This document provides details on a federal contract opportunity for upgrading a chiller plant at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma. The solicitation number is 36C25921R0061 and the project value is estimated between $5 million to $10 million. The project will be a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. A request for quote is expected to be posted on April 15, 2021. Interested vendors must be verified and listed in the Vendor Information Pages database to be considered for the contract award. The point of contact for this project is Robyn Young, who can be reached at 307-433-3728 or robyn.young2@va.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25921R0061 0003.docx | DOCX document | |
| G-101.pdf | ||
| Pre Bid RFIs - 18-416.pdf | ||
| 013526 Safety Reqs.pdf | ||
| 18-416 Bid CombSpecs 20210223-RFI.pdf | ||
| 36C25921R0061 0002.docx | DOCX document | |
| 36C25921R0061 0001.docx | DOCX document | |
| S04 -Site Visit Meeting Doc.pdf | ||
| IMG_0257.jpg | JPG image | |
| Site Visit Station Map.pdf | ||
| 36C25921R0061_1.docx | DOCX document | |
| 18-416 Bid CombDWG 20210223_Part3.pdf | ||
| S02 Past Performance Questionnaire.docx | DOCX document | |
| 18-416 Bid CombDWG 20210223_Part1.pdf | ||
| Site Visit Hatbox Parking.pdf | ||
| 18-416 Bid CombSpecs 20210223.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
G.5 G F.5 F
52-P-552-P-452-P-152-P-352-P-2 52-P-652-P-12
12" CHR 12" CHR
12" CHR 12" CHS
12" CHS
12" CHS
12" CHS
12" CHS
12" CHS
1 2
C H S
C H S
C H S
C H S1 2
C H S
C H S
C H R
C H R
C
H R
C
H R
C H R
C H R
C
H R
16" CHR 16" CHR
12" CHR 12" CHR
16" CHR 16" CHR 16" CHS
C W R
C W S
10" CHR
12" CHR
16" CHR
3" MU 3" MU
C
H R 12
C H R
C
H R
C
H R
C H
R 10" CHR
10" CHR
EXISTING
BUTTERFLY VALVE
(TYP)
1" CHR
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
6B 7
52-CH-1
" C
W R
C H R
10" CWS
10" CHS
10" CWS
12" CWS
3" RV
12" CWR
RV UP THROUGH ROOF
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
G
52-CH-1
" C
W R
C W S
10" CWS
20" CWS
12" CWR
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
GF.5
C H R
10" CHR
10" CWS
10" CHR
10" CHS
52-CH-1
C H S
16" CHR
10" CHS
3" RV
RV UP THROUGH ROOF
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
6B 7
52-CH-2
C W S
C H R
C
W S
C
W R
10" CHR
12" CWR
12" CHR
10" CHR
3" RV
RV UP THROUGH ROOF
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
52-CH-2
C H R
C H S
16" CHS16" CHS
20" CWR
10" CHR
10" CHS
20" CWR
3" RV
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
6B
52-FPHX-1
52-P-4
12" CHS
C H S
20" CWR
C
W R
C W S
C
W S
C
H S
C
H R
10" C W
S
10" CWS
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
F.5
52-FPHX-1
CW
S
10" CWS
10" CHR
10" CHS
10" CW R
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
G
52-CH-2
10" C
W R
C W S
C
W S
12" CWR
20" CWS
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
W ALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:5
P
M
M-301
MECHANICAL SECTIONS
6 48AKS, WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
RBK
N
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
NORTH WALL CHILLED WATER PUMPS SECTION
Scale: 1/4" = 1'-0"
CHILLER 1 - SIDE VIEW
Scale: 1/4" = 1'-0"
CHILLER 1 - CONDENSER WATER SIDE
Scale: 1/4" = 1'-0"
CHILLER 1 - CHILLED WATER SIDE
Scale: 1/4" = 1'-0"
CHILLER 2 - SIDE VIEW
Scale: 1/4" = 1'-0"
CHILLER 2 - CHILLED WATER SIDE
Scale: 1/4" = 1'-0"
PLATE AND FRAME HEAT EXCHANGER PIPING SECTION - SIDE
Scale: 1/4" = 1'-0"
PLATE AND FRAME HEAT EXCHANGER PIPING SECTION - FRONT
Scale: 1/4" = 1'-0"
CHILLER 2 - CONDENSER WATER SIDE
RV UP THROUGH ROOF
DocuSign Envelope ID: B32A6B38-868E-4D60-B593-FDD61A5FDCEC
2/23/2021
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
6B 7
52-CH-31
C
H S
C H S
B S R
C H R
10" CW R
10" CHR
C H R
14" CWR
C
W R
3" RV
RV UP THROUGH ROOF
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
52-CH-3
C
H S
C H S
14" CWR
16" CHR
20" CWR
10" CHR
10" CW R
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
52-CH-3
B S R
B S S
20" CWS
3" RV
14" CWS
C
W R
C
W S
52-CTSSF-1
RV UP THROUGH ROOF
F.F @ Ground Floor 0' - 0"
T.O. Slab 4' - 10"
Mezzanine 16' - 0"
6B7
52-P-7
52-P-8
52-P-13
C
W S
C
W S
C W S
C
W S
C W S
C W S
20" CWS 20" CWS
14" CWS
12" CWS
C
W S
C
W S
EXISTING BUTTERFLY
VALVE (TYP.)
T.O. Roof Slab 26' - 0"
6B 7
10" CWS
20" CWS
20" CWR
3" MU
8" CWR10" CW R
52-CT-1
4" TDO
3" TDO
3" BSS
4" BSR1 1/2" MU
T.O. Roof Slab 26' - 0"
6B 7
52-CT-2
8" CWR
10" CW R
52-WT-3
10" CWS
10" CWS
3" RV
3" RV
3" BSS
4" BSR
3" TDO
1 1/2" MU
3" TDO
20" CW R
20" CWS
CONNECT ALL NEW
TOWERS AS SHOWN HERE
WITH MOTORIZED VALVE,
BALANCING VALVE, AND
NON CHEMICAL WATER
TREATMENT INSTALLED
VERTICALLY.
BALANCING VALVE
(TYP)
52-MV-17
6.A
T.O. Roof Slab 26' - 0"
6B 7
52-CT-3
8" CWR
10" CW R
52-WT-4
6" BSS
3" RV
10" CWS
3" RV
52-EF-4
20" CW R
20" CWS 10" CWS
3" TDO
1 1/2" MU
1 1/2" MU
8A
10" CHR
GROOVED AND CAPPED PIPE FOR
EMERGENCY CHILLER CONNECTION
6" CHR
G.5
GROOVED AND CAPPED PIPE FOR
EMERGENCY CHILLER CONNECTION
(BY CONTRACTOR)
10" CHS
10" CHR
6" CHS
6" CHS
6" CHR
6" CHR
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
W ALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:0
P
M
M-302
MECHANICAL SECTIONS
7 48AKS, WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
RBK
N
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
CHILLER 3 - SIDE VIEW
Scale: 1/4" = 1'-0"
CHILLER 3 - CHILLED WATER SIDE
Scale: 1/4" = 1'-0"
CHILLER 3 - CONDENSER WATER SIDE
Scale: 1/4" = 1'-0"
CONDENSER WATER PUMPS - SECTION
Scale: 1/4" = 1'-0"
COOLING TOWER 1 - SIDE VIEW
Scale: 1/4" = 1'-0"
COOLING TOWER 2 - SIDE VIEW
Scale: 1/4" = 1'-0"
COOLING TOWER 3 - SIDE VIEW
Scale: 1/4" = 1'-0"
EMERGENCY CHILLER CONNECTION - NORTH VIEW
Scale: 1/4" = 1'-0"
EMERGENCY CHILLER CONNECTION - WEST VIEW
T.O. Roof Slab 26' - 0"
G.5 G F.5 F
52-CT-152-CT-252-CT-3
8" CWR 8" CWR
8" CWR 8" CWR
3" MU3" MU3" MU
3" MU
3" RV
6" BSS
6" BSS6" BSS6" BSS6" BSS
3" BSS
8" BSR
4" BSR
4" BSR
2" TD3" BSS2" TD
8" CWR8" CWR
1 1/2" MU4" BSR
3" BSS
4" BSR
3" BSS
2" TD
3" TDO
4" BSR
3" BSS
1 1/2" MU
3" BSS
4" BSR
52-MV-32
52-MV-31 52-MV-28 52-MV-27
52-MV-23
52-MV-24
52-MV-25
52-MV-2652-MV-2952-MV-3052-MV-33
1 1/2" MU
NEW BUTTERFLY
VALVE (TYP)
T.O. Roof Slab 26' - 0"
G.5GF.5F
52-CT-352-CT-252-CT-1
8" CWR 10" CW R 8" CWR 8" CWR 8" CWR 10" CW R
52-WT-452-WT-3
52-WT-252-WT-1
20" CWR 20" CWR 20" CWR20" CWR
20" CWS20" CWS20" CWS20" CWS20" CWS
3" MU 3" RV 3" RV
52-WT-5
52-WT-6
52-MV-20
52-EF-452-MV-1952-MV-16
52-MV-1552-MV-1252-MV-11
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
W ALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:1
P
M
M-303
MECHANICAL SECTIONS
8 48AKS, WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
RBK
N
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
COOLING TOWERS - SOUTH
Scale: 1/4" = 1'-0"
COOLING TOWERS - NORTH
EXISTING CHEMICAL
POT FEEDER
SIDE STREAM FILTER WITH PUMP
3# DIFFERENTIAL PRESSURE
SENSORS/TRANSMITTERS
LOCATION PER VA
OUTSIDE
OUTSIDE
INSIDE ROOM
INSIDE ROOM
52-CH-3
52-CH-2
52-CH-1
52-FPHX-1
52-P-12
52-P-2
52-P-1
52-P-3
52-P-4
52-P-5
52-P-6
16" COMMON PIPE
3/4"
2"
16"
16"
16"
16"
16"
16"
16"
TO FD
TO FD
16"
16"
16"
16"
16"
16"
16"
16"
16"
16"
16"
16"16"
12"
12"
12"
12"
10"
12"
12"
12"
12"
12"
10"
12"
10"
10"
10"
12"
12"
12"
12"
10"
12"
12"
10"
12"
10"
10"
16"
16"
16"
12"
12"
12"
12"
12"
12"
1 2
1/2"
1/2"
1/2"
1/2"
12"
12"
10" 10"
10" 10"
" 6
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
W ALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:1
P
M
M-501
CHILLED W ATER PIPING SCHEMATIC
9 48AKS, WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
RBK
Scale: N.T.S.
