Section 00 01 01 Project Title Page
HBMD ADMINISTRATION BUILDING
RENOVATION AND EXPANSION Section 00 01 01 BID/CONTRACT NO.: PNC2122804P1 Project Title Page Project No. CMD: 104025 – RLI # PNC2122804P1 Date 09/20/2024 Page 1 of 1
Broward County Commission Construction Management Division 115 South Andrews Avenue, Room A550 Fort Lauderdale, FL 33301
Phone: (954) 357-6419 Fax: (954) 357-6411
Standard Form Construction Contract Documents:
RENOVATION AND EXPANSION
1600 BLOUNT ROAD
POMPANO BEACH, FLORIDA
100% CDs
September 20, 2024
Revised June 26, 2025
END OF SECTION
Section 00 01 07
Seal Page
RENOVATION AND EXPANSION Section 00 01 07
BID/CONTRACT NO.: PNC2122804P1 Seal Page
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division 115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Fax: (954) 357-6411
For ___ Architects, Inc.
Name
For ___ Engineers, Inc.
Name
To the best of my knowledge these drawings and the project manual are complete, and comply with the Broward edition of the Florida Building Code (Latest Edition).
RENOVATION AND EXPANSION
1600 BLOUNT ROAD
POMPANO BEACH, FLORIDA
100% CDs
September 20, 2024
Section 00 01 10
Table of Contents
RENOVATION AND EXPANSION Section 00 01 10
BID/CONTRACT NO.: PNC2122804P1 Table of Contents
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 7
Broward County Commission
Construction Management Division 115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
00 PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 PROJECT TITLE PAGE 1-1
00 01 07 SEAL PAGE 1-1
00 01 10 TABLE OF CONTENTS 1-7
00 01 15 LIST OF DRAWING SHEETS 1-5
00 31 00 AVAILABLE PROJECT INFORMATION 1-3
00 43 25 SUBSTITUTION REQUEST FORM 1-2
00 62 11 SUBMITTAL TRANSMITTAL FORM 1-1
00 62 76 APPLICATION FOR PAYMENT FORM 1-2
00 63 13 REQUEST FOR INTERPRETATION FORM 1-1
00 63 33 SUPPLEMENTAL INSTRUCTIONS FORM 1-1
00 63 34 WEEKLY PROGRESS REPORT FORM 1-1
00 63 35 PERIODIC OBSERVATION REPORT FORM 1-1
00 63 37 NON-CONFORMING WORK NOTICE FORM 1-1
00 63 46 CONSTRUCTION CHANGE DIRECTIVE FORM 1-1
00 63 53 REQUEST FOR PROPOSAL FORM 1-1
00 63 54 PROPOSAL WORKSHEET SUMMARY FORM 1-1
00 63 55 PROPOSAL WORKSHEET DETAIL FORM 1-1
00 63 57 CHANGE ORDER REQUEST FORM 1-1
00 65 14 SUBSTANTIAL COMPLETION REQUEST FORM 1-1
00 65 15 SUBSTANTIAL COMPLETION READINESS FORM 1-1
00 65 16 SUBSTANTIAL COMPLETION FORM 1-1
00 65 17 SUBSTANTIAL COMPLETION PUNCHLIST FORM 1-2
00 65 18 SUBSTANTIAL COMPLETION DATE FORM 1-1
00 65 19 FINAL COMPLETION REQUEST FORM 1-1
00 65 20 FINAL COMPLETION READINESS FORM 1-1
00 65 21 FINAL COMPLETION DATE FORM 1-1
01 GENERAL REQUIREMENTS
01 22 00 UNIT PRICES 1-3
01 23 00 ALTERNATES 1-2
01 25 00 SUBSTITUTION PROCEDURES 1-4
01 26 00 CONTRACT MODIFICATION PROCEDURES 1-7
01 29 00 PAYMENT PROCEDURES 1-4
01 31 00 PROJECT MANAGEMENT AND COORDINATION 1-9
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION 1-10
01 33 00 SUBMITTAL PROCEDURES 1-9
01 35 00 SPECIAL PROCEDURES 1-3
01 35 23 SAFETY AND HEALTH 1-4
BID/CONTRACT NO.: PNC2122804P1 Table of Contents
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 2 of 7
01 41 00 REGULATORY REQUIREMENTS 1-6
01 42 00 REFERENCES 1-4
01 43 00 QUALITY ASSURANCE 1-4
01 45 00 QUALITY CONTROL 1-8
01 51 00 TEMPORARY UTILITIES 1-7
01 52 00 CONSTRUCTION FACILITIES 1-6
01 53 00 TEMPORARY CONSTRUCTION 1-5
01 54 00 CONSTRUCTION AIDS 1-2
01 55 00 VEHICULAR ACCESS AND PARKING 1-4
01 55 10 MAINTENANCE OF TRAFFIC 1-1
01 56 00 TEMPORARY BARRIERS & ENCLOSURES 1-10
01 57 00 TEMPORARY CONTROLS 1-3
01 58 00 PROJECT IDENTIFICATION 1-3
01 61 00 BASIC PRODUCT REQUIREMENTS 1-5
01 62 00 PRODUCT OPTIONS 1-3
01 66 30 PRODUCT DELIVERY, STORAGE AND HANDLING REQUIREMENTS 1-2
01 71 00 EXAMINATION 1-2
01 72 00 PREPARATION 1-5
01 73 00 EXECUTION 1-10
01 74 00 CLEANING 1-5
01 74 19 CONSTRUCTION WASTE MANAGEMENT 1-5
01 75 00 STARTING AND ADJUSTING 11--22
01 76 00 PROTECTION OF INSTALLED CONSTRUCTION 1-3
01 77 00 CLOSEOUT PROCEDURES 1-7
01 78 00 CLOSEOUT SUBMITTALS 1-16
01 79 00 DEMONSTRATION AND TRAINING 1-2
01 81 13 SUSTAINABLE DESIGN REQUIREMENTS 1-4
01 91 13 COMMISSIONING REQUIREMENTS 1-6
02 EXISTING CONDITIONS
02 11 00 SITE CLEARING 1-5
02 20 00 EARTHWORK 1-8
02 22 00 EXCAVATION AND FILL FOR UTILITY SYSTEMS 1-7
02 28 00 SOIL TREATMENT 1-3
02 41 19 SELECTIVE DEMOLITION 1-6
02 51 00 ASPHALTIC CONCRETE PAVING FOR PARKING AND DRIVES 1-6
02 55 10 MAINTENANCE OF TRAFFIC 1-2
02 58 00 PAVEMENT MARKING 1-3
02 60 50 PRECAST MANHOLES 1-4
02 66 00 WATER DISTRIBUTION 1-7
