18-416 Bid CombDWG 20210223_Part1.pdf
PDF 10 MB Posted
- Attached to
- Z2DZ--Upgrade Chiller Plant (VA-21-00024244)
- Solicitation number
- 36C25921R0061
About this file
This document provides details on a federal contract opportunity for upgrading a chiller plant at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma. The solicitation number is 36C25921R0061 and the project magnitude is estimated between $5-10 million. The NAICS code is 238220 with a small business size standard of $39.5 million. This opportunity is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The point of contact is Robyn Young and offerors must be verified and listed in the Vendor Information Pages database by the time of proposal submission. A request for quote will be posted on April 15, 2021. The selected contractor will provide construction services to complete the upgrade of the chiller plant.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25921R0061 0003.docx | DOCX document | |
| G-101.pdf | ||
| Pre Bid RFIs - 18-416.pdf | ||
| 013526 Safety Reqs.pdf | ||
| 18-416 Bid CombSpecs 20210223-RFI.pdf | ||
| 36C25921R0061 0002.docx | DOCX document | |
| 36C25921R0061 0001.docx | DOCX document | |
| S04 -Site Visit Meeting Doc.pdf | ||
| IMG_0257.jpg | JPG image | |
| Site Visit Station Map.pdf | ||
| 18-416 Bid CombDWG 20210223_Part2.pdf | ||
| 36C25921R0061_1.docx | DOCX document | |
| 18-416 Bid CombDWG 20210223_Part3.pdf | ||
| S02 Past Performance Questionnaire.docx | DOCX document | |
| Site Visit Hatbox Parking.pdf | ||
| 18-416 Bid CombSpecs 20210223.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP
PROJECT LOCATION MAP
SIGNATURE BLOCK
MEDICAL CENTER DIRECTOR DATE
ASSOCIATE MEDICAL CENTER DIRECTOR DATE
CHIEF OF STAFF DATE
CHIEF OF ENGINEERING SERVICES DATE
SAFETY OFFICER DATE
INDUSTRIAL HYGIENIST DATE
INFECTION CONTROL OFFICER DATE
PRESIDENT AFGE 2250 DATE
ENERGY ENGINEER DATE
ASSOCIATE DIRECTOR PATIENT CARE SERVICES DATE
/2
/2
:5
:0
A
M
G-001
COVER SHEET
1 6WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
VA PROJECT #: 623-16-101 APOGEE PROJECT #: 18-416
RBK
MUSKOGEE VAMC
MUSKOGEE VAMC
DocuSign Envelope ID: 48BA7B65-BF21-435C-8DD2-617C81DA6FEC
2/23/2021
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
TRUE
0 4 8 16
GENERAL CONSTRUCTION: WORK INCLUDES GENERAL CONSTRUCTION REPLACEMENT OF CAMPUS CHILLERS, PUMPS, HEAT EXCHANGERS CONTROLS AND COOLING TOWERS. WORK TO INCLUDE ASSOCIATED SWITCHGEAR AND MOTOR CONTROL CENTERS. WORK ALSO INCLUDES, NEW CATWALK AROUND COOLING
TOWERS, ROOFING REPLACEMENT AND MISCELLANEOUS ARCHITECTURAL IMPROVEMENTS.
BID ITEM II (ALTERNATE BID DEDUCT NO.1) :
EXISTING LIGHT TO REMAIN. PLEASE REFER TO ED102.
BID ITEM III (ALTERNATE BID DEDUCT NO.2) :
REMOVE PLATE AND FLAME HEAT EXCHANGER. REUSE EXISTING UNIT BUT THE UNIT STILL NEEDS TO BE RELOCATED AND REINSTALLED. PLEASE REFER TO M-101.
BID ITEM IV (ALTERNATE BID DEDUCT NO.3) :
REMOVE STRUCTURAL MEZZANINE FLOOR FOR DOMESTIC WATER HEATER EQUIPMENT ACCESS. REMOVE STRUCTURAL MEZZANINE ACCESS PLATFORM AND
LADDER TO ACCESS EXISTING EXHAUST FAN. PLEASE REFER TO S-102.
BID ITEM IV (ALTERNATE BID DEDUCT NO.4) :
REMOVE DEMOLITION WORK FOR CONC PAD ON FIRST FLOOR (1 EA.) REMOVE DEMOLITION WORK FOR CONC PAD ON MEZZANINE LEVEL (1 AE). PLEASE REFER
TO S-101 AND S-102.
BID ITEM IV (ALTERNATE BID DEDUCT NO.5) :
REMOVE FLOORING FINISHES IN CHILLER PLANT 104 FROM SCOPE. PLEASE REFER TO AD-101.
BID ITEM IV (ALTERNATE BID DEDUCT NO.6) :
REMOVE NEW FINISHES FROM ENGINEERING OFFICE 106 FROM SCOPE. PLEASE REFER TO SHEET AE-101.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:0
P
M
G-002
GENERAL INFORMATION
2 6WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
RBK
GENERAL SYMBOL LEGEND
BID DEDUCT ALTERNATES
DRAWING LIST
M-601 MECHANICAL SCHEDULES 18 48
M-602 MECHANICAL SCHEDULES 19 48
MD711 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 1 20 48
MD712 MEZZANINE MECHANICAL DEMOLITION PLAN - PHASE 1 21 48
MD713 ROOF MECHANICAL DEMOLITION PLAN - PHASE 1 22 48
M-711 FIRST FLOOR MECHANICAL PLAN - PHASE 1 23 48
M-712 MEZZANINE MECHANICAL PLAN - PHASE 1 24 48
M-713 ROOF MECHANICAL PLAN - PHASE 1 25 48
MD721 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 2 26 48
MD722 MEZZANINE MECHANICAL DEMOLITION PLAN - PHASE 2 27 48
MD723 ROOF MECHANICAL DEMOLITION PLAN - PHASE 2 28 48
M-721 FIRST FLOOR MECHANICAL PLAN - PHASE 2 29 48
M-722 MEZZANINE MECHANICAL PLAN - PHASE 2 30 48
M-723 ROOF MECHANICAL PLAN - PHASE 2 31 48
MD731 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 3 32 48
MD732 MEZZANINE MECHANICAL DEMOLITION PLAN - PHASE 3 33 48
M-731 FIRST FLOOR MECHANICAL PLAN - PHASE 3 34 48
M-732 MEZZANINE MECHANICAL PLAN - PHASE 3 35 48
MD741 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 4 36 48
MD742 MEZZANINE MECHANICAL DEMOLITION PLAN - PHASE 4 37 48
MD743 ROOF MECHANICAL DEMOLITION PLAN - PHASE 4 38 48
M-741 FIRST FLOOR MECHANICAL PLAN - PHASE 4 39 48
M-742 MEZZANINE MECHANICAL PLAN - PHASE 4 40 48
M-743 ROOF MECHANICAL PLAN - PHASE 4 41 48
M-901 FIRST FLOOR MECHANICAL 3D VIEW 42 48
M-902 MEZZANINE MECHANICAL 3D VIEW 43 48
M-903 ROOF MECHANICAL 3D VIEW 44 48
M-904 CHILLED WATER PIPING ISOMETRIC VIEWS - PHASE 1 AND PHASE 2 45 48
M-905 CHILLED WATER PIPING ISOMETRIC VIEWS - PHASE 3 AND PHASE 4 46 48
M-906 CONDENSER WATER PIPING ISOMETRIC VIEWS - PHASE 1 AND PHASE 2 47 48
M-907 CONDENSER WATER PIPING ISOMETRIC VIEWS - PHASE 3 AND PHASE 4 48 48
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 19
ES101 ELECTRICAL SITE PLAN 2 19
ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN 3 19
ED102 FIRST FLOOR LIGHTING DEMOLITION PLAN 4 19
ED103 MEZZANINE ELECTRICAL DEMOLITION PLAN 5 19
ED104 MEZZANINE LIGHTING DEMOLITION PLAN 6 19
ED105 ROOF ELECTRICAL & LIGHTING DEMOLITION PLAN 7 19