CHILLED WATER PIPING SCHEMATIC
N
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
1 6" CHILLED WATER SUPPLY/RETURN
CONNECTION FOR TEMPORARY CHILLER.
2 PROVIDE BOLTED BLIND FLANGE FOR
SUPPLY/RETURN PIPING.
A. FOR COMPLETE EXTENT OF NEW PIPING, SEE FLOOR
PLANS AND SECTION DRAWINGS.
C W
R
C W
S
52-MV-914"
14"
12"
52-MV-10
20"
20"
20"
52-P-7
52-P-8
52-P-13
SPILL CONTAINMENT
CHEMICAL/INHIBITOR DRUMS
52-CWCDS-1
52-MV-8
52-CH-3
52-CH-2
52-CH-1
12"
12"
20"
20"
20"
20"
20"
20"
10"
10"
52-FPHX-1
CW
R
CW
S
CW
S
CW
S
CW
R
CW
R
TO COOLING TOWER AND
HYDRONIC SYSTEM FILL
AND MAKEUP WATER.
SEE M-102 FOR POINT OF
CONNECTION.
3"
3"
EXISTING MAKE-UP WATER DETAIL
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
W ALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:1
P
M
M-502
CONDENSER W ATER PIPING SCHEMATIC
10 48AKS, WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
RBK
N
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: N.T.S.
CONDENSER WATER PIPING SCHEMATIC
A. FOR ROOF PIPING SEE DRAWIN M-503.
B. FOR EXTENT OF NEW PIPING, REFER TO FLOOR PLANS
AND SECTION DRAWINGS.
52-MV-31
52-MV-22
52-WT-6
BSR
CW
R
DRAIN
TDO
BSS
MU
CW
S
4" B
SR
10" C W
R
2" T D
3" T
DO
3" B
SS
1-1/2" M U
10" C W
S
4" B
SR
10" C W
R
2" T D
3" T
DO
3" B
SS
1-1/2" M U
10" C W
S
6" (EX)
8" (EX)
20" (EX)
3" (EX)
4" (N)
4" (EX)
20" (EX)
3"
6"
4"
4"
20"8"
20"
52-MV-34
52-MV-20
52-MV-32
52-MV-33
52-MV-20
52-WT-5
52-MV-21
52-MV-27
52-MV-18
52-MV-30
52-MV-16
52-MV-28
52-MV-17
52-MV-29
52-MV-15
52-MV-24
52-MV-14
52-MV-26
52-MV-12
52-MV-11
52-MV-25
52-MV-13
52-MV-23
52-WT-4
52-WT-3
52-WT-2
52-WT-1
(EX) CAPPED (TYP)
AIR
D
ISCHARGE
52-CT-1
52-CT-2
52-CT-3
CELL #1
CELL #2
10" E
QL
10" E
QL
(T
YP. 3
SUMP
SUMP
AIR
D
ISCHARGE
AIR
D
ISCHARGE
4" B
SR
10" C W
R
2" T D
3" T
DO
3" B
SS
1-1/2" M U
10" C W
S
4" B
SR
10" C W
R
2" T D
3" T
DO
3" B
SS
1-1/2" M U
10" C W
S
SUMP
SUMP
SUMP
SUMP
SUMP
CELL #1
CELL #2
CELL #1
CELL #2
*ALL CONDENSER WATER AND
CONDENSER WATER TREATMENT PIPING
EXTERIOR TO THE CHILLER PLANT TO BE
INSULATED AND HEAT TRACED,
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
W ALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:1
P
M
M-503
COOLING TOW ER PIPING SCHEMATIC
11 48AKS, WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
RBK
N
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1" = 10'-0"
COOLING TOWER PIPING SCHEMATIC
TT
TT
TT TT
1 13
52-P-4
52-P-5
52-P-6
TT
FT
PT
FT
PDT
52-CH-3 52-CH-2 52-CH-1 52-HX-1
PT
FT
PDT
PT
FT
PDT
PT
FT
PDT
TT
TT TT TT
A A A A
52-P-12
52-P-2 52-P-1 52-P-3
PDT
9 2 14
CHWR
CHWS CHWS CHWS CHWS
CHWR CHWR CHWR
TT
TT
16TT
TT
TT
TT
TT
TT
PDT
FT
FT
4 FT
FT
TT
FT
FT
TT
FT
PDT
PDT
PDT
52-MV-6
52-MV-4 52-MV-2
52-MV-8
CWS
CWR
TT
FT
TT
FT
CHWR
CONTROL
PANEL
TO BMS
52-CTSSF-1
52-P-14
PDT
PDT
C H
W R
C H
W S
TOWER CONTROL PANEL
(TYP. FOR ALL CT)
A
A
A
A
A
A
52-P-7
52-P-8
52-P-13
B S
R
B S
S
52-MV-5 52-MV-3
52-MV-1
52-MV-7
TT
FT
WSMCM
IT
SST
HS
CHWR
52-MV-10
52-MV-9
TT
52-MV-32
M
M
A
A
M
M
A
A
BSS
BSR
52-CT-3 52-CT-2 52-CT-1
TO BMS
52-MV-34 52-MV-33 52-MV-30
52-MV-29
52-MV-26 52-MV-25
52-MV-13
52-MV-14
52-MV-17
52-MV-18
52-MV-21
52-MV-22
52-MV-24
52-MV-23
52-MV-28
52-MV-27
52-MV-31
52-MV-20
52-MV-19
52-MV-16
52-MV-11
52-MV-1252-MV-15
A: MOTOR CONTROLLER
INPUTS (TYP. FOR ALL
PUMP MOTORS, COOLING
TOWERS, AND EXHAUST
FANS)
M
M
A
A
SUPPLY (2) LOOSE PRESSURE
DIFFERENTIAL TRANSDUCERS FOR FIELD
INSTALLATION W ITHIN THE SECONDARY
CHW PIPING. LOCATION PER VA DIRECTION.
TO BUILDING LOADS
A. CONTRACTOR SHALL PROVIDE ALL PROVISIONS IN THE PIPING FOR INSTALLING CONTROLS DEVICES, LIKE SENSORS ETC., IN EACH PHASE DURING PHASE-1 OF THE PROJECT.
B. CONTRACTOR SHALL PROVIDE ALL NECESSARY ISOLATION VALVES TO FACILITATE INSTALLATION OF FUTURE CONTROL DEVICES.
C. EXISTING CONTROLS FOR SECONDARY CHILLED WATER DISTRIBUTION SYSTEM TO REMIN INTEGRATED WITH NEW CONTROL SYSTEM.
TO BUILDING LOADS
C
BACNET FOR DATA POINTS ONLY.
POINTS SHOWN ARE HARDWIRED
FROM DDC CONTROLLERS.
120 VAC BY 26
120 VAC BY 26
BACNET CHILLER
CONTROLLER/PANEL
(TYP. 3)
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
M
ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER -
WALL MOUNT
TT TEMPERATURE TRANSIMTTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
MT MOISTURE (HUMIDITY) TRANSMITTER
PT PRESSURE TRANSMITTER
SPS STATIC PRESSURE TRANSMITTER
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
CT CONDUCTIVITY TRANSMITTER
SD SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
PDS PRESSURE DIFFERENTIAL SWITCH
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
ZC VALVE OR DAMPER POSITION CONTROLLER
KR LOCAL RECORDING TIME CLOCK (RUNTIME)
TSL TEMPERATURE SWITCH, LOW (FREEZESTAT)
TSH TEMPERATURE SWITCH, HIGH (FREEZESTAT)
LC LEVEL CONTROLLER
LT LEVEL TRANSMITTER
PSH PRESSURE SWITCH HIGH
PSL PRESSURE SWITCH LOW
EPT ELECTRONIC TO PNEUMATIC TRANSDUCER
AT
CO2
CARBONDIOXIDE TRANSMITTER
AT
AT
CO
OC
CARBON MONOXIDE TRANSMITTER
OCCUPANCY SENSOR
LTCP
HVAC
LOCAL TEMPERATURE CONTROL PANEL
HVAC CONTROL PANEL
VSMC
ECC
TC
PC
VARIABLE SPEED MOTOR CONTROLLER
INTEGRAL CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CDENTER
TEMPERATURE CONTROLLER. SEE SEQUENCE OF
OPERATION
PRESSURE CONTROLLER. SEE SEQUENCE OF
OPERATION
SPEED CONTROLLER. SEE SEQUENCE OF
OPERATION
SC
FC
FSH
FSL
KC
FLOW CONTROLLER. SEE SEQUENCE OF OPERATION
FLOW SWITCH HIGH
FLOW SWITCH LOW
TIME CLOCK CONTROLLING EQUIPMENT ON A
SCHEDULE
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS (PROVIDE
12 INCHES [200 mm] MINIMUM LENGTH IN DUCT
WHEN SPACE PERMITS)
SENSOR WITH AVERAGING ELEMENT TO TRANSMIT
TEMPERATURE TO EMCS
MOTOR STARTER
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
A
CONTROL SYMBOLS
SST START STOP RELAY
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:1
P
M
M-504
CHILLER PLANT CONTROL SCHEMATIC AND
POINTS LIST
12 48AKS, WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
RBK
Scale: N. T. S.
