Appendix A - Survey Volume 1.pdf
PDF 2 MB Posted
- Attached to
- Carville Job Corps Center Caretaker Services
- Solicitation number
- 1605AE-27-Q-00001
About this file
This document is a Facility Planning Report for Carville Job Corps Center in Carville, Louisiana, covering the Program Year 2021 facility survey and assessment completed in March 2022.
The report documents existing conditions across the 26-acre facility, which comprises 9 buildings totaling 116,346 gross square feet and 6 structures. The center is leased from the State of Louisiana through August 22, 2050, and is currently operated by the Louisiana National Guard. Key findings indicate that most buildings are in good condition; however, Dormitory Building 6 is rated as fair condition due to worn interior finishes, a leaking roof, and deteriorated HVAC systems. The facility survey identified significant short-term needs totaling $1,990,670: roof replacement on five buildings (Education Building 2, Recreation Building 3, Cafeteria Building 4, Administration Building 5, and Dormitory Building 6) costing $1,538,101; dormitory interior upgrades including HVAC system replacement, interior repainting, and door hardware replacement costing $436,533; replacement of outdated Fire Alarm Control Panels in six buildings costing $36,954; and restoration of drainage swales choking with vegetation and debris costing $16,036. The report also documents 18 funded but not corrected deficiencies totaling $259,417 and 29 unfunded deficiencies totaling $2,887,207. No National Office projects are proposed. Energy and water conservation goals are being met, with the facility achieving energy intensity of 86,320 BTU/GSF against a target of 96,289 BTU/GSF. All future projects will comply with Architectural Barriers Act standards and sustainable design criteria per Job Corps Handbook 814.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CARVILLE
Job Corps Center Carville, LA
Facility Planning Report Planning Strategy
Volume I
June 2022 Final
Departmentoflaborl
Office of Job Corps i
CARVILLE JOB CORPS CENTER
PY2021 FACILITY SURVEY REPORT
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Objectives and Scope
1.2 Report Contents
1.3 Existing Site Plan
1.4 Center Statistics
1.5 Executive Summary
1.6 Facility Survey Assessment Site Conditions, Available Deficiency Funding, and Office of Management and Budget (OMB) Score Card
2.0 EXISTING CONDITIONS
2.1 Background
2.2 Ownership
2.3 General Site Conditions
2.3.1 Water
2.3.2 Fire Protection
2.3.3 Sewer
2.3.4 Stormwater
2.3.5 Gas
2.3.6 Electrical
2.3.7 Communications
2.4 General Building Conditions
2.4.1 Roofing Issues
2.5 Preventive Maintenance
2.6 Facility Assessment by Function
2.6.1 Student Housing
2.6.2 Education
2.6.3 Food Service
2.6.4 Recreation
2.6.5 Administration
2.6.6 Medical/Dental
ii
2.6.7 Storage/Support
2.7 Environmental Management
2.8 Resource Use and Conservation: Energy and Water Conservation
2.8.1 Background
2.8.2 Energy Data Issues
2.8.3 Benchmarking
2.8.4 Electricity
2.8.5 Natural Gas
2.8.6 Water
2.9 Sustainability
2.9.1 Climate Resilience
2.10 Accessibility Standards
2.11 Historic Preservation Issues
2.12 Campus Security Inventory
2.13 Warranties
2.14 Health and Life Safety Issues
2.15 Completed and Current Projects Since the Last Survey
2.16 Funded Not Corrected (FNC) Deficiencies
3.0 PLANNING ANALYSIS
3.1 Introduction
3.2 Significant Issues
3.2.1 Significant Issues Being Addressed
3.2.2 Significant Issues to be Addressed
4.0 RECOMMENDATIONS
4.1 Introduction
4.2 Proposed Plan for Program Year 2021
4.3 Summary of Proposed Projects
4.3.1 Proposed National Projects
4.3.2 Proposed Regional Short Term Needs
4.4 Student Vocational Participation
4.5 Proposed Site Plan and National Project Implementation Plan iii
Proposed Site Plan
APPENDICES
Space Utilization Chart ................................................................................................... A-1
Federal Real Property Asset Management Performance Measures ................................ A-2
Funded but Not Corrected Deficiencies by Classification .............................................. A-3
Unfunded Deficiencies by Classification ........................................................................ A-4
Facility Condition Summary Report ............................................................................... A-5
Building Condition by Function ..................................................................................... A-6
Acronyms and Abbreviations ......................................................................................... A-7 iv
Page Intentionally Left Blank
1.0 INTRODUCTION
A team of Engineering Support Contractor (ESC) architects and engineers completed a facility survey and assessment of Carville Job Corps Center (Carville JCC) Carville, Louisiana, during the week of March 21, 2022 The results, conclusions, and recommendations of the Survey are documented in two volumes: Volume I - Planning Strategy and Volume II - Supporting Data.
The United States Department of Labor (DOL) ESC team completed the Survey on behalf of the Job Corps Division of Facilities and Asset Management. The following team members conducted the completed facility survey and assessment for Carville JCC:
Architect: Tom Fisher Mechanical Engineer: Julian Cruz Electrical Engineer: Hung Do
The facility survey relies on the assistance and cooperation of the JCC Operator without whose help this could not have been completed. Appreciation to the team that directly assisted the facility survey including:
Center Team
Center Director: Maj. John Meche F&A Administrator: Maj. John Lock Maintenance Supervisor: Kenny Minevielle
1.1 Objectives and Scope
The purpose of the Facility Survey is to accomplish the following objectives:
A. Document existing conditions of Carville JCC B. Identify new deficiencies and status of previously documented deficiencies.
C. Recommend funding for health and life safety deficiencies D. Identify short-term (less than 3 year) needs for the Campus.
E. Consolidate functions, improve operations, enhance security, reduce footprint by demolishing buildings where feasible.
F. Develop a Long Range Plan to optimize Campus operations.
1.2 Report Contents
Volume I includes the information and basis for the recommendations for long range planning.
Volume I consists of the sections identified below.
Section 2.0 – Existing Conditions
In this section, the status of the site and buildings in Carville JCC is presented in terms of conditions, functionality, energy and water usage, sustainability, and accessibility. The status of funded projects is noted and current and prior deficiencies are summarized.
Section 3.0 – Planning Analysis
The analysis leading to the proposed plan is presented in this section and is based on the existing site conditions and functions; and on near-term and long-term Center mission and objectives.
Section 4.0 – Recommendations
The recommendations for proposed projects and revised site plan are presented for Carville JCC.