02 72 00 STORM DRAINAGE 1-9
02 73 00 SANITARY SEWERAGE 1-7
02 84 80 PARKING BUMPERS 1-2
02 89 00 TRAFFIC SIGNS AND SIGNALIZATION 1-2
BID/CONTRACT NO.: PNC2122804P1 Table of Contents
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 3 of 7
03 CONCRETE
03 10 00 CONCRETE FORMING AND ACCESSORIES 1-11
03 20 00 CONCRETE REINFORCEMENT 1-3
03 30 00 CAST-IN-PLACE CONCRETE 1-23
03 41 00 PRECAST CONCRETE 1-13
03 52 16 LIGHTWEIGHT INSULATING CONCRETE 1-5
04 MASONRY
04 23 00 UNIT MASONRY 1-14
05 METALS
05 12 00 STRUCTURAL STEEL FRAMING 1-11
05 31 00 STEEL DECKING 1-6
05 40 00 COLD-FORMED METAL FRAMING 1-4
05 50 00 METAL FABRICATION 1-9
05 51 00 FIXED METAL LADDERS 1-3
05 52 13 PIPE AND TUBE RAILINGS 1-10
05 52 50 STAIR NOSINGS 1-3
06 WOOD AND PLASTICS
06 10 00 ROUGH CARPENTRY 1-4
06 20 20 INTERIOR FINISH CARPENTRY 1-4
06 41 16 PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS 1-9
07 THERMAL AND MOISTURE PROTECTION
07 21 00 THERMAL INSULATION 1-5
07 26 00 UNDER-SLAB VAPOR BARRIER 1-4
07 27 20 FLUID-APPLIED MEMBRANE AIR BARRIERS 1-8
07 54 23 THERMOPLASTIC SINGLE-PLY ROOFING FOR CONCRETE DECKS 1-13
07 62 00 SHEET METAL FLASHING AND TRIM 1-10
07 71 00 MANUFACTURED ROOF SPECIALTIES 1-7
07 72 00 ROOF ACCESSORIES 1-6
07 84 13 PENETRATION FIRESTOPPPING 1-5
07 92 00 JOINT SEALANTS 1-7
07 95 13 INTERIOR EXPANSION JOINT COVER ASSEMBLIES 1-5
07 95 16 EXTERIOR EXPANSION JOINT COVER ASSEMBLIES 1-6
BID/CONTRACT NO.: PNC2122804P1 Table of Contents
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 4 of 7
08 OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES 1-8
08 14 16 FLUSH WOOD DOORS 1-7
08 30 50 ACCESS DOORS 1-3
08 41 13 ALUMINUM-FRAMED STOREFRONTS 1-13
08 51 13 ALUMINUM WINDOWS 1-8
08 71 00 DOOR HARDWARE 1-19
08 80 00 GLAZING 1-11
08 83 00 MIRRORED GLASS 1-5
08 87 33 ARCHITECTURAL WINDOW FILMS 1-5
08 91 19 FIXED LOUVERS 1-6
09 FINISHES
09 22 16 NON-STRUCTURAL METAL FRAMING 1-6
09 24 00 CEMENT PLASTERING (STUCCO) 1-13
09 26 50 GYPSUM BOARD SHAFT-WALL ASSEMBLIES 1-6
09 29 00 GYPSUM BOARD ASSEMBLIES 1-16
09 30 13 CERAMIC TILING 1-11
09 51 13 ACOUSTICAL PANEL CEILINGS 1-8
09 65 13 RESILIENT BASE AND ACCESSORIES 1-5
09 65 19 RESILIENT TILE FLOORING 1-5
09 67 23 RESINOUS FLOORING 1-8
09 68 13 TILE CARPETING 1-4
09 80 00 ACOUSTICAL WALL AND CEILING PANELS 1-6
09 90 00 PAINTING 1-16
10 SPECIALTIES
10 11 00 VISUAL DISPLAY BOARDS 1-4
10 14 23 ROOM-IDENTIFICATION PANEL SIGNAGE 1-5
10 20 00 TOILET COMPARTMENTS 1-3
10 22 19 NON-UNITIZED PARTITIONS 1-11
10 28 00 TOILET ACCESSORIES 1-7
10 28 13 ELECTRIC HAND DRYERS 1-4
10 44 00 FIRE PROTECTION SPECIALTIES 1-4
10 51 13 METAL LOCKERS 1-6
10 70 80 SUSPENDED SUNSHADES 1-5
11 EQUIPMENT
11 53 00 LABORATORY EQUIPMENT 1-3
12 FURNISHINGS
BID/CONTRACT NO.: PNC2122804P1 Table of Contents
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 5 of 7
12 24 13 ROLLER WINDOW SHADES 1-6
12 36 61 QUARTZ AGGLOMERATE COUNTERTOPS 1-5
12 48 40 FLOOR MATS 1-2
12 59 00 SYSTEMS FURNITURE 1-3
13 SPECIAL CONSTRUCTION
NOT USED
14 CONVEYING SYSTEMS
NOT USED
21 FIRE SUPPRESSION
21 05 13 COMMON MOTOR REQUIREMENTS FOR FIRE SUPPRESSION EQUIPMENT 1-3
21 05 17 SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 1-4
21 05 23 GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING 1-6
21 05 29 HANGERS AND SUPPORTS FOR FIRE-SUPPRESSION PIPING AND EQUIP. 1-4
21 05 53 IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT 1-5
21 11 19 FIRE DEPARTMENT CONNECTIONS 1-3
21 12 00 FIRE-SUPPRESSION STANDPIPES 1-11
21 12 13 FIRE-SUPPRESSION HOSES AND NOZZLES 1-4
21 13 13 WET-PIPE FIRE SPRINKLER SYSTEM 1-5
22 PLUMBING
22 05 16 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING 1-2
22 05 17 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 1-5
22 05 18 ESCUTCHEONS FOR PLUMBING PIPING 1-2
22 05 23.12 BALL VALVES FOR PLUMBING PIPING 1-4
22 05 23.14 CHECK VALVES FOR PLUMBING PIPING 1-4
22 05 23.15 GATE VALVES FOR PLUMBING PIPING 1-4
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 1-5
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 1-5
22 07 19 PLUMBING PIPING INSULATION 1-8
22 08 00 PLUMBING SYSTEMS COMMISSIONING (LEED) 1-1
22 11 16 DOMESTIC WATER PIPING 1-10
22 11 19 DOMESTIC WATER PIPING SPECIALTIES 1-5
22 13 16 SANITARY WASTE AND VENT PIPING 1-9
22 13 19 SANITARY WASTE PIPING SPECIALTIES 1-5
22 13 19.13 SANITARY DRAINS 1-4
22 13 23 SANITARY WASTE INTERCEPTORS 1-2
22 14 13 FACILITY STORM DRAINAGE PIPING 1-9
22 14 23 STORM DRAINAGE PIPING SPECIALTIES 1-4
BID/CONTRACT NO.: PNC2122804P1 Table of Contents
