1700000 C BSVE v2.2_6MAY25.docx

DOCX document 46 KB Posted

Attached to
Sources Sought Notice - Crane New Requirement
Solicitation number
N40080-27-R-5660
Issued by

About this file

This document is a Performance Work Statement (PWS) for Base Support Vehicles and Equipment (BSVE) services for the Department of the Navy Naval Facilities Engineering Command. The contract covers maintenance, repair, and operational services for government-owned vehicles and equipment at multiple naval and marine corps facilities within a 100-mile radius of Washington Navy Yard, including locations in Washington D.C., Virginia, and Maryland. Key service requirements include emergency and urgent work orders, annual equipment inspections and load testing, preventive maintenance, and maintaining fleet inventory for Weight Handling Equipment (WHE), Material Handling Equipment (MHE), and Ordinance Handling Equipment (OHE).

The contractor must provide qualified personnel certified to operate and maintain various vehicles and equipment, comply with safety regulations, and follow specific maintenance standards outlined in NAVFAC P-300 and P-307. The contract includes both Fixed-Price (FFP) and Indefinite Delivery/Indefinite Quantity (IDIQ) work components, with emergency response requirements of 24/7 availability and a 4-hour response time for critical issues. Maintenance work is subject to a $3,000 per work order limit, with the government issuing separate task orders for repairs exceeding this amount. The contract emphasizes maintaining equipment in fully operational condition, with strict documentation and certification requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1700000 – Base Support Vehicles and Equipment

Table of Contents

Spec Item
Title
1
General Information
1.1
Concept of Operations
2
Management and Administration
2.1
Definitions and Acronyms
2.2
Personnel
2.2.1
Certification, Training, and Licensing
2.3
Special Requirements
2.3.1
Safety
2.3.2
Audits and Inspections
2.3.3
Labor Requirements
2.4
References and Technical Documents
3
FFP Work
3.1
(Reserved) Operations
3.2
(Reserved) Support Services
3.3
Maintenance
3.3.1
Maintenance (Government-Owned)
3.3.1.1
Emergency Work
3.3.1.2
Urgent Work
3.3.1.3
Inspection and Load Test Certification of WHE, MHE and OHE
3.3.1.4
Preventive Maintenance Inspections
4
IDIQ Work

1700000 – Base Support Vehicles and Equipment

Spec Item
Title
Description
1
General Information
The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Base Support Vehicles and Equipment services at various locations within a 100-mile radius of the Washington Navy Yard, Washington, D.C. and outlying areas supported by this installation performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.

Locations to include but are not limited to:

· Naval Support Activity Washington Navy Yard, Washington, D.C. (Reserved)

· Naval Research Laboratory (NRL), Washington, D.C. (Reserved)

· United States Naval Observatory (USNO), Washington, D.C. (Reserved)

· Marine Corps Barracks (MBW), 8th and I Streets, Washington, D.C. (Reserved)

· Naval Support Facility Arlington Service Center (ASC), VA (Reserved)

· Naval Support Facility Annapolis and Annexes, Annapolis, MD

· Marine Corps Base Quantico (MCBQ), Quantico, VA (Reserved)

· Naval Support Activity Bethesda, Bethesda, MD (Reserved)

· Naval Support Facility Carderock, Bethesda, MD (Reserved)

· Naval Support Facility Dahlgren and Annexes, Dahlgren, VA (Reserved)

· Naval Support Facility Indian Head and Annexes, Indian Head, MD (Reserved)

· Naval Air Station Patuxent River and Annexes, Patuxent River, MD (Reserved)

Locations marked (Reserved) have no requirements but may be modified after award for services to be performed.

1.1
Concept of Operations
The intent of 1700000 BSVE is to specify the requirements for a transportation program consisting of vehicles and equipment maintenance and repairs, vehicle and equipment operations to include Weight Handling Equipment (WHE) / Material Handling Equipment (MHE), inspection and certification, and specified administrative program management. The following services are not considered BSVE and are not included in this template:

· Maintenance and repair of facility mounted Weight Handling Equipment (WHE) is included in 1502000 Facility Investment.

1700000 – Base Support Vehicles and Equipment

Spec Item
Title
Description
2
Management and Administration
2.1
Definitions and Acronyms
Definitions and Acronyms are listed in J-1700000-01.
2.2
Personnel
The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the BSVE function.
2.2.1
Certification, Training, and Licensing
BSVE operators shall comply with all Federal, state, and local laws and regulations regarding certification, training and licensing.

