This is a design drawing sheet for the 2026 Borough-Wide Pedestrian Improvements and Traffic Calming project in Jenkintown Borough, Pennsylvania, prepared by Pennoni Associates Inc. The project involves pedestrian infrastructure improvements including curb, sidewalk, ADA curb ramps, accessible pedestrian signal push buttons, pavement markings, signage, and related work across the borough. The drawing sheet (CT-502, Sheet 5 of 8) depicts a raised pedestrian crossing at the intersection of Summit Avenue and Wyncote Road, with elevation details and benchmark references. Sealed bids will be received electronically through PennBid until 11:00 A.M. on September 11, 2026, with questions due by 11:00 A.M. on September 8, 2026. The contract requires Pennsylvania prevailing wage compliance and PennDOT prequalification. Bids of $100,000 or more are subject to Jenkintown Borough's Responsible Contractor Ordinance, and each bid must include a certified check or bid bond equal to 10 percent of the bid amount.

The document notes that all elevations are based on an assumed datum with reference to Benchmark #1, and that proposed work is dependent on the results of a Utility and Infrastructure Survey (SUE) investigation. The design indicates that a complete SUE Level B investigation must be completed first, with data informing the subsequent Level A investigation. All rim and invert elevations are subject to verification by the SUE investigation. Bids shall remain binding for 30 days following submission. Jenkintown Borough reserves the right to reject any or all bids, waive informalities, and accept the bid deemed to be in its best interest. No specific contract term length or renewal options are identified in this design document.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CT-502

BY

N

O

D

AT

E R

EV

IS

IO

N

S

PE

D

ES

TR

IA

N

IM

PR

O

VE

M

EN

TS

AN

D T

R

AF

FI

C

C

AL

M

IN

G

JE

N

KI

N

TO

W N

B O

R O

U G

H ,P

A

SU

M

M

IT

A

VE

JE

N

KI

N

TO

W

N , P

A

JE

N

KI

N

TO

W

N B

O R

O U

G H

JENKB25003

1"=25'

TLW

2026-08-17

MEB

SHEET

APPROVED BY

OF5 8

DRAWN BY

DRAWING SCALE

DATE

PROJECT

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES

ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTED

TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION

OR ADAPTATION BY PENNONI ASSOCIATES FOR THE

SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

SOLE RISK AND WITHOUT LIABILITY OR LEGAL

EXPOSURE TO PENNONI ASSOCIATES; AND OWNER

SHALL INDEMNIFY AND HOLD HARMLESS PENNONI

ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND

EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

AL

L

D

IM

EN

SI

O N

S M

U

ST

B E

VE

R

IF

IE

D B

Y C

O N

TR

AC

TO

R

AN

D

O W

N

ER

M U

ST

B

E N

O

TI

FI

ED

O F

AN

Y

D

IS

C R

EP

AN

C

IE

S

BE

FO

R

E

PR

O C

EE

D

IN

G

W

IT

H W

O R

K

U:

\A cc ou nt s\J

EN

KB

\JE

NK

B2

M on tco

0\

DE

SI

GN

SH

EE

TS

\C

T-

2.

dw g

PL

OT

TE

D:

8/

/2

5:

P

M, B Y:

Ta ylo r W ra ze n

PL

OT

ST

YL

E:

Pe nn on i N

CS

.st b

PR

OJ

EC

T

ST

AT

US

LO

C

AT

IO

N

SU

M

M

IT

A

VE

W

YN

C

O

TE

R D

PE

N

N O

N I A

SS

O

C

IA

TE

S

IN

C

M ain S tre et

, S uit e

W ar rin gt on

, P A

T

5.

5.

F

5.

5.

6 MONTGOMERY 5 8

JENKINTOWN BOROUGH

RAISED

PEDESTRIAN

CROSSING

RIM 100.00

INV 106.00

(@ 2%)

RIM 100.40

INV 105.82 (IN-N)

INV 105.82 (IN-S)

INV 105.5 (IN-E)

INV 105.50 (OUT-W)

RIM 100.27

INV 105.93

(@ 0.5%)

BM #1

100.74

NOTES:

1. ELEVATIONS PROVIDED ARE BASED ON AN ASSUMED DATUM WITH REFERENCE TO

BENCHMARK #1 (BM #1) IDENTIFIED ON THE PLAN.

2. WORK PROPOSED AT THIS LOCATION IS DEPENDENT ON THE RESULTS OF THE SUE

INVESTIGATION.

3. RIM AND INVERTS PROVIDED ARE SUBJECT TO VERIFICATION BY SUE

INVESTIGATION.

4. COMPLETE SUE LEVEL B INVESTIGATION FIRST. DATA OBTAINED FROM THE LEVEL B

INVESTIGATION WILL BE USED TO INFORM THE SUE LEVEL A INVESTIGATION.