ||||
| 10.10 | Condenser units | u | - 0 | - 0 | - 0 | ||||
| 10.11 | Ceiling fans & extractors | u | - 0 | - 0 | - 0 | ||||
| 10.12 | Metallic supports and accesories for air conditioning units (A/C) | u | - 0 | - 0 | - 0 | ||||
| 10.13 | Pipes and cables for electric connection (A/C & ventilation) | u | - 0 | - 0 | - 0 | ||||
| 10.14 | Pipese for drainage for split units | u | - 0 | - 0 | - 0 | ||||
| 10.15 | Cooper pipes for A/C | m | - 0 | - 0 | - 0 | ||||
| SUBTOTAL | - 0 | - 0 | - 0 | ||||||
| OVERHEAD | 0% | - 0 | - 0 | - 0 | |||||
| PROFIT | 0% | - 0 | - 0 | - 0 | |||||
| DBA | |||||||||
| TOTAL PROJECT COST | - 0 | - 0 | - 0 |