1.3 Existing Site Plan
x x x x x x x x
P o i n t
C l a i r
R o a d
Gillis W. Long Center
OAK TREES
ELEC.
TRANSFORMER
RESTORE SWALES
GOVT. VEHICLE
PARKING
B e t t y
M a r t i n
R o a d
Carville Job Corps Center
Carville, Louisiana
BUILDINGS
1 - VOCATIONAL EDUCATION/MAINTENANCE
2 - EDUCATION/LIGHT VOCATION
3 - RECREATION/GYMNASIUM
4 - CAFETERIA
5 - ADMINISTRATION/MED-DENTAL
6 - DORMITORY
7 - RECEIVING
8 - VOCATIONAL
9 - GUARD HOUSE
STRUCTURES
10 - GAZEBO
11 - GAZEBO
12 - GAZEBO
13 - STORAGE
14 - STORAGE
15 - HOME BUILDERS STORAGE
Existing Site Plan
400 Feet2001000
STORAGE
RECREATION
MEDICAL/DENTAL
EDUCATION
DORMITORY
CAFETERIA
ADMINISTRATION
FUNCTION LEGEND
VACANT
AS OF 05/13/2021 FROM
INVENTORY VALIDATION
1.4 Center Statistics Date: 06/27/2022
Leased Activation Date: 2004
Site & Utilities
Water Source:
Sanitary Sewer:
Electrical Service:
Gas Type:
Telephone Service:
116,346
Bldgs with Asbestos:
Asbestos Survey Date:
Bldgs with Radon:
No Survey Performed
Yes
Regulated:
Non-Regulated:
Above Ground Tanks:
Sewage Treatment:
Publicly Owned Treatment Works
Air Pollution Sources: None
(225)642-9564
Eric Kallio
(225)642-0699Phone No.:
Fax No.:
Center Director:
Operating Contractor: Louisiana National Guard Ownership Status:
Lease Expiration:
Resident Men: Resident Women: Non-residents:
Facilities Maint. and Const. 24 Welding 15
Health Occupations 30 API Field Operator Assistant 24 Culinary Arts 12
Computer Operations 30 Automotive Mechanic 15 Medical Assistant 10
153 77 76 0
Real Estate Management
Buildings
Program
JCC# 618 CARVILLE 5465 Point Clair Road, Carville, LA 70721
Accessibility
Environmental Site Area (Acres):
Carville JCC
Bldg to Site Coverage: 10%
Age Distribution
Building Age > 50 yrs:
Building Age 20-50yrs:
Building Age 10-20yrs:
Building Age < 10 yrs:
Building Age Unknown :
Under Ground Tanks: 0
Energy Actual - BTU/GSF/YR: 98,054
YesEnergy Audit Done:
Status of ECM: Not Implemented
08/22/2050
70%
81,696
Site Access:
Buildings with Access:
Buildings with Access to Services:
Buildings with Accessible Restrooms:
Buildings with Other Accessible Features: 7
Buildings in Total Compliance: 7
# GSF %
116,346 100
No. Of Buildings:
Gross Sq. Footage:
Net Sq. Footage:
No. of Vacant Buildings:
Vacant (NSF):
Net / Gross (%):
Average Building Age: 18
Contract Strength:
Vocations (160):
Radon Surveys Reqd: 9
Mitigated: 0
Historic Status
Public Water Authority Publicly Owned Treatment Works Entergy Gulf States Louisiana, L.L.C
Natural
AT&T (local) and JCDC by AT&T (long distance)
26.00
12/31/2022Start / End Dates: N/A
Buildings on National List:
Eligible Buildings:
Candidate Buildings:
Historic District:
Contributing:
In/Pending:
Dorm Courtyard Building 6
Dining Hall Building 4
Vocational Building 1
Recreation / Gymnasium
1.5 Executive Summary
Short-Term Needs
1. Roofing on Education Building 2, Cafeteria Building 4, Administration Building 5, and Dormitory Building 6 is deteriorated and leaking. $1,538,101
2. Dormitory Building 6 suffers from worn finishes, damaged HVAC controls and damaged bed-room door hardware. $436,533
3. Fire Alarm Control Panels in 5 Center buildings are outmoded and replacement parts are not available. $147,816
4. The two main drainage swales are choked with vegetation and debris. $16,036
Proposed Projects
No National Office projects are proposed for Carville JCC.
Building Condition The Survey results indicate that the 26 acre site is in good condition except for drainage problems in swales. All buildings are in good condition except for Dormitory Building 6 which has worn interior finishes, a leaking roof and failing HVAC system. Additionally the Guard House is reported as too small for all the security and screening tasks needed..
Maintenance Operations and maintenance (O&M) of the Center Operator and preventive maintenance practices are excellent.
Energy and Water Goals
Energy and Water
Category FY2019 Intensity Baseline Year Baseline Intensity FY2019 Target
Difference from
Target Energy 86,320 BTU/GSF FY2018 98,054 BTU/GSF 96,289 BTU/GSF -10.0% Water 8,709.00 kgal FY2018 9,545.86 kgal 9,450.40 kgal -8.0%
Green – meeting target, Yellow- within 10% of target. Red – not meeting target.
The Center is meeting Energy and Water goals.
1.6 Facility Survey Assessment Site Conditions, Available Deficiency Funding, and Office of Management and Budget (OMB) Score Card
KEY
CRA: Construction Rehabilitation and Acquisition FCI: Facility Condition Index ((1-repair cost)/value)
GSF: Gross Square Feet O&M: Operations and Maintenance OBS: On Board Strength (current number of students) OMB: Office of Management and Budget
*NOTE: Prior to LA Guard, CS was 153 Students
Site Condition Roads and Pavement Good Power Good Natural Gas Good Central Plant N/A Water Supply Good Sewage Good
Building Conditions Student Housing Fair Worn interior, leaking roof ,HVAC systems deteriorated Education Good HVAC systems are failing, roof is leaking Food Service Good Recreation Good Medical/ Dental Good Administration Good Storage Support Good
Deficiency Cost Life Safety Deficiencies Non-Life Safety Deficiencies
Number Cost, $ Number Cost, $ Recently Funded 12 $86,962 8 $234,186 Prior Funded 0 $0 1 $3,094 O&M 22 Non-CRA Funded 46 Non CRA Funded
Unfunded 0 $0 26 $2,806,347
Available Beds Contract Strength OBS during Survey
Maximum Bed Capacity
Bed Capacity above Contract
Strength Resident Students Non-Resident
Students Resident Students
Non-Resident Students
N/A* N/A 17 0 200 N/A
OMB Score Card Metrics Current Goal Carville JCC Comments
O&M Costs $/
GSF/YR
5.10 1.85
%Utilization Office 97 100
Housing 98 100 Warehouse 96 100
FCI 0.919 .89 Roofing and HVAC %FCI < 0.90 15.2 72.2 Building systems end of life
2.0 EXISTING CONDITIONS
2.1 Background
The Carville JCC is not currently being operated as a JCC. There is no contracted program managed by the Dallas Regional Office. It is operated as a training center by the Louisiana Army National Guard but not currently under the auspices of Job Corps or DOL. Consequently, there are no Job Corps defined vocational trades.
