Attachment_2_Power_Point_from_Facility_Operations_Staff.pdf

PDF 2 MB Posted

Attached to
Operation and Maintenance of Facility Services
Solicitation number
16-223-SOL-00006
Issued by

About this file

Attachment 2 Power Point

View the file

Other files

File Type Posted
Amendment_4.pdf PDF
Utilities_Manager.pdf PDF
Refrigeration_Shop.pdf PDF
Attachment_3_floor_plans.doc DOC document
Millwright.pdf PDF
Attachment_4_Vending_Sales_CAFE_2015.pdf PDF
Lawn_Crew.pdf PDF
Housekeeping.pdf PDF
Dometic_Engineer.pdf PDF
Electric_Shop.pdf PDF
Shift_Technician.pdf PDF
Attachment_1_revised_J-1_PWS_2016_Final_6-22-2016.pdf PDF
Sheetmetal_Shop.pdf PDF
Instrument_Shop.pdf PDF
Carpentry_Shop.pdf PDF
Pipe_Shop.pdf PDF
General_Maintenance.pdf PDF
Amendment_3.pdf PDF
Boiler_.pdf PDF
Water_Plant.pdf PDF
Attachment_2_site_visit_attendee_list.pdf PDF
Amendment_2.pdf PDF
16-223-SOL-00006_amendment_2.pdf PDF
amendment_1.pdf PDF
Attachment_J-5.pdf PDF
16-223-SOL-00006.pdf PDF
Attachment_J-9_PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE.doc DOC document
Attachment_J-6.pdf PDF
Attachment_J-8_Personnel_Security_Clearance_Requirements.doc DOC document
Attachment_J-11_employees_length_of_service.pdf PDF
Attachment_J-4_NCTR_CBA_Final_2015-9-14.pdf PDF
Attachment_J-10_SAMPLE_CLIENT__LETTER.doc DOC document
Attachment_J-7.pdf PDF
Attachment_J-3_Appendix_VII_Equipment_List.pdf PDF
Attachment_J-2_Appendix_II_and_III.pdf PDF
Attachment_J-1_PWS_2016_Final_5-19-2016.pdf PDF
Attachment_J-3_Appendix_VII_Equipment_List.pdf PDF
Attachment_J-2_Appendix_II_and_III.pdf PDF
PWS_2016_Working_Draft_.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The National Center for Toxicological Research

And Arkansas Regional Laboratory

Facility Facts General Statement of Work Facility Photos Facility Tour Route

Agenda

Consists of 35 buildings totaling 1 million + sf, set on a 496 acres of pine forest Workforce consists 600 government and contract employees Building types include: Laboratory, animal holding, industrial and administration Onsite potable water treatment facility, central steam production plant, electrical/gas distribution systems, 3 district chilled water plants, and industrial sewage pretreatment facility.

Facility Site Facts

Operation & Maintenance of Facilities Jefferson Laboratories Complex 1 Table of Contents 2

SECTION 1: OVERVIEW 8

1.1 Background 8

1.2 General Statement of Work 9

SECTION 2: WORK MANAGEMENT 23

SECTION 3: CRAFT SHOP SERVICES 33

SECTION 4: MAINTENANCE, ALTERATION, AND REPAIR OF BUILDINGS

EQUIPMENT, AND STRUCTURES 36

SECTION 5: STEAM GENERATION AND DISTRIBUTION 38

SECTION 6: NATURAL GAS AND FUEL OIL PUMPING AND STORAGE 38

SECTION 7: WATER PUMPING, TREATMENT, STORAGE, AND DISTRIBUTION 39

SECTION 8: WASTE WATER PLANT AND SEWAGE SYSTEMS 40

SECTION 9: GROUNDS MAINTENANCE 40

SECTION 10: HVAC AND REFREIGERATION SYSTEMS AND EQUIPMENT 43

SECTION 11: ELECTRICAL PLANT AND DISTRIBUTION 45

SECTION 12: COMPRESSED AIR AND DISTRIBUTION 46

SECTION 13: PEST CONTROL 47

SECTION 14: PREVENTIVE MAINTENANCE PROGRAM 47

SECTION 15: HOUSEKEEPING SERVICES (SP OCCUPIED FACILITIES) 49

SECTION 16: ENVIRONMENTAL MONITORING AND CONTROL SYSTEMS 50

SECTION 17: JANITORIAL SERVICES 54

SECTION 18: CAFETERIA FOOD SERVICE OPERATION 56

APPENDIX I: DEFINITIONS 60

APPENDIX II: DESCRIPTION OF EXISTING FACILITIES 67

APPENDIX III DESCRIPTION OF UTILITY SYSTEMS 68

APPENDIX IV: APPLICABLE PUBLICATIONS 69

APPENDIX V: Sub-Contracted Services 70

APPENDIX VI: AREAS TO BE SERVICED BY JANITORIAL SERVICES 72

APPENDIX VII: EQUIPMENT LIST 74

Appendix VIII Performance Requirements Summary 75 Appendix IX Historical Workload 77 Appendix X Summary of SP Submissions 80 Appendix XI Mowing Areas 82 Appendix XII SP Occupied Facilities 82 Appendix XIII Vending Machines 86 Appendix XIV SOW for Fire extinguisher tasks for Jefferson Labs 87 Appendix XV Jefferson Laboratories Early Dismissal and Closure 89 Appendix XVI Snow Route NCTR Campus 92

Facility Photos

Court Yard

Boiler House

Switch Gear

Water Plant

Building 14

Building 53

Cafeteria

EMCS

Typical Labs

Building 26 Basement

Dangerous Machinery

Welcome to Jefferson Labs�
Agenda
Facility Site Facts
General Statement of Work
General Statement of Work
Facility Photos�
Court Yard
Boiler House
Switch Gear
Water Plant
Building 14
Building 53
Cafeteria
EMCS
Typical Labs
Building 26 Basement
Dangerous Machinery

File details come from the government source that posted it. Updated .