CHILLER PLANT CONTROL SCHEMATI AND POINTS LIST
NEW GRAPHICS ON
EXISITNG FRONT END
BMS
EXHAUST FAN START/STOP 52-EF-4 X
EXHAUST FAN SPEED 52-EF-4 X
EXHAUST FAN STATUS 52-EF-4 X
EA LOUVER DAMPER 52-MD-1 X
REFRIGERENT LEAK ALARM 52-RLM-1 X
REFRIGERENT LEAK MONITOR STATUS 52-RLM-1 X X
SUPPLY FAN START/STOP 52-SF-1 X
SUPPLY FAN SPEED 52-SF-1 X
SUPPLY FAN STATUS 52-SF-1 X
OA INTAKE LOUVER DAMPER 52-LA-11 X
ELECTRICAL ROOM SPACE TEMPERATURE T X
EXHAUST FAN START/STOP 52-EF-3 X
EXHAUST FAN SPEED 52-EF-3 X
EXHAUST FAN STATUS 52-EF-3 X
EA LOUVER DAMPER 52-LA-10 X X
EXHAUST FAN START/STOP 52-EF-6 X
EXHAUST FAN SPEED 52-EF-6 X
EXHAUST FAN STATUS 52-EF-6 X
EA LOUVER DAMPER 52-LA-4 X X
OA INTAKE LOUVER DAMPER 52-LA-8 X X
OA INTAKE LOUVER DAMPER 52-LA-7 X X
ELECTRICAL ROOM SPACE TEMPERATURE T X
EXHAUST FAN START/STOP 52-EF-2 X
EXHAUST FAN SPEED 52-EF-2 X
EXHAUST FAN STATUS 52-EF-2 X
EA LOUVER DAMPER 52-LA-9 X X
OA INTAKE LOUVER DAMPER 52-LA-12B2 X X
OA INTAKE LOUVER DAMPER 52-LA-12B1 X X
OA INTAKE LOUVER DAMPER 52-LA-12A2 X X
OA INTAKE LOUVER DAMPER 52-LA-12A1 X X
ELECTRICAL ROOM SPACE TEMPERATURE T X
EXHAUST FAN START/STOP 52-EF-7 X
EXHAUST FAN SPEED 52-EF-7 X
EXHAUST FAN STATUS 52-EF-7 X
EA LOUVER DAMPER 52-LA-6 X
OA INTAKE LOUVER DAMPER 52-LA-5 X X
CHILLER PLANT FF SPACE TEMP T X
EXHAUST FAN START/STOP 52-EF-5 X
EXHAUST FAN SPEED 52-EF-5 X
EXHAUST FAN STATUS 52-EF-5 X
EA LOUVER DAMPER 52-LA-3 X X
OA INTAKE LOUVER DAMPER 52-LA-2 X X
OA INTAKE LOUVER DAMPER 52-LA-1 X X
POINT DESCRIPTION POINT ID
ANALOG
INPUT
BINARY
INPUT
ANALOG
OUTPUT
BINARY
OUTPUT
ANALOG
VIRTUAL
BINARY
VIRTUAL
TREND ALARM POINT OTHER NOTES
SYSTEM INPUT SYSTEM OUTPUT SOFTWARE POINTS
CHILLER PLANT VENTILATION SYSTEM POINTS LIST
GENERAL NOTES:
1. ALL 120VAC POWER WIRING TO CONTROL PANELS AND VALVE ACTUATORS BY DIV 26 FROM EMERGENCY CIRCUITS.
2. ALL CHILLERS, PUMPS, VFDS, COOLING TOWERS, CHEMICAL TREATMENT SYSTEMS, SIDE STREAM FILTERS, ETC. SHOULD BE PROVIDEDWITH BACNET CARDS FOR
INTEGRATION TO BAS.
3. EQUIPMENT SUPPLIERS SHALL PROVIDE ON SITE SUPPORT FOR INTEGRATION AND COMMISSIONING OF THEIR EQUIPMENT. ALL BACNET CARDS SET UP AND
COMMISSIONING SHALL BE PROVIDED BY THE MANUFACTURER.
4. ALL VALVE AND DAMPER ACTUATORS ARE SCHEDULED TO BE PROVIDED WITH POSITIVE BINARY OR ANALOG FEEDBACK. THE FEEDBACK SIGNALS SHALL BE
HARDWIRED TO THE APPROPRIATE INPUT ON THE DDC CONTROLLER FOR POSITIVE FEEDBACK.
5. THE CONTROL PANEL PROVIDED BY THE MANUFACTURER WITH THE COOLING TOWER, SIDE STREAM FILTER, AND CHEMICAL TREATMENT SYSTEM SHALL PROVIDE A
BACNET INTERFACE TO PROVIDE THE STATUS AND ALARMS TO THE BMS AS REQUIRED BY THE POINT CHARTS.
6. SOME OF THE CONTROL POINTS SHOWN ARE EXISTING AND ARE CURRENTLY INTEGRATED INTO THE AUTOMATED BUILDING SYSTEMS DDC CONTROL SYSTEM.
UTILIZE WORKPLACE TECH SOFTWARE AS NEEDED TO REPROGRAM THESE CONTROL POINTS AS NEEDED.
7. PROVIDE ALL DEMO OF EXISTING CONTROLS. THE GENERAL CONTRACTOR SHALL PROVIDE NOTICE OF ITEMS THAT NEED TO BE DISCONNECTED FROM THE
EXISTING CONTROL SYSTEM PRIOR TO DEMO OF THAT AREA. THE CONTROL SYSTEM MUST REMAIN OPERATIONAL THROUGHOUT THE PROJECT.
8. PROVIDE TEMPORARY CONTROLS AS NEEDED TO ENSURE THE SYSTEM REMAINS OPERATIONAL DURING THE PROJECT.
REFRIGERANT
MONITOR
PANEL
52-CH-1 SENSOR
52-CH-2 SENSOR
52-CH-3 SENSOR
120V/1 Ph
DIV 26
TO BMS
SYSTEM
LOCAL AND
REMOTE
M
MA
M
52-EF-4
52-MD-1
LOUVER
52-L-1 NA
FAN
OPEN
STATUS SUPPLY AIR
( CFM)
10,000
EXHUAST
AIR ( CFM)
NOTE: CHILLER PLANT AT NEGATIVE PRESSURE
AIR FLOWS DURING EMERGENCY EXHAUST
52-L-2 NA OPEN 10,000
52-L-7 NA CLOSED -
52-L-8 NA -
52-L-11 52-SF-1 CLOSE/OFF -
52-L-3 52-EF-5 OPEN/ON -
52-L-4 52-EF-6 -
52-L-10 52-EF-3 -
CLOSED
20,000
52-MD-1 52-EF-4 - 15,000
TOTAL 20,000 35,000
CLOSE/OFF
CLOSE/OFF
OPEN/ON
M
OA
52-LA-5
M
TM
EA
52-LA-6
52-EF-7
M
M
EA
52-LA-9
52-EF-2
EXISTING CONTROL SEQUENCE TO REMAIN.
M
52-LA-12B1
M
52-LA-12B2
T
M
M
52-LA-12B1
52-LA-12B2
T
A
A
M
52-LA-5
M
M
IT
M M
M
T
T
M
52-L-1
(10,000 CFM)
52-LA-1
M
M
52-LA-12B2
52-LA-12B1
52-L-12B
(5,000 CFM)
52-L-12A
(5,000 CFM)52-LA-12A1
52-LA-12A2
A
52-L-9
(10,000 CFM)
52-LA-9
SST
HS
A
VSMC M
M
T
52-LA-2
52-L-5
52-LA-6
52-L-6
52-EF-7
52-EF-2
52-L-2(10,000 CFM)
(5,000 CFM)
(5,000 CFM)
A
52-LA-1
M
52-LA-2
M
OA
OA
T
M
52-LA-3
EA M
52-EF-5
A
52-LA-8
52-LA-7
52-LA-10
52-EF-3
M
52-LA-4
52-EF-6
M
M
M
M
M
M
M
T
52-LA-11
52-SF-1
OA
EA
EA
OA
OA
A
A
A
M
MA
M
M
A
M
M A
52-L-3
52-LA-3
M
M
M
(12,000 CFM)
52-EF-2 52-EF-4
52-MD-1
52-EF-6
52-L-4
(20,000 CFM)
52-LA-4
52-L-7
52-LA-7
52-L-8
52-LA-8
(15,000 CFM)
(15,000 CFM)
52-EF-3 52-EF-1
52-LA-1152-LA-10
52-L-1152-L-10
(10,000 CFM) (30,000 CFM)
A
M
M T
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:1
P
M
M-505
MECHANICAL CONTROLS
13 48AKS, WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
RBK
Scale: N.T.S.
EMERGENCY EXHAUST CONTROLS SCHEMATIC
Scale: N.T.S.
ELECTRICAL ROOM VENTILATION CONTROL DIAGRAM
Scale: N.T.S.
FIRST FLOOR VENTILATION CONTROL SCHEMATIC
Scale: N.T.S.
FIRST FLOOR VENTILATION DIAGRAM
Scale: N.T.S.
MEZZANINE FLOOR VENTILATION CONTROL DIAGRAM
Scale: N.T.S.