Data contained in this report, such as vocational allocations, student numbers and student mix, is reflective of the Pre-Covid status of the Center.
Carville JCC is located on 26 acres of land in Carville, Louisiana, approximately 16 miles south of Baton Rouge. It adjacent to the dike separating it from the Mississippi River. The site is owned by the State of Louisiana and served as the U.S. Public Health Service Hospital for the treatment of Hansen’s disease until 1999. The name of the site was changed to the Gillis W.
Long Center (GWLC). In 2004 the DOL leased a portion of the GWLC property and activated the Carville JCC. The Center has 116,346 gross square feet (GSF) in nine buildings and 1,413 GSF in six structures. All buildings were built by and are owned by DOL.
The Center had provided residential living, academic education, recreation and vocational training for up to one hundred fifty three (153) resident male and female students, prior to Center’s management transition to the Louisiana National Guard.
Table 1: Number of Students Resident Men & Women
Non- Residents
On-Board Strength (at the date of the survey) 17 Projected Strength 52*
*LA Guard target student population at time of March 2022 Facility Survey.
2.2 Ownership
The Carville JCC is operated on property leased by the DOL from the State of Louisiana through the State Military Department. The lease commenced on August 23, 2000 and if all options are exercised, the lease will expire on August 22, 2050. The Government paid $10.00 for the entire term of the lease. The Center Operator and their employer are solely responsible for the cost and expense of keeping the premises in good repair. They are also responsible for insuring that construction and maintenance at the Center will not adversely affect the oak trees located on the
Table 2 Number of Beds and Rooms per Dormitory Wing Building Floor Room allocations Beds Rooms Dorm 6 West Wing 1 1 24 @4, 2@2 100 26 Dorm 6 East Wing 2 1 24 @4, 2@2 100 26 Total Beds and Rooms: 200 52 leased property. All buildings and improvements by the Government remain the property of the Government for the duration of the lease. As of this report, the Center is in operation under the Louisiana National Guard.
2.3 General Site Conditions
The Center is located in the Central Time Zone at approximately 30°N latitude and 91°W longitude at about 23 feet above sea level. The climate is a humid subtropical climate with the average annual precipitation of 60.7 inches. The average temperature for January ranges from a low of 41°F to a high of 61°F and the average temperature for July ranges from a low of 73°F to a high of 91°F.
The Center is located in a rural area adjacent to the Gillis W. Long Center to the west, rural properties to the north and the Mississippi River to the south. There are temporary trailer housing units installed in the aftermath of Hurricane Katrina on the adjacent property running the length of the east property line. Access to the site is from Point Clair Road to the southeast. The layout of the Center’s buildings creates a very attractive, well landscaped and effective campus. Walkways serves as the organizing element of the commons which are the main gathering place for both day and night activities. Dormitory and recreation buildings are located west of this walk while the cafeteria and education buildings are located on the east with Administration/Medical-Dental Building 5 to the south at the front of the campus. Gazebo Structures 10 and 11 are at the north end of the campus walk and Gazebo Structure 12 is at the south end. Outdoor recreation areas are located north of Recreation/Gymnasium Building 3 along the northwest perimeter of the campus.
Pedestrian and vehicular circulation within and around the site is satisfactory. Vehicular circulation is generally segregated from pedestrian traffic. Parking is typically located along the perimeter of the Center, with staff parking strategically located near Administration/Medical- Dental Building 5, and along the east perimeter road behind the Educational and Vocational buildings. An adequate number of standard and accessible spaces are provided. The roads and parking lots are asphalt with some curbs and gutters and are generally in good condition. The pedestrian circulation on the site is by central walkways interconnecting the buildings in through
Front View of Administration Building 5 the Central commons. Most sidewalks are concrete with some asphalt sidewalks leading to buildings on the northwest side of the campus. The site is pleasantly landscaped with large oak trees running along the northeast and southwest perimeters of the site. The Center is fenced with chain link fencing along north, east, and south sides. The fencing on the west is wrought iron with masonry piers owned by the adjacent site Louisiana National Guard Youth Challenge Program also known as Gillis W. Long Center. The sidewalks, landscaping and fencing are generally in good condition.
2.3.1 Water
The municipal water supply to the Carville JCC is from the Public Water Authority via the lessor’s facility, Gillis W. Long Center (GWLC). Water is metered on an individual building basis. The domestic water system is adequate and in good condition.
2.3.2 Fire Protection
Fire hydrants are located at strategic points around the Center. The nearest fire station is East Iberville Volunteer Fire Station# 1 at Saint Gabriel, LA four miles from the center and the response time is approximately five minutes. The fire alarm systems in buildings are connected to the central fire alarm control panel (FACP) in Administration/Medical-Dental Building 5. This central FACP is connected to the local Fire department.
2.3.3 Sewer
Sanitary sewer is piped from the Center through a lift station located at GWLC and connected to its system; collection is done by contract with GWLC. The sanitary sewer system is adequate and in good condition.
2.3.4 Stormwater
The site is flat with very little change in elevation. Storm water management is through surface run-off leading to swales and area drains which lead to underground piping. The storm water management system is choked with debris and vegetation and does not drain adequately. This results in intermittent ponding of water around the campus that is slow to drain off.
2.3.5 Gas
Natural gas is supplied by Atmos Energy Corporation. The Center owns and maintains the underground gas distribution piping used for heating, cooking and domestic water heating.
Natural gas system is adequate and in good condition.
Front View of Gymnasium Building 3
2.3.6 Electrical
Electrical service is provided by Entergy Gulf States Louisiana, L.L.C. and brought to the Center from a utility substation located at the southeast corner of the site. Service to most buildings is underground with pad-mounted transformer and meter.
Buildings 1, 7 and 8 are served from the same pad-transformer but each has its own meter.
separately metered. The buildings service is 480/277V with step-down transformers for 120/208V. Cafeteria Building 4, Administration/Medical-Dental Building 5 and Dormitory Building 6 each is supported by a diesel engine generator. The substation, primary pad-mounted transformers and meters are owned and maintained by the utility company. The Center owns and is responsible for secondary step-down transformers and distribution system. The service and electrical distribution systems are good and adequate.
