amendment_1.pdf

PDF 86 KB Posted

Attached to
Operation and Maintenance of Facility Services
Solicitation number
16-223-SOL-00006
Issued by

View the file

Other files

File Type Posted
Amendment_4.pdf PDF
Utilities_Manager.pdf PDF
Refrigeration_Shop.pdf PDF
Attachment_3_floor_plans.doc DOC document
Millwright.pdf PDF
Attachment_4_Vending_Sales_CAFE_2015.pdf PDF
Lawn_Crew.pdf PDF
Housekeeping.pdf PDF
Dometic_Engineer.pdf PDF
Electric_Shop.pdf PDF
Shift_Technician.pdf PDF
Attachment_1_revised_J-1_PWS_2016_Final_6-22-2016.pdf PDF
Sheetmetal_Shop.pdf PDF
Instrument_Shop.pdf PDF
Carpentry_Shop.pdf PDF
Pipe_Shop.pdf PDF
General_Maintenance.pdf PDF
Amendment_3.pdf PDF
Boiler_.pdf PDF
Water_Plant.pdf PDF
Attachment_2_site_visit_attendee_list.pdf PDF
Amendment_2.pdf PDF
16-223-SOL-00006_amendment_2.pdf PDF
Attachment_2_Power_Point_from_Facility_Operations_Staff.pdf PDF
Attachment_J-5.pdf PDF
16-223-SOL-00006.pdf PDF
Attachment_J-9_PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE.doc DOC document
Attachment_J-6.pdf PDF
Attachment_J-8_Personnel_Security_Clearance_Requirements.doc DOC document
Attachment_J-11_employees_length_of_service.pdf PDF
Attachment_J-4_NCTR_CBA_Final_2015-9-14.pdf PDF
Attachment_J-10_SAMPLE_CLIENT__LETTER.doc DOC document
Attachment_J-7.pdf PDF
Attachment_J-3_Appendix_VII_Equipment_List.pdf PDF
Attachment_J-2_Appendix_II_and_III.pdf PDF
Attachment_J-1_PWS_2016_Final_5-19-2016.pdf PDF
Attachment_J-3_Appendix_VII_Equipment_List.pdf PDF
Attachment_J-2_Appendix_II_and_III.pdf PDF
PWS_2016_Working_Draft_.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

16-223-SOL-00006

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

JEFFERSON AR 72079

HFT-323

3900 NCTR ROAD

Nick Sartain OAGS - Field Operations Branch

FDA/OO/OFBA/OAGS/DAP

JEFFERSON AR 72079

HFT-323

3900 NCTR ROAD, Bldg. 50, Room 422 Nick Sartain OAGS - Field Operations Branch

FDA/OO/OFBA/OAGS/DAP

05/26/2016000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/19/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide answers to questions submitted.

1. Can subcontractor past performance be provided as part of the offerer past performance?

Response: Subcontractor past performance will not be evaluated. Past performance is for the prime contractor only.

2. Section L - Paragraph D. Recent and Relevant Past Performance Instructions.

Paragraph one states that "Any finalized, applicable Contractor Performance Assessment

Reports (CPAR) may be provided in lieu of the Past Performance Questionnaire and Sample

Client Letters. If Offeror is submitting a CPAR instead of the PPQs, should the CPAR be

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

16-223-SOL-00006/000001

sent directly to you, or should it be included in

Volume III of the Past Performance Proposal?

Response: Include CPAR in Volume III of Past

Performance Proposal.

3. Section L - Paragraph C. Technical Proposal Instructions - sub paragraph (c).

Do tab dividers count toward page counts?

Response: Tab dividers will not be included for page count limitation purposes unless proposal information is included on the dividers.

4. Section L - Paragraph B. Business Proposal Instructions - sub paragraph 1.

Sub paragraph one states "Standard Form 33 of the

Contract. One (1) original of the completed, signed offer (Section A through K) of the solicitation package. Do you want all sections including Sections C, D, E, F, G, H, I, and J included in proposal?

Response: The original completed signed offer shall have all sections included (Sections A through K) and signed amendments.

5. Section L-5 General Proposal Instructions - A.

GENERAL INSTRUCTIONS - Sub Paragraph 1.

Submission of Proposals. Part III - Past

Performance Proposal. Please clarify that it is required to submit 35 Electronic Copies on CD?

Response: This is a typo. Five (5) electronic copies on CD is required.

6. Section L-5 Past Performance Volume.

Technical Proposal Instructions state that the text of the proposal should be double-spaced 11 point font or greater. Does the double spacing apply to Past Performance Proposal Volume II also?

Response: The Past Performance Volume should be double-spaced with 11 point font or greater.

7. Section L - Paragraph C. Technical Proposal Instructions - sub paragraph (b). Technical

Proposal is limited to a total of Fifty (50) double-sided pages. Does this include resumes of key personnel? Since there are several resumes

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

16-223-SOL-00006/000001

to be included in the technical proposal can resumes be excluded from page count?

Response: Resumes will not count towards the 50 double-sided page limit. Resumes shall be contained at the end of the proposal following the 50 page technical proposal.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .