J-2-1_Mat_Prod_Substitution_Form.pdf

PDF 239 KB Posted

Attached to
Remodel of Barracks at the Murcielago Police Academy
Solicitation number
19AQMM19R0005
Issued by

About this file

J-2-1 Mat Prod Substitution Form

View the file

Other files

File Type Posted
QA_19R0005_3.pdf PDF
A004_SF30.pdf PDF
QA_19R0005_2.pdf PDF
A003_SF30.pdf PDF
A003_Attachments.zip ZIP file
QA_19R0005.pdf PDF
19AQMM19R0005_A002.pdf PDF
19AQMM19R0005_A001.pdf PDF
J-1-3_Past_Performance_and_References.xlsx XLSX spreadsheet
J-2-5_Submittal_Form.xlsx XLSX spreadsheet
J-2-6_Bidding_Chart.xls XLS spreadsheet
19AQMM19R0005.pdf PDF
J-2-4_Exoneration_Form_(Tax_Exemption).pdf PDF
J-2-3_Incident_Reports.docx DOCX document
J-3-1_Drawings.zip ZIP file
J-2-2__Firm_and_Project_Information.pdf PDF
J-1-2_Past_Performance_Questionnaire_(PPQ).pdf PDF
J-1-1_Statement_of_Work.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATERIAL/PRODUCT SUBSTITUTION REQUEST

Date: __________________________

Project:_____________________________________________________________________________________

D/B –A/E ___________________________________________________________________________________

Contractor: __________________________________________________________________________________

After the construction NTP, this form shall be used to request consideration of materials for substitution of products specified as a minimum standard.

Specified

Material/Product___________________________________________________________________________

Specification Division – Section________________________________________________________________

Specified Manufacturer/Origin ________________________________________________________________

Proposed Substitution ________________________________________________________________________

Proposed Manufacturer/Origin _________________________________________________________________

Proposed Supplier/Source_____________________________________________________________________

Attached hereto are the specification, data, performance documents and standard laboratory test results supporting the product substitution

The following criteria has been taken into consideration

The use of this material/product is applicable to this product in the prescribed location and will be warranted in the same manner as the specified product for a period of ___ years, when applied and used as per the manufacturers’ guidelines.

The substitution of this product will not affect the dimensions shown on the drawing in any way.

This product substitution will not affect the work of other trades working on this product

The advantages of incorporating the proposed substitution into this Project are as follows:_____________

Submitted By: ________________________________________of_______________________________________

This completed form is to be sent to INL COR with the required submittal.

File details come from the government source that posted it.