MEZZANINE FLOOR VENTILATION CONTROL SCHEMATIC
T T
WEB
BROWSER
FRONT
END
MANAGEMENT LEVEL
INTEGRATION LEVEL
FIELD CONTROLLER LEVEL
SENSOR/ ACTUATOR LEVEL
BACNET
INTERFACE
CHILLER
CONTROLLER
JACE
(FOUR LEVEL ARCHITECTURE)
CHILLER
CONTROL
PANEL
52-CH-1
CHILLER
CONTROL
PANEL
52-CH-2
CHILLER
CONTROL
PANEL
52-CH-3
JACE 8000
(PROVIDE EXPANSION MODULES AS REQUIRED)
JACE 8000 JACE 8000
CONTROL
PANEL
LOCATED IN
ENG. OFFICE
120V/1 Ph
DIV 26
CT
CONTROL
PANEL
52-CT-1 52-CT-2 52-CT-3
CT
CONTROL
PANEL
CT
CONTROL
PANEL
52-RLM-1
REFRIGERANT
LEAK DETECTOR
PANEL
BACNET
IP
52-CTSSF-1
CW SIDE
STREAM PANEL
52-CWCDS-1
CW CHEMICAL
TREATMENT
PANEL
120V/ 1Ph
(FRONT END SYSTEM)
WEB BROW SER
EXPANDABLE,
AS REQUIRED
PUMP
CONTROLLER
DAMPER
ACTUATOR
ALL NETWORK W IRING BY CONTROLS CONTRACTOR
1. HIGH ALARM
2. M/UP VALVE OFF
3. M/UP VALVE ON
4. LOW ALARM
5. GROUND
MM
MM
LEGEND
1. 480V/3 Ph WIRING
2. 120V/3 Ph WIRING
3. CONTROL WIRING
CT FAN MOTOR
VIBRATION SWITCH
LEVEL
CONTROL
BASIN
HEATERS
CT SINGLE CELL
(TYPICAL FOR ALL)
BASIN
THERMOSTAT
CT CONTROL
PANEL ( BY MFG.)
HIGH WATER ALARM
VIBRATION ALARM
BASIN HEATER STATUS
LOW WATER ALARM
TO BMS VIA
INTERFACE DEVICE
480V/3
BY DIV 26
MOTOR DISCONNECT
BY DIV 26
TOWER FAN VFD
( BY MFG.)
IT HS
SST
TO BMS480V/3
BY DIV 26
BACNET PANEL
PROVIDED/INSTALLED
BY DIV 23
ALL POWER WIRING BY DIV 26
PANEL PROVIDED/
INSTALLED BY DIV 23
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:1
P
M
M-506
MECHANICAL CONTROLS
14 48AKS, WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
RBK
Scale: N.T.S.
CONTROLS SYSTEM ARCHITECTURE
Scale: N.T.S.
COOLING TOWER CONTROL SCHEMATIC
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:2
P
M
M-507
CONTROL POINTS LIST
15 48AKS, WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
RBK
CT-1 CELL 2 BSS VALVE 52-MV-26 X X
CT-1 CELL 1 BSS VALVE 52-MV-25 X X
CT-1 CELL 2 BSR VALVE 52-MV-24 X X
CT-1 CELL 1 BSR VALVE 52-MV-23 X X
CT-1 CELL 2 CWR VALVE 52-MV-14 X X
CT-1 CELL 1 CWR VALVE 52-MV-13 X X
CT-1 CELL 2 CWS VALVE 52-MV-12 X X
CT-1 CELL 1 CWS VALVE 52-MV-11 X X
COOLING TOWER CELL-2 VFD SPEED CONTROL 52-CT-1 X X
COOLING TOWER CELL-2 VFD STATUS 52-CT-1 X X
COOLING TOWER CELL-1 VFD SPEED CONTROL 52-CT-1 X X
COOLING TOWER CELL-1 VFD STATUS 52-CT-1 X X
COOLING TOWER CELL-2 START/STOP 52-CT-1 X
COOLING TOWER CELL-1 START/STOP 52-CT-1 X
COOLING TOWER CELL-2 STATUS 52-CT-1 X
COOLING TOWER CELL-1 STATUS 52-CT-1 X
CONDENSER WATER PUMP VFD STATUS 52-P-13 X X
CONDENSER WATER PUMP START/STOP 52-P-13 X
CONDENSER WATER PUMP STATUS 52-P-13 X
CONDENSER WATER PUMP VFD STATUS 52-P-8 X X
CONDENSER WATER PUMP START/STOP 52-P-8 X
CONDENSER WATER PUMP STATUS 52-P-8 X
CONDENSER WATER PUMP VFD STATUS 52-P-7 X X
CONDENSER WATER PUMP START/STOP 52-P-7 X
CONDENSER WATER PUMP STATUS 52-P-7 X
SECONDARY CHWS PUMP SPEED CONTROL 52-P-6 X X EXISTING TO BE REUSED
SECONDARY CHWS PUMP VFD STATUS 52-P-6 X X EXISTING TO BE REUSED
SECONDARY CHWS PUMP START/STOP 52-P-6 X EXISTING TO BE REUSED
SECONDARY CHWS PUMP STATUS 52-P-6 X EXISTING TO BE REUSED
SECONDARY CHWS PUMP SPEED CONTROL 52-P-5 X X EXISTING TO BE REUSED
SECONDARY CHWS PUMP VFD STATUS 52-P-5 X X EXISTING TO BE REUSED
SECONDARY CHWS PUMP START/STOP 52-P-5 X EXISTING TO BE REUSED
SECONDARY CHWS PUMP STATUS 52-P-5 X EXISTING TO BE REUSED
SECONDARY CHWS PUMP SPEED CONTROL 52-P-4 X X EXISTING TO BE REUSED
SECONDARY CHWS PUMP VFD STATUS 52-P-4 X X EXISTING TO BE REUSED
SECONDARY CHWS PUMP START/STOP 52-P-4 X EXISTING TO BE REUSED
SECONDARY CHWS PUMP STATUS 52-P-4 X EXISTING TO BE REUSED
CHILLER CONTROL PANEL ALARM 52-CH-3 X
CHILLER VFD STATUS 52-CH-3 X X
CHILLER START/STOP 52-CH-3 X
CHILLER STATUS 52-CH-3 X
CHILLER CONTROL PANEL ALARM 52-CH-2 X
CHILLER VFD STATUS 52-CH-2 X X
CHILLER START/STOP 52-CH-2 X
CHILLER STATUS 52-CH-2 X
CHILLER CONTROL PANEL ALARM 52-CH-1 X
CHILLER VFD STATUS 52-CH-1 X X
CHILLER START/STOP 52-CH-1 X
CHILLER STATUS 52-CH-1 X
PRIMARY CHWS PUMP SPEED CONTROL 52-P-3 X X
PRIMARY CHWS PUMP VFD STATUS 52-P-3 X X
PRIMARY CHWS PUMP START/STOP 52-P-3 X
PRIMARY CHWS PUMP STATUS 52-P-3 X
PRIMARY CHWS PUMP SPEED CONTROL 52-P-12 X X
PRIMARY CHWS PUMP VFD STATUS 52-P-12 X X
PRIMARY CHWS PUMP START/STOP 52-P-12 X
PRIMARY CHWS PUMP STATUS 52-P-12 X
PRIMARY CHWS PUMP SPEED CONTROL 52-P-2 X X
PRIMARY CHWS PUMP VFD STATUS 52-P-2 X X
PRIMARY CHWS PUMP START/STOP 52-P-2 X
PRIMARY CHWS PUMP STATUS 52-P-2 X
PRIMARY CHWS PUMP SPEED CONTROL 52-P-1 X X
PRIMARY CHWS PUMP VFD STATUS 52-P-1 X X
PRIMARY CHWS PUMP START/STOP 52-P-1 X
PRIMARY CHWS PUMP STATUS 52-P-1 X
SECONDARY LOOP DIFF. PRESSURE (X3) PDT X X
SECONDARY LOOP CHWS FLOW FT-14 X X
SECONDARY LOOP CHWS TEMPERATURE TT-22 X X
MAIN SECONDARY CHWR FLOW FT-13 X X
MAIN SECONDARY CHWR TEMPERATURE TT-21 X X
MAIN CWS PRESSURE PT-5 X X
MAIN CWR FLOW FT-12 X X
MAIN CWR TEMPERATURE TT-20 X X
MAIN CWS FLOW FT-11 X X
MAIN CWS TEMPERATURE TT-19 X X
PRIMARY LOOP CHWR FLOW FT-10 X X
PRIMARY LOOP CHWR TEMP TT-18 X X
PRIMARY LOOP CHWS FLOW FT-9 X X
PRIMARY LOOP CHWS TEMP TT-17 X X
HX-1 CWS/R DIFF. PRESSURE PDT-8 X X
HX-1 CW MOTORIZED VALVE 52-MV-8 X X
HX-1 CWS TEMPERATURE TT-16 X X
HX-1 CWR TEMPERATURE TT-15 X X
HX-1 CHWS/R DIFF. PRESSURE PDT-7 X X
HX-1 CHWR FLOW FT-7 X X
HX-1 CHWR PRESSURE PT-4 X X
HX-1 CHW MOTORIZED VALVE 52-MV-7 X X
HX-1 CHWR TEMPERATURE TT-14 X X
HX-1 CHWS TEMPERATURE TT-13 X X
CH-3 CWS/R DIFF. PRESSURE PDT-6 X X
CH-3 CWS FLOW FT-6 X X
CH-3 CW MOTORIZED VALVE 52-MV-6 X X
CH-3 CWS TEMPERATURE TT-12 X X
CH-3 CWR TEMPERATURE TT-11 X X
CH-3 CHWS/R DIFF. PRESSURE PDT-5 X X
CH-3 CHWR FLOW FT-5 X X
CH-3 CHWR PRESSURE PT-3 X X
CH-3 CHW MOTORIZED VALVE 52-MV-5 X X
CH-3 CHWR TEMPERATURE TT-10 X X
CH-3 CHWS TEMPERATURE TT-9 X X
CH-2 CWS/R DIFF. PRESSURE PDT-4 X X
CH-2 CWS FLOW FT-4 X X
CH-2 CW MOTORIZED VALVE 52-MV-4 X X
CH-2 CWS TEMPERATURE TT-8 X X
CH-2 CWR TEMPERATURE TT-7 X X
CH-2 CHWS/R DIFF. PRESSURE PDT-3 X X
CH-2 CHWR FLOW FT-2 X X
CH-2 CHWR PRESSURE PT-2 X X
CH-2 CHW MOTORIZED VALVE 52-MV-3 X X
CH-2 CHWR TEMPERATURE TT-6 X X
CH-2 CHWS TEMPERATURE TT-5 X X
CH-1 CWS/R DIFF. PRESSURE PDT-2 X X
CH-1 CWS FLOW FT-2 X X
CH-1 CW MOTORIZED VALVE 52-MV-2 X X
CH-1 CWS TEMPERATURE TT-4 X X
CH-1 CWR TEMPERATURE TT-3 X X
CH-1 CHWS/R DIFF. PRESSURE PDT-1 X X
CH-1 CHWR FLOW FT-1 X X
CH-1 CHWR PRESSURE PT-1 X X
CH-1 CHW MOTORIZED VALVE 52-MV-1 X X
CH-1 CHWR TEMPERATURE TT-2 X X
CH-1 CHWS TEMPERATURE TT-1 X X
OUTSIDE AIR HUMIDITY HT-OA X X
OUTSIDE AIR TEMPERATURE TT-OA X X
POINT DESCRIPTION POINT ID
ANALOG
INPUT
BINARY
INPUT
ANALOG
OUTPUT
BINARY
OUTPUT
ANALOG
VIRTUAL
BINARY
VIRTUAL
TREND ALARM POINT OTHER NOTES
SYSTEM INPUT SYSTEM OUTPUT SOFTWARE POINTS
CHILLED WATER GENERATION PLANT POINTS LIST
NEW GRAPHICS ON EXISITNG...
