1501000 C Facility Management v2.3 5MAY25.docx

DOCX document 55 KB Posted

Attached to
Sources Sought Notice - Crane New Requirement
Solicitation number
N40080-27-R-5660
Issued by

About this file

This document is a Performance Work Statement (PWS) for Facility Management Services for the Department of the Navy. The contract covers facility management services at multiple naval and marine corps facilities in the Washington D.C. metropolitan area, including Naval Support Activity Washington Navy Yard, Naval Research Laboratory, United States Naval Observatory, Marine Corps Barracks, Naval Support Facility Annapolis, Marine Corps Base Quantico, Naval Support Activity Bethesda, and other regional installations.

The PWS outlines comprehensive facility management requirements, including work control, service request reception, infrastructure condition assessment, asset inventory management, and system access. Key performance objectives include managing service requests 24/7, utilizing NAVFAC MAXIMO system for tracking, performing annual equipment condition assessments, and supporting the Navy's facility investment strategy to maintain fully functional capabilities that directly support warfighter readiness. The contractor must provide professional personnel, complete customer service training, and follow specific protocols for service request classification, work order tracking, and asset management, with precise time-based performance standards for data entry, reporting, and system updates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C – 1501000 Facility Management

1501000 – Facility Management

Spec Item
Title
1
General Information
1.1
Concept of Operations
2
Management and Administration
2.1
Definitions and Acronyms
2.2
Personnel
2.2.1
Certification, Training, and Licensing
2.3
Special Requirements
2.3.1
System Access
2.3.2
System Training
2.3.3
Facility Investment Strategy
2.4
References and Technical Documents
3
Recurring Work
3.1
Work Control
3.1.1
Service Request Reception
3.1.2
Work Induction
3.1.3
Work Order Tracking
3.2
Infrastructure Condition Assessment Program (ICAP) Services
3.2.1
Inventory Management
3.2.2
Condition Assessment
3.3
(Reserved) Project Development
3.4
(Reserved) Asset Management Services
3.5
(Reserved) Technical Support Services
4
Non-Recurring Work
Spec Item
Title
Description
1
General Information
The Contractor shall provide all labor, management, supervision, tools, materials, and equipment required to perform Facility Management services at.

Locations to include but are not limited to:

· Naval Support Activity Washington Navy Yard, Washington, D.C.

· Naval Research Laboratory (NRL), Washington, D.C.

· United States Naval Observatory (USNO), Washington, D.C.

· Marine Corps Barracks (MBW), 8th and I Streets, Washington, D.C. (Reserved)

· Naval Support Facility Arlington Service Center (ASC), VA (Reserved)

· Naval Support Facility Annapolis and Annexes, Annapolis, MD

· Marine Corps Base Quantico (MCBQ), Quantico, VA

· Naval Support Activity Bethesda, Bethesda, MD

· Naval Support Facility Carderock, Bethesda, MD (Reserved)

· Naval Support Facility Dahlgren and Annexes, Dahlgren, VA (Reserved)

· Naval Support Facility Indian Head and Annexes, Indian Head, MD (Reserved)

· Naval Air Station Patuxent River and Annexes, Patuxent River, MD (Reserved)

Locations marked (Reserved) have no requirements but may be modified after award for services to be performed.

1.1
Concept of Operations
The intent of 1501000 Facility Management is to specify the requirements for facility planning and asset management services including, but not limited to, work control, service call reception, Condition Based Maintenance Management (CBMM) / Infrastructure Condition Assessment Program (ICAP) support, Preventive maintenance (PM) inspection of systems and equipment and other Sustainment, Restoration and Modernization (SRM) work are covered under 1502000 Facility Investment.

1501000 – Facility Management

Spec Item
Title
Description
2
Management and Administration
2.1
Definitions and Acronyms
Definitions and Acronyms provided in J-1501000-01.
2.2
Personnel
The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required to provide facility management services.
2.2.1
Certification, Training, and Licensing
The Contractor’s personnel who regularly engage in customer interface shall present a professional appearance and use customer interaction best practices. Contractor personnel shall complete customer service training within 30 days of assignment and attend refresher training annually thereafter.
2.3
Special Requirements
2.3.1
System Access
The Government will provide access to the following systems: NAVFAC MAXIMO.

