J-2-5_Submittal_Form.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Remodel of Barracks at the Murcielago Police Academy
Solicitation number
19AQMM19R0005
Issued by

About this file

J-2-5 Submittal Form

View the file

Other files

File Type Posted
QA_19R0005_3.pdf PDF
A004_SF30.pdf PDF
QA_19R0005_2.pdf PDF
A003_SF30.pdf PDF
A003_Attachments.zip ZIP file
QA_19R0005.pdf PDF
19AQMM19R0005_A002.pdf PDF
19AQMM19R0005_A001.pdf PDF
J-1-3_Past_Performance_and_References.xlsx XLSX spreadsheet
J-2-6_Bidding_Chart.xls XLS spreadsheet
19AQMM19R0005.pdf PDF
J-2-4_Exoneration_Form_(Tax_Exemption).pdf PDF
J-2-3_Incident_Reports.docx DOCX document
J-2-1_Mat_Prod_Substitution_Form.pdf PDF
J-3-1_Drawings.zip ZIP file
J-2-2__Firm_and_Project_Information.pdf PDF
J-1-2_Past_Performance_Questionnaire_(PPQ).pdf PDF
J-1-1_Statement_of_Work.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TRANSMITAL OF SHOP DRAWING, EQUIPMENT DATA, MATERIAL SAMPLES, OR MANUFACTUR'S CERTIFICATE, COMPLIANCETRANSMITTAL #:1
# OF PAGES:2
# OF COPYS:3
DATE: 00/MONTH/0000
PROJECT:MURCIELAGO WOMENS BARRACKSCONTRACT #:########
COSTA RICA
FROM:
TO:
TRANSMITTAL SUMMARY:CHECK ONE
In this cell provide a short description of the purpose of the transmittal. Include informtion about the use of the items, for what type of work is going to be used, etc.THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL
OF TRANSMITTAL #:##
ITEM #DESCRIPTION ITEM SUBMITTEDCONTRACT REFERENCE DOCUMENTCHECK ON THIS ITEM FOROBSERVATIONSAPPROVAL
SPEC #DRAWING #INFORM. ONLYGOV. APPROVYN
PRESENTATION DATE: 00/MONTH/0000PROCESS DATE:APPROVING DATE:
I certify that the submitted items have been reviewed in detail and are correct in strict conformance with the contract drawings and specifications, except as otherwise stated.I recommend the approval of the items listed and appointed with "Y", while items appointed with "N" the contractor shall submit new transmittals. Items for "information only" do not require approval.I approve the items listed and appointed with "Y", while items appointed with "N" are not approved and the contractor shall submit new transmittals. The approval of these items does not means the acceptance of the works. Items for "information only" do not require approval.
CONTRACTORTECHNICAL ADVISORCONTRACTING OFFICER'S REPRESENTATIVE
NAMEENG.MARIO NARVAEZNAME
IEA Corporation