Appendix D - Transition Checklist 11.18.2026.docx

DOCX document 39 KB Posted

Attached to
Carville Job Corps Center Caretaker Services
Solicitation number
1605AE-27-Q-00001
Issued by

About this file

This is an appendix document containing a transition checklist dated November 18, 2026, for the Carville Job Corps Center Caretaker Services contract. As a supporting document to the solicitation rather than a primary requirements document, this file serves as an administrative tool to guide the transition process during contract changeover. The checklist is designed to ensure continuity of caretaker services at the facility and to establish procedures for transferring operational responsibilities from the incumbent contractor to the successor contractor. While the specific checklist items are not detailed in this summary, such transition documents typically address facility walkthroughs, equipment inventory transfers, personnel briefings, documentation handovers, and verification of service continuity to maintain protection of the Government property and facility operations during the transition period. The checklist supports the broader contract requirements for facility upkeep, grounds maintenance, site security, and caretaker support activities specified in the Performance Work Statement for this 8(a) competitive acquisition set at the Carville Job Corps Center in Louisiana.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX D

JOB CORPS CENTER OPERATOR TRANSITION

FACILITIES, HEALTH/SAFETY, AND FLEET VEHICLE CHECKLIST

INSTRUCTIONS

During transition at a Job Corps Center, the incumbent is responsible for reviewing this checklist with the new contractor and providing the applicable deliverables listed on this checklist to facilitate a successful transition of center facilities, health/safety, and fleet vehicle documentation. Both contractors shall sign the checklist when complete and submit to the Regional COR prior to transition completion.

FACILITIES TRANSITION DELIVERABLES
YES
NO
N/A
1
Provide inventory and location of facility as-built drawings
2
Provide inventory and location of facility equipment operations & maintenance manuals
3
Provide all training materials for facility equipment and systems including video training and training manuals
4
Provide list of all preventive and corrective maintenance vendors used by outgoing vendor (elevator, fire alarm/suppression, HVAC controls, pest management, etc.)
5
Provide copy of preventive maintenance plan and all facilities maintenance records (corrective and preventive)
6
Conduct review of all outstanding Work Orders in the Computerized Maintenance Management System (CMMS) Brightly
7
Provide copy of required life safety system inspection reports
a
Fire alarm annual inspection and maintenance reports
b
Fire suppression annual inspection and maintenance reports
c
Kitchen hood fire suppression annual inspection and maintenance reports
d
Boiler inspection reports
e
Backflow prevention device certification and inspection reports
f
Elevator certificates and inspection/maintenance reports
8
Food service health and safety inspection report and certificate
9
Provide all facility keys and overview of keying system and key control measures
10
Verify username and passcodes for all computer systems with the outgoing operator, such as HVAC controls software, CMMS system, Energy Watchdog, FNC/CRA Request System, etc.
11
Provide copies of all utility bills and utility agreements
12
Review list of all outstanding FNC and O&M deficiencies
FLEET/TRANSPORTATION TRANSITION DELIVERABLES
YES
NO
N/A
1
Provide vehicle daily logs and maintenance/repair logs
SAFETY/HEALTH TRANSITION DELIVERABLES
YES
NO
N/A
1
Center Occupational Safety and Health Plan (see Section 5.1 R15)
2
Fire safety training, drills, and inspections (see Section 5.1 R17)
3
Incidents requiring OSHA notification (see Section 5.4 R4)
4
Hearing Conservation Plan related documents including noise surveys (Section 5.1 R25)
5
Hazardous Materials Management documentation including inventory, spills, and releases (Section 5.9 R7)
6
Polychlorinated Biphenyls (PCBs) containing equipment inventory and all related documents (Section 5.13 R2)
7
Underground Storage Tanks (USTs)/Aboveground Storage Tanks (ASTs) documentation and records (see Section 5.13 R3)
8
Spill Prevention, Control, and Countermeasure (SPCC) plan (if required) (see Section 5.13 R3)
9
Lead documentation and records (see Section 5.9 R8)
10
Asbestos documentation and records (see Section 5.9 R9)
11
File containing SDSs for chemicals previously used on-center (see Section 5.9 R10)
12
Mercury documentation and records (see Section 5.13 R4)
13
Hexavalent Chromium documentation and records (see Section 5.9 R11)
14
Respirable Crystalline Silica documentation and records (see Section 5.9 R12)
15
Documentation as required by Safe Drinking Water Act (see Section 5.13 R6) (if center is Water Treatment Plant (WTP) operator)
16
Influent and Effluent monitoring data and documentation as required by the discharge permit (see Section 5.13 R6) (if center is Waste-Water Treatment Plant (WWTP) operator)
17
Confined Space Entry Program related documents including inventory (Section 5.1 R22)
18
Previous five years - OSHA 300A for students (Section 5.9 R18)
19
Temperature monitoring logs for refrigerators and freezers (Section 5.10 R1)

SIGNATURES

INCUMBENT CARETAKER (Printed Name, Title, Signature, Date)

INCOMING CONTRACTOR (Printed Name, Title, Signature, Date)

File details come from the government source that posted it. Updated .