EL101 FIRST FLOOR LIGHTING PLAN 8 19
EL102 MEZZANINE LIGHTING PLAN 9 19
EP101 FIRST FLOOR ELECTRICAL PLAN 10 19
EP102 MEZZANINE ELECTRICAL PLAN 11 19
EP103 ROOF ELECTRICAL AND LIGHTING PLAN 12 19
E-501 ELECTRICAL DETAILS 13 19
E-601 ELECTRICAL EQUIPMENT SCHEDULES 14 19
E-602 CAMPUS ELECTRICAL ONE-LINE DIAGRAM DEMOLITION 15 19
E-603 CAMPUS ELECTRICAL ONE-LINE DIAGRAM NEW WORK 16 19
E-604 BUILDING 52 ELECTRICAL ONE-LINE DIAGRAM DEMOLITION AND NEW WORK 17 19
E-605 PANEL SCHEDULES 18 19
E-701 MECHANICAL SCHEDULE 19 19
DRAWING LIST
GENERAL
G-001 COVER SHEET 1 6
G-002 GENERAL INFORMATION 2 6
G-003 SITE PLAN 3 6
G-101 PRE CONSTRUCTION RISK ASSESSMENT (PCRA) 4 6
LS101 FIRST FLOOR LIFE SAFETY PLAN 5 6
LS102 MEZZANINE LEVEL LIFE SAFETY PLAN 6 6
STRUCTURAL
S-001 ABBREVIATIONS, SYMBOL LEGEND, AND GENERAL STRUCTURAL NOTES 1 8
S-002 SPECIAL INSPECTIONS 2 8
S-101 PARTIAL FOUNDATION DEMO AND PLAN 3 8
S-102 MEZZANINE PARTIAL PLAN DEMO AND PARTIAL PLAN FRAMING 4 8
S-103 PARTIAL ROOF DEMO AND FRAMING 5 8
S-104 COOLING TOWER DEMO AND FRAMING PLAN 6 8
S-501 DETAILS 7 8
S-502 DETAILS 8 8
ARCHITECTURAL
AG001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 10
AD101 FIRST FLOOR DEMOLITION PLAN 2 10
AD102 MEZZANINE LEVEL DEMOLITION PLAN 3 10
AD103 ROOF DEMOLITION PLAN 4 10
AE101 FIRST FLOOR PLAN 5 10
AE102 MEZZANINE LEVEL PLAN 6 10
AE103 ROOF PLAN 7 10
AE201 SOUTH STAIR PLAN, SECTIONS AND DETAILS 8 10
AE301 GATE ELEVATION, SECTION AND DETAILS 9 10
AE501 ROOF DETAILS 10 10
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 4
FX101 FIRST FLOOR FIRE SUPPRESSION PLAN 2 4
FX102 MEZZANINE LEVEL FIRE SUPPRESSION PLAN 3 4
FX103 ROOF LEVEL FIRE SUPPRESSION PLAN 4 4
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 48
M-002 PROJECT PHASING PLAN 2 48
M-101 FIRST FLOOR MECHANICAL OVERALL PLAN 3 48
M-102 MEZZANINE MECHANICAL OVERALL PLAN 4 48
M-103 ROOF MECHANICAL OVERALL PLAN 5 48
M-301 MECHANICAL SECTIONS 6 48
M-302 MECHANICAL SECTIONS 7 48
M-303 MECHANICAL SECTIONS 8 48
M-501 CHILLED WATER PIPING SCHEMATIC 9 48
M-502 CONDENSER WATER PIPING SCHEMATIC 10 48
M-503 COOLING TOWER PIPING SCHEMATIC 11 48
M-504 CHILLER PLANT CONTROL SCHEMATIC AND POINTS LIST 12 48
M-505 MECHANICAL CONTROLS 13 48
M-506 MECHANICAL CONTROLS 14 48
M-507 CONTROL POINTS LIST 15 48
M-508 SEQUENCES OF OPERATION 16 48
M-509 MECHANICAL DETAILS 17 48
TEMPORARY EQUIPMENT REQUIRED - GENERATOR DRIVEN CHILLER (500 TONS) COOLING TOWER (1000 TON) AND CHILLER CHILLER (500 TON) CHILLER (500 TON) -
*WHILE THE TEMPORARY CHILLER IS ON SITE AND IN OPERATION, THERE WILL BE A BRIEF POWER INTERUPTION, DURING WHICH THE ONLY COOLING AVAILABLE WILL BE PROVIDED BY THE TEMPORARY CHILLER. THIS WILL REDUCE
THE PLANT CAPACITY TO 500 TONS.
*TEMPORARY CHILLER ON SITE AFTER PHASE 1 SHALL BE SUPPLIED ELECTRICAL POWER
FROM THE CHILLER PLANT. SEE ELECTRICAL PLANS.
*A BREIF POWER INTERUPTION WILL BE
REQUIRED DURING PHASE 4, DURING WICH NO
EQUIPMENT CAN BE ENERGIZED.
TOTAL NOMINAL CAPACITY (RT) NO CHANGE 950 1450 1500 1650 1500
DESCRIPTION
PUMPING AND ELECTRICAL EQUIPMENT REPLACED DURING
THIS PHASE SHALL BE DONE IN A MANNER THAT DOES NOT
AFFECT PLANT CAPACITY. THE GOALS OF WORK DONE
DURING THIS PHASE ARE TO PREPARE THE PLANT FOR
OPERATION WITH TEMPORARY COOLING TOWER AND
CHILLER. THIS WILL INCLUDE THE DEMOLITION AND
REPLACEMENT OF VARIOUS PUMPING AND ELECTRICAL
EQUIPMENT. TEMPORARY CHILLER SHALL BE ON SITE AND
OPERATIONAL BEFORE THE NEXT STEP CAN BEGIN.
AFTER THE TEMPORARY CHILLER IS IN PLACE AND
OPERATIONAL, MODIFICATIONS THAT WILL REQUIRE THE
DRAINING OF THE MAIN CONDENSER WATER PIPING CAN
BEGIN.
EXISTING COOLING TOWERS CONNECTED TO THE
CONDENSER WATER MAINS SHALL BE DEMOLISHED.
STRUCTURAL MODIFICATIONS SHALL BE MADE TO
ACCOMMODATE THE NEW COOLING TOWERS AND NEW
COOLING TOWERS INSTALLED.
EXISTING CHILLER 3 AND COOLING TOWER 3
SHALL BE DEMOLISHED AND REPLACED.
STRUCTURAL MODIFICATIONS WILL BE
REQUIRED TO COMPLETELY INSTALL COOLING
TOWER 3.
EXISTING CHILLER 1 SHALL BE DEMOLISHED
AND REPLACED ALONG WITH VARIOUS
EQUIPMENT.
EXISTING CHILLER 2 SHALL BE DEMOLISHED
AND REPLACED ALONG WITH VARIOUS
EQUIPMENT.
MODIFICATION AND PREPERATION CRITICAL
EX 52-CT-1 AND EX 52-CT-2 DEMOLITION AND
REPLACEMENT
EX 52-CT-3 AND EX 52-CH-3 DEMOLITION AND
REPLACEMENT EX 52-CH-1 DEMOLITION AND REPLACEMENT EX 52-CH-2 DEMOLITION AND REPLACEMENT
PHASE 1 PHASE 2 PHASE 3 PHASE 4
PHASING PLAN
GENERAL NOTES:
1. EQUIPMENT/TOOLS AND MEANS/METHODS REQUIRED TO DO THE WORK IN EACH PHASE SHALL BE ARRANGED BY GC AND OTHER CONTRACTORS.
2. THIS PHASING PLAN IS A GUIDELINE FOR GC TO DEVELOP A DETAILED PHASING PLAN AND SUBMIT TO VA FOR APPROVAL PRIOR TO START OF ANY WORK.
3. GC SHALL DEVELOP FINAL PHASING PLAN IN COORDINATION WITH ALL OTHER CONTRACTORS.
4. FOLLOW DISCIPLINE SPECIFIC DRAWINGS FOR DETAILED WORK SEQUENCE.
5. CONTRACTOR SHALL ENSURE THAT DURING ANY PHASE A MINIMUM OF TWO CHILLERS ARE OPERATIONAL.
CONDITIONS FOR CHILLER PLANT SHUTDOWN:
SHUT DOWN CAN OCCUR ONLY OUTSIDE NORMAL WORKING HOURS, STARTING FRIDAY AFTERNOON AND FINISHING BY SUNDAY AFTERNOON AND MEETING THE FOLLOWING CONDITIONS.
1. ALL EQUIPMENT/PARTS AND MATERIAL ARE SUBMITTED FOR APPROVAL AND ARE APPROVED BY VA.
2. ALL EQUIPMENT/PARTS AND MATERIAL REQUIRED FOR THE WORK HAS BEEN ORDERED AND INSPECTED, TESTING HAS BEEN WITNESSED BY VA AND MATERIAL HAS BEEN RELEASED FOR SHIPMENT.
3. ALL EQUIPMENT/PARTS AND MATERIAL REQUIRED FOR THE WORK SHALL BE STORED IN A BONDED WAREHOUSE IN MUSKOGEE, OK. BONDED WAREHOUSE SHALL BE WITHIN 15 MILE RADIUS FROM THE SITE.
4. OA TEMPERATURE IS LESS THAN 50 F.
5. THE TOTAL SHUTDOWN DURATION OF 48 HRS SHALL INCLUDE SHUTTING OFF THE PLANT, DRAINING THE WATER FROM THE SYSTEM, COMPLETING THE RENOVATION WORK, FILLING THE SYSTEM WITH WATER, VERIFICATION OF CONTROLS AND SAFETIES AND PUTTING THE PLANT BACK IN OPERATION.