The site lighting consists of pole-mounted and building-mounted light fixtures which are controlled by photocells or timers. Additional bollards lights are installed at the dormitory courtyards. The site lighting is owned and maintained by the Center, and is adequate and in good condition
2.3.7 Communications
Telephone service to the Center is provided by AT&T. The main telephone room and server room are both located in Administration/Medical-Dental Building 5. The internal data distribution systems, including internet, telephone and digital Voice over Internet Protocol (VoIP) are implemented, managed and maintained by Job Corps Data Center (JCDC). The server has a small uninterruptible power system (UPS) module that provides power backup for 15 minutes. The telephone and data/communication services are adequate and in good condition. The fire alarm system on Center is network configured with the central fire alarm control/annunciator panel located in Security Office in Building 5 and is monitored by Simplex Grinnell via telephone lines. The security system includes pad-mounted electric vehicular barrier arm operator, DOL/JCDC installed interior and exterior closed-circuit television (CCTV) cameras and software-based cards access system at all buildings main entrance, multi-display color monitors, scanner, metal detector and door alarms with magnetic contacts.
2.4 General Building Conditions
The six buildings were built in 2004 and one in 2005.
Receiving Building 7 and Vocational Building 8 were built in 2006. Education Building 2, Administration Building 5 and Dormitory Building 6 are one story load bearing masonry with brick facades, operable and fixed aluminum double gazed windows and sloped asphalt shingle roofs over wood trusses. The Recreation/ Gymnasium Building 3 is steel frame and load bearing construction with a brick façade and sloped asphalt shingle roof. Vocational / Maintenance Building 1, Receiving Building 7 and Vocational Building 8 are metal framed buildings with metal siding and metal sloped roofs. The mechanical systems in Buildings 2, 3, 5 are in fair condition. Dormitory Building 6 HVAC is in poor condition. All buildings function well, adequately accommodate their use and are generally in good condition except for Dormitory Building 6
2.4.1 Roofing Issues
Recreation Building 3 has a new 40 year asphalt shingle roof and Vocational Building 1 and Receiving Building 7 have metal roofs in good condition. The remainder of the roofs on Center are in fair to poor condition. They are experiencing leaks which are then repaired but recurring. At the time of the March 2022 facility survey the asphalt shingles were examined and determined to be prematurely failing with brittleness, loss of shingles in storms, and leaking around penetrations. The dormers shed water around their sides and the roof areas below are stained.
2.5 Preventive Maintenance
The Center utilized SchoolDude, a facility Computerized Maintenance Management System (CMMS), to track maintenance requests. Maintenance of the Center grounds and buildings are generally in good condition. As of the date of this report, the Center is under the National Guard’s management. Test and inspection documents were not up to date.
Prior to this report, the digital controls for heating, ventilation and air conditioning (HVAC) equipment are not functioning or maintained well to save energy. The digital control HVAC systems are in fair condition.
View of Vocational Building 1
Typical View of Center’s roof dormer vents
2.6 Facility Assessment by Function
2.6.1 Student Housing
The Center can accommodate two hundred (200) students in Dormitory Building 6 which is a variation of the Job Corps’ “H” prototype dormitory building design. The building has two 100-bed wings (East and West) which branch which are separated by a large pleasant central commons area. Each wing contains a lounge area, twenty four 4-bed sleeping rooms and two 2-bed accessible sleeping rooms with individual toilet/showers in each room. Each wing shares a laundry, a study, and is supervised by a common Residential Advisor’s office. The HVAC direct digital controls are malfunctioning and the inside temperatures are unevenly cold or hot throughout the building.
Overall the building is in good to fair condition with extensive roofing and HVAC deterioration, worn finishes and damaged door hardware to many rooms.Also, occasional ground moisture issues from flooding negatively impacts the living environment.
2.6.2 Education
Facilities Maintenance, Construction, and Automotive Mechanic are located in Vocational Education /Maintenance Building 1. The vocational spaces include shops, classrooms, tool rooms, and mezzanine storage and instructors offices.
Academic educational theory classrooms; introduction to Center life; and counselors offices are located in the Education Building
2. The academic and vocational classroom layouts function well. However, the Center lacks a student library where students can get books for educational and entertainment use.
The Home Builders Institute (HBI) Facility Maintenance and Construction vocation is located in the southeast end of Vocational Building 8. The north end of Building 8 accommodates the Certified Medical Assistant (CMA) and Computer Managed Instruction (CMI) soft vocations. Vocational spaces are adequate in size, function well and the
Dormitory Building 6
Education Building 1 buildings are in good condition, however, due to the transition of ownership to National Guard, these spaces where not in use by Job Corps students and staff.
2.6.3 Food Service
Food Service functions are located in Cafeteria Building
4. The building is conveniently located between Education/ Light Vocation Building 2 and Administration/Medical- Dental Building 5. Three meals were served each day, during two sittings per meal.
The building contains a dining hall, food preparation area, kitchen, dish washing, food storage area, one (1) office and restrooms. Spatial functional relationships, including circulation and queuing are adequate. Access to the dock area is from the access road running along the southeast perimeter of the site. The building functions well, and is in good condition.
2.6.4 Recreation
Indoor recreation functions are located in Recreation/Gymnasium Building 3. The recreation functions located in the building include the gymnasium, women’s and men’s weight rooms, locker rooms, a game room, arts and crafts, canteen, barber shop/laundry, equipment and uniform storage, student leadership and recreation manager offices, and media room. This building functions well and is in good condition.
Cafeteria Building 4
Cafeteria Building 4
Outdoor recreation facilities consist of a football field, baseball field and basketball courts.
The outdoor recreation facilities are generally in good condition and function well. There are three small gazebos.
2.6.5 Administration
Administration/Medical-Dental Building 5 is located on the southeast end of the campus near the main entrance. The security office is located next to the finance office. Account specialist is accessed from the buildings main lobby where there is a teller window available for financial transactions. The administration building adequately accommodates the current needs of the Center, and the building is in good condition.
2.6.6 Medical/Dental
Medical/dental functions are located in the southwest end of Administration/ Medical- Dental Building 5. The medical/dental facility includes a waiting room adjacent to the central building lobby, manager’s office, nurse’s station, unisex isolation room, men’s and women’s wards, examination rooms, medical laboratory, a prescription storage room, dental suite, trainee employee assistance program (TEAP) and mental health consultant office. The medical/dental facility is appropriately sized for a Center of this size, functions well and is in good condition.
