1630J1-18-R-00010_Amendment_0005.pdf
PDF 274 KB Posted
- Solicitation number
- 1630J1-18-R-00010
- Issued by
-
Department of Labor Office of Job Corps
About this file
Amendment 0005
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1630J1-18-R-00010 x x x
Washington DC 20210
ETA OCM JOB CORPS
Room N-4643 200 Constitution Ave, NW Division of Job Corps Procurement US Department of Labor
Boston MA 02203
BOSTON
Room E-215 25 New Sudbury St.
JFK Federal Building U.S. Department of Labor
09/28/20180005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning _________1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/31/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to incorporate the following changes to the subject RFP:
1)New Section B Pricing Schedule
2)Updated Section F.5
3)Updated J-5 Attachment
4)Updated J-13 Attachment
5)Updated J-16 Attachment (Davis Bacon Wage Determination)
6)Updated Clause H.28 Key Personnel
7)Environmental Reports
8)Answers to Questions.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Steven A. Fusco
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
09/28/2018
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 27
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1630J1-18-R-00010/0005
The due date for receipt of proposals remains
Friday, October 5, 2018 at 4:00 P.M.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
RFP No. 1630J1-18-R-00010 Operation of the Puerto Rico JCC with OA/CTS is amended as follows:
Delete Section B.2 PRICING SCHEDULE in its entirety
ADD:
B.2. PRICING SCHEDULE
The Contract Line Item Numbers (CLINs) are a combination of Firm-Fixed-Price (FFP), and Cost Reimbursement (CR) and Not-To-Exceed (NTE) CLINs.
FFP CLINs 0002, 1002, 2002, and 3002 in the Pricing Schedule shall be based on fully burdened hourly rates. The fully burdened hourly rate is defined as the direct hourly labor rate with the appropriate load factors, inclusive of profit, overhead, fringe and General & Administrative (G&A) costs.
PLEASE NOTE: Offerors shall compute a total price for the following Firm-Fixed-Price Outreach and Admission, and Career Transition Services CLINS; and shall split that one computation 60/40 across the two CLINS for each specific service for each period of performance as outlined in the pricing schedule.
When proposing pricing for FFP CLINs 0007 and 0008, Outreach and Admissions, the Contractor shall use 60% of the total price of admission for the initial enrollment and 40% after the completion of the first 90 days of enrollment.
When proposing pricing for FFP CLINs 0009 and 0010, Career Transition Services for graduates, the contractor shall use 60% of the total price of placement for the initial graduate placement and 40% for total price at 6 month follow-up.
When proposing pricing for FFP CLINs 0011 and 0012, Career Transition Services for former enrollees, the contractor shall use 60% of the total price for initial placement and former enrollees and 40% for former enrollees.
Offerors shall propose the 1% management fee and .7% performance incentive fee
Cost Reimbursement CLINs are only applicable to CLINs 0004, 1004, 2004, 3004 and corresponding SubCLINs. The Contractor will be reimbursed for the actual cost of the service or item including overhead (if applicable), G&A, and profit/fee. The cost of services shall be fair and reasonable. Offerors shall propose the maximum 1% management fee and 1.5% cost incentive fee.
Offerors shall refer to G.3 of this Solicitation regarding fees.
Not-to-Exceed (NTE) overall CLIN amount will be provided by the Government and will not be considered as part of the Offeror’s total evaluated cost. Contractors will invoice for actual costs during the performance of this contract. The Contractor agrees to notify the Government in accordance with FAR 52.232-22 (c) when the Cost Reimbursable NTE reaches 75% of the set amount.
In accordance with Section G of the solicitation, Assessments are as stated herein.
For Demonstration Projects, a “not to exceed” ceiling will be negotiated at the time that Demonstration projects, if any, are identified, and incorporated by contract modification.
Further, there shall be no fixed fee or incentive fee based on work involved with capital line items, which consists of work or purchases funded under the Construction, Rehabilitation, and Acquisition; Equipment; and CTST categories listed above. Indirect cost charges shall not be allowed for or based on Construction, Rehabilitation, and Acquisition; Equipment; or CTST costs, unless authorized by the Contracting Officer.