LP
LP
H O N O R
H E
IG
H T S
D R
IV
E
B U F F A L O
D R
IV
E
P A R K
D R
IV
E
LP
LP
DN
DN
G-003
BLDG 56
BLDG 53
BLDG
BLDG 1C
BLDG 1E
BLDG 1B
BLDG 24
BLDG 22
BLDG 44
BLDG 59T
BLDG 57
BLDG 47
BLDG 26
BLDG 38
BLDG 11BLDG 18
BLDG 50
BLDG 49
BLDG 54
BLDG
BLDG 32
BLDG 37
BLDG 20
BLDG 55
BLDG 6
BLDG 7
BLDG 8
BLDG 9
BLDG 10
BLDG 52
8A
G.5H
TRENCH DRAIN
HANDRAIL
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:1
P
M
G-003
SITE PLAN
3 6GTS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
TM
Scale: 1" = 40'-0"
SITE PLAN
A. CONTRACTOR SHALL PROVIDE TEMPORARY
ENTRANCES AND SCAFFOLDING TO PROVIDE
CONSTRUCTION ACCESS TO ROOF CONSTRUCTION
AREA.
B. CONTRACTOR TO ENSURE THAT SCAFFOLDING
AND PROTECTIVE MEASURES COMPLY WITH ALL
OSHA REQUIREMENTS. CONTRACTOR WILL BE
RESPONSIBLE FOR DESIGN AND ENGINEERING OF
SCAFFOLDING AND PROTECTIVE MEASURES.
C. CONTRACTOR SHALL BE REQUIRED TO INSPECT
ALL SCAFFOLDING AND PROTECTIVE MEASURES
DAILY TO ENSURE THEY ARE SAFE AND COMPLY
WITH OSHA REQUIREMENTS.
D. CONTRACTOR SHALL REPAIR ALL AREAS DAMAGED
OR DISTURBED DURING CONSTRUCTION. THIS
INCLUDES BUILDING FINISHES, EXTERIOR OR
INTERIOR, LANDSCAPE, SIDEWALKS, PAVING OR
ANY AREA DAMAGED BY THE CONSTRUCTION
WORK. RESTORE AREAS TO ORIGINAL CONDITION.
E. DUMPSTER AND TRASH CHUTE LOCATIONS ARE TO
BE COORDINATED WITH THE COR PRIOR TO
LOCATION ON SITE.
F. CONTRACTOR SHALL PROVIDE A SECURE, OFF-
SITE STORAGE FACILITY FOR STORING ALL NEW
EQUIPMENT AND CONSTRUCTION MATERIALS. NO
ON-SITE STORAGE WILL BE PERMITTED.
COORDINATE ALL MATERIAL DELIVERIES WITH THE
COR MINIMUM ONE WEEK PRIOR TO DELIVERY.
G. CONTRACTOR SHALL PREPARE A PLAN OF THE LAY
DOWN/SECURITY FENCE AREA WITH LOCATION ALL
ELEMENTS INCLUDING DUMPSTER AND TRASH
CHUTE/COLLECTION AREA.
H. CONTRACTOR AND ALL PERSONNEL AND
SUBCONTRACTORS SHALL NOT PARK PRIVATE OR
CONSTRUCTION VEHICLES ON SITE. COORDINATE
PARKING REQUIREMENTS WITH THE COR.
I. CONTRACTOR SHALL COORDINATE ANY WORK
THAT PRODUCES EXCESSIVE NOISE WITH THE
COR. TO BE PERFORMED DURING OFF HOURS.
J. CONTRACTOR SHALL RESTORE ALL LANDSCAPING,
HARDSCAPING AND SITE ELEMENTS TO THE
ORIGINAL CONDITION AT THE COMPLETION OF
CONSTRUCTION. CONTRACTOR WILL
PHOTOGRAPH AND DOCUMENT EXISTING
CONDITIONS PRIOR TO INSTALLING FENCING,
SCAFFOLDING OR STATING ANY CONSTRUCTION
WORK.
0 4020 80
NORTH
PLAN
01 LOCATION OF TEMPORARY COOLING TOWER.
02 LOCATION OF TEMPORARY 500 TON CHILLER AND
FLAT BED TRUCK.
03 AREA DESIGNATED LOCATION OF CRANE FOR ALL
ITEMS TO BE LOADED ON ROOF. CONTRACTOR
MAY SUBMIT ALTERNATE LOCATION TO COR FOR
CONSIDERATION. CRANE LIFTS MAY ONLY BE ON
SUNDAYS BETWEEN THE HOURS OF 6:00AM THRU
6:00PM.
04 SUGGESTED CONTRACTOR LAY DOWN AREA FOR
TEMPORARY STAGING OF EQUIPMENT AND
MATERIAL TO BE LOADED ONTO THE ROOF BY
CRANE. COORDINATE FINAL STAGING AREA
LOCATION WITH THE VA COR.
05 LOCATION OF EXISTING ELECTRICAL
TRANSFORMER.
06 PROVIDE PROTECTIVE BARRIER IN AREAS
DESIGNATED AT A MINIMUM DURING PERIODS
WHEN WORK IS BEING PERFORMED ON THE
ROOF.
07 DELIVERIES AT DOCK WILL BE ALLOWED FROM
6PM TO 10PM ONLY. ALL OTHER EQUIPMENT AND
MATERIAL DELIVERIES DURING THE HOURS OF
7AM-5PM MUST BE SCHEDULED WITH THE COR.
08 EXISTING FDC LOCATION TO REMAIN.
09 FIRE TRUCK ACCESS TO BE MAINTAINED.
10 TEMPORARY TRAILER LOCATION FOR
CONTRACTORS. COORDINATE FINAL LOCATION
WITH VA COR.
11 DESIGNATED CONTRACTOR PARKING AREA.
PARKING SPACES WILL BE EXTREMELY LIMITED.
COORDINATE FINAL LOCATION WITH VA COR.
12 AREA DESIGNATED LOCATION FOR CONTRACTOR
PROVIDED PORT-O-JOHNS
13 FRONT GATE ACCESS WILL BE RESTRICTED. ALL
CONTRACTORS SHALL USE THIS ENTRANCE TO
ACCESS THE PROJECT LOCATION. COORDINATE
ACCESS WITH VA COR.
Scale: 1/4" = 1'-0"
ENLARGED SITE PLAN 0 2 4 8
NORTH
PLAN
UPGRADE CHILLER
PLANT BUILDING 52
623-16-101
Margaret Kelly
UPGRADE CHILLER
PLANT BUILDING 52 623-16-101
UPGRADE CHILLER
PLANT BUILDING 52 623-16-101
UPGRADE CHILLER
PLANT BLDG 52
623-16-101
UPGRADE CHILLER PLANT BLDG 52
UPGRADE CHILLER PLANT BLDG 52
623-16-101
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:5
P
M
G-101
PRE CONSTRUCTION RISK ASSESSMENT
(PCRA)
4 6GTS/LG
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
TM
DUST CONTROL PLAN NOTES
A. THIS PROJECT INCLUDES CONSTRUCTION ENTRY VESTIBULE -
CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING
INTO CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA
AND TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF
WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY
CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER.
UPON COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS
SHALL BE REMOVED CAREFULLY AFTER VA COR'S APPROVAL TO
MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A
PERMANENT BARRIER.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND
DEBRIS CONTROL
B. USE EXTERIOR WINDOW AS PRIMARY CONSTRUCTION ACCESS AS
INDICATED ON GC103.
C. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED
TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO
ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT
PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND
MATERIALS.
D. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER
CONSTRUCTION MATERIAL AND OUT OF THE PROJECT - CLEAN CART
SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN
THE MAIN ENTRY AND THE CONSTRUCTION STAGING PREP AREA.
E. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTE.
EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF
ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES
SPECIFIED BY THE COR. IF CHUTES ARE USED TO DIRECT DEBRIS
OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING
SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED
AND SEALED BEFORE BEING TRANSPORTED OUT OF THE
CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE
COR.
F. EXTERIOR WINDOWS: EXISTING WINDOWS SHALL BE PROTECTED TO
PREVENT DAMAGE BY ADJACENT CONSTRUCTION WORK.
VENTILATION AND ENVIRONMENTAL CONTROLS
G. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE
CONTRACTOR WHETHER THE CONSTRUCTION AREA USES
FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED
OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR
PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY PLACES.
H. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA
SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND
WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF
THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO
REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE
PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800
CUBIC FEET PER MINUTE. EXHAUST AIR DIRECTLY TO THE OUTSIDE IF
APPROVED BY COR IF EXHAUST SHALL BE TIED INTO A RE-
CIRCULATED AIR SYSTEM, PRE-FILTER AND HEPA FILTER SHALL BE
USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE
DUCTS.
I. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILING SHALL BE VERIFIED DAILY.
J. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN
CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS
NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE
TESTING THROUGHOUT THE PROJECT IN THE FREQUENCY AS
IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND
RELATED AREAS
K. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL
BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE
CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G.,
COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM
SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE
LEAVING THE BARRICADE. THE CONTRACTOR SHALL CONSTRUCT AN
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND
MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE
MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET
WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE
OR WORK AREA.
L. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION
SITE, VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA
INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE
CLEANING.
GENERAL
M. PROVIDE TEMPORARY 1-HOUR RATED SLAB-TO-SLAB BARRIERS
CONSIST OF 3-5/8" METAL STUD FRAMING WITH 5/8" GYPSUM BOARD
ON BOTH SIDES. BARRIERS SHALL BE INSPECTED BY VA PCRA STAFF
PRIOR TO START OF CONSTRUCTION IN SPACE. MAINTAIN NEGATIVE
PRESSURE VENTILATION IN THE CONSTRUCTION SPACE.
N. PROVIDED HARD DOOR FOR ANTEROOM FOR CONSTRUCTION
ACCESS.
O. USE ISOLATION CART FOR ALL WORK IN THIS AREA.
P. PROVIDE TWO STICKY MATS AT EACH CONSTRUCTION ACCESS POINT
IN ALL PHASES.
Q. PROVIDE TWO STICKY MATS AT EACH CONSTRUCTION ACCESS POINT
IN ALL PHASES.
R. VA REQUIRES THAT ALL APPLICABLE PERMITS BE COMPLETED AND
APPROVED PRIOR TO BEGINNING ANY WORK ON STATION.
PERMITS INCLUDE:
ICRA, PCRA, ILSM, ABOVE CEILING, FIRE/SMOKE
WALL, UTILITY, FIRE SPRINKLER, FIRE ALARM SYSTEM, MEDICAL
GASES, CONFINED SPACE AND HOT WORK.
SHEET NOTES:
V F
D
3 3 3
V F
D V
F D
VFD VFDVFD
VFD
VFD
VF
D
VFD
VFD
VFD
V
FD
VFDVFDVFDVFDVFD VFD
UP
DN
G
6.A
F.5 F E.5 E
6B
7A
8A
G.5HH.5
TRANSFORMER
VAULT
TOILET
CHILLER
PLANT
STORAGE
WATER
SAMPLING
ENGINEERING
OFFICE
CORRIDOR
DISTANCE: 67'-7''
D
IS
T A
N C
E
DISTANCE: 83'-10''
D
IS
T A
N C
E
D
IS
T A
N C
E
DISTANCE: 123'-6''
FEC 2
FEC 2 FEC 2
FEC 2
FEC 2
TRANSFORMER
VAULT
LOADING
DOCK AREA
LOADING
DOCK AREA
CHILLER
PLANT
CHILLER
PLANT
LOADING
DOCK AREA
OCCUPANCY CLASSIFICATION
(NFPA 2018 101 SECTION 4.1):
OCCUPANCY BUILDING, SPRINKLERED
TYPE I-B (EXISTING CONSTRUCTION) INDUSTRIAL GENERAL
AND HIGH HAZARD
MEANS OF EGRESS:
FIRE STAIR (NFPA 7.2.8)
MIN. EXIT WIDTH: 32" CLEAR (NFPA 101.2.1.2.2)
OCCUPANT LOAD: (NFPA 7.3.12)
INDUSTRIAL: NA
CAPACITY FACTORS: (NFPA 101.7.3.3):
STAIRS: 0.3
OTHER: 0.2
GENERAL NOTE:
EXISTING INDUSTRIAL OCCUPANCY:
NUMBER OF EXITS: 1 EXIT / LESS THAN 100 OCCS. (NFPA
101.2.4.2 exc. 2) CURRENT PLAN INDICATED 2 EXITS.
COMMON PATH OF TRAVEL DISTANCE: NA
(NFPA 101.39.2.5.3 exc. 1)
TOTAL TRAVEL DISTANCE: 300' (NFPA 101.39.2.6)
200'-0" MAX. TOTAL TRAVEL
DISTANCE TO AN EXIT
(NFPA 2018: 101-426 /
TABLE A.7.6)
FEC 1 FIRE EXTINGUISHER CABINET
- FULLY RECESSED - EXISTING
FEC 2 FIRE EXTINGUISHER CABINET
- SURFACE MOUNTED - EXISTING
FEC (E)
EXISTING FIRE EXTINGUISHER CABINET
TOTAL SQUARE
FOOTAGE:
FIRST FLOOR:
MEZZANINE:
16,850 GSF
10,180 SF
6,670 SF
INDUSTRIAL - SPECIAL PURPOSE
OCCUPANTS/ SF - NA
EGRESS LEGEND
REQUIRED # OF
EXITS
(per IBC 1015.1)
2 EXITS - FIRST FLOOR
1 EXIT - MEZZANINE
OCCUPANCY:
EGRESS
REQUIRED:
1.
2.
EGRESS WIDTH
(per IBC 1005.1) - EXIT DOORS =
36"/(0.20) = 180 PPL
EXIT STAIRS = EXISTING
EXIT ACCESS
TRAVEL
(per IBC TABLE 1016.1)
300'-00" MAXIMUM DISTANCE
FULLY SPRINKLERED
COMMON PATH
OF TRAVEL
(per IBC Chapter 1014.3)
100'-00" MAXIMUM
TRAVEL
DISTANCE
INCREASE
(per NFPA 101-19.2.6.2.1)
150'-0" MAXIMUM DISTANCE, WHEN NOT
WHOLLY IN A SMOKE COMPARTMENT.
DEAD END
CORRIDOR
NA
INCREASE TRAVEL DISTANCE 50FT IF
BUILDING IS SPRINKLED
A. SEE SHEETS AG001 FOR SYMBOLS AND
ABBREVIATIONS.
B. REFER TO PLUMBING DRAWINGS FOR
INFORMATION CONCERNING PLUMBING
FIXTURES AND PIPING SYSTEM(S).
C. REFER TO MECHANICAL DRAWINGS FOR
INFORMATION CONCERNING HVAC SYSTEM(S).
D. REFER TO ELECTRICAL DRAWINGS FOR
INFORMATION CONCERNING POWER, LIGHTING
AND COMMUNICATION SYSTEM(S).
E. ALL EXISTING FIRE RATED ASSEMBLIES SHALL
REMAIN.
F. EXTEND FIRE RATED PARTITIONS, BARRIERS,
AND OTHER SEPARATIONS TO BOTTOM OF
ROOF/FLOOR DECK ABOVE (OR AS DIRECTED
BY UL ASSEMBLY) AND TO EXTERIOR
WALL. SEAL JOINT BETWEEN EDGES OF
PARTITION WITH FIRE RATED SEALANT AND/OR
INTUMESCENT ASSEMBLY.
G. ALL PENETRATIONS OF FIRE-RATED
ASSEMBLIES SHALL BE FIRE-SEALED IN
ACCORDANCE WITH APPROVED
MANUFACTURER'S DETAIL FOR LOCATION,
TYPE OF CONSTRUCTION, PENETRATING ITEM
AND RATING REQUIRED.
H. ALL DUCTWORK, DIFFUSERS AND GRILLES
PENETRATING FIRE-RATED WALLS, CEILINGS
AND FLOORS SHALL HAVE THE APPROPRIATE
TYPE OF FIRE/SMOKE DAMPER IN
ACCORDANCE WITH THE TYPE OF
CONSTRUCTION BEING PENETRATED AND THE
FIRE/SMOKE RATING REQUIRED.
I. ALL LIGHT FIXTURES AND ELECTRICAL DEVICES
PENETRATING FIRE-RATED ASSEMBLIES SHALL
BE UL-LISTED FOR INSTALLATION IN THE
ASSEMBLY OR SHALL BE INSTALLED SUCH
THAT THE FIRE-RATING IS NOT COMPROMISED.
J. SMOKE RESISTANT CONSTRUCTION SHALL
MEET THE REQUIREMENTS OF ALL APPLICABLE
CODES. AREA SHALL BE SEPARATED FROM THE
REMAINDER OF THE BUILDING BE
CONSTRUCTION CAPABLE OF RESISTING THE
PASSAGE OF SMOKE. THE PARTITIONS SHALL
EXTEND FROM THE FLOOR TO THE UNDERSIDE
OF THE FLOOR OR ROOF ASSEMBLY ABOVE.
DOORS SHALL BE SELF OR AUTOMATIC
CLOSING. DOORS SHALL NOT HAVE AIR
TRANSFER OPENINGS AND SHALL NOT BE
UNDERCUT IN EXCESS OF CLEARANCE
PERMITTED WITH ACCORDANCE TO NFPA 80.