CHW TEMPERATURE RESET - X
HIGH CWS/R PRESSURE DROP PDT-8
HIGH CWS/R PRESSURE DROP PDT-6
HIGH CWS/R PRESSURE DROP PDT-4
HIGH CWS/R PRESSURE DROP PDT-2
HIGH MAKEUP WATER GPM/DAY - X
PRIMARY CHW PUMP HIGH PRESSURE PT-4 X
PRIMARY CHW PUMP HIGH PRESSURE PT-3 X
PRIMARY CHW PUMP HIGH PRESSURE PT-2 X
PRIMARY CHW PUMP HIGH PRESSURE PT-1 X
HIGH OA HUMIDITY HT-OA X
HIGH CWR TEMPERATURE TT-20 X
LOW CWS TEMPERATURE TT-19 X
LOW CHWR TEMPERATURE TT-18 X
HIGH CHWS TEMPERATURE TT-17 X X
REFRIGERENT LEAK DETECTOR PANEL STATUS X X
CT BLOW DOWN (GPM) - X X
CT MAKEUP WATER (GPM) - X X
CT KW/TON (FAN+HEATER+CW PUMP) - X X X
CT KW/TON (FAN+HEATER+CW PUMP) - X X X
CT KW/TON (FAN+HEATER+CW PUMP) - X X X
CT SUMP HEATER KWH (CELL 2) 52-CT-3 X X X
CT SUMP HEATER KWH (CELL 1) 52-CT-3 X X X
CT SUMP HEATER KWH (CELL 2) 52-CT-2 X X X
CT SUMP HEATER KWH (CELL 1) 52-CT-2 X X X
CT SUMP HEATER KWH (CELL 2) 52-CT-1 X X X
CT SUMP HEATER KWH (CELL 1) 52-CT-1 X X X
CT FAN KWH (CELL 2) 52-CT-3 X X X
CT FAN KWH (CELL 1) 52-CT-3 X X X
CT FAN KWH (CELL 2) 52-CT-2 X X X
CT FAN KWH (CELL 1) 52-CT-2 X X X
CT FAN KWH (CELL 2) 52-CT-1 X X X
CT FAN KWH (CELL 1) 52-CT-1 X X X
CW PUMP KWH 52-P-13 X X X
CW PUMP KWH 52-P-8 X X X
CW PUMP KWH 52-P-7 X X X
SIDE STREAM FILTER PUMP KWH 52-P-14 X X X
CHILLER KW/TON (CHILLER+PCHW PUMP) - X X X
CHILLER KW/TON (CHILLER+PCHW PUMP) - X X X
CHILLER KW/TON (CHILLER+PCHW PUMP) - X X X
CHW PUMP KWH 52-P-3 X X X CALCULATED
CHW PUMP KWH 52-P-12 X X X CALCULATED
CHW PUMP KWH 52-P-2 X X X CALCULATED
CHW PUMP KWH 52-P-1 X X X CALCULATED
HEAT EXCHANGER BTU 52-HX-1 X X X CALCULATED
CHILLER BTUH 52-CH-3 X X X CALCULATED
CHILLER BTUH 52-CH-2 X X X CALCULATED
CHILLER BTUH 52-CH-1 X X X CALCULATED
CHILLER KWH 52-CH-3 X X X CALCULATED
CHILLER KWH 52-CH-2 X X X CALCULATED
CHILLER KWH 52-CH-1 X X X CALCULATED
CONDENSER WATER CHEMISTRY (X4) - X X
CHEMICAL DELIVERY SYSTEM ALARM 52-CWCDS-1 X X
CHEMICAL DELIVERY SYSTEM STATUS 52-CWCDS-1 X X
CT-3 CELL-2 NC WATER TREATMENT ALARM 52-WT-6 X X
CT-3 CELL-2 NC WATER TREATMENT STATUS 52-WT-6 X X
CT-3 CELL-1 NC WATER TREATMENT ALARM 52-WT-5 X X
CT-3 CELL-1 NC WATER TREATMENT STATUS 52-WT-5 X X
CT-2 CELL-2 NC WATER TREATMENT ALARM 52-WT-4 X X
CT-2 CELL-2 NC WATER TREATMENT STATUS 52-WT-4 X X
CT-2 CELL-1 NC WATER TREATMENT ALARM 52-WT-3 X X
CT-2 CELL-1 NC WATER TREATMENT STATUS 52-WT-3 X X
CT-1 CELL-2 NC WATER TREATMENT ALARM 52-WT-2 X X
CT-1 CELL-2 NC WATER TREATMENT STATUS 52-WT-2 X X
CT-1 CELL-1 NC WATER TREATMENT ALARM 52-WT-1 X X
CT-1 CELL-1 NC WATER TREATMENT STATUS 52-WT-1 X X
SIDE STREAM FILTER ALARM X X
SIDE STREAM FILTER PUMP STATUS 52-P-14 X X
SIDE STREAM FILTER STATUS 52-CTSSF-1 X X
SIDE STREAM FILTER SYSTEM STATUS 52-CTSSF-1 X X
CONDENSER WATER MAIN SUPPLY TEMPERATURE TT-23 X X
CONDENSER WATER BYPASS VALVE 52-MV-10 X X
CONDENSER WATER MAIN BYPASS VALVE 52-MV-9 X X
CT-3 CONTROL PANEL ALARM - X X
CT-3 CELL 1 WATER LEVEL ALARM (X2) - X X
CT-3 CELL 1 WATER LEVEL ALARM (X2) - X X
CT-3 CELL 2 SUMP HEATER STATUS - X X
CT-3 CELL 1 SUMP HEATER STATUS - X X
CT-3 CELL 2 M/UP WATER SOLENOID VALVE STATUS - X X
CT-3 CELL 1 M/UP WATER SOLENOID VALVE STATUS - X X
CT-3 CELL 2 BSS VALVE 52-MV-34 X X
CT-3 CELL 1 BSS VALVE 52-MV-33 X X
CT-3 CELL 2 BSR VALVE 52-MV-32 X X
CT-3 CELL 1 BSR VALVE 52-MV-31 X X
CT-3 CELL 2 CWR VALVE 52-MV-22 X X
CT-3 CELL 1 CWR VALVE 52-MV-21 X X
CT-3 CELL 2 CWS VALVE 52-MV-20 X X
CT-3 CELL 1 CWS VALVE 52-MV-19 X X
COOLING TOWER CELL-2 VFD SPEED CONTROL 52-CT-3 X X
COOLING TOWER CELL-2 VFD STATUS 52-CT-3 X X
COOLING TOWER CELL-1 VFD SPEED CONTROL 52-CT-3 X X
COOLING TOWER CELL-1 VFD STATUS 52-CT-3 X X
COOLING TOWER CELL-2 START/STOP 52-CT-3 X
COOLING TOWER CELL-1 START/STOP 52-CT-3 X
COOLING TOWER CELL-2 STATUS 52-CT-3 X
COOLING TOWER CELL-1 STATUS 52-CT-3 X
CT-2 CONTROL PANEL ALARM - X X
CT-2 CELL 1 WATER LEVEL ALARM (X2) - X X
CT-2 CELL 1 WATER LEVEL ALARM (X2) - X X
CT-2 CELL 2 SUMP HEATER STATUS - X X
CT-2 CELL 1 SUMP HEATER STATUS - X X
CT-2 CELL 2 M/UP WATER SOLENOID VALVE STATUS - X X
CT-2 CELL 1 M/UP WATER SOLENOID VALVE STATUS - X X
CT-2 CELL 2 BSS VALVE 52-MV-30 X X
CT-2 CELL 1 BSS VALVE 52-MV-29 X X
CT-2 CELL 2 BSR VALVE 52-MV-28 X X
CT-2 CELL 1 BSR VALVE 52-MV-27 X X
CT-2 CELL 2 CWR VALVE 52-MV-18 X X
CT-2 CELL 1 CWR VALVE 52-MV-17 X X
CT-2 CELL 2 CWS VALVE 52-MV-16 X X
CT-2 CELL 1 CWS VALVE 52-MV-15 X X
COOLING TOWER CELL-2 VFD SPEED CONTROL 52-CT-2 X X
COOLING TOWER CELL-2 VFD STATUS 52-CT-2 X X
COOLING TOWER CELL-1 VFD SPEED CONTROL 52-CT-2 X X
COOLING TOWER CELL-1 VFD STATUS 52-CT-2 X X
COOLING TOWER CELL-2 START/STOP 52-CT-2 X
COOLING TOWER CELL-1 START/STOP 52-CT-2 X
COOLING TOWER CELL-2 STATUS 52-CT-2 X
COOLING TOWER CELL-1 STATUS 52-CT-2 X
CT-1 CONTROL PANEL ALARM - X X
CT-1 CELL 1 WATER LEVEL ALARM (X2) - X X
CT-1 CELL 1 WATER LEVEL ALARM (X2) - X X
CT-1 CELL 2 SUMP HEATER STATUS - X X
CT-1 CELL 1 SUMP HEATER STATUS - X X
CT-1 CELL 2 M/UP WATER SOLENOID VALVE STATUS - X X
CT-1 CELL 1 M/UP WATER SOLENOID VALVE STATUS - X X
POINT DESCRIPTION POINT ID ANALOG... BINARY... ANALOG... BINARY... ANALOG... BINARY... TREND ALARM... OTHER NOTES
SYSTEM INPUT SYSTEM OUTPUT SOFTWARE POINTS
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:2
P
M
M-508
SEQUENCES OF OPERATION
16 48AKS, WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
RBK
THE CHILLER PLANT IS COMPRISED OF THREE CHILLERS, EACH 750 TON COOLING CAPACITY. THESE CHILLERS HAVE EXCELLENT PART LOAD EFFICIENCIES. THE PRIMARY PUMP AND CONDENSER WATER PUMPS RUN AT CONSTANT FLOW. THE SECONDARY CHILLED WATER LOOP PUMPS HAVE VFDS AND OPERATE WITH VARIABLE FLOW CONTROLLED FROM DIFFERENTIAL PRESSURE BASED ON OUTDOOR AIR TEMPERATURE, WHICH ATTEMPTS
TO SATISFY THE CURRENT CAMPUS LOAD.
