Jefferson Laboratories Complex Performance Work Statement
Appendix II P R O C U R E M E N T S E N S I T I V E
APPENDIX II
DESCRIPTION OF EXISTING FACILITIES
Figure 1 Jefferson Labs Campus
Table of Contents
APPENDIX II
Table of Contents
DESCRIPTION OF EXISTING FACILITIES
BUILDING: 5A
Description
ARCHITECTURAL
STRUCTURE
BUILDING EXTERIOR
BUILDING INTERIOR
SITEWORK:
HANDICAPPED PARKING:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
EXISTING SYSTEMS IN FACILITY
HVAC SYSTEM
PLUMBING:
ELECTRICAL
FIRE PROTECTION
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
BUILDING: 5B
Description
ARCHITECTURAL
STRUCTURE
SUBSTRUCTURE:
SUPERSTRUCTURE:
BUILDING EXTERIOR
EXTERIOR WALLS:
EXTERIOR DOORS:
ROOFING:
BUILDING INTERIOR
PARTITIONS:
INTERIOR DOORS:
WALL FINISHES:
FLOOR FINISHES:
CEILING FINISHES:
CONVEYING:
BUILDING PERIMETER
SITEWORK:
HANDICAPPED PARKING:
MECHANICAL HVAC
COOLING GENERATION:
HEAT GENERATION:
DISTRIBUTION SYSTEMS:
TERMINAL & PACKAGE UNITS:
CONTROLS & INSTRUMENTATION:
PLUMBING
PIPING:
FIXTURES:
FIRE PROTECTION
ELECTRICAL
ELECTRICAL SERVICE & DISTRIBUTION:
EMERGENCY LIGHT & POWER SYSTEMS:
LIGHTING & BRANCH WIRING:
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 5C
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
BUILDING PERIMETER
MECHANICAL HVAC
DISTRIBUTION SYSTEMS:
TERMINAL & PACKAGE UNITS:
CONTROLS & INSTRUMENTATION:
FIRE PROTECTION
ELECTRICAL
ELECTRICAL SERVICE & DISTRIBUTION:
EMERGENCY LIGHT & POWER SYSTEMS:
LIGHTING & BRANCH WIRING:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
SPECIAL EQUIPMENT
CRITICAL SYSTEMS
BUILDING: 5D
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
BUILDING PERIMETER
MECHANICAL HVAC
FIRE PROTECTION
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 6 storage only This building’s HVAC is shut down and is currently being used as a storage facility only and contains a large walk-in cooler/freezer. The walk-in cooler/freezer is fed by an electric panel in Building 26 which is capable of providing emergency power Description
ARCHITECTURAL
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION:
ELECTRICAL
COMMUNICATIONS & SECURITY: Abandoned
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
SPECIAL EQUIPMENT
CRITICAL SYSTEMS
BUILDING: 7
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL BOILERS
BOILER AUXILIARY EQUIPMENT
HVAC
PLUMBING
FIRE PROTECTION
ELECTRICAL
COMMUNICATIONS & SECURITY:
CRITICAL ENVIRONMENTAL CONDITIONS
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
BUILDING: 9
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
HVAC
FIRE PROTECTION:
ELECTRICAL
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 10
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION:
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
BUILDING: 11
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION:
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
None
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
BUILDING: 12
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION:
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 13
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
HVAC
PLUMBING
FIRE PROTECTION:
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
BUILDING: 14A
Description
ARCHITECTURAL
SUBSTRUCTURE:
SUPERSTRUCTURE:
BUILDING EXTERIOR
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
EXISTING SYSTEMS IN FACILITY
FIRE PROTECTION
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 14B
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 14C
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION
ELECTRICAL
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
SPECIAL EQUIPMENT
CRITICAL SYSTEMS
BUILDING: 15
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION
ELECTRICAL
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 16
Description
ARCHITECTURAL
BUILDING EXTERIOR
ROOFING
BUILDING INTERIOR
STRUCTURE
HANDICAPPED ACCESSIBILITY
HAZARDOUS MATERIALS
MECHANICAL
FIRE PROTECTION
ELECTRICAL
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
BUILDING: 17
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
MAJOR EQUIPMENT
CRITICAL SYSTEMS None
BUILDING: 20 Abandoned Description
ARCHITECTURAL
MECHANICAL
Abandoned
FIRE PROTECTION
ELECTRICAL
BUILDING: 21
Description
ARCHITECTURAL
MECHANICAL
FIRE PROTECTION
FIRE ALARM EQUIPMENT
ELECTRICAL
SECURITY AND COMMUNICATION SYSTEMS
OTHER EQUIPMENT
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS None
BUILDING: 26
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION
ELECTRICAL
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 28
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
HANDICAPPED ACCESSIBILITY
MECHANICAL
FIRE PROTECTION
ELECTRICAL
FIRE ALARM EQUIPMENT
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS None
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
CRITICAL SYSTEMS
BUILDING: 31
Description
ARCHITECTURAL
BUILDING EXTERIOR
ROOFING:
BUILDING INTERIOR
STRUCTURE
HANDICAPPED ACCESSIBILITY
HAZARDOUS MATERIALS
MECHANICAL
FIRE PROTECTION
ELECTRICAL
FIRE ALARM EQUIPMENT
SECURITY AND COMMUNICATION SYSTEMS
OTHER EQUIPMENT
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
CRITICAL SYSTEMS
BUILDING: 32
Description
ARCHITECTURAL
MECHANICAL
ELECTRICAL
FIRE ALARM EQUIPMENT
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
EXISTING SYSTEMS IN FACILITY
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 37
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
PLUMBING
FIRE PROTECTION:
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
MAJOR EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
BUILDING: 44
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
BUILDING: 45
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION:
ELECTRICAL
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
MAJOR EQUIPMENT None
SPECIAL EQUIPMENT
None. CRITICAL SYSTEMS
BUILDING: 46
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION:
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS None
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 50
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION
CRITICAL ENVIRONMENTAL CONDITIONS
BUILDING: 51
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
CRITICAL SYSTEMS
BUILDING: 52
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL
FIRE PROTECTION
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS None
BUILDING: 53A
Description
ARCHITECTURAL
STRUCTURE
BUILDING EXTERIOR
BUILDING INTERIOR
BUILDING PERIMETER
MECHANICAL
PLUMBING
FIRE PROTECTION:
ELECTRICAL
COMMUNICATIONS & SECURITY:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
SPECIAL EQUIPMENT
BUILDING: 53B, C, D and E
ROOFING:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
EXISTING SYSTEMS IN FACILITY
HVAC SYSTEM
Plumbing
ELECTRICAL
FIRE PROTECTION:
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 54
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL HVAC
PLUMBING
FIRE PROTECTION:
ELECTRICAL
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 60
Description
ARCHITECTURAL
BUILDING EXTERIOR
MECHANICAL HVAC
PLUMBING
FIRE PROTECTION:
ELECTRICAL
FACILITY FUNCTION
CRITICAL ENVRIONMENTAL CONDITIONS
SPECIAL EQUIPMENT
BUILDING: 62
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL HVAC
PLUMBING
OTHER EQUIPMENT
FIRE PROTECTION
ELECTRICAL
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS HVAC
BUILDING: 62A
Description
ARCHITECTURAL
BUILDING EXTERIOR
BUILDING INTERIOR
MECHANICAL HVAC
PLUMBING
OTHER EQUIPMENT
FIRE PROTECTION
ELECTRICAL
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS HVAC
BUILDING: 85
ROOFING:
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
EXISTING SYSTEMS IN FACILITY
Mechanical
ELECTRICAL
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: Trailers
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL SYSTEMS
EXISTING SYSTEMS IN FACILITY
MAJOR EQUIPMENT
SPECIAL EQUIPMENT
SPECIAL MAINTENANCE ATTENTION
CRITICAL SYSTEMS
BUILDING: 70, 71, 72, 73, & 74
FACILITY FUNCTION
CRITICAL ENVIRONMENTAL CONDITIONS
EXISTING SYSTEMS IN FACILITY
HVAC
DESCRIPTION OF EXISTING FACILITIES
This Appendix provides the SP with an overview of the existing facilities at the Jefferson Laboratory Complex by providing a general description of the Architecture, building function at the facility, function of the major systems in each building, and the major and special equipment.
Performance Work Statement (PWS).
• This Appendix is not a listing of only SP-occupied facilities; rather, it describes all facilities at the Center.
A list of SP-occupied facilities is included at Exhibit 15-1 to the PWS.
• Some systems and items of equipment are described as being in poor operating condition. These items shall be maintained in as good working order as possible, but shall not be replaced without prior COTR approval.
• Some systems and items of equipment are described as being inoperative. These items are included herein for informational purposes only. They shall not be repaired or otherwise maintained without COTR approval.