K. STORAGE OF ANY FLAMMABLE OR
COMBUSTIBLE LIQUIDS IS UNDERSTOOD TO
NOT BE WITHIN THE BUILDING. STORAGE OF
ANY MATERIAL IS TO BE IN COMPLIANCE WITH
ALL APPLICABLE CODES AND AUTHORITIES
HAVING JURISDICTION
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:1
P
M
LS101
FIRST FLOOR LIFE SAFETY PLAN
5 6WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
TM
0 4 8 16
NORTH
PLAN
Scale: 1/8" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN
EGRESS INFORMATION
LIFE SAFETY LEGEND
CODE INFORMATION
PROPOSED USE:
OWNED BY: FEDERAL GOVERNMENT
CODE ENFORCEMENT JURISDICTION: FEDERAL
APPLICABLE CODES:
GENERAL CODE INFORMATION:
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
SPRINKLERED
PRIMARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
NFPA 101
I-B
INDUSTRIAL
2018 International Building Code 2018 International Energy Conservation Code 2018 International Mechanical Code 2018 International Fire Code 2020 National Electrical Code 2018 NFPA Life Safety Code
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
JACK C. MONTGOMERY VAMC
2018 International Plumbing Code ABA Standards
N
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
DN UP
G
6.A
F.5 F E.5 E
6B
7A
8A
G.5HH.5
MEZZANINE
TELECOMMUNICATION
ROOM
OFFICE
OFFICE
OFFICE
TOILET
OFFICE
CORRIDOR
D
IS
T A
N C
E
DISTANCE: 172'-0''
D
IS
TAN
C E: 1
'-4
OPEN TO BELOW
D
IS
T A
N C
E
D
IS
TA
N C E : 1
'-0
A. SEE SHEETS AG001 FOR SYMBOLS AND
ABBREVIATIONS.
B. REFER TO PLUMBING DRAWINGS FOR
INFORMATION CONCERNING PLUMBING
FIXTURES AND PIPING SYSTEM(S).
C. REFER TO MECHANICAL DRAWINGS FOR
INFORMATION CONCERNING HVAC SYSTEM(S).
D. REFER TO ELECTRICAL DRAWINGS FOR
INFORMATION CONCERNING POWER, LIGHTING
AND COMMUNICATION SYSTEM(S).
E. ALL EXISTING FIRE RATED ASSEMBLIES SHALL
REMAIN.
F. EXTEND FIRE RATED PARTITIONS, BARRIERS,
AND OTHER SEPARATIONS TO BOTTOM OF
ROOF/FLOOR DECK ABOVE (OR AS DIRECTED
BY UL ASSEMBLY) AND TO EXTERIOR
WALL. SEAL JOINT BETWEEN EDGES OF
PARTITION WITH FIRE RATED SEALANT AND/OR
INTUMESCENT ASSEMBLY.
G. ALL PENETRATIONS OF FIRE-RATED
ASSEMBLIES SHALL BE FIRE-SEALED IN
ACCORDANCE WITH APPROVED
MANUFACTURER'S DETAIL FOR LOCATION,
TYPE OF CONSTRUCTION, PENETRATING ITEM
AND RATING REQUIRED.
H. ALL DUCTWORK, DIFFUSERS AND GRILLES
PENETRATING FIRE-RATED WALLS, CEILINGS
AND FLOORS SHALL HAVE THE APPROPRIATE
TYPE OF FIRE/SMOKE DAMPER IN
ACCORDANCE WITH THE TYPE OF
CONSTRUCTION BEING PENETRATED AND THE
FIRE/SMOKE RATING REQUIRED.
I. ALL LIGHT FIXTURES AND ELECTRICAL DEVICES
PENETRATING FIRE-RATED ASSEMBLIES SHALL
BE UL-LISTED FOR INSTALLATION IN THE
ASSEMBLY OR SHALL BE INSTALLED SUCH
THAT THE FIRE-RATING IS NOT COMPROMISED.
J. SMOKE RESISTANT CONSTRUCTION SHALL
MEET THE REQUIREMENTS OF ALL APPLICABLE
CODES. AREA SHALL BE SEPARATED FROM THE
REMAINDER OF THE BUILDING BE
CONSTRUCTION CAPABLE OF RESISTING THE
PASSAGE OF SMOKE. THE PARTITIONS SHALL
EXTEND FROM THE FLOOR TO THE UNDERSIDE
OF THE FLOOR OR ROOF ASSEMBLY ABOVE.
DOORS SHALL BE SELF OR AUTOMATIC
CLOSING. DOORS SHALL NOT HAVE AIR
TRANSFER OPENINGS AND SHALL NOT BE
UNDERCUT IN EXCESS OF CLEARANCE
PERMITTED WITH ACCORDANCE TO NFPA 80.
K. STORAGE OF ANY FLAMMABLE OR
COMBUSTIBLE LIQUIDS IS UNDERSTOOD TO
NOT BE WITHIN THE BUILDING. STORAGE OF
ANY MATERIAL IS TO BE IN COMPLIANCE WITH
ALL APPLICABLE CODES AND AUTHORITIES
HAVING JURISDICTION
OCCUPANCY CLASSIFICATION
(NFPA 2018 101 SECTION 4.1):
OCCUPANCY BUILDING, SPRINKLERED
TYPE I-B (EXISTING CONSTRUCTION) INDUSTRIAL GENERAL
AND HIGH HAZARD
MEANS OF EGRESS:
FIRE STAIR (NFPA 7.2.8)
MIN. EXIT WIDTH: 32" CLEAR (NFPA 101.2.1.2.2)
OCCUPANT LOAD: (NFPA 7.3.12)
INDUSTRIAL: NA
CAPACITY FACTORS: (NFPA 101.7.3.3):
STAIRS: 0.3
OTHER: 0.2
GENERAL NOTE:
EXISTING INDUSTRIAL OCCUPANCY:
NUMBER OF EXITS: 1 EXIT / LESS THAN 100 OCCS. (NFPA
101.2.4.2 exc. 2) CURRENT PLAN INDICATED 2 EXITS.
COMMON PATH OF TRAVEL DISTANCE: NA
(NFPA 101.39.2.5.3 exc. 1)
TOTAL TRAVEL DISTANCE: 300' (NFPA 101.39.2.6)
200'-0" MAX. TOTAL TRAVEL
DISTANCE TO AN EXIT
(NFPA 2018: 101-426 /
TABLE A.7.6)
FEC 1 FIRE EXTINGUISHER CABINET
- FULLY RECESSED - EXISTING
FEC 2 FIRE EXTINGUISHER CABINET
- SURFACE MOUNTED - EXISTING
FEC (E)
EXISTING FIRE EXTINGUISHER CABINET
TOTAL SQUARE
FOOTAGE:
FIRST FLOOR:
MEZZANINE:
16,850 GSF
10,180 SF
6,670 SF
INDUSTRIAL - SPECIAL PURPOSE
OCCUPANTS/ SF - NA
EGRESS LEGEND
REQUIRED # OF
EXITS
(per IBC 1015.1)
2 EXITS - FIRST FLOOR
1 EXIT - MEZZANINE
OCCUPANCY:
EGRESS
REQUIRED:
1.
2.
EGRESS WIDTH
(per IBC 1005.1) - EXIT DOORS =
36"/(0.20) = 180 PPL
EXIT STAIRS = EXISTING
EXIT ACCESS
TRAVEL
(per IBC TABLE 1016.1)
300'-00" MAXIMUM DISTANCE
FULLY SPRINKLERED
COMMON PATH
OF TRAVEL
(per IBC Chapter 1014.3)
100'-00" MAXIMUM
TRAVEL
DISTANCE
INCREASE
(per NFPA 101-19.2.6.2.1)
150'-0" MAXIMUM DISTANCE, WHEN NOT
WHOLLY IN A SMOKE COMPARTMENT.