THERE ARE THREE COOLING TOWERS, EACH ASSIGNED TO ONE CHILLER WITH OPTION OF USING ANY TOWER WITH ANY CHILLER.
THERE IS A FLAT PLATE HEAT EXCHANGER IN THE CONDENSER WATER LOOP THAT ACT AS WATER SIDE ECONOMIZER IN WINTER CONDITIONS.
THE BUILDING AUTOMATION SYSTEM CONTROLS MANY OF CHILLER FUNCTIONS AND SETPOINTS AND JUST ENABLES OTHERS AND MONITORS A NUMBER OF POINTS THROUGH THE CHILLER INTERFACE.
PROPOSED SEQUENCE
CHILLERS-1,2 AND 3
1. SOFTWARE (BAS) LEAD LAG SELECTOR TO ALLOW ANY OF THE CHILLERS TO ACT AS THE LEAD MACHINE.
2. CHILLER WILL ONLY BE ENABLED TO OPERATE IN AUTO OPTION UPON THE FOLLOWING CONDITIONS:
a. CHILLER SCHEDULED ON (BY BAS)
b. OSAT > 55 DEG. F (ADJ)
SHUTS BACK AT OSAT < 52 DEGREE F.
c. THERE ARE NO ACTIVE ALARMS THAT INITIATE A SHUTDOWN (REPORTED TO BAS AND CHILLER PANEL.
d. THE COOLING TOWER (CT) SUMP PUMP TEMPERATURE IS ABOVE ITS MINIMUM (BAS AND CHILLER PANEL.
e. CHILLED AND CONDENSER WATER FLOWS ARE VERIFIED (BAS AND CHILLER PANEL-FLOW SWITCHES) AND METER FLOWS ARE TO BE FED TO BAS FROM METER SOFTWARE CONVERSION.
3. UPON CHILLER PLANT START-UP, THE CH-3 PRIMARY CHILLED WATER PUMP STARTS AND THE PUMP STATUS IS CONFIRMED ON VIA A CURRENT SENSOR IN THE BAS AND FLOW IS CONFIRMED THROUGH A FLOW SWITCH.
AFTER INTERNAL DIAGNOSTIC BY CHILLER CONTROLS, THE CONDENSER WATER PUMP STARTS AND THE STATUS IS CONFIRMED ON VIA A CURRENT SENSOR IN THE BAS AND FLOW IS CONFIRMED THROUGH A FLOW SWITCH.
THERE ARE 30-60 SECOND DELAYS BETWEEN THESE PUMPS, PER CHILLER INTEGRAL PROGRAMMED SETTINGS (ADJUSTABLE). THE LEAD SECONDARY CHILLED WATER PUMP THEN STARTS, RAMPING UP FROM MINIMUM SPEED
OF 20 HZ VIA THE VARIABLE FREQUENCY DRIVE (VFD).
4. THE CHILLER MAINTAINS THE CHW SUPPLY TEMPERATURE AT THE SETPOINT (BAS) WHICH RANGES FROM 42 DEG. F TO 48 DEG. F, BASED ON A RESET SCHEDULE BY MODULATING CHILLER CAPACITY.
5. CHILLED WATER SUPPLY TEMPERATURE RESET: THE CHWST WILL HAVE A DEFAULT OF 44 DEG F (ADJUSTABLE). THE CHILLED WATER, TEMPERATURE WILL BE RESET UPWARD ONLY WHEN THE SECONDARY PUMPS SPEEDS ARE AT THEIR MINIMUM (AS DESCRIBED IN SEQUENCE 31). THIS IS BECAUSE LOWERING PUMP SPEED WITH THE DIFFERENTIAL PRESSURE RESET STRATEGY (SEQUENCE 31) COMPETES WITH CHWST RESET, BUT DP RESET WILL SAVE MORE ENERGY THAN RESETTING THE CHILLED WATER TEMPERATURE UP, PER TON OF COOLING. WHEN SECONDARY PUMP SPEED IS AT ITS MINIMUM ALLOWED THE CHWST RESET ROUTINE IS
STARTED AND CONTINUES UNTIL ONE OR MORE PUMPS ARE ABOVE THEIR MINIMUM SPEED, THEN HOLD THE CHWST SETPOINT WHERE IT IS UNTIL THE PUMPS ARE AT THEIR MINIMUMS. A DIFFERENTIAL OR TIME DELAY W ILL BE INCLUDED TO PREVENT HUNTING. LIKEWISE, CHWST SETPOINT W ILL NOT LOWER FROM CURRENT CONDITIONS UNTIL ALL SECONDARY PUMPS ARE AT THEIR MAXIMUM SPEED. WHEN ENABLED, THE CHWST RESET SEQUENCE IS WHEN THE CHWST SETPOINT (SPT) IS AT ITS HIGHEST VALUE OF A PROPORTIONAL RANGE (48 DEGREE ADJ). THE CHWS SPT IS AT IT LOWEST VALVE (42 F ADJ).
6. CHILLER STAGING (ALL IN BAS): CH-3 IS DESIGNATED AS LEAD CHILLER. CH-1 AND 2 ARE TO ALTERNATE AS LAG CHILLERS. CH-3 SHALL OPERATE AT 50% CAPACITY AND WHENEVER SECONDARY CHW FLOW EXCEEDS THE PRIMARY FLOW FOR 20 MINUTES (ADJ) AS DETERMINED BY THE FLOW METERS AND THE LEAD CHILLER IS AT 50% CAPACITY (% RATED CURRENT) THE LAG CHILLER WILL BE CALLED FOR. THE LAG CHILLER WILL
CONTINUE TO RAMP UP TILL 50% CAPACITY.
7. THE LAST SELECTED LAG CHILLER AND ASSOCIATED PUMPS STAGE OFF WHEN THE TOTAL PRIMARY CHW FLOW EXCEEDS THE TOTAL SECONDARY CHW FLOW BY THE CAPACITY (FLOW) OF THE LAST SELECTED
CHILLER’S PRIMARY CHW PUMP FOR A 20 MINUTE DURATION (ADJ).
8. ALL CHILLERS AND PUMPS SHALL TURN OFF WHEN OSAT IS <54 DEGREE F OR W HEN ALL AIRHANDLERS ARE OFF.
MISCELLANEOUS:
9. CHILLERS SHALL NOT CYCLE ON AND OFF MORE THAN THREE TIMES IN A ONE HOUR PERIOD (CHILLER CONTROLS).
10. ALARM ON CHILLER FAILURE MUST BE MANUALLY RESET.
11. DEMAND LIMITING: DEMAND LIMITING SETPOINT ADJUSTMENT MAY BE MADE THROUGH BUILDING AUTOMATION SYSTEM. THE DEMAND LIMIT (SUM OF CHILLER KW) SHALL LIMIT CHILLER START BY ONE HOUR.
12. BAS SHALL MONITOR KW AND CALCULATE LOAD ON THE CHILLER USING EVAPORATOR FLOW AND TEMPERATURE DIFFERENTIALS.
13. PROVIDE EMERGENCY STOP SWITCH LOCATED ADJACENT TO CHILLER ROOM MANDOOR EXIT TO STOP ALL EQUIPMENT IN THE CHILLER ROOM EXCEPT VENTILATION SYSTEM.
PRIMARY CHILLED WATER PUMPS:
1. EACH PRIMARY CHW PUMP IS ASSIGNED TO ONE CHILLER. LEAD PRIMARY CHW PUMP STARTS UPON CALL FOR COOLING PER ABOVE CHILLER SEQUENCES. LAG PRIMARY CHW PUMP STARTS UPON A CALL FOR THE LAG
CHILLER PER ABOVE SEQUENCES.
2. PRIMARY CHW PUMP TO OPERATE CONTINUOUSLY WHEN THEIR ASSOCIATED CHILLER IS RUNNING. PRIMARY CHW PUMPS VARY FLOW AS PER THE CHILLER CAPACITY.
3. PIPING ARRANGEMENT ALLOWS ANY PUMP TO BE USED WITH ANY CHILLER. CHANGE OVER SHALL BE MANUAL.
4. CHILLED WATER PUMP FAILURE SHALL BE MONITORED ON BMS. MANUAL CHANGEOVER SHALL BE DONE IF THE PUMP FAILS.
CHILLER CONDENSER WATER PUMPS:
1. ANY CONDENSER WATER PUMP CAN OPERATE WITH ANY CHILLER. WHENEVER CHILLER IS IN OPERATION PUMP SHALL OPERATE. CONDENSER WATER PUMP SHALL OPERATE AT CONSTANT SPEED.