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 6 of 7
23 HEATING, VENTILATING, AND AIR CONDITIONING
23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 1-3
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1-6
23 05 46 COATINGS FOR HVAC 1-3
23 05 48.13 VIBRATION CONTROLS FOR HVAC 1-4
23 05 93 TESTING, ADJUSTING & BALANCING FOR HVAC 1-35
23 07 13 DUCT INSULATION 1-5
23 07 19 HVAC PIPING INSULATION 1-7
23 08 00 HVAC SYSTEMS COMMISSIONING (LEED) 1-1
23 09 23.12 CONTROL DAMPERS 1-26
23 23 00 REFRIGERANT PIPING 1-10
23 31 13 METAL DUCTS 1-10
23 31 16 NONMETAL DUCTS 1-16
23 33 00 AIR DUCT ACCESSORIES 1-6
23 33 46 FLEXIBLE DUCTS 1-4
23 34 13 AXIAL HVAC FANS 1-10
23 36 00 AIR TERMINAL UNITS 1-11
23 37 13.13 AIR DIFFUSERS 1-3
23 37 13.23 REGISTERS AND GRILLES 1-4
23 37 23 HVAC GRAVITY VENTILATORS 1-7
23 74 16.11 PACKAGED SMALL CAPACITY ROOFTOP AC UNITS 1-25
23 81 26 SPLIT-SYSTEM AIR-CONDITIONERS 1-6
26 ELECTRICAL
26 05 00 BASIC MATERIALS AND METHODS 1-6
26 05 19 CONDUCTORS AND CABLES 1-4
26 05 20 CONDUITS 1-5
26 05 26 GROUNDING 1-4
26 05 28 SUPPORTING DEVICES 1-2
26 05 33 RACEWAYS AND BOXES 1-8
26 05 53 ELECTRICAL IDENTIFICATION 1-2
26 08 00 ELECTRICAL SYSTEMS COMMISSIONING (LEED) 1-1
26 08 30 TESTINGS AND DEMONSTRATIONS 1-2
26 24 16 BRANCH CIRCUIT PANEL BOARDS 1-3
26 27 26 WIRING DEVICES 1-3
26 28 16 SAFETY AND DISCONNECTS SWITCHES 1-2
26 32 13.16 GAS ENGINE DRIVEN GENERATOR SETS 1-7
26 41 13 LIGHTNING PROTECTION SYSTEM 1-2
26 43 13 TRANSIENT VOLTAGE SURGE SUPPRESSORS 1-5
26 51 00 INTERIOR LIGHTING 1-5
26 56 00 EXTERIOR LIGHTING 1-8
BID/CONTRACT NO.: PNC2122804P1 Table of Contents
Date 09/20/2024 Page 7 of 7
28 ELECTRONIC SAFETY AND SECURITY
28 23 00 VIDEO SURVEILLANCE 1-10
28 31 12 FIRE ALARM SYSTEM 1-2
31 EARTHWORK
31 31 16 TERMITE CONTROL 1-4
32 EXTERIOR IMPROVEMENTS
32 31 13 CHAIN-LINK FENCE AND GATES 1-4
32 84 00 PLANTING IRRIGATION 1-35
32 91 13 SOIL PREPARATION 1-10
32 92 00 TURF AND GRASSES 1-8
32 93 00 PLANTS 1-25
Section 00 01 15 – List of Drawing Sheets
RENOVATION AND EXPANSION Section 00 01 15 BID/CONTRACT NO.: PNC2122804P1 List of Drawings
Date 09/20/2024 Page 1 of 5
Broward County Commission
Construction Management Division
A0.0 COVER SHEET
A0.1 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
ARCHITECTURAL
SP1.0 SITE PLAN
SP1.1 SITE PLAN DIAGRAM & GENERATOR ROOM
SP1.2 SITE DETAILS
D1.0 FIRST FLOOR DEMOLITION PLAN
A1.0 PHASING PLAN
LS1.0 FIRST FLOOR LIFE SAFETY PLAN
A1.1 PARTIAL FIRST FLOOR PLAN - NEW ADDITION
A1.2 PARTIAL FIRST FLOOR PLAN - EXISTING
A1.3 OVERALL ROOF PLAN
A2.0 FIRST FLOOR REFLECTED CEILING PLAN
A3.0 BUILDING ELEVATIONS
A4.0 BUILDING SECTIONS
A4.1 WALL SECTIONS
A4.2 WALL SECTIONS
A5.0 INTERIOR ELEVATIONS & ENLARGED PLANS
A6.0 DOOR AND WINDOW DETAILS
A6.1 ROOF DETAILS
A6.2 STOREFRONT SYSTEM DETAILS
A6.3 MISCELLANEOUS DETAILS
A6.4 ACCESSIBILITY, STAIR AND RAMP DETAILS
A7.0 DOOR & WINDOW SCHEDULE
A8.0 PARTITION TYPES & DETAILS
A9.0 FINISH FLOOR PLAN
BID/CONTRACT NO.: PNC2122804P1 List of Drawings
Date 09/20/2024 Page 2 of 5
A9.1 FURNITURE PLAN
A9.2 EXTERIOR FINISHES
CIVIL
C-0 COVER SHEET, PROJECT INFO. & LOCATION MAP
C-1.0 UTILITY DEMOLITION PLAN
C-2.0 PAVING, GRADING & DRAINAGE PLAN
C-3.0 WATER & SEWER PLAN
C-4.0 PAVEMENT MARKING & SIGNAGE PLAN
C-5.0 STORM WATER POLLUTION PREVENTION PLAN
C-6.0 CIVIL DETAILS & SECTIONS
C-7.0 CIVIL DETAILS
C-8.0 UTILITIES DETAILS
C-9.0 UTILITY DETAILS
C-10.0 UTILITY DETAILS
C-11.0 SANITARY SEWER PROFILES
STRUCTURE
S0.1 GENERAL NOTES AND STRUCTURAL NOTES
S0.2 SCHEDULES
S0.3 TYPICAL SECTIONS AND DETAILS
S0.4 TYPICAL SECTIONS AND DETAILS
S0.5 TYPICAL SLAB AND BEAM REINFORCEMENT PLACEMENT DIAGRAM
S2.0 FOUNDATION PLAN
S2.1 FIRST FLOOR STRUCTURAL PLAN
S2.2 ROOF FRAMING PLAN
S2.3 ENLARGED FRAMING PLANS
S3.1 BUILDING SECTION
S3.2 BUILDING SECTION
S3.3 BUILDING SECTION
BID/CONTRACT NO.: PNC2122804P1 List of Drawings
Date 09/20/2024 Page 3 of 5
S3.4 BUILDING SECTION
S3.5 SECTIONS AND DETAILS
S3.6 BUILDING SECTIONS
S3.7 BUILDING SECTIONS
MECHANICAL
M0.1 MECHANICAL GENERAL NOTES, LEGENDS, AND INDEX
MD1.1 NEW MECHANICAL - SOUTH
M2.1 MECHANICAL PARTIAL FLOOR PLAN - NORTH
M2.2 MECHANICAL PARTIAL FLOOR PLAN - SOUTH
M2.3 MECHANICAL PARTIAL ROOF PLAN - NORTH
M2.4 MECHANICAL PARTIAL ROOF PLAN - SOUTH
M4.1 MECHANICAL ENLARGED PLANS - GENERATOR
M6.1 HVAC DETAILS 1
M7.1 HVAC SCHEDULES
M8.1 MECHANICAL CONTROL DIAGRAMS
ELECTRICAL
E0.1 ELECTRICAL GENERAL NOTES, LEGENDS, AND ANNEX
ED1.1 ELECTRICAL DEMOLITION FLOOR PLAN