2.6.7 Storage/Support
Center maintenance is located in the northwest end of Vocational Education/Warehouse Building 1. Warehouse and general storage is located in Receiving Building 7. Both buildings function adequately and are in good condition. General storage is also located in Storage Structures 13 and14, built by CTST. Tractor storage is located in Storage Structure 15 also built by CTST. The structures are generally in good condition.
Administration and Medical/Dental Building 5
2.7 Environmental Management
There were no environmental issues raised during the March 2022 Facility Survey. Mold is an ongoing issue in the humid Louisiana climate but past incidents have been thoroughly addressed.
2.8 Resource Use and Conservation: Energy and Water Conservation Energy and water use, and associated trends are summarized below for Carville JCC. This data only includes the data from September 2019 and back. As of the fiscal year that ended in September of 2019, the center has provided no records for FY2020 or FY2021 and is operated by the Louisiana National Guard.
2.8.1 Background
Table 3, Electricity and Water Statistics – FY2019, has current electricity, natural gas and water usage and cost. (Energy Watchdog 2019) Electricity and water unit costs are lower than the Average Cost in Job Corps however the natural gas unit cost is higher than the Average Cost in Job Corps.
Table 3: Energy and Water Statistics – FY2019 Energy Usage Cost Unit Cost Average Cost in Job Corps Electricity 2,333,610 kWh $166,428.99 $0.071 kWh $0.102 kWh Natural Gas 20,202.79 CCF $20,910.24 $1.035 CCF $0.364 CCF Water 8,709.00 kgal $22,207.99 $2.000 kgal $8.00 kgal Total $209,547.22
Notes: 1. This analysis is based on the latest energy information available.
2. Financial Year 2019 (FY 2019) energy data are the latest entire year available for analysis.
3. kgal = thousand gallons; kWh = kilowatt-hours; CCF= Centum cubic feet (100 cubic feet)
Receiving Building 7
2.8.2 Energy Data Issues
The Carville JCC began posting electricity, natural gas and water data since the second quarter of FY2005 and has been consistent with each year’s information going forward.
2.8.3 Benchmarking
The DOLr has set the following goals in the Sustainability Report and Implementation Plan for energy intensity and water intensity reduction. These goals will be used to benchmark each JCC. (Table 4)
Table 4: DOL Energy and Water Intensity Reduction Goals Energy Intensity Reduction Water Intensity Reduction
From FY2018 to FY2019 1.8% 1.0% From FY2019 to FY2020 1.5% 1.5%
Table 5: Energy and Water Benchmarking
Category FY2019 Intensity Baseline Year Baseline Intensity FY2019 Target
Difference from
Target Energy 86,320 BTU/GSF FY2018 98,054 BTU/GSF 96,289 BTU/GSF -10.0% Water 8,709.00 kgal FY2018 9,545.86 kgal 9,450.40 kgal -8.0%
Green – meeting target, Yellow- within 10% of target. Red – not meeting target.
The Center is meeting Energy and Water goals.
Figure 1 shows the Energy Intensity in BTU/GSF FY2010-FY2019. Energy intensity has been in steady decline since FY2015 with the exception of a small spike in FY2018, and lowest point is reached in FY2019. Figure 2 shows the Energy Usage Comparison in MMBTU for FY2010 to FY2019 which reveals a similar downward trend to Figure 1.
Figure 1: Energy Intensity for Carville JCC for FY2010-FY2019
Figure 2: Energy Usage comparison for Carville JCC for FY2010-FY2019
2.8.4 Electricity
Figure 3, Annual Electricity Usage, tracks the electricity usage for FY2010-FY2019. A spike in usage was reported in FY2015 with a decrease to its lowest in FY2019. Figure 4 shows Monthly Electricity Usage comparison for FY2017-FY2019. Usage was very similar across each fiscal year with spikes in the summer months which was likely due to HVAC usage.
Figure 3: Annual Electricity Usage for Carville JCC FY2010-FY2019
Figure 4: Monthly Electricity Usage for Carville JCC for FY2017-FY2019
2.8.5 Natural Gas
Monthly natural gas consumption is shown in Figure 5, Monthly Natural Gas Usage. Usage is primarily for heating as shown by the higher demand during winter months. Usage reporting dropped to zero in June FY2019 with no explanation. Figure 6, Annual Natural Gas Usage, shows the total natural gas usage per year for FY2010-FY2019. Annual usage reached its lowest point in FY2019.
Figure 5: Monthly Natural Gas Usage for Carville JCC for FY2017-FY2019
Figure 6: Annual Natural Gas Usage for Carville JCC for FY2010-FY2019
2.8.6 Water
Monthly water consumption is shown in Figure 7, Monthly Water Usage comparison FY2017-FY2019. Water usage reporting dropped to zero in FY2019 after May and no explanation was given for the omission. Figure 8, Annual Water Usage, shows the total water usage per year since FY 2010. Water usage dropped significantly in FY2019 as no data was reported after May.
Figure 7: Monthly Water Usage for Carville JCC for FY2017-FY2019
Figure 8: Annual Water Usage for Carville JCC for FY2010-FY2019
2.9 Sustainability
The DOL is committed to implementing initiatives in accordance with Executive Order 14008 Tackling the Climate Crisis at Home and Abroad. As a result, JCCrs have been adopting practices aimed at reducing energy, water, and waste. Center Operators have also been implementing other measures such as enhancement of indoor environmental quality, storm water management, and reduction of environmental impact of materials, green cleaning practices, environmentally preferred purchasing, integrated pest management and recycling. Furthermore, new construction shall comply with the latest version of the Job Corps Handbook 814 (JCH 814) which specifies sustainable design criteria.
Carville JCC has implemented the following initiatives:
1. The Center Operator actively uses SchoolDude for maintenance scheduling and task orders.
A list of nine specific sustainability indicators for the Center Operator is located in the Site Descriptions section of Volume II.
2.9.1 Climate Resilience
The Carville Job Corps Campus is within the flood plain and adjacent to the Mississippi river with a high dike separating the Center from the river. This makes the Center, or access to it, vulnerable to flooding. The campus has areas in the 100-year floodplain on the northwest corner of the site. This floodplain is part of the local drainage system with a creek flowing to the north adjacent to the site. A hurricane or other heavy rainfall could lead to flooding on the site. The Carville area is prone to hurricanes as shown by nearby landfalls of Hurricanes Katrina and Camille. Nearby New Orleans, LA is estimated to receive hurricane force winds on average every 5 to 7 years.