• "Critical Environmental Conditions" (see Appendix I for definition) are indicated for each building where they are needed. These conditions are monitored by the EMCS Systems and the ranges of values (i.e., temperature ranges and tolerances) are programmed therein by the governments EMCS staff.
• HVAC Systems are monitored by Siemens Apogee, Johnson Metasys, or Trane Tracer Summit building automation systems. All are direct digital control (DDC) systems and include many control points.
Temperature and Humidity for individual rooms in laboratory and animal holding spaces shall be included under the “Critical Environment Conditions.”
BUILDING: 5A
SQAURE FOOTAGE: 39,800 SF
NO. FLOORS: 1
Description
ARCHITECTURAL
Building 5A is located at the FDA Jefferson Laboratories, in Jefferson, Arkansas. It is the west portion of a larger structure, which incorporates Buildings 5A, 5B, 5C, and 5D. The original building was constructed in 1952 and there have been a number of alterations since that time. The overall 39,800 square foot one-story structure contains animal holding areas, animal support areas, office space, restrooms, and utility areas.
STRUCTURE
SUBSTRUCTURE:
The substructure consists of cast-in-place concrete perimeter foundation walls with spread footings, and a raised cast-in-place concrete first floor slab.
SUPERSTRUCTURE:
The superstructure is of steel-framed construction and a steel-framed roofing system supporting a concrete roof deck with an original built up roofing system. A steel-framed roofing structure has been added over the original building.
BUILDING EXTERIOR
EXTERIOR WALLS:
The exterior facades consist of painted clay tile block walls, painted concrete masonry unit walls and painted metal fasciae.
EXTERIOR WINDOWS:
The building has no windows.
EXTERIOR DOORS:
The exterior doors consist of glazed, storefront-type units with pull handle-type hardware and metal units set in metal jambs, with knob-type hardware. Two roll-up doors serve the delivery dock and the dirty process area dock.
ROOFING:
The building has a sloped, standing seam, metal roofing system with metal flashing. The north side entranceway and south side canopy have flat, built up roofing systems. It was manufactured by Varco Pruden Buildings installed on 03/18/2003 with a 20 yr. warranty.
BUILDING INTERIOR
PARTITIONS:
Interior walls consist primarily of poured concrete, clay tile block, concrete masonry unit block and metal studded partitions.
INTERIOR DOORS:
The interior door assemblies consist of metal units, set in metal jambs, equipped with pull-handle or knob-type hardware.
WALL FINISHES:
Walls are of painted masonry and gypsum board.
FLOOR FINISHES:
The building interior floor finishes consist of exposed and epoxy-coated concrete.
CEILING FINISHES:
Ceiling finishes are of painted plaster or gypsum board, or are exposed to the steel roof support system and deck.
CONVEYING:
The building is all on one level. Exterior stairs provide access to the roof level.
SITEWORK:
Exterior pedestrian and vehicular paved surfaces consist of cast-in-place concrete.
HANDICAPPED PARKING:
There is adequate area for handicapped parking adjacent to the building. A handicapped accessible ramp provides access to the main entrance at the northwest area of the building.
FACILITY FUNCTION
This section of building 5 consists of animals holding rooms, shower facilities and process equipment area.
The building was partially renovated in 1999, 2005 and 2012. The building contains 20 animal rooms, "clean" and "dirty" support areas containing special equipment used for animal care, men and women's change units, as well as office, storage areas and mechanical rooms that contain the supply fans and HEPA filter housings (major mechanical room in building 5B-120, 5B-180 and in the Building 5A penthouse).
CRITICAL ENVIRONMENTAL CONDITIONS
At the present time 15 animal holding rooms are being utilized requiring a constant environmental condition of 77°+ 3°F temperature, 40-60% relative humidity, and a positive static pressure differential to ensure the cleanliness of the areas. Other critical conditions that require routine maintenance and monitoring are, air flow direction and HEPA filter condition.
EXISTING SYSTEMS IN FACILITY
HVAC SYSTEM
The HVAC systems are 100% outside air systems providing HEPA filtered (99.97% above 0.3 micron particle size) air to the space with individual room control for temperature and humidity. Chilled water is furnished by the campus centralized district cooling system. The temperature and humidity in the animal holding areas are controlled utilizing hot water reheat and variable air volume control. The humidity is controlled by dehumidification at the cooling coils with humidification from in-duct steam humidifiers. The static pressure is controlled by variable speed drives on supply systems.