E1.1 ELECTRICAL SITE PLAN
E1.2 ELECTRICAL SITE PHOTOMETRY PLAN
E2.1 ELECTRICAL FLOOR PLAN
E2.2 POWER ROOF PLAN – NORTH
E2.3 POWER ROOF PLAN - SOUTH
E3.1 LIGHTING PLAN
E3.2 PHOTOMETRY NORMAL LIGHTING PLAN
E3.3 PHOTOMETRY EMERGENCY LIGHTING PLAN
E4.1 ELECTRICAL ENLARGED PLAN
E6.1 ELECTRICAL RISER DIAGRAM
BID/CONTRACT NO.: PNC2122804P1 List of Drawings
Date 09/20/2024 Page 4 of 5
E7.1 ELECTRICAL PANEL SCHEDULES
E9.1 ELECTRICAL DETAILS
TT0.1 TELECOM GENERAL NOTES
TT1.1 TELECOM PLAN
FA1.0 FIRE ALARM GENERAL NOTES
FA1.1 FIRE ALARM PLAN
PLUMBING
P0.1 PLUMBING GENERAL NOTES, LEGENDS, AND INDEX
P1.1 PLUMBING SITE PLAN
P2.1 PLUMBING PARTIAL DRAINAGE PLAN
P2.2 PLUMBING PARTIAL DOMESTIC WATER PLAN
P2.3 PLUMBING ROOF PLAN
P3.1 PLUMBING PIPING ISOMETRIC
P3.2 PLUMBING STORM & CONDENSATE PIPING ISOMETRIC
P4.1 PLUMBING ENLARGED PLAN
P5.1 PLUMBING DETAILS 1
P5.2 PLUMBING DETAILS 2
FIRE PROTECTION
FP0.1 FIRE PROTECTION GENERAL NOTES, LEGENDS, AND INDEX
FP1.1 OVERALL FIRE PROTECTION PLAN
FP2.1 FIRE PROTECTION PARTIAL FLOOR PLAN NORTH
FP2.2 FIRE PROTECTION PARTIAL FLOOR PLAN SOUTH
FP6.1 FIRE PROTECTION DETAILS
FP6.2 FIRE PROTECTION DETAILS CONTD.
LANDSCAPE
IR-1 IRRIGATION PLAN
LP-1 LANDSCAPE PLAN
LP-2 LANDSCAPE NOTES AND SPECIFICATIONS
BID/CONTRACT NO.: PNC2122804P1 List of Drawings
Date 09/20/2024 Page 5 of 5
TR-1 TREE DISPOSITION PLAN
SURVEY
1-6 SURVEY (FOR REFERENCE)
2-6 SURVEY (FOR REFERENCE)
3-6 SURVEY (FOR REFERENCE)
4-6 SURVEY (FOR REFERENCE)
5-6 SURVEY (FOR REFERENCE)
6-6 SURVEY (FOR REFERENCE)
RENOVATION AND EXPANSION Section 00 31 00
BID/CONTRACT NO.: PNC2122804P1 Available Project Information
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 3
SECTION 00 31 00
AVAILABLE PROJECT INFORMATION
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. The following information is presented to Bidders.
1.2 EXHIBIT “A” – REFERENCE DRAWINGS
A. Surveys: A copy of the following land title survey, boundary/location survey, topographic survey and detail of utilities is included in the Drawings.
Survey Titles: Sketch of Topographic and Special Purpose Survey
Surveyor: Stoner & Associates, Inc.
Survey Date: 05/31/2018
1. A site survey of existing conditions can be found within the Drawings. The site survey is not a part of the contractual requirements of this project and is reproduced here solely for the information of prospective bidders. The site survey may be reasonably relied on by Bidders but does not represent a warrant of guarantee of subsurface conditions by either the Owner or the Project Consultant.
B. An Asbestos Sample Analysis Report by Industrial Hygienist Inc. dated April 2, 2014 is included at the end of this section in the Specification. From the Executive Summary: " The results of our observation and laboratory analysis did not identify asbestos containing materials within the samples that were collected at the site."
BID/CONTRACT NO.: PNC2122804P1 Available Project Information
Date 09/20/2024 Page 2 of 3
BID/CONTRACT NO.: PNC2122804P1 Available Project Information
Date 09/20/2024 Page 3 of 3
END OF SECTION 00 31 00
Document 00 43 25: Substitution Request Form
RENOVATION AND EXPANSION Document 00 43 25
BID/CONTRACT NO.: PNC2122804P1 Substitution Request Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 2
Broward County Commission
Construction Management Division 115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
To:
Request No.:
Date:
(Project Consultant)
Project No: Date of NTP Receipt:
Project Title:
Facility Name: (One Substitution request per form)
We hereby submit for your consideration the following product instead of the specified item for the project identified above:
Specification Section: Paragraph: Specified Item:
Drawing Sheet Number(s): Detail, Plan or Section Number(s):
Proposed Substitution:
Manufacturer Company Name: Phone:
Address:
City, State, Zip:
Local Vendor: Company Name: Phone:
Required
Attachments:
1. Attach names and addresses of previous projects on which this product was utilized.
Include project owner’s contact and phone number.
2. Attach complete reason(s) for the proposed substitution.
3. Attach complete technical data, including applicable laboratory test reports.
Include complete information on changes to drawings and/or specifications which the proposed substitution will require for its proper installation.
4. Attach proposed schedule of compensation to the Project Consultant for changes to the as-built drawings caused by the product substitution.
