16-Specifications and Requirements PNC2132528C1.pdf
PDF 2 MB Posted
- Attached to
- Demolition of Air Monitoring Site
- Solicitation number
- PNC2132528C1
- Issued by
- Broward County, Florida
About this file
This is a Specifications and Requirements document for a demolition project in Broward County, Florida, specifically for the removal of an air monitoring site located at Colbert Elementary School, 2702 Funston Street, Hollywood, FL 33020. The scope of work encompasses the complete demolition and removal of an 8' x 10' shed, fencing, footings, pavers, and associated debris, along with removal of trees, shrubs, and vines within the fenced area. Following demolition, the contractor must haul away all detritus and restore the site grounds to grass by installing St. Augustine sod. All solicitation responses must be submitted electronically through BPRO (Bonfire platform) by the specified closing date and time, with vendors strongly encouraged to submit all required and optional documents for comprehensive County review. Vendors must submit questions or clarification requests through BPRO by the designated Questions due date, and the County will respond through the BPRO Messages section.
The County has established specific license and certification requirements, including compliance with Office of Economic and Small Business Development (OESBD) requirements and Small Business Enterprise (SBE) Reserve designations. Vendors must ensure receipt of a Submission Receipt upon electronic submittal through BPRO, as the County will not accept responses by any other means. Vendors are advised to review the complete solicitation document in detail, as the provided information constitutes a summary only. Submittal support and instructions are available through the Purchasing Division website or by contacting support@gobonfire.com.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 11-Location Certification - Invitation to Bid.docx | DOCX document | |
| 2-Summary of Vendor Rights for Broward County Competitive Solicitations.docx | DOCX document | |
| 5-Insurance Requirements - Quotes Bids.docx | DOCX document | |
| 12-Insurance Requirement PNC2132528C1.pdf | ||
| 14-Site Plan PNC2132528C1.pdf | ||
| 1-Domestic Partnership Act Certification.docx | DOCX document | |
| 15-Special Instructions to Vendors PNC2132528C1.pdf | ||
| 3-Subcontractors-Subconsultants-Suppliers Requirement.docx | DOCX document | |
| 6-Security Requirements.docx | DOCX document | |
| 4-Anti-Human Trafficking Affidavit.docx | DOCX document | |
| 9-Vendor Questionnaire - Quotes and Bids.docx | DOCX document | |
| 10-General Conditions - Quotes Bids.docx | DOCX document | |
| 7-Litigation History.docx | DOCX document | |
| 13-OESBD - SBE Reserve PNC2132528C1.docx | DOCX document | |
| 8-OESBD - Procurement Preferences SBE-CBE.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications and Requirements for Demolition of Air Monitoring Site Located at Colbert Elementary School, 2702 Funston St, Hollywood, FL 33020
Scope of Work Demolition of air monitoring site, including 8’ x 10’ shed, fencing, footings, pavers, and other debris at the site. Remove trees and shrubs within the fenced area, including vines on fencing. Haul off and dispose of demolition detritus. Return site grounds to grass by adding sod (St. Augustine grass). Broward County Public Schools (BCPS) Building Department has obtained the Letter of Recommendation for Permit (LOR, see page 7) and approved plans for the project. The BCPS permit will be issued once the LOR is completed with the selected vendor’s information including licensing and insurance. BCPS does not charge for permits. The contractor must submit a 10-day notice of Demolition to the State of Florida. BCPS will issue the demolition permit to be submitted to the City of Hollywood and the BCPS Building Department. Work hours will be coordinated with the school once the permit is received. The BCPS contact person (BCPS Project Manager) will coordinate with the school for access including access through the access gate from Funston to air monitoring site. Prefer demolition completed during summer recess. Note: A reinspection fee is charged after the second failed inspection. Insurance documents are required to ensure vehicles are properly insured . Pictures of site on following pages.
Site includes
• Building = 8” x 10’
• Deck = Square 12’ x 12’. Height off ground is 4’ 6” (8 steps and full rail)
• Fence = 15’ x 48’
• Site area within fence = remove debris, trees, shrubs, plants, vines, pavers, etc.
• Site area = Add sod (St. Augustine grass).
• Electrical = Electricity and meters have been removed by FPL. There is no electricity at the site.
Remove remaining electrical panel and stub up and any conduit tubing to shed or deck.
• Irrigation = Not Applicable
Figure 1. Site Plan. Please refer to full size render for detail.
Figure 2. Site 18 - View of building from deck (2022)
Figure 3. Site 18 – Deck in 2022(left) and 2026 (right)
Figure 4. Site 18 - Front view outside gate (2022)
Figure 5. Site 18 - Side View outside gate (2026).
Figure 6. Site 18 – Area behind the site in 2022 (left) and 2026 (right). FPL has cut electrical lines and removed meter.
Figure 7. Site 18 - Side View outside gate with electrical panel on eastern gate visible (2022).
Figure 8. Site 18 – Inside shed (2026)
Figure 9. Site 18 Examples of debris at the site in 2026.
Figure 10. BCPS LOD form
File details come from the government source that posted it. Updated .