The amount to be reimbursed to the Contractor for purchased Government Furnished Property (as defined in the Job Corps Policy and Requirements Handbook (PRH) Appendix 505, 505a, 505b, and ETA Property Management Handbook, Issue 359, including revisions and amendments thereto), is provided in the pricing schedule below.
The Contractor agrees that the costs generated under construction, rehabilitation, equipment and Career Technical Skills Training (CTST) shall be maintained in a separate accounting classification to be entitled "Capital Expense Accounts," as outlined in PRH Chapter 5 and Appendix 502.
All travel receipts and supporting documentation shall be submitted during the billing period for the trip. Travel and Training costs shall be in accordance with H-31 Reimbursement of Training Costs.
Base Period of Performance: 1/1/2019 to 1/31/2020 including Phase-In
Base Period of Performance: 1/1/2019 to 1/31/2020 including Phase-In
CLIN Supplies/Service QTY Unit Unit Price Amount
0001 Phase In 1 MO $ ______________
Parent
CLIN
Center Operations Type: FFP (Below are the fixed-price categories for Center Operations)
12 MO $ ______________
01 Academic Personnel Exp 02 Other Academic Exp 03 CTT Personnel Exp 04 Other CTT Exp 05 Career Success Personnel Exp 06 Other Career Success Exp 08 Clothing Exp 09 Support Ser Personnel Exp 10 Other Support Ser Exp 11 Medical Personnel Exp 13 CP/CTR Personnel Exp 14 Other CP/CTR Exp 15 Admin Personnel Exp 16 Other Admin Exp 17 Indirect Admin Exp Not applicable 18 Facil Maint Personnel Exp 20 Security Personnel Exp 22 Communications 24 Facility Lease Cost 25 Liability Insurance
0003 Fees – Fixed Price Line Items Management Fee – 1% (Operations) 12 MO $_______________ Management Fee – 1% (OA if app.) 12 MO $_______________ Management Fee – 1% (CTS if app.) 12 MO $_______________ Performance Incentive Fee (Maximum = 1.4% & Average = .7%) $_______________
Center Operations – Type: CR (Below are the cost-reimbursable categories for Center Operations)
12 MO $ ______________
07 Food Exp $ ______________ 12 Other Medical Exp $ ______________ 19 Other Facilities Maintenance Exp $ ______________ 21 Other Security Exp $ ______________ 23 Utilities and Fuel Exp $ ______________
26 Motor Vehicle Exp $ ______________ 0005 Fees – Cost Reimbursable Line Items
Management Fee – 1% 12 MO $ ______________ Cost Incentive Fee (Max 3% & Avg 1.5%) $ ______________
0006 G&A – Center Operations Expenses (CR only) $ ______________
0007 Outreach & Admissions – FFP (60% of total price); Initial Arrival 954 EA
0008 Outreach & Admissions – FFP (40% of total price); 90 Days $ _____ $ ______________
Career Transition Services / Graduates – FFP (60% of total price) Initial Placement 547 EA
Career Transition Services / Graduates – FFP (40% of total price) 6 Months
Career Transition Services / Former Enrollee – FFP (60% of total price) Initial Placement 188 EA
Career Transition Services / Former Enrollee – FFP (40% of total price) 6 Months
0013 27 Travel and Training NTE $12,159
0014 Construction, Rehabilitation, and Acquisition (CRA) (B1)(A/B) NTE $537,072
0015 Equipment (B2) NTE $84,525
0016 Career Technical Skills Training (B4) NTE $90,000
0017 Demonstration Projects – TBD NTE TBD
GRAND TOTAL – BASE PERIOD (CLINs 0002 through 0017) $ _____________
OPTION 1 Period of Performance: 2/1/2020-1/31/2021
OPTION 1 Period of Performance:
2/1/2020-1/31/2021