DEAD END
CORRIDOR
NA
INCREASE TRAVEL DISTANCE 50FT IF
BUILDING IS SPRINKLED
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:1
P
M
LS102
MEZZANINE LEVEL LIFE SAFETY PLAN
6 6WRS
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-10118-416
TM
CODE INFORMATION
0 4 8 16
NORTH
PLAN
Scale: 1/8" = 1'-0"
MEZZANINE LEVEL LIFE SAFETY PLAN
LIFE SAFETY LEGEND
EGRESS INFORMATION
PROPOSED USE:
OWNED BY: FEDERAL GOVERNMENT
CODE ENFORCEMENT JURISDICTION: FEDERAL
APPLICABLE CODES:
GENERAL CODE INFORMATION:
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
SPRINKLERED
PRIMARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
NFPA 101
I-B
INDUSTRIAL
2018 International Building Code 2018 International Energy Conservation Code 2018 International Mechanical Code 2018 International Fire Code 2020 National Electrical Code 2018 NFPA Life Safety Code
UPGRADE CHILLER PLANT
1011 HONOR HEIGHTS DR,
MUSKOGEE, OK 74401
JACK C. MONTGOMERY VAMC
2018 International Plumbing Code ABA Standards
N
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
American Welding Society
American National Standards Institute
American Society for Testing and Materials
American Iron and Steel Institute
American Institute of Steel Construction
American Institute of Architects
American Concrete Institute
CC Carried Column
CIP Cast In Place
Addition
Alternate
Air Condition
Aggregate
Anchor BoltAB
ALT
A/C
AGGR
ADD
Angle
And
Asphalt
Approximate
AIA
ACI
AISI
ANSI
ASTM
AISC
L
ASPH
ARCH
APPROX
AWS
Average
Bottom
Bearing
Bending Moment
Base Plate
Building
Center
Ceiling
Center to Center
Center of Gravity
Bottom of Deck
M
BOT
BRG
B PL
AVG
CG
CEN
CLG
BLDG
B/D
AssemblyASSY
Architect or Architectural
Column
Clear
Channel
Concrete
Control Joint
Connection
Cubic Yard
Cubic Foot
Continuous
Construction
C
CJ
CONN
CONC
COL
CLR
CY
CF
CMU
CMP
CONT
CONST
Diagonal
Detail
Ditto
Diameter
Double Angle
Dimensions
Drawing
Douglas Fir
2L
DO
DIM
DIA
DIAG
DET
DF
DWG
DoubleDBL
Concrete Masonry Units
Corrugated Metal Pipe
C/C
AluminumAL
MB Machine Bolt
Glu lam BeamGLB
Quarter
Radius
Reference
Reinforce, Reinforced, QTR
REF
RAD
REINF
Round
Required
Section
Schedule
Revise or Revision
South
Similar
Steel
Standard
Square
Specifications
Sheet
Stock
Tangent
Symmetrical
Structural
Strut Force
Through
Top of Concrete
Top and Bottom
Tongue & Groove
Tolerance
Thick
Top of Footing or Top of Foundation
RD
REV
SECT
SCHED
REQD
S
SIM
STL
STD
SQ
SPECS
SHT
SYM
STK
TAN
SF
STRUCT
TOL
T/F
T/C
T & B
T & G
THRU
THK
Typical
Total
Transverse
Top of Steel
Top of Masonry
Vertical
Verify in the Field
Unless Noted
Unless Noted Otherwise
Top of Concrete Wall
West
Without
With
Work Point
Wide Flange
Welded Wire Fabric
Yard
T/S
T/M
TYP
TOT
TRANS
UNO
UN
VIF
VERT
W
W
WWF
WP
W/O
W/
YD
T/W
Reinforcement, or Reinforcing
Long
Light
Length
Laminated
Longitudinal
LAM
LGTH
LG
LT
LONGIT
Each
East
EF
EA
E
EW
ELECT Electric or Electrical
Each way
Each face
Mark
Metal
Maximum
Material
Maximum
Mechanical
Manufacturer
LLH
LLBB
LLV
MK
MAX
MECH
MATL
MAX
MET
MFR
Medium
Mezzanine
Minimum
Minute
Miscellaneous
Mixture
North
Nominal
Near Side
Near Face
Multiple
MED
MIN
MEZZ
MIX
MISC
MIN
NF
N
NOM
NS
MULT
EQ
ENGR
ETC
EST
EXCAV
EQUIP
EXT
EJ
EXIST
X-STR
X-HVY
Etcetera
Extra Strong
Extra Heavy
Exterior
Expansion Joint
Existing
Excavate
Estimate
Equipment
Equal
Engineer
FS
FF
FT or '
FIN
FIG
FBM
FTG
FD
FRMG
FND
FLR
Framing
Foundation
Footing
Floor Drain
Floor
Finish
Figure
Feet Board Measure
Feet or Foot
Far Side
Far Face
FabricationFAB
Opposite
Opening
On Center
Number
Perpendicular
Permanent
Original
OPP
OPNG
OC
OD
PERP
PERM
d
ORIG
Point
Plate
Pound
Plywood
Project
PT
PL
PLYWD
PSF
PCF
LB
PROJ
PSI
Piece, Pile CapPC
GEN
GI
GALV
GRND
GR
HEX
HGT
HORIZ
S
IN or " Inches
I Beam
Horizontal
Hexagon
Height
Ground
Grade
General (Notes)
Galvanized Iron
Galvanize
Joint
Joist
ID
JT
JST
KO
K
Knockout
Kip (1,000 lbs)
Inside Diameter
Include or IncludedINCL
Not to ScaleGage or Gauge NTSGA
Elevation LHEELEV
Pounds Per Square Inch
Pounds Per Square Foot
Pounds Per Cubic Foot
Penny (Nails, etc)
Outside Diameter
Long Leg Vertical
Long Leg Horizontal
Long Leg Back To Back
Low Hydrogen Electrode
General Structural NotesGSN
Top of SteelTOS
LEGEND:
GSN = GENERAL STRUCTURAL NOTES
UNO = UNLESS NOTED OTHERWISE
INDICATES TUBE COLUMN
INDICATES WIDE FLANGE COLUMN
INDICATES BEAM SPLICE
INDICATES FOOTING SIZE. SEE SCHEDULE.
F1
SYMBOLS AND ABBREVIATIONS FOR CONCRETE (as per ACI)
SLOPE DIRECTION DOWN
MISCELLANEOUS ELEVATION
FLOOR OR STEEL ELEVATION
REQUIRED NUMBER OF HEADED SHEAR STUDS
RIGID CONNECTION
CAMBER UP
00'-0"
00'-0"
(00'-0")
C=0"
[00]
STEEL ELEVATION
SPAN DIRECTION
To Indicate Size of Deformed Bar.#
Clear
Bottom
Bent
Each Face
Column Tie
Each Way
Limits of Area Covered By Bars
Direction in Which Bars Extend
Spacing Center to Center
Spiral
Stirrup
Plain Bar
Outside Face
Near Face
Inside Face
Top
Straight
Far Face
AT
EF
CT
CL
BOT
BT
EW
T
STR
SP
STIR
PL
OF
NF
IF
FF
Plain Rounds, as Spirals/
INDICATES STD PIPE COLUMN
Construction Management Civil Engineering Surveying
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Calibre Engineering, Inc.
Calib er
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
18-416
/2
/2
:1
:1
A
M
S-001
ABBREVIATIONS, SYMBOL LEGEND, AND
GENERAL STRUCTURAL NOTES
1 8MBT
UPGRADE CHILLER PLANT
MUSKOGEE VAMC
1101 HONOR HEIGHTS DR
MUSKOGEE, OK 74401
FEBRUARY 22, 2021
100% BID DOCUMENTS
623-16-101
GMG
SYMBOL LEGEND
ABBREVIATIONSGENERAL STRUCTURAL NOTES
STRUCTURAL STEEL
1. STRUCTURAL STEEL SHALL BE DESIGNED, DETAILED, FABRICATED AND ERECTED IN
ACCORDANCE WITH THE AISC 'SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS' AND
'CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES' (LATEST EDITION
AND SUPPLEMENTS).
2. ALL WIDE FLANGE SHAPES SHALL CONFORM TO ASTM A992.
3. ALL CHANNELS, ANGLES, PLATES & BARS SHALL CONFORM TO ASTM A36. UNLESS NOTED
OTHERWISE.
4. ALL PIPE COLUMNS SHALL CONFORM TO ASTM A53 (TYPES E OR S), GRADE B OR ASTM
A501.
5. ALL SQUARE OR RECTANGULAR TUBING SECTIONS SHALL CONFORM TO ASTM A500,
GRADE B, OR ASTM A501 WITH Fy= 46 KSI.
6. ALL SIMPLE BEAM TO BEAM OR COLUMN CONNECTION PLATE MATERIAL, INCLUDING
BEARING PLATES, GUSSET PLATES, STIFFENER PLATES, FILLER PLATES, ETC. SHALL
CONFORM TO A36, UNLESS NOTED OTHERWISE.
7. ALL CONNECTION ANGLE MATERIAL SHALL CONFORM TO ASTM A36 UNLESS NOTED
OTHERWISE.
8. CONNECTING OR SPLICING OF STRUCTURAL STEEL NOT SHOWN ON THE DRAWINGS IS
PROHIBITED WITHOUT PRIOR WRITTEN APPROVAL OF THE ARCHITECT/
ENGINEER-OF-RECORD.
9. THE STRUCTURAL STEEL FABRICATOR SHALL FURNISH SHOP DRAWINGS OF ALL
STRUCTURAL STEEL, FOR ARCHITECT'S REVIEW BEFORE FABRICATION. SHOP DRAWINGS
SHALL SHOW THE ERECTION PROCEDURES AND DETAILS. THE ICC REPORT, INCLUDING
VERTICAL LOAD AND DIAPHRAGM SHEAR CAPACITY SHALL BE FURNISHED.