5. Attached construction permits revisions caused by the proposed substitution.
6. Attach details, drawings, specification necessary to show how the changes impact the design.
7. Check items submitted with this substitution request:
Catalog Drawings Samples Tests/Reports
Other:
RENOVATION AND EXPANSION Document 00 43 25
BID/CONTRACT NO.: PNC2122804P1 Substitution Request Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 2 of 2
Completion of the following information is required:
1. This substitution will result in a saving or credit to the Owner in the amount of:
Dollars $
Written Figures
2. Does the proposed substitution affect dimensions shown on the drawings or other specified clearances?
Yes No
3. Will the undersigned pay for changes to the building design, including the costs of all engineering, detailing and other administrative costs caused by requested substitution?
Yes No
4. Manufacturer’s guarantees and warranties of the proposed and specified items are: The Same
Different
5. What effect does the proposed substitution have on other trades? None
Effect
Attach details.
The Undersigned states that this substitution request has been fully checked and coordinated with the Contract
Documents, that all information is true and accurate, and that the undersigned shall bear full responsibility for impacts to the design, coordination, required schedule and costs of the project occasioned and impacted by this request if approved by the Owner.
Submitted By:
Company Name &
Signature
Phone: Title
DO NOT WRITE BELOW THIS LINE FOR OFFICIAL USE ONLY
For Project Consultant’s Use Only For Owner’s Use Only
Recommend Approval Not Recommended
See Attached Received Too Late
Recommend Approval Not Recommended
See Attached Received Too Late
By: _____________________________________ (Signature) Date: ________________________________
By: _____________________________________
Date: _______________________________
Distribution: 1. Project Consultant 2. Project Mgr 3. MGC/Contractor 4. Project File 5.
Document 00 62 11: Submittal Transmittal Form
RENOVATION AND EXPANSION Document 00 62 11
BID/CONTRACT NO.: PNC2122804P1 Submittal Transmittal Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division 115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Fax: (954) 357-6411
Submittal No.:
Attn:
Project No: Resubmittal
Facility Name: (One Submittal item per form)
We hereby submit:
Qty
Reference
Number
Title/Description/
Manufacturer
Spec Section Title, Paragraph/
Drawing Detail Reference
Submitted for Review and Approval. Complies with contract requirements.
Resubmitted for Review and Approval. Will be available to meet construction Schedule.
Reviewed, coordinated and approved by the General
Contractor.
Other remarks concerning submittal:
Contractor:
Retain copy for Project Files By: (Signature)
(Contractor)
Date
Received:
Date
Returned:
FROM: , Project Consultant
The referenced submittal has been/is:
Approved
Approved as Noted Provide file copy with corrections identified.
Disapproved/Resubmit Full Point by Point Comparative Data Required for Evaluation and Approval
Process.
Not Subject to Review Other:
Incomplete/Resubmit
Project Consultant:
Distribution: Contractor Owner Retain Copy for Project File
Document 00 62 76: Application for Payment Form
RENOVATION AND EXPANSION Document 00 62 76 BID/CONTRACT NO.: PNC2122804P1 Application for Payment Project No. CMD: 104025 – RLI # PNC2122804P1 Date 09/20/2024 Page 1 of 2
Broward County Commission
Construction Management Division
To: Broward County Commission
Public Works Department
Application No.:
Period To:
Purchase
Order No.:
(Owner via Project Consultant)
Project No:
Project Title: Project Consultant:
Facility Name:
Change Order Summary Change Orders approved in previous months.
Total:
Additions
Deductions
Approved this Month:
Number Date Approved
Totals
Net change by
Change Orders:
The undersigned contractor certifies that to the best of the Contractor’s knowledge, information and belief the Work covered by this application for payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner and that current payment shown herein is now due.
Notarization State of Florida
County
Sworn Before me on this day of , .
Commission Expires:
Notary Public:
Application is made for Payment, as shown below, in connection with the Contract. The Contractors updated Document 00435, Schedule of Values, is attached as a continuation/detail sheet.
1. ORIGINAL CONTRACT SUM
2. NET CHANGE BY CHANGE ORDER $
3. CONTRACT SUM TO DATE
(Line 1 plus or minus line 2)
4. TOTAL COMPLETED AND STORED TO DATE
(Column H of Document 00435)
5. RETAINAGE
a. % of Completed Work $
(Column E + F of Document 00435)
b. % of Completed Work $ (Column E + F of Document 00435)
Total Retainage (Line 5a + 5b or total in Column K on Document 00435)
6. TOTAL EARNED LESS RETAINAGE
(Line 4 less Line 5 Total)
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT
(Line 6 from previous certificate)
8. CURRENT PAYMENT DUE $
9. BALANCE TO FINISH, PLUS RETAINAGE
(Line 3 less Line 6)
See reverse for Project Consultant’s Certificatiom
Document 00 62 76: Application for Payment
RENOVATION AND EXPANSION Document 00 62 76 BID/CONTRACT NO.: PNC2122804P1 Application for Payment Project No. CMD: 104025 – RLI # PNC2122804P1
Project Consultant’s Certificate for Payment
In accordance with the Contract Documents, based on on-site observations and the data comprising the above application, the Project
Consultant certifies to the Owner that to the best of his knowledge, information and belief, the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the
Contractor is entitled to payment in the AMOUNT CERTIFIED.
AMOUNT CERTIFIED $
(Attach explanation if amount certified differs from the amount applied for.)
Project Consultant:
By: Date:
This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this
Contract.
OWNER’S APPROVAL
AMOUNT APPROVED $
(Attach explanation if amount approved differs from the amount certified above.)
Approved for Payment by:
Construction Manager:
By: Date:
This Approval is not negotiable. The AMOUNT APPROVED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.
Document 00 63 13: Request for Interpretation Form
RENOVATION AND EXPANSION Document 00 63 13
BID/CONTRACT NO.: PNC2122804P1 Request for Interpretation Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division 115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Fax: (954) 357-6411
RFI No.:
Attn:
Facility Name: (One RFI item per form)
Subject:
Category: Reference:
Information not shown on Contract Documents Drawing Reference
Interpretation of Contract Documents Spec/Project Manual Reference
Conflict in Contract Document Requirements Other:
Coordination
Spec
No.
Section Title Paragraph
Reference
Drawing
Sheet No.
Detail
Reference
Request:
Retain copy for Project Files
Replies to RFI’s will be made through the Owner on the County’s standard Supplemental Instructions form for those requests that are not directly or obviously inferable from the Contract Documents.
Document 00 63 33 – Supplemental Instructions Form
RENOVATION AND EXPANSION Document 00 63 33
BID/CONTRACT NO.: PNC2122804P1 Supplemental Instructions Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division 115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Instruction No.:
Facility Name:
You are hereby notified that the Work shall be carried out in accordance with the following supplemental instructions issued in accordance with and reasonably inferable from the Contract Documents without change in
Contract Sum or Contract Time. Prior to proceeding with these instructions, indicate your acceptance of these instructions for a minor change to the Work as consistent with the Contract Documents and return a copy to the
Project Consultant.
