Attachment_4.2_-_BidChart_Tumaco_(A0003).pdf

PDF 90 KB Posted

Attached to
Operations Centers - Villagarzon and Tumaco, Colombia
Solicitation number
19AQMM18R0230
Issued by

About this file

Attachment 4.2 Bid Chart Tumaco

View the file

Other files

File Type Posted
19AQMM18R0230_A0004.pdf PDF
AutoCAD_TUMACO.zip ZIP file
Attachment_1.2-Specifications_Tumaco_A003.pdf PDF
Attachment_2.1.5 Villagarzon-Drawings_E_A003.pdf PDF
Attachment_2.2.2 Tumaco-Drawings_U.pdf PDF
Attachment_2.2.7 Tumaco-Drawings_M.pdf PDF
Attachment_2.2.6 Tumaco-Drawings_E.pdf PDF
Attachment_2.1.3 Villagarzon-Drawings_T_A003.pdf PDF
Attachment_2.2.4 Tumaco-Drawings_S.pdf PDF
CHANGES_LOG-Villagarzon.xlsx XLSX spreadsheet
19AQMM18R0230_Q&A.XLS XLS spreadsheet
Attachment_1.1-Specifications_Villagarzon_A002.pdf PDF
Attachment_2.1.2 Villagarzon-Drawings_A_A003.pdf PDF
Attachment_2.2.1 Tumaco-Drawings_G.pdf PDF
Attachment_2.2.5 Tumaco-Drawings_T.pdf PDF
Attachment_2.1.4 Villagarzon-Drawings_M_A003.pdf PDF
Attachment_2.2.3 Tumaco-Drawings_A.pdf PDF
19AQMM18R0230 A0003.pdf PDF
19AQMM18R0230 B-M PDF
18R0230_Amendment_0003_and_Attachments.zip ZIP file
Attachment_2.1.1 Villagarzon-Drawings_G,U_A003.pdf PDF
19AQMM18R0230_A0002.pdf PDF
19AQMM18R0230_A0001.pdf PDF
Attachment_4.1_-_Bid_Chart_Villagarzon.pdf PDF
Attachment_4.2_-_Bid_Chart_Tumaco.pdf PDF
Attachment_2.2_-_Drawings_Tumaco.zip ZIP file
Attachment_6_-_FirmandProjectInformation.pdf PDF
19AQMM18R0230_B-M.pdf PDF
Attachment_3.1_-_Submittal_Register_Villagarzon.pdf PDF
Attachment_7_-_PastPerformanceQuestionnairen.pdf PDF
Attachment_5_-_Insurance_Policies.pdf PDF
Attachment_1.2_-Specifications_Tumaco.pdf PDF
Attachment_3.2_-_Submittal_Register_Tumaco.pdf PDF
19AQMM18R0230.pdf PDF
Attachment_1.1_-_Specifications_Villagarzon.pdf PDF
Attachment_2.1_-_Drawings_Villagarzon.zip ZIP file
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DETAILED BIDDING CHART

PROJECT: Operation Rooms Tumaco

Place: 9/14/2018

BASE BID

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE UNIT QUANTITY UNIT PRICE UNIT QUANTITY UNIT PRICE TOTAL COST TOTAL COST BY

CHAPTER

A. TUMACO OPERATION ROOM $ 0.00

01 General Requirements $ 0.00

01 11 00 Summary of Work $ 0.00 01 14 00 Work Restrictions $ 0.00

01 32 16.00 20 Construction Progress Documentation $ 0.00 01 33 00 Submittal Procedures $ 0.00 01 40 00 Quality Requirements $ 0.00 01 42 00 Sources for Reference Publications $ 0.00 01 50 00 Temporary Facilities and Controls $ 0.00 01 78 00 Execution and Closeout Requirements $ 0.00

03 Concrete $ 0.00 03 30 00 Cast in Place Concrete $ 0.00

05 Metals $ 0.00 05 12 00 Structural Steel $ 0.00

07 Thermal and Moisture Protection $ 0.00 07 60 00 Flashing and Sheet Metal 07 92 00 Joint Seals $ 0.00

08 Openings $ 0.00 08 71 00 Door Hardware $ 0.00 08 81 00 Glazing $ 0.00

09 Finishes $ 0.00 09 29 00 Gypsum Board $ 0.00 09 65 00 Resilient Floorings $ 0.00 09 90 00 Painting and Coating $ 0.00

12 Furnishings $ 0.00 12 93 00 Site Furnishings $ 0.00

13 Special Construction $ 0.00 13 34 19 Special Building Systems $ 0.00

23 Heating, Ventilating, and Air Conditioning (HVAC) $ 0.00 23 07 00 Thermal Insulation for Mechanical Systems $ 0.00 23 81 00 Unitary AirConditioning equipment $ 0.00

26 Electrical $ 0.00 26 20 00 Interior Low Voltage Electrical Distribution System $ 0.00 26 32 33 Uninterruptible Power Supply $ 0.00 26 51 00 Inteiror Lighting $ 0.00

27 Communications $ 0.00 27 10 00 Building Telecomunications Cabling System $ 0.00 27 21 29 Data Communications Switches $ 0.00 27 22 19 Data Communications Servers $ 0.00 27 22 23 Data Communications Servers $ 0.00 27 41 16 Integrated Audio-Video Systems and Equipment $ 0.00

28 Electronic Safety and Security $ 0.00 28 20 00 Electronic Security Systems (ESS) $ 0.00 28 23 23 Closed Circuit Television Systems with 1 year maintenance $ 0.00

31 Earthwork $ 0.00 31 00 00 EarthWork $ 0.00

33 Utilities $ 0.00 33 71 01 Overhead Transformer $ 0.00 33 71 02 Undergroundg Electrical Distribution $ 0.00

B.1. OVERHEAD $ 0.00

MATERIALLABOREQUIPMENT

Department of State- INL OperationsRoom Tumaco 1 of 2

DETAILED BIDDING CHART

PROJECT: Operation Rooms Tumaco

Place: 9/14/2018

BASE BID

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE UNIT QUANTITY UNIT PRICE UNIT QUANTITY UNIT PRICE TOTAL COST TOTAL COST BY

CHAPTER

MATERIALLABOREQUIPMENT

TOTAL DIRECT COSTS (Base bid) $ 0.00

Administration % 0 $ 0.00 Unforenseens % 0 $ 0.00 Profit % 0 $ 0.00 VAT(Over the profit value) % 0 $ 0.00

TOTAL COSTS (Base bid ) $ 0.00

Department of State- INL OperationsRoom Tumaco 2 of 2