Weight Handling Equipment (WHE) / Material Handling Equipment (MHE), Ordinance Handling Equipment (OHE), Civil Engineering Support Equipment (CESE) operators shall comply with the standards stated in NAVFAC P-300 and NAVFAC P-307.

Personnel working on electric vehicles shall be certified to work on the electrical components, sub assemblies and assemblies.

2.3
Special Requirements
2.3.1
Safety
The Contractor shall comply with all OSHA rules and regulations.

Necessary permits for the movement of overweight/oversized loads on public highways shall be obtained.

2.3.2
Audits and Inspections
The Contractor shall provide assistance and cooperation for all authorized transportation related inspections, internal reviews, and audits conducted by the Government. The Government and other external agencies perform approximately five audits and inspections per year.
2.3.3
Labor Requirements
Chilton Labor Guide, Mitchell Mechanical Parts/Labor Estimating Guide, or similar estimating sources shall be used for determining the number of flat rate hours required to complete the scope of work. Total labor cost will be determined by totaling the number of flat rate hours and then multiplying by the flat rate hour unit price.
2.4
References and Technical Documents
References and Technical Documents are listed in J-1700000-03.

1700000 – Base Support Vehicles and Equipment

Spec Item
Title
Performance Objective
Related Information
Performance Standard
3
FFP Work
The Contractor shall perform operations, support services, and maintenance of BSVE to ensure a well-managed and executed BSVE Program.
Provide the Base Support Vehicle and Equipment management, operations, and maintenance functions identified below under the requirements of this contract.

Fleet Inventory required to be maintained is provided in J-1700000-02.

Historical Data for BSVE work is provided in J-1700000-04.

BSVE are safe and reliable per NAVFAC P-300 and P-307

3.1
Operations (Reserved)
3.2
Support Services (Reserved)
3.3
Maintenance
The Contractor shall maintain, repair and alter Government owned and/or leased equipment to ensure they are in fully operational condition.
The Contractor shall submit a Maintenance Program Plan per Section F.

The Contractor shall submit a Maintenance Schedule per Section F.

Prior to proceeding with any single maintenance or repair estimated to exceed $3,000 obtain approval from the KO.

Selective exchange of parts between equipment must be authorized by the KO.

Ensure adequate parts are available to expedite maintenance repairs in order to minimize downtime.

Maintain on site, and update hard copies of documents filed at the Transportation Maintenance Technical Library for Government owned Equipment.

Properly mark equipment as required so that equipment identification markings are clear and visible at all times in accordance with NAVFAC P-300 and P-307.

Maintain equipment history files (hardcopy) for life of all units serviced under this contract.

Prepare and submit Shop Repair Orders for all work performed on all equipment and maintain copies in each history file.

Equipment is maintained in accordance with OEM and NAVFAC P-307 recommendations.

Provide all tools, testing equipment, technical training, and technical related data necessary to service and maintain new or used equipment throughout the contract. The Government may replace equipment throughout the contract with newer units, which may change in mix, manufacturer, model, and types. The Contractor is responsible for in-service and maintaining these replaced units under the requirements.

Provide a monthly maintenance schedule as required.

Adequate parts are available to expedite maintenance repairs.

Records, data, and reports are accurate and complete.

Shop Repair Orders are accurate and complete.

Equipment is properly marked in accordance with NAVFAC P-300 and P-307.

Maintenance and repair functions are performed in accordance with manufacturer specifications and recommendations.

3.3.1
Maintenance (Government-Owned)
The Contractor shall maintain, repair and alter Government owned equipment to ensure they are in fully operational condition.
Coordinate and complete all scheduled and unscheduled maintenance and repairs including field service.

Provide all tools, testing equipment, technical training, and technical related data necessary to service and maintain new or used equipment throughout the contract. The Government may replace equipment throughout the contract with newer units, which may change in mix, manufacturer, model, and types. The Contractor is responsible for in-service and maintaining these replaced units under the requirements.

WHE and MHE maintenance and repair functions are performed in accordance with manufacturer specifications and recommendations.

All workmanship shall conform to performance standards set forth in the latest edition of NAVFAC P-300 and NAVFAC P-307.

3.3.1.1
Emergency Work Orders
The Contractor shall respond to Emergency work and arrest emergent conditions to minimize and mitigate damage to BSVE and danger to personnel.

The Contractor shall perform emergency work 24 hours a day, seven days a week throughout the contract period.

