16-223-SOL-00006
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
JEFFERSON AR 72079
HFT-323
3900 NCTR ROAD
Nick Sartain OAGS - Field Operations Branch
FDA/OO/OFBA/OAGS/DAP
JEFFERSON AR 72079
HFT-323
3900 NCTR ROAD, Bldg. 50, Room 422 Nick Sartain OAGS - Field Operations Branch
FDA/OO/OFBA/OAGS/DAP
05/26/2016000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/19/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide answers to questions submitted.
1. Can subcontractor past performance be provided as part of the offerer past performance?
Response: Subcontractor past performance will not be evaluated. Past performance is for the prime contractor only.
2. Section L - Paragraph D. Recent and Relevant Past Performance Instructions.
Paragraph one states that "Any finalized, applicable Contractor Performance Assessment
Reports (CPAR) may be provided in lieu of the Past Performance Questionnaire and Sample
Client Letters. If Offeror is submitting a CPAR instead of the PPQs, should the CPAR be
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
16-223-SOL-00006/000001
sent directly to you, or should it be included in
Volume III of the Past Performance Proposal?
Response: Include CPAR in Volume III of Past
Performance Proposal.
3. Section L - Paragraph C. Technical Proposal Instructions - sub paragraph (c).
Do tab dividers count toward page counts?
Response: Tab dividers will not be included for page count limitation purposes unless proposal information is included on the dividers.
4. Section L - Paragraph B. Business Proposal Instructions - sub paragraph 1.
Sub paragraph one states "Standard Form 33 of the
Contract. One (1) original of the completed, signed offer (Section A through K) of the solicitation package. Do you want all sections including Sections C, D, E, F, G, H, I, and J included in proposal?
Response: The original completed signed offer shall have all sections included (Sections A through K) and signed amendments.
5. Section L-5 General Proposal Instructions - A.
GENERAL INSTRUCTIONS - Sub Paragraph 1.
Submission of Proposals. Part III - Past
Performance Proposal. Please clarify that it is required to submit 35 Electronic Copies on CD?
Response: This is a typo. Five (5) electronic copies on CD is required.
6. Section L-5 Past Performance Volume.
Technical Proposal Instructions state that the text of the proposal should be double-spaced 11 point font or greater. Does the double spacing apply to Past Performance Proposal Volume II also?
Response: The Past Performance Volume should be double-spaced with 11 point font or greater.
7. Section L - Paragraph C. Technical Proposal Instructions - sub paragraph (b). Technical
Proposal is limited to a total of Fifty (50) double-sided pages. Does this include resumes of key personnel? Since there are several resumes
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
16-223-SOL-00006/000001
to be included in the technical proposal can resumes be excluded from page count?
Response: Resumes will not count towards the 50 double-sided page limit. Resumes shall be contained at the end of the proposal following the 50 page technical proposal.