2. PUMP FAILURE SHALL BE MONITORED ON BMS AND AUTOMATIC CHANGE OVER TO OTHER PUMP SHALL TAKE PLACE IF DUTY PUMP FAILS.
COOLING TOWER
1. COOLING TOWERS SHALL OPERATE BASED ON THE CONDENSER WATER SUPPLY TEMPERATURE. THE SUMP MINIMUM TEMPERATURE DURING SUMMER SHALL BE MAINTAINED AS PER CHILLER MANUFACTURER’S
RECOMMENDATION.
2. MULTIPLE CELLS SHALL BE IN OPERATION TO HAVE LOWER CONDENSER WATER SUPPLY TEMPERATURE TO MAXIMIZE CHILLER EFFICIENCY.
3. COOLING TOWER FANS VFDS SHALL VARY FAN SPEED TO MAINTAIN SUMP WATER TEMPERATURE.
4. WINTER OPERATION: WHEN OA TEMPERATURE DROPS BELOW 55 F (ADJ) CHILLED W ATER SHALL BE GENERATED VIA FLAT PLATE HEAT EXCHANGER.
5. DURING FREE COOLING TOWER SHALL OPERATE TO MAINTAIN CONDENSER W ATER SUPPLY TEMPERATURE.
6. DURING WINTER COOLING TOW ER SUMP TEMPERATURE SHALL BE MAINTAINED ABOVE 36 F (ADJ).
7. COOLING TOWER’S MAKEUP WATER VALVE, DRAIN, SUMP HEATER ETC. OPERATION SHALL BE CONTROLLED VIA COOLING TOWER CONTROL PANEL.
8. EXCESSIVE VIBRATION ON ANY TOWER SHALL SHUT THAT TOWER AND AUTOMATICALLY START LAG TOWER.
9. THE 12” BYPASS MOTORIZED VALVE SHALL MODULATE TO MAINTAIN MINIMUM CONDENSER WATER TEMPERATURE AS RECOMMENDED BY CHILLER MANUFACTURER.
WATERSIDE ECONOMIZER MODE:
1. FOR CHANGEOVER CONDITIONS (INTO AND OUT OF HX), THE CHILLER SHALL OPERATE SIMULTANEOUSLY AT MINIMUM CAPACITY FOR 15 MINUTES BEFORE SWITCHOVER.
2. THE 14” BYPASS VALVE BETWEEN CWS AND CW R SHALL OPERATE TO MAINTAIN MINIMUM CONDENSER WATER TEMPERATURE.
SECONDARY CHILLED WATER PUMPS:
1. EXISTING CONTROLS AND SEQUENCE SHALL BE MAINTAINED.
2. NEW THREE DIFFERENTIAL PRESSURE SENSORS SHALL BE INSTALLED (LOCATION PER VA) AND PUMP FLOW SHALL VARY TO MAINTAIN AVERAGE DIFFERENTIAL PRESSURE REQUIREMENT.
REFRIGERANT LEAK DETECTOR AND EMERGENCY EXHAUST:
1. REFRIGERANT LEAK SHALL BE MONITORED BY SENSORS LOCATED NEAR EACH CHILLER AND MANUFACTURER PROVIDED CONTROL PANEL.
2. IF LEAK IS DETECTED, CHILLER(S) IN OPERATION SHALL STOP. EMERGENCY EXHAUST FAN 52-EF-4 AND 52-EF-5 SHALL OPERATE AT FULL SPEED AND LOUVERS 52-L-1 AND 52-L-2 SHALL BE FULL OPEN TO PROVIDE MAKE UP
AIR. ALL OTHER INTAKE LOUVERS SHALL BE CLOSED.
3. REMOTE AUDIO-VISUAL ALARM SHALL BE ACTIVATED.
CHILLED WATER GENERATION SYSTEM SEQUENCE OF OPERATION:
THE VENTILATION SYSTEM FOR THE CHILLER PLANT ROOM AND ELECTRICAL ROOMS CONSISTS OF MOTOR OPERATED OA INTAKE LOUVERS, EXHAUST AIR LOUVERS SUPPLY AND EXHAUST FANS.
FIRST FLOOR CHILLER PLANT (104) VENTILATION SYSTEM CONSIST OF FOLLOWING:
1. OUTSIDE AIR INTAKE LOUVER: 52-L-1
2. OUTSIDE AIR INTAKE LOUVER: 52-L-2
3. EXHAUST AIR LOUVER: 52-L-3
4. EXHAUST FAN: 52-EF-5
5. SPACE TEMPERATURE SENSOR
SEQUENCE OF OPERATION:
FIRST FLOOR SPACE IS APPROXIMATELY 6,000 SF. THE VENTILATION SYSTEM SHALL OPERATE CONTINUOUSLY TO PROVIDE MINIMUM VENTILATION OF APPROXIMATELY 1.6 CFM/SF. THE EXHAUST FAN SHALL OPERATE AT 50% (ADJ) SPEED, APPROXIMATELY 10,000 CFM. OA INTAKE DAMPERS SHALL MODULATE TO 40%(ADJ) OPEN TO PROVIDE MINIMUM MAKEUP AIR. IF THE SPACE TEMPERATURE, AS SENSED BY SPACE TEMPERATURE SENSOR, EXCEEDS THE SET POINT OF 85 F (ADJ), OA INTAKE DAMPERS SHALL OPEN 100% AND EXHAUST FAN SHALL OPERATE AT 100% SPEED, APPROXIMATELY 20,000 CFM, 3.33 CFM/SF.
MEZZANINE FLOOR MECHANICAL ROOM (201) VENTILATION SYSTEM CONSIST OF FOLLOWING:
1. OUTSIDE AIR INTAKE LOUVER: 52-L-7
2. OUTSIDE AIR INTAKE LOUVER: 52-L-8
3. EXHAUST AIR LOUVER: 52-L-4
4. EXHAUST FAN: 52-EF-6
5. EXHAUST AIR LOUVER: 52-L-10
6. EXHAUST FAN: 52-EF-3
7. OA SUPPLY FAN: 52-SF-1
8. SPACE TEMPERATURE SENSOR
SEQUENCE OF OPERATION:
MEZZANINE FLOOR MECHANICAL AREA IS APPROXIMATELY 5,000 SF. THE VENTILATION SYSTEM SHALL OPERATE CONTINUOUSLY TO PROVIDE MINIMUM VENTILATION OF APPROXIMATELY 3 CFM/SF. THE SUPPLY FAN AND EXHAUST FANS SHALL OPERATE AT 50% (ADJ) SPEED (52-SF-1-15,000 CFM, 52-EF-6-10,000 CFM AND 52-EF-3-5,000 CFM). OA INTAKE DAMPERS SHALL BE CLOSED. IF THE SPACE TEMPERATURE, AS SENSED BY SPACE TEMPERATURE SENSOR, EXCEEDS THE SET POINT OF 90 F (ADJ) THE EXHAUST FANS SHALL OPERATE AT 100% SPEED AND OA INTAKE DAMPERS SHALL BE 100% OPEN. IF THE SPACE TEMPERATURE EXCEEDS 100 F (ADJ), 52- SF-1 SHALL OPERATE AT 100% SPEED, ALL INTAKE DAMPERS SHALL BE 100% OPEN AND ALL EXHAUST FANS SHALL OPERATE AT 100% SPEED. SYSTEM MINIMUM OPERATION TIME SHALL BE 30 MINUTES.
TRANSFORMER VAULT (102) VENTILATION SYSTEM CONSIST OF FOLLOWING:
1. OUTSIDE AIR INTAKE LOUVER: 52-L-5
2. EXHAUST AIR LOUVER: 52-L-6
3. EXHAUST FAN: 52-EF-7
4. SPACE TEMPERATURE SENSOR
SEQUENCE OF OPERATION:
THE EXISTING CONTROL SEQUENCE FOR THIS ROOM SHALL REMAIN. SPACE TEMPERATURE SENSOR SHALL ACTIVATE THE VENTILATION SYSTEM. IF THE SPACE TEMPERATURE GOES ABOVE 85 F (ADJ), THE OA INTAKE DAMPER SHALL OPEN 100% AND EXHAUST FAN SHALL OPERATE AT 100% SPEED. SYSTEM MINIMUM OPERATION TIME SHALL BE 30 MINUTES.
TRANSFORMER VAULT (103) VENTILATION SYSTEM CONSIST OF FOLLOWING:
1. OUTSIDE AIR INTAKE LOUVER: 52-L-12A1
2. OUTSIDE AIR INTAKE LOUVER: 52-L-12A2
3. OUTSIDE AIR INTAKE LOUVER: 52-L-12B1
4. OUTSIDE AIR INTAKE LOUVER: 52-L-12B2
5. EXHAUST AIR LOUVER: 52-L-9
6. EXHAUST FAN: 52-EF-2
7. SPACE TEMPERATURE SENSOR
SEQUENCE OF OPERATION:
THE EXISTING CONTROL SEQUENCE FOR THIS ROOM SHALL REMAIN. SPACE TEMPERATURE SENSOR SHALL ACTIVATE THE VENTILATION SYSTEM. IF THE SPACE TEMPERATURE GOES ABOVE 85 F (ADJ), THE OA INTAKE DAMPERS SHALL OPEN 100% AND EXHAUST FAN SHALL OPERATE AT 100% SPEED. SYSTEM MINIMUM OPERATION TIME SHALL BE 30 MINUTES.
EMERGENCY EXHAUST SYSTEM DURING REFRIGERANT LEAK:
SEQUENCE OF OPERATION:
DURING EMERGENCY EXHAUST SYSTEM, LOUVERS 52-L-1, 52-L-2 AND MOTORIZED DAMPER 52-MD-1 SHALL BE 100% OPEN. MOTORIZED DAMPER 52-MD-1 SHALL BE 100% OPEN AND EXHAUST FANS 52-EF-4 AND 52-EF-5 SHALL OPERATE AT 100% SPEED. SYSTEM MINIMUM OPERATION SHALL BE 30 MINUTES. ALL OTHER LOUVERS, DAMPERS AND FANS SHALL BE OFF.