The Contractor shall respond to emergency work calls within four (4) hours and with the appropriate service personnel and equipment to commence work immediately.

The Contractor shall remain at the work site until the emergency has been mitigated.

The emergency service order is complete once the emergency has been arrested. The contractor shall restore the WHE to normal working condition using the remaining man-hours and materials up to the work order limit of liability of $3000.

The Government may issue a work/task order for repairs exceeding the emergency work order limit of liability.

Emergency work calls responded to within four (4) hours of receipt of call, 24 hours per day, and seven days per week.

Work is continued without interruption until emergent condition is mitigated.

Repair is complete when the facility, system, or equipment does not present any hazard or danger to personnel.

All workmanship shall conform to performance standards set forth in the latest edition of NAVFAC P-307 and advisories issued by the Navy Crane Center.

3.3.1.2
Urgent Work Orders
The Contractor shall complete urgent work in a timely manner and ensure BSVE is restored to a safe, normal working condition and function properly.
Contractor shall perform urgent work to repair damaged WHE to normal working condition.

Performance of urgent work is not required outside of Government regular working hours.

The Government may combine multiple repair requirements received for the same trade in the same building or structure at the same time into one work order as long as the limit of liability is not exceeded.

Work order shall not exceed a total cost of $3000, to include both labor and materials.

The Government may issue a work/task order for repairs exceeding the work order limit of liability.

Urgent work orders are completed within five working days.

BSVE is restored to operable condition and function properly in accordance with OEM specifications.

When repair is complete, the facility, system, or equipment does not present any hazard or danger to personnel.

All workmanship shall conform to performance standards set forth in the latest edition of NAVFAC P-307 and advisories issued by the Navy Crane Center.

3.3.1.3
Inspection and Load Test Certification of WHE, MHE
Perform inspection, testing, and certification of all WHE and MHE to ensure equipment is maintained in a safe and fully operational condition.
Inspect, test, and certify all WHE, MHE, and OHE at least annually and after an adjustment, repair, replacement, or alternation/modification of a load bearing or load controlling part in accordance with NAVFAC P-300, NAVFAC P-307, NAVSUP 538, NAVSEA OP-5 and the equipment manufacturer's instructions and manuals.

Perform repairs found necessary as a result of any inspection/test, and/or maintenance deficiency. Fully comply with certification and alternation/modification requirements.

The Contractor shall submit a Schedule for Testing and Certification of the equipment listed the Fleet Inventory provided in J-1700000-02, per Section F. Testing and Certification Qualifications, including names and qualifications of Contractor personnel performing load testing certification shall be submitted per Section F. Post certifications on equipment after completion of Annual Load Test and in full view of operator with copies provided to the KO.

Submit a Maintenance Inspection Specification and Record for category 1 through 4 cranes to the KO for approval. Conduct condition inspection for category 1 through 4 cranes in accordance with NAVFAC P-300 and P-307.

Inspection and testing performed per NAVFAC P-300, NAVFAC P-307, and the equipment manufacturer's instructions and manuals as specified.

Upon Government certification, Contractor shall provide a signed copy of certification to KO/COR.

Certification is current and posted on equipment in full view of operator; copy provided to KO and a copy placed in history file within two working days.

Repairs are identified and performed.

Testing and certification are completed as per the Contractor’s Schedule.

Service Repair Orders are accurate and complete.

3.3.1.4
Preventive Maintenance Inspections
The Contractor shall perform preventive maintenance (PM) inspections, including safety and reliability inspections for WHE and MHE to ensure safe and proper operation.
The Contractor shall submit a PM Schedule per Section F.

PM shall be performed during inspection, testing and certification or as needed.

All work shall be in accordance with the NAVFAC P-300, NAVFAC P-307 and OEM standards.

All safety and / or operational deficiencies addressed.

Preventive maintenance schedule submitted as required.

All checkpoints correctly completed.

Safety and operational deficiencies found are corrected using accepted quality standards and manufacturer's recommendations.

Work completed by date scheduled.

Service Repair Orders are accurate and complete.

1700000 – Base Support Vehicles and Equipment

Spec Item
Title
Performance Objective
Related Information
Performance Standard
4
IDIQ Work
IDIQ work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
Refer to IDIQ ELINs for task listings, descriptions, and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance standards for IDIQ work will be the same as those in Spec Item 3 where applicable.
All crane operations are performed in accordance with the NAVFAC P-307 and OSHA.

All operators are licensed for the equipment they operate.

File details come from the government source that posted it. Updated .