10. BOLT HOLES IN STEEL SHALL BE 1/16 INCH LARGER THAN NOMINAL SIZE OF BOLT USED.
HOLE SIZES FOR A307 AND A449 ANCHOR BOLTS MAY BE MADE OVERSIZE TO FACILITATE
ERECTION AS FOLLOWS:
a. BOLTS 3/4 TO 1 INCH: 5/16" LARGER THAN NORMAL SIZE OF BOLT.
b. BOLTS 1 TO 2 INCH: 1/2" LARGER THAN NORMAL SIZE OF BOLT.
c. BOLTS OVER 2 INCHES: 1" LARGER THAN NORMAL SIZE OF BOLT.
IF A449 ANCHOR BOLTS ARE OVERSIZED, AN ASTM F436 HARDENED WASHER SHALL BE
INSTALLED UNDER THE BOLT HEAD AND THE NUTS SHALL MEET THE REQUIREMENTS OF
ASTM A563.
12. SEE SPECIFICATIONS FOR FINISH/PAINTING REQUIREMENTS FOR STRUCTURAL STEEL
SURFACES. VERIFY WITH ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR
ADDITIONALREQUIREMENTS.
13. WELDED JOINTS SHALL CONFORM TO THE PREQUALIFIED JOINT DETAILS AS INDICATED IN
THE STRUCTURAL WELDING CODE (AWS D1.1) BY THE AMERICAN WELDING SOCIETY.
14. ALL WELDING SHALL BE BY WELDERS HOLDING CURRENT VALID CERTIFICATES AND
HAVING CURRENT EXPERIENCE IN TYPE OF WELD CALLED FOR. WELDING RODS TO BE
LOW HYDROGEN TYPE, E70.
15. ALL GROOVE WELDS TO BE FULL PENETRATION UNLESS NOTED. FULL PENETRATION
WELDS AND ALL BUTT WELDED SPLICES OR CONNECTIONS SHALL BE ULTRASONICALLY
TESTED AND INSPECTED BY AN INDEPENDENT TESTING LABORATORY TO CERTIFY ALL
SPLICES AS MEETING OR EXCEEDING STRENGTH OF MATERIALS SPLICED. REDUCTION IN
TESTING MAY BE MADE IN ACCORDANCE WITH THE BUILDING CODE WITH APPROVAL OF
THE ENGINEER. TWO COPIES OF ALL TEST REPORTS AND A LETTER OF SUCH
CERTIFICATION SHALL BE SUBMITTED TO THE ARCHITECT.
16. WELDS MAY BE MADE IN SHOP OR FIELD WITH APPROVAL.
17. WELD LENGTHS CALLED FOR ON PLANS ARE THE NET EFFECTIVE LENGTH REQUIRED.
WELD SIZE SHALL BE AISC MINIMUM PER AISC SECTION J2.1b AND 2.2b UNLESS A LARGER
SIZE IS NOTED.
18. WELD TEST AND INSPECTIONS, SEE SPECIFICATIONS.
19. EXCEPT AS SUBSEQUENTLY NOTED, HIGH STRENGTH BOLTS NEED NOT BE TIGHTENED
BEYOND THE SNUG-TIGHT CONDITION, AS DEFINED IN SECTION 8.(c) OF THE
SPECIFICATIONS FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS. FOR
CONNECTIONS SUBJECT TO DIRECT TENSION, CONNECTIONS FOR BRACED FRAMES, AND
OTHER CONNECTIONS SHOWN OR NOTED ON THE PLANS AS SC (SLIP CRITICAL) OR FULLY
TENSIONED, BOLTS SHALL BE TIGHTENED BY ONE OF THE METHODS DESCRIBED IN
SECTION 8.(d) AND TO THE MINIMUM TENSION SPECIFIED IN SECTION 8.(d), TABLE 4.
20. SEE MECHANICAL DRAWINGS FOR MECHANICAL EQUIPMENT SUPPORT FRAMING.
21. COLD GALVANIZE ALL FIELD WELDS ON HOT DIPPED GALVANIZED STEEL.
GENERAL
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION. NOTIFY
COR OF ANY DISCREPANCIES
2. DO NOT SCALE THE DRAWINGS.
3. GENERAL STRUCTURAL NOTES AND TYPICAL DETAILS APPLY UNLESS NOTED OTHERWISE ON
PLANS, ELEVATIONS, DETAILS AND SPECIFICATIONS. IN CASE OF CONFLICT THE GREATER
REQUIREMENT GOVERNS.
4. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION.
5. THE STRUCTURAL ENGINEER SHALL NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE
RESPONSIBLE FOR, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR
PROCEDURES, FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK,
FOR THE ACTS OF OMISSIONS OF THE CONTRACTOR, SUB-CONTRACTORS OR ANY OTHER
PERSONS PERFORMING AN OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY
OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
6. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE
DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO BRACING
AND SHORING FOR LOADS DUE TO HYDROSTATIC, EARTH, WIND OR SEISMIC FORCES,
CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL
ENGINEER SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS.
7. NOTIFY THE STRUCTURAL ENGINEER VIA COR THROUGH THE ARCHITECT WHEN DRAWINGS BY
OTHERS SHOW OPENINGS, POCKETS, ETC., NOT SHOWN ON THE STRUCTURAL DRAWINGS, BUT
WHICH ARE LOCATED IN THE STRUCTURAL MEMBER.
8. ALL SPECIFICATIONS AND CODES NOTED SHALL BE THE LATEST APPROVED EDITIONS AND
REVISIONS BY THE GOVERNMENTAL AGENCY HAVING JURISDICTION OVER THIS PROJECT.
9. COST OF ADDITIONAL FIELD AND OFFICE WORK NECESSITATED BY REQUESTS BY THE
CONTRACTOR FOR AN OPTION OR DUE TO ERRORS OR OMISSIONS IN CONSTRUCTION SHALL BE
BORNE BY THE CONTRACTOR. OPTIONS ARE FOR CONTRACTOR'S CONVENIENCE. HE SHALL BE
RESPONSIBLE FOR ALL CHANGES NECESSARY IF HE CHOOSES AN OPTION AND HE SHALL
COORDINATE ALL DETAILS.
10. ANY ENGINEERING DESIGN PROVIDED BY OTHERS AND SUBMITTED FOR REVIEW SHALL BEAR
THE SEAL OF AN ENGINEER REGISTERED IN OKLAHOMA.
11. UNLESS NOTED OTHERWISE, DETAILS ON STRUCTURAL DRAWINGS ARE TYPICAL AS INDICATED
BY CUTS, REFERENCES OR TITLE.
12. CONTRACTOR SHALL VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.
13. FIELD VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS PRIOR TO THE START OF SHOP
DRAWINGS OR CONSTRUCTION.
14. EXISTING CONDITIONS REQUIRING MODIFICATIONS TO DOCUMENTS FOR PROPOSED
CONSTRUCTION SHALL BE IMMEDIATELY SUBMITTED TO THE COR.
CODE AND DESIGN CRITERIA
1. BUILDING CODE: LATEST EDITION OF U.S. DEPARTMENT OF VETERANS AFFAIRS DESIGN GUIDES, STANDARDS, AND MANUALS.
2018 INTERNATIONAL BUILDING CODE (IBC)
2. EXISTING DESIGN DEAD LOADS PER HUIT-ZOLLARS DRAWINGS, AS-BUILTS DATED 05/03/2001:
a. ROOF
CONCRETE SLAB ----------------------------------------------------------------- 75 PSF PIPE HANGERS ------------------------------------------------------------------- 20 PSF TAR AND GRAVEL --------------------------------------------------------------- 6 PSF RIGID INSULATION -------------------------------------------------------------- 9 PSF
TOTAL 110 PSF
b. MEZZANINE CONCRETE SLAB ----------------------------------------------------------------- 100 PSF PIPE HANGERS -------------------------------------------------------------------- 20 PSF
TOTAL 120 PSF
EXISTING LIVE LOADS PER HUIT-ZOLLARS DRAWINGS, AS-BUILTS DATED 05/03/2001:
c. ROOF -------------------------------------------------------------------------------- 40 PSF
d. FLOORS, MECHANICAL ROOM --------------------------------------------- 150 PSF
3. ELEVATED COOLING TOWER PLATFORM WALKWAY
a. LIVE LOAD ------------------------------------------------------------------------- 60 PSF
4 WIND DESIGN DATA:
a. BASIC WIND SPEED ------------------------------------------------------------ 120 MPH (ULTIMATE)
b. EXPOSURE ------------------------------------------------------------------------ C
c. INTERNAL PRESSURE COEFFICIENT------------------------------------ +/- 0.18
5. SEISMIC DESIGN DATA:
a. BUILDING RISK CATEGORY------------------------------------------------- IV
b. STRUCTURE IMPORTANCE FACTOR (IE) ------------------------------ 1.50
c. NON-STRUCTURAL COMPONENT IMPORTANCE FACTOR (IP) - 1.50
d. SS ------------------------------------------------------------------------------------ 0.142g
e. S1 ------------------------------------------------------------------------------------- 0.076g
f. SITE CLASS ---------------------------------------------------------------------- D
g. SDS ---------------------------------------------------------------------------------- 0.152g
h. SD1----------------------------------------------------------------------------------- 0.122g
i. SEISMIC DESIGN CATEGORY--------------------------------------------- C
6. GROUND SNOW LOAD---------------------------------------------------------- 10 PSF
SNOW IMPORTANCE FACTOR (IE)------------------------------- ---------- 1.20
CONCRETE AND MASONRY ADHESIVE ANCHORS
1. ADHESIVE ANCHORS SHALL NOT BE USED UNLESS SPECIFICALLY DETAILED ON DRAWINGS OR
APPROVED BY THE STRUCTURAL ENGINEER.