2.10 Accessibility Standards
The PY21 Facility Survey included an accessibility assessment for Carville JCC. The site is accessible, and seven of the nine buildings are in total compliance. All future projects at the Center will be in conformance with the Architectural Barriers Act (ABA) Standards as adopted in 2005 by the United States General Services Administration (GSA) for Federal Facilities and will include provisions for full accessibility. All areas of newly constructed buildings, facilities, and altered or leased buildings and facilities as well as the existing buildings and structures, shall comply with ABA requirements to provide reasonable accommodation as required by federal disability and non-discrimination laws. (All future projects at the Center will include provisions for full accessibility).
2.11 Historic Preservation Issues
Neither the site nor buildings have been evaluated for a determination eligibility to be listed on the National Register of Historic Places (NRHP). All buildings have been built since 2004.
2.12 Campus Security Inventory
There are security cameras throughout the campus, which are monitored from the security office located in Administration/Medical-Dental Building 5. The Guard Shack building 9 is very small and cannot adequately perform visitor and vehicular screening. There is no means to monitor the cameras from the Guard House, which is always manned.
The National Office of Job Corps is aware and sensitive to the security concerns at all Job Corps Campuses. Center Operator security concerns are being considered as part of a National Office security plan, now under development, to evaluate and address the physical security needs of all Campuses.
2.13 Warranties
No warranties were received in conjunction with the PY21 Facility Survey. There are 37 warranties on file with the National Office that predominantly pertain to roofing and doors.
However, the new Recreation Building 3 roof is not included. The Education Building 2 has a 40 year asphalt shingle roofing warranty (due to expire in 2044). This roof (as well as all the other asphalt shingle roofs except on Recreation 3) is currently leaking and appears to be failing.
2.14 Health and Life Safety Issues
The number of deficiencies identified or validated during the PY21 Survey can be found in Section 1.3, Executive Summary of this Report. Prior to this Report, twelve deficiencies Health and Life Safety Deficiencies have been funded of which three were funded after the PY 21 Facility Survey. 22 Operations and Maintenance (not funded) deficiencies were identified during the PY21 Facility Survey. The life safety deficiencies can be found in Volume II of this report under Life Safety Deficiencies for Correction by Center. Life Safety issues identified include:
1. Damaged dormitory door hardware
2. Corridor fire rated ceilings have holes and non-compliant wood pull-down stairs..
2.15 Completed and Current Projects Since the Last Survey
The following is a list of completed and current (funded not corrected) projects since the previous Survey that exceed $5,000 in cost.
Table 6: Completed Projects Deficiency ID Description Building Responsibility
109238 CRA ID 40905:
Domestic hot water heater past end of useful life
0001 –
ADMINISTRATION/HEALTH
SERVICES
Region
125928 Fire alarm system audio/visual coverage inadequate
0001 –
ADMINISTRATION/HEALTH
SERVICES
Region
126057 CRA ID 41455:
Temperature is excessive in computer equipment
0002 – VOCATION/EDUCATION
Region
134200 Existing Overhead door is broken
0003 – WAREHOUSE Region
109242 CRA ID 34927:
Domestic water heaters are failing
0004 – DINING
Region
125959 Automatic fire suppression system does not meet code
0004 – DINING Region
129790 CRA ID 29242:
Dishwasher not operating properly; past life cycle
0004 – DINING
Region
Table 7: Current Projects Deficiency/Project Number Description Responsibility
There were no current projects noted during the March 2022 Facility Survey
2.16 Funded Not Corrected (FNC) Deficiencies
The ESC reviewed the prior Funded Not Corrected (FNC) deficiencies. The Center Operator is responsible for completion of these deficiencies. If necessary, the Center Operator should coordinate with their ESC PM and request technical assistance from the ESC through the DOL Region.
There are no funded deficiencies older than 2018.
Table 8 Funded Not Corrected Deficiencies PY FNC Class Discipline / Item Number Cost Status
2019 IIA Site Door locks 133412 $5,131 Unknown 2019 IIIA Site Leaking AC refrigerant 136895 $3,084 Unknown 2019 IIIA Site Ductwork Cleaning 136974 $69,633 Unknown 2019 IIIA Site Building Automation 136975 $81,055 Unknown 2019 IIIA Site Compressors failed 136976 $10,856 Unknown 2019 IIIA Site Generator Testing 136985 $32,747 Unknown 2019 IIA Bldg1 Voc Overhead door 133581 $2,328 Unknown 2019 IIA Bldg. 1 Voc door 133581 $1,687 Unknown 2019 IIA Bldg. 2 Ed Elect room ceiling 133585 $1,604 Unknown 2019 IIA Bldg. 2 Ed Comm room ceiling 133586 $1,604 Unknown 2019 IIA Bldg. 2 Ed Mech room ceiling 133587 $1,604 Unknown 2019 IIA Bldg. 2 Ed pull down stair 134322 $2,566 Unknown 2019 IIIA Bldg. 4 Cafeteria Ductwork 136891 $8,400 Unknown 2019 IIA Bldg. 6 Dorm FACP 133406 $2,085 Unknown 2019 IIIA Bldg. 6 Dorm Ductwork 1336892 $26,000 Unknown 2019 IIIA Bldg. 6 Dorm AC System Parts 136894 $2,412 Unknown 2018 IIIB Bldg. 8 Voc HBI Door 83134 $3,094 Unknown 2019 IIIA Bldg. 8 Voc HVAC plenum 133786 $3,528 Unknown
The Center Operator had not corrected nine prior funded life safety deficiencies. The ESC Project Manager will monitor progress of all funded projects.
3.0 PLANNING ANALYSIS
3.1 Introduction
The purpose of this section is to present objectives, assumptions, space needs, and cost data considered during the planning process. The Long Range Plan for the Campus is based on this information. The goal is to provide the Job Corps Program with the best living and learning environment at the best value, consolidating functions, improving operations and security, and right sizing through demolition of unneeded buildings.
Data collected during the PY21 Facility Survey is provided in the attached Appendix and in Volume II of this report
The Long Range Plan is presented in Section 4.0 Recommendations.
3.2 Significant Issues
Significant issues impacting operations, learning, and living environment at Carville JCC identified during the March 2022 Facility Survey are listed below.
3.2.1 Significant Issues Being Addressed
i. There were no significant issues being addressed at the time of the PY 2021 Facility Survey.
3.2.2 Significant Issues to be Addressed
i.