Description of Interpretation or Minor Change: (Written description of the Work)
Attachments: (List attached documents that support description):
Issued Accepted
Project
Consultant:
By: (Signature) By: (Signature)
Copies: Project Manager Consultants Other:
Document 00 63 34: Weekly Progress Report Form
RENOVATION AND EXPANSION Document 00 63 34
BID/CONTRACT NO.: PNC2122804P1 Weekly Progress Report Form
Date 09/20/2024 Page 1 of 1
115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Report No.:
Project Title: (One Weekly Report per form)
Contract Completion Date/Time: Approved Time Extensions:
Date Construction Started: Contract Completion Date/Time:
Revised Completion Date: Percent of Project Completion:
Percent of Time Used: Days Elapsed:
Is Project on Schedule: Yes No If Not, Why:
Summary of Construction Activities Since Last Report:
Attachments Attach Additional Sheets as Necessary
Attached is supporting information from: Subcontractor Supplier
Copies to: Contractor Project Consultant Owner
Document 00 63 35: Periodic Observation Report Form
RENOVATION AND EXPANSION Document 00 63 35
BID/CONTRACT NO.: PNC2122804P1 Periodic Observation Report Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division 115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Report No.:
Time: AM PM
Project No: Superintendent Present: Yes No
Project Title: Record Doc’s Updated: Yes No
Facility Name: Proper Job Trailer Postings: Yes No
Weather Site Conditions Day
Clear Hot Clear Dusty Mon Fri
Overcast Warm Muddy Other: Tues Sat
Rain Cold Temperature Range: Wed Sun
Windy Other: Wind From: Thur
Persons
Contacted:
Items Discussed:
Work Observed:
Attachments: Provide attachment for more detailed descriptions and supporting documentation.
Materials/Equipment Delivered:
Item: Date: Condition: Properly Stored: Utilization:
Yes No Used Idle
Yes No Used Idle
Yes No Used Idle
Provide attachment to list additional items, note exceptions and detail improper storage.
Workforce:
Total Workers Present: Trades:
Foremen: Journeymen: Apprentices: Helpers:
Other Contractors on Site:
Non-Conforming Work Notices Issued: Yes No (Provide copies of Nonconforming Work Notices.)
Remarks/Concerns:
Distribution:
Contractor
Project Files
By: (Signature) Title:
Document 00 63 37: Non-Conforming Work Notice Form
RENOVATION AND EXPANSION Document 00 63 37
BID/CONTRACT NO.: PNC2122804P1 Non-Conforming Work Notice
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division 115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Notice No.:
Project Title: (One Notice per form)
Contract Document Reference: Para: Drawing Ref: Detail:
Nature of Non-Conformance:
By: (Signature) Date: Date Response Needed:
Distribution: Contractor Owner Subconsultant:
Proposed Correction (Response):
By: (Signature) Date: Date Response Needed:
Distribution: Project Consultant Owner Subcontractor
Document 00 63 46 – Construction Change Directive Form
RENOVATION AND EXPANSION Document 00 63 46 BID/CONTRACT NO.: PNC2122804P1 Construction Change Directive Form Project No. CMD: 104025 – RLI # PNC2122804P1 Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division 115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Fax: (954) 357-6411
To: Directive No.: Date:
(Contractor)
Project No:
Project Title: (One Directive per form)
Description of Directed Change:
You are hereby directed to make the following change(s) in this Contract:
Proposed Adjustments
1. The Proposed basis of adjustment of the Contract Sum or Guaranteed Maximum price is:
Lump Sum Increase Decrease of $ .
Unit Price of $ per .
As provided in Specification Section 01260, Contract Modifications.
As follows:
2. The Contract Time is proposed to be adjusted remain unchanged. The proposed adjustment, if any, is an increase of days.
decrease of days.
When signed by the Consultant and the Owner and received by the Contractor, this document becomes effective immediately as a Construction Change Directive and the Contractor shall proceed with the change(s) described above.
Signature by the Contractor indicates the Contractor’s Agreement with the Proposed Adjustments in Contract Sum and Contract Time as set forth in this Construction Change Directive.
Project Consultant Owner Contractor
By: By: By:
Date Date Date
Document 00 63 53 – Request for Proposal Form
RENOVATION AND EXPANSION Document 00 63 53
BID/CONTRACT NO.: PNC2122804P1 Request for Proposal Form
115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Proposal
Project Title: (One Proposal request per form)
Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modifications to the Contract Documents described below.
This is not a Change Order nor a direction to proceed with the Work described below.
Description: (Written description of the Work)
Attachments: (List attached documents that support description):
Project
Document 00 63 54 – Proposal Worksheet Summary Form
RENOVATION AND EXPANSION Document 00 63 54
BID/CONTRACT NO.: PNC2122804P1 Proposal Worksheet Summary Form
115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Change Order
Project Title: Date Prepared:
From/Trade:
Contact:
Phone:
Additions:
Sheet Item Description Materials
Labor
Subtotal
Subtotal Additions:
Deductions:
Sheet Item Description Materials
Labor
Subtotal
Subtotal Deductions:
Subtotal (Additions - Deductions):
7.5% Contractor’s Fee
10% Subcontractor’s Profit and Overhead
1% Bond Allowance
Total
*Verify that Subcontractors overhead complies with BCF – 170
Document 00 63 55: Proposal Worksheet Detail Form
RENOVATION AND EXPANSION Document 00 63 55
BID/CONTRACT NO.: PNC2122804P1 Proposal Worksheet Detail Form
Project Title: Date Prepared:
From/Trade:
Shaded Areas for Project Consultant’s Use Only
Contact:
Phone:
Additions:
UNIT PRICES SUBTOTALS
Ref No. Item Description Quantity Materials Labor Materials Labor TOTAL
Subtotal: (Enter this number on Worksheet Summary)
Deductions:
UNIT PRICES SUBTOTALS
Ref No. Item Description Quantity Materials Labor Materials Labor TOTAL
Subtotal: (Enter this number on Worksheet Summary)
Document 00 63 57 – Change Order Request Form
RENOVATION AND EXPANSION Document 00 63 57
BID/CONTRACT NO.: PNC2122804P1 Change Order Request Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division 115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Project Title: (One Request (Proposal) per form)
This Change Order Request (Proposal) contains an itemized quotation for changes in the Contract Sum and/or Time in response to proposed modifications to the Contract Documents based on Proposal Request No. or other conditions which require this Proposal.