2. ADHESIVE ANCHORS IN NORMAL-WEIGHT HARDROCK CONCRETE SHALL BE BY HILTI, INC. (ICC NO.
ESR-3187; HIT-HY 200 ADHESIVE) OR ICC APPROVED EQUIVALENT.
3. ADHESIVE ANCHORS IN GROUT FILLED CMU SHALL BE BY HILTI, INC. (ICC NO. ESR-3963; HIT-HY 200
ADHESIVE) OR ICC APPROVED EQUIVALENT.
4. MINIMUM EMBEDMENT IN NORMAL-WEIGHT HARDROCK CONCRETE SHALL BE THE TABULATED
VALUE IN THE ICC REPORT THAT EXCEEDS SIX BOLT DIAMETERS OF THE ANCHOR SPECIFIED BUT
NOT LESS THAN AS INDICATED ON PLANS OR IN DETAILS.
REINFORCING STEEL
1. ALL REINFORCING STEEL SHALL BE DETAILED AND PLACED IN CONFORMANCE WITH THE `BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE' (ACI 318) AND THE `MANUAL OF STANDARD PRACTICE FOR REINFORCED CONCRETE CONSTRUCTION' BY CRSI AND WCRSI, AS MODIFIED BY THE PROJECT DRAWINGS
AND SPECIFICATIONS.
2. DEFORMED REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF ASTM A615 GRADE 60, EXCEPT TIES, STIRRUPS AND REINFORCING BARS IN NON-STRUCTURAL CONCRETE SUCH AS SLABS ON GRADE, WHICH MAY BE GRADE 40, UNLESS NOTED OTHERWISE.
3. WELDING OF REINFORCING SHALL BE WITH LOW HYDROGEN ELECTRODES IN CONFORMANCE WITH 'RECOMMENDED PRACTICES FOR WELDING REINFORCING STEEL, ETC.', AMERICAN WELDING SOCIETY, AWS
D1.4. WELDING OF REINFORCING STEEL IS LIMITED TO A706 REBAR.
4. ALL REINFORCING BAR BENDS SHALL BE MADE COLD.
5. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185.
6. MINIMUM LAP OF WELDED WIRE FABRIC SHALL BE 6 INCHES OR ONE FULL MESH AND ONE HALF, WHICH EVER
IS GREATER.
7. SPLICES SHALL BE MADE ONLY AS AND WHERE INDICATED ON THE STRUCTURAL DRAWINGS.
8. DOWELS BETWEEN FOOTINGS AND WALLS OR COLUMNS SHALL BE THE SAME GRADE, SIZE, SPACING AND
NUMBER AS THE SPECIFIED VERTICAL REINFORCING, U.N.O.
9. ALL BARS SHALL BE MARKED SO THEIR IDENTIFICATION CAN BE MADE WHEN THE FINAL IN-PLACE
INSPECTION OCCURS.
10. PROVIDE SHOP DRAWINGS AND FABRICATE AFTER THE COR'S REVIEW. ALL SPLICE LOCATIONS ARE SUBJECT
TO APPROVAL. PLACE REBAR PER CRSI STANDARDS.
CONCRETE
1. ALL PHASES OF WORK PERTAINING TO THE CONCRETE CONSTRUCTION SHALL CONFORM TO THE 'BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE', ACI 318, AND THE `SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS', ACI 301, LATEST EDITIONS, WITH MODIFICATIONS AS NOTED ON THE DESIGN DRAWINGS OR SPECIFICATIONS.
2. REINFORCED CONCRETE DESIGN IS BY THE ULTIMATE STRENGTH DESIGN METHOD.
3. CONCRETE MIXES SHALL BE DESIGNED BY A QUALIFIED TESTING LABORATORY AND SHALL BEAR THE SEAL OF A CIVIL
ENGINEER LICENSED IN THE STATE OF OKLAHOMA.
4. THE CONCRETE MIXTURES SHALL BE BASED ON THE FOLLOWING EXPOSURE CATEGORIES AND CLASSES.
a. MINIMUM SULFATE EXPOSURE CLASS ----------------------- S1
b. CORROSION PROTECTION OF REINF. CLASS ------------- C1
c. PERMEABILITY EXPOSURE CLASS ----------------------------- P0
d. FREEZING AND THAWING EXPOSURE CLASS ------------- F1
e. WATER CEMENT RATIO MAXIMUM W/CM ------------------- 0.45
5. SCHEDULE OF STRUCTURAL CONCRETE 28-DAY STRENGTHS AND TYPES:
LOCATION IN STRUCTURE STRENGTH (PSI) TYPE
CONCRETE SLAB 4000 HARD ROCK
ALL CONCRETE UNO 4000 HARD ROCK
6. PORTLAND CEMENT SHALL CONFORM TO ASTM C150, TYPE II.
7. AGGREGATE FOR HARD ROCK CONCRETE SHALL CONFORM TO ALL REQUIREMENTS AND TESTS OF ASTM C33 AND PROJECT SPECIFICATIONS. EXCEPTIONS MAY BE USED ONLY WITH PERMISSION OF THE STRUCTURAL ENGINEER. USE 1" MAX
AGGREGATE SIZE.
8. CONCRETE MIXING OPERATIONS, ETC., SHALL CONFORM TO ASTM C94.
9. PLACEMENT OF CONCRETE SHALL CONFORM TO ACI STANDARD 304 AND PROJECT SPECIFICATIONS. SANDBLAST ALL
CONCRETE SURFACES AGAINST WHICH CONCRETE IS TO BE PLACED.
10. PLACING OF CONCRETE SHALL CONFORM TO ACI 305 "HOT WEATHER CONCRETING" AND ACI 306 "COLD WEATHER CONCRETE"
WHEN APPLICABLE.
11. CLEAR COVERAGE OF CONCRETE OVER REINFORCING BARS BE AS FOLLOWS:
a. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH ------------ 3”
b. CONCRETE EXPOSED TO EARTH OR WEATHER:
i. NO. 6 THROUGH NO. 18 BAR ----------------------------------------------------------------------- 2”
ii. NO. 5 BAR AND SMALLER -------------------------------------------------------------------------- 1 1/2”
c. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND
i. SLABS, WALLS, JOISTS:
1. NO. 14 AND NO. 18 BAR -------------------------------------------------------------------------- 1 1/2”
2. NO. 11 BAR AND SMALLER --------------------------------------------------------------------- 3/4”
ii. BEAMS, COLUMNS:
1. PRIMARY REINFORCEMENT, TIES, STIRRUPS, SPIRALS ---------------------------- 1 1/2”
d. SLABS ON GRADE (FROM TOP)---------------------------------------------------------------------- 1 1/2”
11. ALL REINFORCING BARS, ANCHOR BOLTS AND OTHER CONCRETE INSERTS SHALL BE WELL SECURED IN POSITION PRIOR TO
PLACING CONCRETE.
12. MECHANICAL PIPES AND ELECTRICAL CONDUITS WHICH PASS THROUGH SLAB ON GRADE, CONCRETE ON STEEL DECK, FRAMED CONCRETE FLOORS AND WALLS DO NOT REQUIRE SLEEVES, UNLESS OTHERWISE INDICATED IN THE PROJECT SPECIFICATIONS, MECHANICAL OR ELECTRICAL DRAWINGS. IF SLEEVES ARE REQUIRED, INSTALL SLEEVES BEFORE PLACING CONCRETE. DO NOT CUT ANY REINFORCING WHICH MAY INTERFERE WITH SLEEVE PLACEMENT. CORING OPENINGS IN CONCRETE IS NOT PERMITTED. NOTIFY THE STRUCTURAL ENGINEER THROUGH THE ARCHITECT IN ADVANCE OF CONDITIONS NOT SHOWN ON THE STRUCTURAL DRAWINGS. NO PIPES OR ELECTRICAL CONDUIT SHALL PASS THROUGH CONCRETE BEAMS
OR COLUMNS UNLESS SPECIFICALLY DETAILED.
13. PROJECTING CORNERS OF BEAMS, WALLS, COLUMNS, ETC., SHALL BE FORMED WITH A 3/4 IN. CHAMFER, UNLESS OTHERWISE
NOTED ON ARCHITECTURAL DRAWINGS.
14. CURING COMPOUNDS USED ON CONCRETE…