DISTRIBUTION SYSTEMS:
The building has ducted air handlers with air to air heat exchangers that are roof mounted or located in Bldg 5B mechanical room 180 providing 100 percent outside air to zone control boxes. Steam, heating hot water and chilled water is supplied from site utilities. The exhaust fans that provide exhaust for animal rooms and restrooms are incorporated into the air handlers.
Chilled water is supplied from site AW, air conditioning, water system. Heating hot water is provided from steam converters in the 5B building. Space humidity is provided by steam humidifiers.
TERMINAL & PACKAGE UNITS:
The building has zone control boxes mounted in the ceilings and in the penthouse.
CONTROLS & INSTRUMENTATION:
Electric thermostats and humidity sensors are interfaced to a Siemens Apogee DDC system for control.
PLUMBING:
In the processing area, plumbing has been replaced (2004), excluding in slab sewer lines to all processing equipment.
Building 5A is also served by the industrial and sanitary sewer systems, the low pressure steam system, the low pressure steam condensate system, and the central plant compressed air system, hot and cold water system.
PIPING:
Domestic water is supplied to the building by the site distribution system, with distribution by copper piping. Domestic hot water for the building is provided from hot water system in the penthouse installed in 2012.
Storm water is removed from the rooftops by gutters with leaders to ground drainage. The sanitary system is gravity piping to the site system. The process equipment waste water goes to a sump pump and is pump to the gravity fed system.
FIXTURES:
There are men's and women's multi-fixture restrooms - shower rooms with vitreous china lavatories, urinals and water closet fixtures. The janitorial closet is equipped with a utility sink. Individual DX cooled drinking fountains are provided.
ELECTRICAL
ELECTRICAL SERVICE & DISTRIBUTION:
Electrical power for building 5A is supplied from the 480 V switchgear located in building 5B.
Transformers are provided for lights and receptacle power distribution throughout the building. Panels are typically recessed mounted in corridors and also located in utility spaces at selected areas within the building.
EMERGENCY LIGHT & POWER SYSTEMS:
Building 5A obtains emergency power service from the emergency generating system at building 5B.
Exit lighting and emergency lighting as well as selected critical equipment appear to be connected to the emergency power distribution system.
LIGHTING & BRANCH WIRING:
Interior lighting generally consists of fluorescent fixtures equipped with type T8 lamps and ballasts.
Typical interior fixtures are two by four with lens. Exterior lighting is generally provided through surface mounted cylinders and HID wall packs.
COMMUNICATIONS & SECURITY:
The facility is equipped with a conventional fire alarm system with control panel, enunciator, initiation and alert devices. Some portions of the facility are equipped with fire alarm initiation and alert devices believed to be tied in to the fire alarm control panel serving building 5B. Telecom service is provided through fiber optic cabling and multiple pair copper terminating in a dedicated telecom closet.
The facility is equipped with a security system.
FIRE PROTECTION
This building is only partially protected by an automatic fire alarm system. The section west of corridor 132 has a old Simplex system in place but is not functional and will be replaced. The Animal care section and Air handler ERU-3 is served by a Simplex 4005 system in Bldg 5B. . See Appendix III Description of Existing Utilities for more details.
Handheld fire extinguishers are located throughout the building.
SPECIAL EQUIPMENT
Two (2) large industrial sterilizers (one is a gas sterilizer) are no longer in service. One (1) tunnel rack washer, one (1) enclosed rack washer, a tunnel cage washer with a bedding dispenser, one (1) tunnel bottle washer is in service as of 2012.
SPECIAL MAINTENANCE ATTENTION
All of the critical environmental conditions are monitored and controlled within AAALAS specified limits at all times. All processing area equipment must be calibrated and certified to comply with AAALAS requirements.
BUILDING: 5B
SQUARE FOOTAGE: 76,550 SF
NO. FLOORS: 1
Description
ARCHITECTURAL
Building 5B is located at the FDA Jefferson Laboratories, in Jefferson, Arkansas. It is a portion of a larger structure, which incorporates Buildings 5A, 5B, 5C, and 5D. The original building was constructed in 1952 and there have been a number of alterations since that time. The overall 76,550 square foot one-story structure, with a partial basement, contains office space, laboratory areas, restrooms, storage and utility areas.
Per the 2003 International Building Code, Building 5B is classified as Business occupancy, Use Group B, and Construc