THE REFRIGERANT LEAK DETECTION PANEL SHALL BE INTERLOCKED WITH VENTILATION SYSTEM TO ENSURE EMERGENCY EXHAUST SYSTEM OPERATES WHEN LEAK IS DETECTED BY PANEL.
VENTILATION SYSTEM SEQUENCE OF OPERATION:
ANCHOR BOLT
PIPE SLEEVE
(5D, 3" MIN.)
WELD HEAD TO PLATE
OR BEND OVER END
5D
FLOOR
CONCRETE BASE
A
2D
5D
D
SECTION B-BPLAN
A
B B
L
W
D
EQUIPMENT BASE PLATE
TYPICAL ANCHOR
BOLT AND NUT &
WASHER
PROVIDE DOUBLE SLAB
REINFORCING IN BASE AREA
SECTION A-A (BASE POURED WITH FLOOR SLAB)
L /1
M
IN
SECTION A-A (BASE NOT POURED WITH FLOOR SLAB)
EQUIPMENT BASE PLATE
L /1
M
IN
TYPICAL ANCHOR
BOLT AND NUT &
WASHER
PROVIDE #3 BARS 12" O.C.
EACH WAT IN THE BASE &
DOWEL BASE FLOOR
NOTE:
L & W DIMENSIONS SHALL BE 6" GREATER THAN THE EQUIPMENT BASE
PLATE.
16"
PIPE AND INSULATION
INSULATION PROTECTION SHIELD
2" STEEL PIPE
2-1/2" STEEL PIPE
SEALANT
PROVIDE ALUMINUM JACKET
HIGH COMPRESSIVE
STRENGTH INSULATION
INSERT UNDER SHIELD
WELD PIPE SADDLE SUPPORT
TO PIPE. PROVIDE WATER
TIGHT CONNECTION
CLAMPING RING
PRE-MOULDED FLEXIBLE
PIPE COUNTER FLASHING
ROOF SYSTEM
INSULATION AND
MEMBRANE
ROOF SURFACE
CONCRETE ROOF SLAB
OR STEEL ROOF DECK
SECURE TO ROOF SLAB WITH
(4) 3/8" Ø EXPANSION BOLTS
OR WELD TO STEEL DECK
WELD PLATE TO PIPE
8" x 8" x 3/8" STEEL PLATE
M
IN
NOTES:
PROVIDE RESTRAINING CLAMPS 8'-0" O.C.
NOM. SIZE (IN.)
PIPE (FT.)
TUBING (FT.)
5 FT
THRU 3/4
1 1 1/4
1 1/2
HANGER ROD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR
LOW TEMPERATURE
PIPE)
PROVIDE HIGH
COMPRESSIVE
STRENGHT
INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION SHIELD AT
HANGER
WELD
SADDLE
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE
SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE
SPECIFICATIONS
1/2" DIA. HANGER RODS
WITH 36" MAX. SPACING
ON EACH CHANNEL
BAND
1-5/8" 12 GAUGE CHANNEL
OR 2" x 2" x 1/4" ANGLE
NOTES:
SEE SPECIFICATIONS FOR DETAILED
HANGER REQUIREMENTS.
SIDE VIEW TRAPEZE HANGER
FOR UP TO 1000 LB. UNIFORM
LOAD
1" MAX.
PROVIDE INSULATION SHIELD &
INSERT FOR ALL PIPING (8" MIN.)
2 2 1/2 3 4 5 6 8 10 12
11 12 14 16 17 19 22 23
9 10 12 13 14 16 - -
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE
MAXIMUM PIPE/TUBING SUPPORT SPACING
ABOVE 2" [50mm] DIA. PIPE 2" [50mm] DIA. & SMALLER
VERTICAL
2 1/2" [65mm] DIA.
ABOVE 2" [50mm] DIA. PIPE 2" [50mm] DIA. & SMALLER
HORIZONTAL
2 1/2" [65mm] DIA.
NOTES:
1. SEE EXPANSION TANK SYSTEM SCHEDULE FOR COMPONENT SIZES.
2. RELIEF VALVE FOR CHILLED WATER SYSTEM IS SHOWN. OMIT WHEN RELIEF VALVE IS SHOWN
ON HEAT EXCHANGER DETAIL & SYSTEM IS USED ONLY FOR HOT WATER HEATING.
3. PROVIDE STRAINER IN AIR SEPARATOR W HEN INDICATED IN EXPANSION TANK SCHEDULE.
4. FOR HOT WATER SYSTEMS 2" [50mm] AND SMALLER AND CHILLED WATER SYSTEMS USE IN-LINE
AIR PURGER IN LIEU OF AIR SEPARATOR.
5. SET PRESSURE REDUCING VALVE SO PRESSURE AT HIGHEST POINT IN SYSTEM HAS A MINIMUM
OF 4 PSIG [28kPa].
DIAPHRAGM EXPANSION
TANK
TANK SADDLE
TO PUMP
SUCTION
PITCH UP 1.6%
SLOPE (MIN.)
HANGER ROD
SUPPORTS (TYPICAL)
CONNECTOR PIPE
NORMALLY OPEN
GATE VALVE IN
VERTICAL (REMOVE
HANDLE)
RUN DRAIN LINE
TO NEAREST
F.D. UNLESS
INDICATED
OTHERWISE
FROM SYSTEM
AIR
SEPARATOR
SEE NOTES
NO. 3 & 4
DRAIN
COLD WATER FILL LINE.
SEE EXPANSION TANK
SCHEDULE FOR SIZE
NC
D
RUN DRAIN
LINE TO
NEAREST FD
REDUCED PRESSURE
BACKFLOW PREVENTER
D
BUTTERFLY
OR BALL
ISOLATION
VALVE
HANGER
RODS
(TYP)
AV
AUTOMATIC AIR VENT
PI
NOTE:
1. SIZE WATER FILTER
FOR 5% OF TOTAL
SYSTEM FLOW
F R
O M
P U
M P
D
IS
C H
A R
G E
PRESSURE
GAUGE
1/2" [15mm]
T O
P U
M P
S U
C T
IO
N
AUTOMATIC FLOW
CONTROL DEVICE SEE
LOW POINT DRAIN
DRAIN
CONNECTION
WATER
FILTER
TYPICAL WATER
PIPING
REDUCER, IF
REQUIRED
3/4" [20mm] BALL
VALVE
ADAPTER TO 3/4" [20mm] HOSE
TREAD-PROVIDE HOSE CAP NUT
ELEVATION
THREADED
PIPING
ELEVATION
WELDED
PIPING
TYPICAL CHILLED AND HOT WATER
PIPING DRAIN VALVE CONNECTIONS
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
MV
OR
AV 1/4" [8mm]
COPPER TUBING
1/2" [15mm] x 4" [100mm]
NIPPLE
AIR
VENT
1/2" [15mm]
BALL VALVE
CIRCULATING WATER
PIPING
ELEVATION
TYPICAL MANUAL AIR VENT
NOTES:
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
BLOWDONW
DIFFERENTIAL PRESSURE
TRANSMITTER (FLOW,
LEVEL)
PT
1/2" [15mm] STEEL PIPE
OR STEEL TUBING TO
SENSORS
ELEVATION
NOTE:
1. INSTALLATION OF SENSORS AND TRANSMITTERS SHALL CONFORM TO
RECOMMENDATIONS OF MANUFACTURERS OF TRANSMITTERS.
MOTOR
HOUSING
ELECTRICAL
CONDUIT GUIDE
WOOD
NAILING STRIP
PREFABRICATED ROOF
CURB
SEE NOTE 2
RIGID CONDUIT TO
ACCOMMODATE
ELECTRICAL WIRES
GRAVITY BACKDRAFT
DAMPER
CURB
CAP
SEE NOTE 1
SEE NOTE 2
ROOF
TRANSITION DUCT TO
FULL SIZE OF DAMPER
SUPPLIED WITH ROOF
VENTILATOR
DUCT
NOTE:
1. SECURE CURB CAP TO WOOD NAILING STRIP WITH 3/8" [10mm] CADMIUM PLATED LAG BOLTS NOT OVER 12" [300mm] ON CENTER.
2. SECURE ROOF CURB, DUCTWORK, AND DAMPER TO ROOF WITH EXPANSION
BOLTS (CONCRETE ROOF) OR RUST RESISTANT BOLTS (METAL DECK AND BAR
JOIST ROOF).
3. RUN ELECTRICAL LINES THROUGH CLEARANCE HOLE PROVIDED IN GRAVITY
DAMPER, THEN THROUGH VENTILATOR ELECTRICAL CONDUIT GUIDE.
4. PROVIDE A MOTORIZED DAMPER, IF APPLICABLE.
5. PROVIDE DIRECT DRIVE FANS FOR LOCATIONS NOT EASILY ACCESSIBLE. AS
ATTIC OR PIPE BASEMENT AND LESS THAN 2 HP.
6. MINIMUM CURB HEIGHT SHALL BE 12" [300mm]. INCREASE HEIGHT, IF REQUIRED, TO OVERCOME SNOW DRIFT.
C W
S C
W S
SIDESTREAM
SEPARATOR
SEE PUMP
SCHEDULE
AND DETAIL
SOLIDS
RECOVERY
SEPARATOR
FD
SEPARATOR DETAIL WITH
SIDESTREAM PUMP
C H
IL
L
E D
W A
T E
R R
E T
U R
N H
E A
D E
R
RELIEF BYPASS
VALVE TYP.
CHEMICAL
FEED
PUMP
NO.1
HS HS HS
CHEMICAL
FEED
PUMP
NO.2
CHEMICAL
FEED
PUMP
NO.3
MODULATING LEVEL
CONTROL VALVE
REDUCED
PRESSURE
BACK FLOW
PREVENTER
DCW
SEE
PLUMBING
DWG MAKE
UP
METER
M
PHT
PH
TRANSMITTER
CT
SAMPLE
CONDUCTIVITY
TRANSMITTER
CHEMICAL FEED
CONTROLLER
STORAGE TANK NO. 1
CHILLED WATER SCALE
AND CORROSION
INHIBITOR
STORAGE…