CLIN Supplies/Service QTY Unit Unit Price Amount
Parent
CLIN
Center Operations Type: FFP (Below are the fixed-price categories for Center Operations)
12 MO $ _____________
01 Academic Personnel Exp 02 Other Academic Exp 03 CTT Personnel Exp 04 Other CTT Exp 05 Career Success Personnel Exp 06 Other Career Success Exp 08 Clothing Exp 09 Support Ser Personnel Exp 10 Other Support Ser Exp 11 Medical Personnel Exp 13 CP/CTR Personnel Exp 14 Other CP/CTR Exp 15 Admin Personnel Exp 16 Other Admin Exp 17 Indirect Admin Exp Not applicable 18 Facil Maint Personnel Exp 20 Security Personnel Exp 22 Communications 24 Facility Lease Cost 25 Liability Insurance
1003 Fees – Fixed Price Line Items Management Fee – 1% (Operations) 12 MO $ _____________ Management Fee – 1% (OA if app.) 12 MO $ _____________ Management Fee – 1% (CTS if app.) 12 MO $ _____________ Performance Incentive Fee (Maximum = 1.4% & Average = .7%) $ _____________
Center Operations – Type: CR (Below are the cost-reimbursable categories for Center Operations)
12 MO $ _____________
07 Food Exp $ _____________ 12 Other Medical Exp $ _____________ 19 Other Facilities Maintenance Exp $ _____________ 21 Other Security Exp $ _____________ 23 Utilities and Fuel Exp $ _____________ 26 Motor Vehicle Exp $ _____________
1005 Fees – Cost Reimbursable Line Items Management Fee – 1% 12 MO $ _____________ Cost Incentive Fee (Max 3% & Avg 1.5%) $ _____________
1006 G&A – Center Operations Expenses (CR only) $ _____________
1007 Outreach & Admissions – FFP (60% of total price); Initial Arrival 1,254 EA
1008 Outreach & Admissions – FFP (40% of total price); 90 Days $ _____ $ _____________
Career Transition Services / Graduates – FFP (60% of total price) Initial Placement 716 EA
Career Transition Services / Graduates – FFP (40% of total price) 6 Months
Career Transition Services / Former Enrollee – FFP (60% of total price) Initial Placement 244 EA
Career Transition Services / Former Enrollee – FFP (40% of total price) 6 Months
1013 27 Travel and Training NTE $15,002
1014 Construction, Rehabilitation, and Acquisition (CRA) (B1)(A/B) NTE $926,448
1015 Equipment (B2) NTE $145,806
1016 Career Technical Skills Training (B4) NTE $114,000
1017 Demonstration Projects – TBD NTE TBD
GRAND TOTAL – Option Period 1 (CLINs 1002 through 1017) $ _____________
OPTION 2 Period of Performance: 2/1/2021-1/31/2022
CLIN Supplies/Service QTY Unit Unit Price Amount
Parent
CLIN
Center Operations Type: FFP (Below are the fixed-price categories for Center Operations)
12 MO $ _____________
01 Academic Personnel Exp 02 Other Academic Exp 03 CTT Personnel Exp 04 Other CTT Exp 05 Career Success Personnel Exp 06 Other Career Success Exp 08 Clothing Exp 09 Support Ser Personnel Exp 10 Other Support Ser Exp 11 Medical Personnel Exp 13 CP/CTR Personnel Exp 14 Other CP/CTR Exp 15 Admin Personnel Exp 16 Other Admin Exp 17 Indirect Admin Exp Not applicable 18 Facil Maint Personnel Exp 20 Security Personnel Exp 22 Communications 24 Facility Lease Cost 25 Liability Insurance
2003 Fees – Fixed Price Line Items Management Fee – 1% (Operations) 12 MO $ _____________ Management Fee – 1% (OA if app.) 12 MO $ _____________ Management Fee – 1% (CTS if app.) 12 MO $ _____________ Performance Incentive Fee (Maximum = 1.4% & Average = .7%) $ _____________
Center Operations – Type: CR *Below are the cost-reimbursable categories for Center Operations.
