Attachment_5_-_Insurance_Policies.pdf

PDF 334 KB Posted

Attached to
Operations Centers - Villagarzon and Tumaco, Colombia
Solicitation number
19AQMM18R0230
Issued by

About this file

19AQMM18R0230 Insurance Policies

View the file

Other files

File Type Posted
Attachment_4.2_-_BidChart_Tumaco_(A0003).pdf PDF
19AQMM18R0230_A0004.pdf PDF
AutoCAD_TUMACO.zip ZIP file
Attachment_1.2-Specifications_Tumaco_A003.pdf PDF
Attachment_2.1.5 Villagarzon-Drawings_E_A003.pdf PDF
Attachment_2.2.2 Tumaco-Drawings_U.pdf PDF
Attachment_2.2.7 Tumaco-Drawings_M.pdf PDF
Attachment_2.2.6 Tumaco-Drawings_E.pdf PDF
Attachment_2.1.3 Villagarzon-Drawings_T_A003.pdf PDF
Attachment_2.2.4 Tumaco-Drawings_S.pdf PDF
CHANGES_LOG-Villagarzon.xlsx XLSX spreadsheet
19AQMM18R0230_Q&A.XLS XLS spreadsheet
Attachment_1.1-Specifications_Villagarzon_A002.pdf PDF
Attachment_2.1.2 Villagarzon-Drawings_A_A003.pdf PDF
Attachment_2.2.1 Tumaco-Drawings_G.pdf PDF
Attachment_2.2.5 Tumaco-Drawings_T.pdf PDF
Attachment_2.1.4 Villagarzon-Drawings_M_A003.pdf PDF
Attachment_2.2.3 Tumaco-Drawings_A.pdf PDF
19AQMM18R0230 A0003.pdf PDF
19AQMM18R0230 B-M PDF
18R0230_Amendment_0003_and_Attachments.zip ZIP file
Attachment_2.1.1 Villagarzon-Drawings_G,U_A003.pdf PDF
19AQMM18R0230_A0002.pdf PDF
19AQMM18R0230_A0001.pdf PDF
Attachment_4.1_-_Bid_Chart_Villagarzon.pdf PDF
Attachment_4.2_-_Bid_Chart_Tumaco.pdf PDF
Attachment_2.2_-_Drawings_Tumaco.zip ZIP file
Attachment_6_-_FirmandProjectInformation.pdf PDF
19AQMM18R0230_B-M.pdf PDF
Attachment_3.1_-_Submittal_Register_Villagarzon.pdf PDF
Attachment_7_-_PastPerformanceQuestionnairen.pdf PDF
Attachment_1.2_-Specifications_Tumaco.pdf PDF
Attachment_3.2_-_Submittal_Register_Tumaco.pdf PDF
19AQMM18R0230.pdf PDF
Attachment_1.1_-_Specifications_Villagarzon.pdf PDF
Attachment_2.1_-_Drawings_Villagarzon.zip ZIP file
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSURANCE POLICIES

SOLICITATION No. 19AQMM18R0230

OPERATION ROOM

VILLA GARZON AND TUMACO, COLOMBIA

Performance Policy (Póliza de Cumplimiento): Submitted after the contractor is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract and valid for the duration of the contract and a further two months, Payment Policy (Póliza de Pago de Salarios y Prestaciones Sociales): Submitted after the contract is signed and prior to the notice to proceed in a sum equal to 20% of the value of the contract, and valid for the duration of the contract and a further three years for the salaries and social benefits of the workers.

Liability Policy ( Póliza de Responsabilidad Civil Contractual): submitted after the contract is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract, and valid for the duration of the contract and a further two months covering contractual and Third Party Civil Liability, Stability Policy (Póliza de Estabilidad): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for three years from the date of the handover of the work/ substantial completion.

Elements Quality Policy ( Póliza de Calidad de Elementos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion.

Correct Equipment Functioning Policy (Póliza de correcto funcionamiento de los equipos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion

File details come from the government source that posted it.