Roof damage on Education Building 2 Broken hardware on Dormitory Building 6 bedroom door.
i. The roofs of Education-Light Vocation Building 2, Recreation-Gymnasium Building 3, Cafeteria Building 4, Administration-Med-Dent Building 5, and Dormitory Building 6 are asphalt shingles which have deteriorated and are prematurely failing.
ii. HVAC Components have failed in Dormitory Building 6.
iii. The finishes in Dormitory Building 6 are old and worn.
iv. Many of the doors and door hardware to bedrooms in Dormitory Building 6 are damaged
v. Existing Fire Alarm Control panels are outdated in Vocation Building 1, Education-Light Vocation Building 2, Recreation-Gymnasium Building 3, Cafeteria Building 4 Administration-Med-Dent Building 5 and Dormitory Building 6.
vi. The campus experiences periodic flooding due to a drainage system filled with debris and vegetation.
4.0 RECOMMENDATIONS
4.1 Introduction
Recommendations that comprise the Long Range Plan are presented in this section. The recommendations are aimed to improve elements impacting operation of Carville JCC.
4.2 Proposed Plan for Program Year 2021
The proposed plan recommends three corrections to the Carville JCC:
1 A comprehensive project is recommended to re-roof five Buildings 2 A second project recommends interior improvements to Dormitory Building 6 to upgrade the HVAC system, repaint the interior and replace door hardware.
3. A third project is to replace the outdated Fire Alarm Control Panels in Vocation
Building 1, Education-Light Vocation Building 2, Recreation-Gymnasium Building 3, Cafeteria Building 4 Administration-Med-Dent Building 5 and Dormitory Building 6.
4.3 Summary of Proposed Projects
4.3.1 Proposed National Projects
No National Projects are proposed.
4.3.2 Proposed Regional Short Term Needs
The cost of unfunded deficiencies amounts to $2,871,172. Each remaining deficiency is considered for funding on an annual basis and will be funded based on National priorities.
Regional and Center projects recommended to be addressed in the short term include the following:
Table 9: Center Short Term Needs Building(s) Deficiency Number(s) Issue Cost Replace Roofing Buildings 2, 3, 4, 5 &6
134889, 134890, 124891, 134892 & 134893 Failing roofs $1,538,101
Dormitory Building 6 126924, 143447 & 143962 Building upgrades $436,533
Buildings 1, 2, 3, 5 & 6 133399, 133413, 133414, 133416 & 133417 FACPs Discontinued. $36,954
Site 144472 Drainage swales choked $16,036 $1,990,670
4.4 Student Vocational Participation
The following are recommendations for Career Technical Skills Training (CTST) projects which would improve the facility while enhancing student skills.
1. Re-roof Gazebos
4.5 Proposed Site Plan and National Project Implementation Plan The following pages illustrate a Proposed Site Plan for the above noted short term projects
TOTAL
Proposed Site Plan x x x x x x x x
P o i n t
C l a i r
R o a d
Gillis W. Long Center
OAK TREES
ELEC.
TRANSFORMER
RESTORE SWALES
GOVT. VEHICLE
PARKING
B e t t y
M a r t i n
R o a d
NEW ROOFING
UPGRADE HVAC
PAINT INTERIOR
DORMITORY
BUILDING 6
Carville Job Corps Center
Carville, Louisiana
BUILDINGS
1 - VOCATIONAL EDUCATION/MAINTENANCE
2 - EDUCATION/LIGHT VOCATION
3 - RECREATION/GYMNASIUM
4 - CAFETERIA
5 - ADMINISTRATION/MED-DENTAL
6 - DORMITORY
7 - RECEIVING
8 - VOCATIONAL
9 - GUARD HOUSE
STRUCTURES
10 - GAZEBO
11 - GAZEBO
12 - GAZEBO
13 - STORAGE
14 - STORAGE
15 - HOME BUILDERS STORAGE
Proposed Site Plan
400 Feet2001000
STORAGE
RECREATION
MEDICAL/DENTAL
EDUCATION
DORMITORY
CAFETERIA
ADMINISTRATION
FUNCTION LEGEND
VACANT
6 June 2021
A
APPENDICES
APPENDICES
PLANNING STRATEGY REPORTS
Page Intentionally Left Blank
Space Utilization Chart Carville (00618) Date: 06/27/2022Center :
Page: 1 of 1
0001 - VOCATIONAL EDUCATION/M
0002 - EDUCATION/LIGHT VOCATIO
0003 - RECREATION/GYMNASIUM
0004 - CAFETERIA
0005 - ADMINISTRATION/MED-DENT
0006 - DORMITORY
0007 - RECEIVING
0008 - VOCATIONAL
0009 - GUARD HOUSE
Buildings
24,844
2,674
Education
6,375
Food
14,778
Recreation
2,695
Medical
4,113
Admin
3,325
1,800
Storage Support
Student Housing
Actual Net Area 24,844 2,674 6,375 14,778 2,695 4,987 5,715
Area (SQ FT) Gross
12,700 13,877 20,034 10,212 12,095 37,926 2,000 7,442
Suggested Net Area
Actual Net less Suggested Net
Vacant Net
11,269 8,882
15,464 6,375 6,808
24,844 1,800 6,204
Ratio Net/Gross
89% 64% 77% 62% 56% 66% 90% 83% 83%
96 81,696 116,346 70%
16,524 2,142 7,650 1,445 3,060 3,060
8,320 2,674 4,233 7,128 1,250 1,927 2,655
27,540 3,295 10,929 2,408 4,708 3,600 Suggested Gross Area
Non-AcadAcademic Voc/Theo
5,334
5,602
5,602
7,676
6,204
13,880
10,170 3,710
15,646
44,051
37,645
This chart provides net square feet (NSF) by individual buildings (rows), NSF by Job Corps functions (columns), gross square feet (GSF) for each building, and the suggested NSF for each function. Further NSF breakdowns of functional categories into subcategories may be found in Section D under Descriptions. Section D is typically included in Volume II.