12 MO $ _____________
07 Food Exp $ _____________ 12 Other Medical Exp $ _____________ 19 Other Facilities Maintenance Exp $ _____________ 21 Other Security Exp $ _____________ 23 Utilities and Fuel Exp $ _____________ 26 Motor Vehicle Exp $ _____________
2005 Fees – Cost Reimbursable Line Items Management Fee – 1% 12 MO $ _____________
CLIN Supplies/Service QTY Unit Unit Price Amount
Cost Incentive Fee (Max 3% & Avg 1.5%) $ _____________
2006 G&A – Center Operations Expenses (CR only)
2007 Outreach & Admissions – FFP (60% of total price); Initial Arrival 1254 EA
2008 Outreach & Admissions – FFP (40% of total price); 90 Days $ _____ $ _____________
Career Transition Services / Graduates – FFP (60% of total price) Initial Placement 716 EA
Career Transition Services / Graduates – FFP (40% of total price) 6 Months
Career Transition Services / Former Enrollee – FFP (60% of total price) Initial Placement 244 EA
Career Transition Services / Former Enrollee – FFP (40% of total price) 6 Months
2013 27 Travel and Training NTE $15,002
2014 Construction, Rehabilitation, and Acquisition (CRA) (B1)(A/B) NTE $926,448
2015 Equipment (B2) NTE $145,806
2016 Career Technical Skills Training (B4) NTE $114,000
2017 Demonstration Projects – TBD NTE TBD
GRAND TOTAL – Option Period 2 (CLINs 2002 through 2017) $ _____________
OPTION 3 Period of Performance: 2/1/2021 -1/31/2022
CLIN Supplies/Service QTY Unit Unit Price Amount
Parent
CLIN
Center Operations Type: FFP (Below are the fixed-price categories for Center Operations)
12 MO $ _____________
01 Academic Personnel Exp 02 Other Academic Exp 03 CTT Personnel Exp 04 Other CTT Exp 05 Career Success Personnel Exp 06 Other Career Success Exp 08 Clothing Exp 09 Support Ser Personnel Exp 10 Other Support Ser Exp 11 Medical Personnel Exp 13 CP/CTR Personnel Exp 14 Other CP/CTR Exp 15 Admin Personnel Exp 16 Other Admin Exp 17 Indirect Admin Exp Not applicable 18 Facil Maint Personnel Exp 20 Security Personnel Exp 22 Communications 24 Facility Lease Cost 25 Liability Insurance
3003 Fees – Fixed Price Line Items Management Fee – 1% (Operations) 12 MO $ _____________ Management Fee – 1% (OA if app.) 12 MO $ _____________ Management Fee – 1% (CTS if app.) 12 MO $ _____________ Performance Incentive Fee (Maximum = 1.4% & Average = .7%) $ _____________
Center Operations – Type: CR (Below are the cost-reimbursable categories for Center Operations)
12 MO $ _____________
07 Food Exp $ _____________ 12 Other Medical Exp $ _____________ 19 Other Facilities Maintenance Exp $ _____________ 21 Other Security Exp $ _____________ 23 Utilities and Fuel Exp $ _____________ 26 Motor Vehicle Exp $ _____________
3005 Fees – Cost Reimbursable Line Items Management Fee – 1% 12 MO $ _____________
CLIN Supplies/Service QTY Unit Unit Price Amount
Cost Incentive Fee (Max 3% & Avg 1.5%) $ _____________
3006 G&A – Center Operations Expenses (CR only) $ _____________
3007 Outreach & Admissions – FFP (60% of total price); Initial Arrival 1,254 EA
3008 Outreach & Admissions – FFP (40% of total price); 90 Days $ _____ $ _____________
Career Transition Services / Graduates – FFP (60% of total price) Initial Placement 716 EA
Career Transition Services / Graduates – FFP (40% of total price) 6 Months
Career Transition Services / Former Enrollee – FFP (60% of total price) Initial Placement 244 EA
Career Transition Services / Former Enrollee – FFP (40% of total price) 6 Months
3013 27 Travel and Training NTE $15,002
3014 Construction, Rehabilitation, and Acquisition (CRA) (B1) (A/B) NTE $926,448
3015 Equipment (B2) NTE $145,806
3016 Career Technical Skills Training (B4) NTE $114,000
3017 Demonstration Projects – TBD NTE TBD
5001 Phase out $ _____________
GRAND TOTAL – Option Period 3 (CLINs 3002 through 3017) $ _____________
Delete Section F.5 DELIVERABLES in its entirety
ADD:
Section F.5 DELIVERABLES
The Contractor shall deliver all program and reporting requirements as defined in Exhibit 5-2 of the Program Requirements Handbook.