The Contractor shall submit a complete list of personnel requiring access to these systems per Section F. The Contractor shall provide information on each employee as required by Government information technology personnel.

Additional information regarding NAVFAC MAXIMO data requirements and account access is provided in Spec Item 2.6.6 in Annex 0200000.

2.3.2
System Training
The Government will provide one, three-day training session on the systems identified above. In addition, the Government will provide technical assistance to the Contractor’s functional systems manager for five working days prior to full performance start date.

Periodically, the Government will provide no-cost training on new systems and system enhancements to a limited number of Contractor personnel who are expected to provide training to remaining Contractor personnel. The Contractor shall send employees to Government-directed training on forthcoming systems either on-site or at a location specified by the Government. All costs of attendance at either on-site or off-site training, including, but not limited to, wages, travel, and per diem shall be borne by the Contractor.

Informational Note:

Historically, there has been a requirement for approximately five man-days of such off-site training per year.

2.3.3
Facility Investment Strategy
The Contractor shall engage in the Navy’s facility investment strategy to provide efficient and effective facilities that directly support warfighter readiness at the lowest possible life cycle cost, while maintaining fully functional capabilities.
2.4
References and Technical Documents
References and Technical Documents provided in J-1501000-02.

1501000 – Facility Management

Spec Item
Title
Performance Objective
Related Information
Performance Standard
3
Recurring Work
The Contractor shall provide facility management services to ensure real property infrastructure supports installation mission requirements.
Site maps are provided in J-1501000-03.

The Contractor shall comply with installation facility management reporting and coordination requirements provided in J-1501000-04.

Facility management services performed as specified.

Facility management services completed within the specified time.

3.1
Work Control
The Contractor shall perform work control to ensure requests for services are properly received, identified, tracked and reported in a timely manner.
The Contractor shall utilize NAVFAC MAXIMO for entry and updates to service requests and work orders.

A listing of Government designated customer interface representatives will be provided after contract award and updated as changes occur.

Service request and work order data are complete and accurate.

Service request and work order data are inputted within specified time.

3.1.1
Service Request Reception
The Contractor shall receive Emergency/Urgent service requests to ensure work requirements are properly received, prioritized, and routed for execution in a timely manner.

Process for Proper Work Classification and the associated Playbook provided in J-1501000-05.

Process for Utility Outage Reporting and Data Collection and the associated Service Desk Guide for Utility Outages provided in J-1501000-04.

The Contractor shall follow BMS B-15.27, Facility Emergency/Urgent Service Request and Work Order Process to receive all service requests for the entire Washington Capital Region 24 hours per day, seven days per week.

The Contractor shall answer calls within 20 seconds by a knowledgeable receptionist.

The Contractor shall obtain the following information for each request: site (installation) name, facility (building) number, detailed location information (e.g., first floor, north end of building), point of contact name, telephone number, email address, and description of the problem that requires correction.

During normal government working hours the Contractor shall enter all required information into MAXIMO within 15 minutes following receipt of call. For after normal working hours MAXIMO entries should be done the next working day by 0900.

Emergency/Urgent service request are properly classified.

Emergency/Urgent service request input complete and accurate as specified.

Emergency/Urgent service requests received and input within specified times.

3.1.2
Work Induction
The Contractor shall induct work to ensure service requests are properly received, identified and documented in a timely manner.
The process for induction and routing of service requests provided in J-1501000-06.

The Contractor shall receive service requests from internal and external customers via Government designated customer interface representatives and input into MAXIMO within four hours of receipt of request.

The Contractor shall follow-up as necessary to collect additional information related to the service request to support proper work induction.

Service request input complete and accurate and routed as specified.

Service requests input within specified time.

3.1.3
Work Order Tracking
The Contractor shall perform work order tracking to ensure status of work orders are properly updated and work is monitored for timely completion.
The Contractor shall monitor all open work orders within MAXIMO, enter appropriate status updates and close out completed work orders.

The Contractor shall provide updates on work order status to Government designated customer interface representatives within one hour of request during regular working hours.

The Contractor shall submit a monthly MAXIMO work order report detailing work orders completed during the prior month and the status of all outstanding work orders per Section F.

Work order data complete and accurate.

Work order reports submitted within specified time.

3.2
Infrastructure Condition Assessment Program (ICAP) Services
The Contractor shall perform ICAP services to ensure accurate asset inventory and condition information to properly support Condition Based Maintenance Management (CBMM).
As part of CBMM, the Contractor shall perform ICAP services by maintaining an accurate asset inventory within MAXIMO and performing periodic condition assessments.

Descriptions of assets are provided in:

· J-1501000-07 Crane and Railroad Trackage

· J-1501000-08 Weight Handling Equipment (WHE) and Systems MAXIMO asset data complete and accurate.

Asset condition assessment complete and accurate.

MAXIMO data updated within the specified time.

3.2.1

Inventory Management
The Contractor shall manage asset inventory to ensure accurate asset information is available for CBMM.
The Contractor shall be responsible for all changes to asset inventory updates within MAXIMO including adding, deactivating, and updating assets.

The Contractor is responsible for updates to asset data for all facilities and equipment regardless of whether or not they are maintained under this contract or identified in Section J at no additional cost to the Government.

For assets installed, removed, or replaced outside of this contract, the Contractor shall receive and validate inventory information provided by the Government and update asset data within MAXIMO.

The Contractor shall update MAXIMO upon identification of discrepancies in inventory (e.g. assets with incorrect data elements, assets that no longer exist, or assets found that are not within current inventory).

The Contractor shall submit a Summary of MAXIMO Asset Changes report per Section F.

The Contractor shall ensure that assets are properly tagged. The format for asset tags and guidance on assets that require tagging are in J-1501000-09.

Required data fields for updates to asset information are indicated in J-0200000-06.

The Government will provide format requirements for nomenclature of assignment of new asset numbers.

The process for providing MAXIMO asset updates are specified in Spec Item 2.6.6 in Annex 0200000.

MAXIMO asset data updated within 10 days of identification or notification of change.

Asset data fields required in MAXIMO complete and accurate.

3.2.2

Condition Assessment
The Contractor shall assess and document asset condition to ensure accurate condition information is available for CBMM.
The Contractor shall perform condition assessments on all equipment maintained under the Preventive Maintenance (PM) specified in 1502000, Facility Investment to support ICAP and CBMM. Refer to Spec Item 3.2 and Section J for description of assets historically included in the ICAP.

The Contractor shall assess equipment condition annually and document the characteristic meter readings within MAXIMO. Condition assessments shall also be updated after equipment/assets have been repaired or replaced and any time a significant change in condition is noted.

The meter group description and direct condition rating guidance for each Uniformat Classification is listed in J-1501000-10. The General Direct Condition Rating Guidance is shown in J-1501000-11.

Required data fields for updates to uniformat condition rating for each meter group provided in J-0200000-07.

The process for providing MAXIMO characteristic meter reading updates are specified in Spec Item 2.6.6 in Annex 0200000.

Informational Note: Condition Assessments are typically performed by the maintenance technician on an annual basis during the most invasive Preventive Maintenance (PM) circumstances.

Characteristic Meter Reading updates for all required assets do not exceed 365 days.

Characteristic Meter Reading data fields required in MAXIMO complete and accurate.

Direct condition rating reflective of current asset status.

3.3
Project Development (Reserved)
3.4
Asset Management Services (Reserved)
3.5
Technical Support Services (Reserved)
4
Non-recurring Work
Non-recurring work may be ordered utilizing DoD FEDMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
Refer to Non-recurring work ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance Standards for Non-recurring work will be the same as those in Spec Item 3 where applicable.