Description of Proposed Change:
Attachments
Reason for Change:
Does Proposed Change involve a change in Contract Sum or Time? Yes No
If yes: Proposed Change in Contract Sum:
Proposed Change in Contract Time:
Attached Pages: Proposal Worksheet Summary
Proposal Worksheet Detail(s)
Attached is supporting information from: Subcontractor Supplier
Document 00 65 14: Substantial Completion Request Form
RENOVATION AND EXPANSION Document 00 65 14
BID/CONTRACT NO.: PNC2122804P1 Substantial Completion Request Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division 115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Fax: (954) 357-6411
Project No: Full Project
Project Title: Designated Portion (Attach Description)
I hereby certify that I am an officer of the firm or corporation named herein and have been properly authorized to make the following statements concerning the project named above:
1. The above named project or designated portion thereof will be substantially complete in accordance with the contract requirements and ready (excluding the attached list of deficiencies) for inspection on:
2. The Date of Substantial Completion required by the Contract (as modified by any approved change orders affecting
Contract Time) is:
3. I understand that I am to continue with builder's risk insurance coverage required by the Contract until the Date of
Substantial Completion is agreed upon by the parties to the Contract. Additionally, I understand that I am to continue with liability coverage and maintenance required by the Contract until the Owner's Final Acceptance of the Work.
4. I have assembled and attached complete sets of Operations and Maintenance Manuals and other required closeout documents along with my Contractor's List of Deficiencies that will not preclude Substantial Completion. I have also attached my Time Extension Request for any delays related to this portion of the Work.
Distribution Project Consultant
Field Construction Manager
Contractor’s Surety
Contractor’s List of Deficiencies
Applicable Closeout Documents
Time Extension Request (if applicable)
Notice to Contractor
Submit this form at least 10 calendar days prior to the requested inspection date to allow scheduling of the inspection.
Neither the determination by the Project Consultant that the Work is substantially complete, nor the acceptance thereof by the Owner, shall preclude subsequent claims against the Owner pursuant to portions of the Work not meeting the requirements of the Contract or for the Contract’s provisions for the Contractor’s warranty of the
Work.
Document 00 65 15: Substantial Completion Readiness Form
RENOVATION AND EXPANSION Document 00 65 15
BID/CONTRACT NO.: PNC2122804P1 Substantial Completion Readiness Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division
Instructions for Project Consultant’s Use: Provide this completed letter to notify the Owner that the Work, or a designated portion thereof, is ready for the Owner’s Substantial Completion Inspection.
(Field Construction
Manager)
Contractor’s
I have completed a preliminary site visit as a result of the Contractor's Request for Substantial Completion
Inspection and have found that:
The work, or designated portion thereof, will be ready to receive a Substantial Completion Inspection as requested by the Contractor on:
The work, or designated portion thereof, is not ready to receive a Substantial Completion Inspection. A listing of items which preclude Substantial Completion is attached to this letter.
Director of Construction Management
Project Manager
County Architect
Project File
Document 00 65 16: Substantial Completion Form
RENOVATION AND EXPANSION Document 00 65 16
BID/CONTRACT NO.: PNC2122804P1 Substantial Completion Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division
Inspection Date:
Project Title: Full Project
Facility Name: Designated Portion (Attach Description)
Representation: Phone:
Consultant:
Using Agency:
Construction Mgmt Div.:
Others:
The attached pages 2 through list “punch items” noted as a result of the Substantial Completion Inspection, completed by the persons listed above.
The punch list items are of a nature that will allow beneficial occupancy of the premises and are issued as a final punch list. If any item on the preliminary punch list is inaccurate, notify the Construction
Management Division’s Project Manager immediately. These punch list items shall be corrected on or before the mutually agreed date of: .
The punch list items are of a nature that preclude beneficial occupancy of the premises by the County and Substantial Completion is denied at this time. Items on the attached page 2 must be completed prior to requesting a re-inspection.
Remarks:
Recommended By:
(Consultant)
Signature Title
(Firm Name)
Approved By:
Broward County Construction Management Division
Accepted By:
(Consultant)
(Firm Name)
Contractor, Consultant, Construction Management Division
Document 00 65 17: Substantial Completion Punch List Form
RENOVATION AND EXPANSION Document 00 65 17
BID/CONTRACT NO.: PNC2122804P1 Substantial Completion Punch List Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 2
Broward County Commission
Construction Management Division
Inspection Date:
Project Title: Full Project
Facility Name: Designated Portion (Attach Description)
Preliminary Punch List Final (Edited) Punch List
Room
Item
Notes
RENOVATION AND EXPANSION Document 00 65 17
BID/CONTRACT NO.: PNC2122804P1 Substantial Completion Punch List Form
Room
Item
Notes
Document 00 65 18: Substantial Completion Date Form
RENOVATION AND EXPANSION Document 00 65 18
BID/CONTRACT NO.: PNC2122804P1 Substantial Completion Date Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division 115 South Andrews Avenue, Room A550
Fort Lauderdale, FL 33301
Phone: (954) 357-6419
Fax: (954) 357-6411
Instructions for Project Consultant’s Use: Provide this completed letter to establish the Date of Substantial Completion of the
Work or a designated portion thereof.
(Contract
Administrator)
On , we completed the Substantial Completion
Inspection for the project, or designated portion thereof, listed above.
I hereby certify that the General Contractor achieved Substantial Completion and the project, or designated portion thereof, was ready for beneficial occupancy on the following date:
The date of Substantial Completion is the last date of Substantial Completion for this project, or a designated portion thereof, requested by the Contractor pursuant to the request number listed above. Evidence is provided by our signatures below that the Project Consultant and Contractor agree that this project was ready for
Beneficial Occupancy by the Owner for its intended purpose on the date of Substantial Completion listed above.
You are advised to submit Standard Form 770 to advise Risk Management and Safety of the required change of insurance for this completed portion of the Work.
By:
(Project
Consultant)
Firm Name
Contract Administrator
Project Manager
Consultant
Contractor Surety
For Construction Management Division Use
Only
Date is acceptable; letter is hereby placed in Project Files as an official record.
Project Manager
Document 00 65 19: Final Completion Request Form
RENOVATION AND EXPANSION Section 00 65 19
BID/CONTRACT NO.: PNC2122804P1 Final Completion Request Form
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division
I hereby certify that I am an officer of the firm or corporation named herein and have been properly authorized to make the following statements concerning the project named above:
1. The above named project or designated portion thereof will be finally complete in accordance with the contract requirements and ready (including all punch list items) for inspection on:
2. The Date of Final Completion required by the Contract (as modified by any approved change orders affecting Contract
Time) is:
3. I understand that I am to continue with insurance coverage and maintenance required by the Contract until the Owner's
Final Acceptance of the Work. Additionally, I understand that I am to continue with liability coverage and maintenance required by the Contract until the Owner's Final Acceptance of the Work.
4. I have attached a time extension request/change order proposal for any delays related to work required for completion of the punch list.
Project Consultant
Field Construction Manager
Contractor’s Surety
Time Extension Request/Change Order Proposal
(if applicable)
Notice to Contractor
Neither the determination by the Project Consultant that the Work is finally complete, nor the acceptance thereof by the Owner, shall preclude subsequent claims against the Owner pursuant to portions of the Work not meeting the requirements of the Contract or for the
Contract’s provisions for the Contractor’s warranty of the Work.
