16 - Appendix 12 - SMP Checklist.pdf

PDF 159 KB Posted

Attached to
Facility Maintenance RFI
Solicitation number
RFI08132025
Issued by

About this file

This document is a Site Maintenance Plan (SMP) Checklist for Defense Commissary Agency (DeCA) facilities. The two-page checklist provides a comprehensive inspection template for maintenance technicians to systematically evaluate both exterior and interior building conditions. The checklist includes detailed sections for examining critical infrastructure elements such as security lights, generator status, door operations, emergency exits, electrical systems, plumbing, safety railings, and environmental compliance.

Key reminders on the checklist indicate that materials under $100 are the contractor's responsibility, while materials over $100 require Store Director approval. The document includes space to record the store name, date of visit, technician information, and specific inspection details across multiple categories. Sample work items mentioned include painting (up to 200 sq ft), replacing ceiling tiles, patching wall damages, replacing plumbing components, cleaning honeycombs, and replacing lamps and filters in various facility systems. The checklist is designed to ensure thorough maintenance documentation and tracking of facility repair needs.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix 12 – Site Maintenance Plan

DeCA SMP Checklist 1 | P a g e

DeCA Commissary SMP Checklist

Store Name: Date of Visit:

SMP Technician:

Time of Arrival: Time of Departure:

Task Yes No Comments

Complete task established by Store Management (see page 2 for details)

Exterior of Building Inspection Yes No Comments Are repairs/maintenance needed, Security Lights operating, Gutters, ETC

Generator on Line

Interior of Building Inspection Yes No Comments Problems with front door operation

Check door locks and hinges throughout the store for proper operation.

Exterior door locks operational

Emergency exit doors, batteries and alarm wiring functional

Any missing case trim/bumpers

Any noisy display case evaporator fan motor

Clean air supply honeycomb grilles at display cases Clean air supply and return registers

Replace any burned out lamps throughout the building (for ceiling height up to 12'), in refrigerated rooms and in display cases

Any visible leaks or stained ceiling tiles

Any visible damage to walls, protective barriers, door frames, etc.

Toilets flush properly Check all sinks and faucets for leaks. Repair as needed.

Floor tile or trip hazards

Overhead Doors or dock levelers operational

Check Safety Railings (interior and exterior) Repainting of Safety Markings In Warehouse and Exterior Docks necessary

Used Ballast or Bulbs need to be disposed of Per Base Environmental Regulations

Reminders:

• Material under $100.00 per tasks is contractor responsibility

• Seek approval from Store Director for Material over $100.00

• Establish Material List for Next visit

Notes:

SMP Signature & Date

Authorized Government Personnel Signature & Date

Appendix 12 – Site Maintenance Plan

DeCA SMP Checklist 2 | P a g e

SMP Completed Task Sample Work Items: Painting, up to 200SF, Replace damaged ceiling tiles, Patch small wall damages and holes, Replace faucets, valves and accessories, Replace automatic plumbing sensors, Replace and clean honeycombs, Replace thermometers and sensors in coolers and freezers, replace burned out lamps (for fixtures from ground level up to 12-foot high), Replace filters in ice machines and other identified in the PWS.

Details of Work Completed

File details come from the government source that posted it. Updated .