18-C-Adden2 01 CT-502 Sheet 5 of 8.pdf
PDF 1 MB Posted
- Solicitation number
- Not on record
- Issued by
- Montgomery County, Pennsylvania
About this file
This is a technical drawing sheet prepared by Pennoni Associates for the Jenkintown Borough, Pennsylvania 2026 Borough-Wide Pedestrian Improvements and Traffic Calming project. The document, specifically Sheet 5 of 8 from Addendum 2, illustrates a raised pedestrian crossing design at the intersection of Summit Avenue and Wyncote Road in Jenkintown. The drawing includes detailed elevation data, rim heights, invert elevations, and benchmark references necessary for construction. Two addenda have been issued to the project: Addendum 1 (dated 9/10/26) added sidewalk information, and Addendum 2 (dated 9/13/26) added Subsurface Utility Engineering (SUE) details. The project scope encompasses curb, sidewalk, ADA curb ramps, accessible pedestrian signal push buttons, pavement markings, signage, and related work. Sealed electronic bids through PennBid were due by 11:00 A.M. on September 11, 2026, with questions required to be submitted by 11:00 A.M. on September 8, 2026.
The drawing emphasizes that all proposed work at the location is contingent upon the results of a SUE investigation, with both Level B (Ground Penetrating Radar or approved equal) and Level A (test hole) investigations required. All elevations and utility information are subject to verification through the SUE process. The contractor is required to verify all dimensions and notify the borough of any discrepancies before proceeding. Pennsylvania prevailing wage rates apply to the project, and PennDOT prequalification is required for bidders. Bids of $100,000 or more are subject to Jenkintown Borough's Responsible Contractor Ordinance. Each bid must include a certified check or bid bond equal to 10% of the bid amount, with bids remaining binding for 30 days following submission.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CT-502
BY
N
O
D
AT
E R
EV
IS
IO
N
S
PE
D
ES
TR
IA
N
IM
PR
O
VE
M
EN
TS
AN
D T
R
AF
FI
C
C
AL
M
IN
G
JE
N
KI
N
TO
W N
B O
R O
U G
H ,P
A
SU
M
M
IT
A
VE
JE
N
KI
N
TO
W
N , P
A
JE
N
KI
N
TO
W
N B
O R
O U
G H
JENKB25003
1"=25'
TLW
2026-08-17
MEB
SHEET
APPROVED BY
OF5 8
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.
AL
L
D
IM
EN
SI
O N
S M
U
ST
B E
VE
R
IF
IE
D B
Y C
O N
TR
AC
TO
R
AN
D
O W
N
ER
M U
ST
B
E N
O
TI
FI
ED
O F
AN
Y
D
IS
C R
EP
AN
C
IE
S
BE
FO
R
E
PR
O C
EE
D
IN
G
W
IT
H W
O R
K
U:
\A cc ou nt s\J
EN
KB
\JE
NK
B2
M on tco
0\
DE
SI
GN
SH
EE
TS
\C
T-
2.
dw g
PL
OT
TE
D:
8/
/2
5:
P
M, B Y:
Ta ylo r W ra ze n
PL
OT
ST
YL
E:
Pe nn on i N
CS
.st b
PR
OJ
EC
T
ST
AT
US
LO
C
AT
IO
N
SU
M
M
IT
A
VE
W
YN
C
O
TE
R D
PE
N
N O
N I A
SS
O
C
IA
TE
S
IN
C
M ain S tre et
, S uit e
W ar rin gt on
, P A
T
5.
5.
F
5.
5.
6 MONTGOMERY 5 8
JENKINTOWN BOROUGH
RAISED
PEDESTRIAN
CROSSING
RIM 100.00
INV 106.00
(@ 2%)
RIM 100.40
INV 105.82 (IN-N)
INV 105.82 (IN-S)
INV 105.5 (IN-E)
INV 105.50 (OUT-W)
RIM 100.27
INV 105.93
(@ 0.5%)
BM #1
100.74
NOTES:
1. ELEVATIONS PROVIDED ARE BASED ON AN ASSUMED DATUM WITH REFERENCE TO
BENCHMARK #1 (BM #1) IDENTIFIED ON THE PLAN.
2. WORK PROPOSED AT THIS LOCATION IS DEPENDENT ON THE RESULTS OF THE SUE
INVESTIGATION.
3. RIM AND INVERTS PROVIDED ARE SUBJECT TO VERIFICATION BY SUE
INVESTIGATION.
4. COMPLETE SUE LEVEL B INVESTIGATION FIRST. DATA OBTAINED FROM THE LEVEL B
INVESTIGATION WILL BE USED TO INFORM THE SUE LEVEL A INVESTIGATION.
SUE QUALITY LEVEL B (GPR OR APPROVED EQUAL)
SUE QUALITY LEVEL A (TEST HOLE)
9/
/2
AD
D
EN
D
U M
AD
D
S U
E D
ET
AI
L
M
EB
9/
/2
AD
D
EN
D
U M
AD
D
S W
IN
FO
M
EB
File details come from the government source that posted it. Updated .