In addition to those deliverables required in the PRH, the Contractor shall adhere to the following input schedule: Applicable □ Not Applicable
Year 1 Annual Arrival by Center – GAP Table
Center
Male Residential
Male
Non Residential
Female Residential
Female
Non Residential
Total
Ramey 310 97 200 93 700
Virgin Islands 135 N/A 119 N/A 254
TOTAL 954
Year 2-4 Annual Arrival by Center – GAP Table
Center
Male Residential
Male
Non Residential
Female Residential
Female
Non Residential
Total
Ramey 310 97 200 93 700
Arecibo 125 35 105 35 300
Virgin Islands 135 N/A 119 N/A 254
TOTAL 1254
Ramey Annual Arrival by Month (Years 1 through 4)
February 1, 2019 through January 31, 2023
Month Male Male NR Female Female NR Total
February 26 8 17 8 59
March 26 8 17 8 59
April 26 8 17 8 59
May 26 8 17 8 59
June 26 8 17 8 59
July 26 8 17 8 59
August 26 8 17 8 59
September 26 8 17 8 59
October 26 8 17 8 59
November 26 8 17 8 59
December 25 8 15 6 54
January 25 9 15 7 56
TOTAL: 310 97 200 93 700
U.S. Virgin Islands Annual Arrival by month (To the PR Centers & Various Mainland Centers) Years 1 – 4 - February 1, 2019 through January 31, 2023
Month Male Female Total
February 8 10 18
March 14 13 27
April 13 12 25
May 8 5 13
June 7 5 12
July 13 13 26
U.S. Virgin Islands Annual Arrival by month (To the PR Centers & Various Mainland Centers) Years 1 – 4 - February 1, 2019 through January 31, 2023
Month Male Female Total
August 15 13 28
September 15 13 28
October 13 13 26
November 13 12 25
December 8 5 13
January 8 5 13
Total: 135 119 254
DELETE SECTION H.28 Key Personnel
ADD:
H.28 KEY PERSONNEL (September 2018) In the event any personnel is reassigned or otherwise removed before his or her service is completed under resulting contract, the Contractor shall assign an appropriate replacement. This shall be done within a maximum of two weeks after the personnel is reassigned or otherwise removed, unless a different replacement period is required under the instructions of the contract. The Contractor shall ensure smooth transition between resulting contract personnel and their replacements. Training of these personnel replacements shall not be an additional charge to the DOL.
The Contractor shall not assign any Key Personnel without the approval of the Regional Director, in accordance with the PRH, and the express written consent of the Contracting Officer.
Replacement of Key Personnel If reassignment or replacement of any Key Personnel becomes necessary, the Contractor shall immediately notify the CO in writing, accompanied by the resume of the proposed replacement personnel who shall be of at least substantially equal in qualifications and comparable skills as the individual currently approved for that category. The request must include the number of hours the Contractor will provide, at its own expense, to train the proposed replacement personnel; and any other information requested by the CO to reach a decision on replacement or reassignment.
SECTION J:
See amended Attachment J.5 Puerto Rico CTST Offerings
See amended Attachment J.13 GSA Leased Vehicles FY 18 Puerto Rico
See amended Attachment J-16 Attachment (Davis Bacon Wage Determination) General Decision Number: PR180001 01/05/2018 PR1
File details come from the government source that posted it.