Security
A-1
Federal Real Property Asset Management Performance Measures
Center: CARVILLE (00618) Page: 1 of
Date: 06/27/2022
$222,554.00
0001 - VOCATIONAL
EDUCATION/MAINTENANCE
0002 - EDUCATION/LIGHT VOCATION
0003 - RECREATION/GYMNASIUM
0004 - CAFETERIA
0005 - ADMINISTRATION/MED-DENTAL
0006 - DORMITORY
0007 - RECEIVING
0008 - VOCATIONAL
0009 - GUARD HOUSE
0010 - GAZEBO (295Ft Diameter) 0011 - GAZEBO (295Ft Diameter) 0012 - GAZEBO (295Ft Diameter) 0013 - STORAGE (12Ft x 12Ft) 0014 - STORAGE (12Ft x 12Ft) 0015 - HOME BUILDERS STORAGE (12Ft x 20Ft)
CARVILLE JCC (LAND)
Name
0061808008
0061808009 0061808010 0061808011 0061808012 0061808013 0061808014 0061808015 0061808016 0061808017 0061808018 0061808019 0061808020 0061808021 0061808024
0061808007
Asset Number
Building
Building Building Building Building Building Building Building Building Structure Structure Structure Structure Structure Structure
Land
Type
Owned
Owned Owned Owned Owned Owned Owned Owned Owned Owned Owned Owned Owned Owned Owned
Leased
Own/ Lease
12,700
13,877 20,034 10,212 12,095 37,926
2,000 7,442
Size
100% 100% 100%
Utilization Percent
$23,421.08
$25,590.34 $30,497.42 $25,909.59 $20,388.21 $76,810.19
$972.70 $13,723.73
$100.98 $146.05 $146.05 $146.05
$68.33 $68.33
$113.88
$4,451.08
Annual Op Cost
98%
88% 88% 95% 88% 83% 97% 99% 78%
100% 100% 100% 100% 100% 100%
0%
FCI
MC
MC
MC
MC
MDNC
MC
MDNC
MC
NMD
MDNC
MDNC
MDNC
MDNC
MDNC
MDNC
MC
Mission Dependency Restrictions
Totals:
A-2
Federal Real Property Asset Management Performance Measures
Center: CARVILLE (00618) Page: 2 of
Date: 06/27/2022
Building Mission Dependency Summary
Buildings Mission Critical
Buildings Mission Dependent Not Critical
Buildings Not Mission Dependent
GSF Mission Critical
GSF Mission Dependent Not Critical
GSF Not Mission Dependent of of of
102,191
14,095
(66.7%)
(22.2%)
(11.1%)
(87.8%)
(12.1%)
(.1%)
Facilities Not Meeting Facility Condition Index (FCI) Target (90%)
5 of 9 Buildings FCI < 90% (55.6%)
0 of 6 Structures FCI < 90% (0%)
83,992 GSF FCI < 90% (72.2%)
Funded But Not Corrected Deficiencies by Classification Carville (00618)Center:
1Page:
06/27/2022Date:
of 2
Site Electrically locked security door denies access to firefighters in case of a fire
AC Refrigerant leaking
Ductwork dirty
Building automation system needs upgrade
Compressors failed
Generator testing
133412
136895
136974
136975
136976
136985
$3,084
$69,633
$81,055
$10,856
$32,747
$5,131
Building
0001 - Vocational Education/Maintenance
0002 - Education/Light Vocation
Maintenance entry door by the overhead door does not self-close and self-latch.
Automotive entry door below mezzanine does not self-close and self-latch.
Electrical Room ceiling portions have been removed Fiber Optics and Communications Room ceiling portions have been removed to accommodate a nonrated attic stair Mechanical room ceiling has gaps around penetrations or in ceiling Attic Stair Door Cover is Combustible
133581
133582
133585
133586
133587
134322
$2,328
$1,687
$1,604
$1,604
$1,604
$2,566
Deficiency Total Costs by Classification
Deficiency Description Proj PY Yr Fund IA IIA IIB IIIA IIIB IVA IVB TotalsDef ID Off.
R
R
R
R
R
R
R
R
R
R
R
R
Summary
Site Total: $197,374 $5,131 $202,505
$4,015
$7,378
$4,015
$7,378
Subtotal:
Subtotal:
$0 $234,186 $22,137 $0 $3,094 $0 $0 $259,417
Deficiency Total Numbers by Classification 0 9 0 8 1 0 0 18
IIC
$0
A-3
Funded But Not Corrected Deficiencies by Classification
2Page:
06/27/2022Date:
of 2
Building
0004 - Cafeteria
0006 - Dormitory
0008 - Vocational
Ductwork dirty
Fire alarm control panel not protected by smoke detector Ductwork dirty Replacement parts for AC system required for system to function.
There is no door from the HBI vocation to the access road Plenum located inside the Mechanical Room is made of combustible material
136891
133406
136892 136894
83134
133786
$8,400
$26,000 $2,412
$3,094
$2,085
$3,528
Deficiency Description Proj PY Yr Fund IA IIA IIB IIIA IIIB IVA IVB TotalsDef ID Off.
R
R
R R
R
R
$36,812 $3,094 $17,006 $56,912Totals by Classification:
$8,400
$28,412
$3,094
$2,085
$3,528
$8,400
$30,497
$6,622
Subtotal:
Subtotal:
Subtotal:
IIC
Unfunded Deficiencies by Classification
1Page:
06/27/2022Date:
of 3
Security
Site Buildings fluorescent lights are not energy efficient
Pole mounted exterior lights are not energy efficient
Swales are choked and overflowing
107115
107118
144472
2022 $16,036
$88,965
$85,174
Campus entry lacks a Student Welcome Center129759 2019 $340,659
Deficiency Total Costs by Classification
Deficiency Description Proj IDID Year IA IIA IIB IIIA IIIB IVA IVB TotalsDef ID Off.
R
R
R
R
Summary
Program Total: $340,659 $340,659
Site Total: $16,036 $174,140 $190,175
Program
$0 $0 $0 $0 $0 $0
$0 $64,825 $17,563 $1,968,143 $340,659 $0
$0
$2,887,207 Cost of Deficiencies Linked to National (or Major Agency) Projects Cost of Deficiencies not Linked to Projects
$0
$492,739
$0 $1,968,143 $64,825 $17,563 $492,739 $340,659 $0 $2,887,207
Deficiency Total Numbers by Classification 0 3 5 8 11 1 0 29
IIC
$3,278
$3,278
A-4
2Page:
06/27/2022Date:
of 3
Building
0001 - VOCATIONAL EDUCATION/MAINTENANCE
0002 - EDUCATION/LIGHT VOCATION
0003 - RECREATION/GYMNASIUM
0004 - CAFETERIA
0005 - ADMINISTRATION/MED-DENTAL
HID high bay lighting not energy efficient Fire alarm control panel is being discontinued
Fire alarm control panel is being discontinued Domestic hot water system has no means for expansion Asphalt shingle roof is deteriorated and near end of useful life Attic lacks heat detectors
HID lighting in the gymnasium is not energy efficient Fire alarm control panel is being discontinued Asphalt shingle roof is deteriorated and near end of useful life
Asphalt shingle roof is deteriorated and near end of useful life
Door was installed incorrectly and violates code swing direction Fire alarm system audio/visual coverage inadequate Fire alarm control panel is being discontinued Domestic hot water system has no means for expansion Asphalt shingle roof is deteriorated and…