Document 00 65 20: Final Completion Readiness Form
RENOVATION AND EXPANSION Section 00 65 20
BID/CONTRACT NO.: PNC2122804P1 Final Completion Readiness Form
Instructions for Project Consultant’s Use: Provide this completed letter to notify the Owner that the Work, or a designated portion thereof, is ready for the Owner’s Final Completion Inspection.
(Field Construction
Manager)
I have completed a preliminary site visit as a result of the Contractor's Request for Final Completion Inspection and have found that:
The work, or designated portion thereof, will be ready to receive a Final Completion Inspection as requested by the Contractor on:
The work, or designated portion thereof, is not ready to receive a Final Completion Inspection. A listing of items which preclude Final Completion is attached to this letter.
Project Manager
County Architect
Project File
Document 00 65 21: Final Completion Date Form
RENOVATION AND EXPANSION Section 00 01 01
BID/CONTRACT NO.: PNC2122804P1 Project Title Page
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 1
Broward County Commission
Construction Management Division
Instructions for Project Consultant’s Use: Provide this completed letter to establish the Date of Final Completion of the
Work or a designated portion thereof.
(Contract
Administrator)
On , we completed the Final Completion
Inspection for the project, or designated portion thereof, listed above.
I hereby certify that the General Contractor achieved Final Completion and the project, or designated portion thereof, was ready for beneficial occupancy on the following date:
The date of Final Completion is the last date of Final Completion for this project, or designated portion thereof, originally requested by the Contractor. Evidence is provided by our signatures below that the Project Consultant and Contractor agree that this project was Finally Complete on the date of Final Completion listed above.
(Project
Consultant)
Contract Administrator
Project Manager
Consultant
Contractor Surety
For Construction Management Division Use
Only
Date is acceptable; letter is hereby placed in Project Files as an official record.
Project Manager
RENOVATION AND EXPANSION Section 01 22 00
BID/CONTRACT NO.: PNC2122804P1 Unit Prices
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 1 of 3
SECTION 01 22 00
UNIT PRICES
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Measurement and payment criteria applicable to portions of the Work performed under a unit price payment method.
B. Defect assessment and non-payment for rejected work.
1.2 AUTHORITY
A. Measurement methods delineated in the individual specification sections complement the criteria of this section. In the event of conflict, the requirements of the individual specification section govern.
B. Take all measurements and compute quantities. The Project Consultant and Owner will verify measurements and quantities.
C. Assist by providing necessary equipment, workers, and survey personnel as required.
1.3 UNIT QUANTITIES SPECIFIED
A. All unit prices shall be listed before the start of construction. Quantities listed in the Unit Price section of the Schedule of Prices Bid are for bidding and contract purposes only. Quantities and measurements supplied or placed in the work and verified by the Project Consultant and Owner determine payment. If in the course of construction it appears that the quantities of work to be paid for on a unit price basis are twenty percent (20%) greater than or less than those indicated, the contractor shall submit to the Project
Consultant and Owner a proposal for change in the contract sum on the Proposal Worksheet Summary per quantities indicated on the Proposal Worksheet Detail. One document shall be prepared for work in each affected specification section, and shall be reflected in one line item on the document.
B. If the actual Work requires more or fewer quantities than those quantities indicated, provide the required quantities at the unit sum/prices contracted.
1.4 MEASUREMENT OF QUANTITIES
A. Measurement Devices:
1. Weigh Scales: Inspected, tested and certified by the applicable Florida department or The Broward
County Board of County Commissioners within the past year.
2. Platform Scales: Of sufficient size and capacity to accommodate the conveying vehicle.
BID/CONTRACT NO.: PNC2122804P1 Unit Prices
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 2 of 3
3. Metering Devices: Inspected, tested and certified by the applicable Florida department within the past year.
B. Measurement by Weight: Concrete reinforcing steel, rolled or formed steel or other metal shapes will be measured by handbook weights. Welded assemblies will be measured by handbook or scale weight.
C. Measurement by Volume: Measured by cubic dimension using mean length, width and height or thickness.
D. Measurement by Area: Measured by square dimension using mean length and width or radius.
E. Linear Measurement: Measured by linear dimension, at the item centerline or mean chord.
F. Stipulated Sum/Price Measurement: Items measured by weight, volume, area, or linear means or combination, as appropriate, as a completed item or unit of the Work.
1.5 PAYMENT
A. Payment Includes: Full compensation for all required labor, Products, tools, equipment, plant, transportation, services and incidentals; erection, application or installation of an item of the Work;
overhead and profit.
B. Final payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities accepted by the Project Consultant multiplied by the unit sum/price for Work which is incorporated in or made necessary by the Work.
1.6 DEFECT ASSESSMENT
A. Replace the Work, or portions of the Work, not conforming to specified requirements.
B. If, in the opinion of the Project Consultant and Owner, it is not practical to remove and replace the Work, the Project Consultant will direct one of the following remedies:
1. The defective Work may remain, but the unit sum/price will be adjusted to a new sum/price at the discretion of the Owner.
2. The defective Work will be partially repaired to the instructions of the Project Consultant, and the unit sum/price will be adjusted to a new sum/price at the discretion of the Owner.
C. The individual specification sections may modify these options or may identify a specific formula or percentage sum/price reduction.
D. The authority of the Project Consultant and Owner to assess the defect and identify payment adjustment is final.
1.7 NON-PAYMENT FOR REJECTED PRODUCTS
BID/CONTRACT NO.: PNC2122804P1 Unit Prices
Project No. CMD: 104025 – RLI # PNC2122804P1
Date 09/20/2024 Page 3 of 3
A. Payment will not be made for any of the following:
1. Products wasted or disposed of in a manner that is not acceptable.
2. Products determined as unacceptable before or after placement.
3. Products not completely unloaded from the transporting vehicle.
4. Products placed beyond the lines and levels of the required Work.
5. Products remaining on hand after completion of the Work.
6. Loading, hauling and disposing of rejected Products.
1.8 SCHEDULE OF UNIT PRICES
A. Trenching, conduit, and landscape restoration in open space per lineal foot.
B. Trenching, conduit, and landscape restoration in hardscapes: i.e., concrete sidewalks, pavements, surfaces with pavers and any other hardscapes per lineal foot.
PART 2 - PRODUCTS NOT USED
PART 3 - EXECUTION NOT USED
RENOVATION AND EXPANSION Section 01 23 00
BID/CONTRACT NO.: PNC2122804P1 Alternates
Date 09/20/2024 Page 1 of 2
SECTION 01 23 00
ALTERNATES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for alternates.
1.3 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if the
Owner decides to…