This file is a Questions and Answers document from an RFQ interchange form for the FBI Crime Scene Management Vehicles solicitation (RFQ-15F06726Q0000291). The Q&A provides clarifications on vehicle specifications and requirements for the delivery of ten Crime Scene Management Vehicles to ten FBI Field Office locations within 18 months after award. Key clarifications include: only one Air Transport Large Crime Scene Management Vehicle (ATLCSMV) is required for delivery to Miami Field Office, with three additional Large Crime Scene Management Vehicles (LCSMV) and one Small Crime Scene Management Vehicle (SCSMV) comprising the remainder of the order. The Government confirmed that Mercedes Sprinter chassis are acceptable (replacing Dodge Sprinter references), that the SCSMV overall length of 290" is acceptable, and that fully welded all-aluminum body types are acceptable for the ATLCSMV and LCSMV but not the SCSMV.
The responses address technical specifications and alternative construction methods, confirming the Government will accept alternative build methodologies exceeding requirements to promote competition, and that vendors should submit preliminary weight and weight distribution calculations with their proposals. Additional clarifications cover warranty requirements, with the Government reducing the electrical warranty from "lifetime" to 3 years/50,000 miles for all components and workmanship. The response also confirms that contractors are responsible for ensuring vehicles meet C-5 air transport requirements and providing necessary certification documentation but are not required to obtain actual certification. Regarding insurance, the $25 million umbrella liability requirement was clarified to require only $5 million or greater coverage. The Government confirmed 12kW generator capability is required, though a hybrid lithium battery system may be considered if capable of producing 12kW for a minimum of 24 hours without interruption.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ
Interchange Form
| To: | Jamie Compton |
| Federal Bureau of Investigation | |
| CJIS |
Date: 8/1/26
Solicitation #: RFQ-15F06726Q0000291 Project Name: Crime Scene Management Vehicles (CSMV)
Contact Name: Jamie Compton
Email: jlmelzer@fbi.gov
| Item # | Document | Section/Reference #/Page # | Question | Government Response |
| 1 | Are there any drawings or sketches that outline the design and specifications of these vehicles? | The FBI does not have any drawings or sketches of the vehicles. | ||
| 2 | RFQ | Page 3- Section 2.3 Scope of Work/ 2.4 Deliverables | The LCSMV being delivered to Miami, FL is the only ATLCSMV listed. Do any other vehicles need to be Air- Transport approved? | Only 1 Air Transport. ATLCSMV, Air Transport Large Crime Scene Management Vehicle (Quantity 1) delivered to Miami Field Office |
| 3 | SOW | 2. Description of Services/Introduction (2.1,2.2) | Do all four LCSMV's need to be Air-Transport approved? | Only 1 Air Transport Variant is needed delivered to Miami Field Office. |
ATLCSMV - quantity 1 is the air transport large crime scene vehicle LCSMV - quantity 3 is just the large crime scene vehicle
| 4 | General | N/A | There are numerous ways the specs and layout can be interpreted. Is there a floor plan to reference. | The FBI does not have any plans to reference. | ||
| 5 | Would a fully welded, all-aluminum body type be acceptable? | Yes for the ATLCSMV & LCSMV, no for the SCSMV | ||||
| 6 | Attachment_1_-_Statement_of_Work_(SOW)_-_Crime_Scene_Vehicles | Page 8, Section 4.1(i) General Construction | The requirements outline the vehicle load distribution being in accordance with the National Fire Protection Association. Would the Government consider requiring the vendors provide preliminary weight and weight distribution calculations with the submission in place? | Yes | ||
| 7 | Attachment_1_-_Statement_of_Work_(SOW)_-_Crime_Scene_Vehicles | Page 7–8, Section 4.1(a) Intent of Specifications | The build specifications for the vehicle outline the use of double H wall beams alongside 0.125" aluminum alloy 5052-H36 side panels. These specifications reflect a single manufacturer's build methodology for the vehicles. Would the Government accept and alternative build methodology that exceeds the requirements, promoting increased competition between vendors? | Yes | ||
| 8 | Attachment_1_-_Statement_of_Work_(SOW)_-_Crime_Scene_Vehicles | Page 3, Section 2.3 Scope of Work and Page 7–8, Section 4.1(a) Intent of Specifications | The dodge Sprinter van outlined in the specifications has been retired and replaced with the Mercedes Sprinter van. Can the Government please confirm if the intent is to use the Mercedes Sprinter? | Mercedes Sprinter is acceptable | ||
| 9 | Attachment_1_-_Statement_of_Work_(SOW)_-_Crime_Scene_Vehicles | Page 3, Section 2.3 Scope of Work and Page 7–8, Section 4.1(a) Intent of Specifications | The specifications outline an overall length for the Small Crime Scene Management Vehicle to be less than 175". A Sprinter Van 3500XD is a larger vehicle with a configured bumper to bumper length up to 290". Is it acceptable for vendors to propose a 3500XD that stays within an overall length of 290"? | 290" is acceptable for overall length | ||
| 10 | SOW | 3 Vehicle Variants | The document references a Dodge Sprinter chassis. Please confirm that Mercedes-Benz Sprinter meets the stated performance requirement. | Mercedes Sprinter is acceptable | ||
| 11 | SOW | 3 Air Transport Vehicle | On page 3 the SOW states "Each of the LCSMV's, when delivered to the four RDT locations, must have modifications to ensure they meet the air-transport requirement." However, page 4 paragraph 2.2 identified "(1) LCSMV (Air-Transport Requirement". Please confirm it is only one vehicle. | Only 1 is correct for the LCSMV Air Transport to be delivered to Miami Field Office | ||
| 12 | SOW | 3 Air Transport | Please confirm that the Contractor is responsible for only designing the vehicle to published C-5 transport requirements and providing associated documentation for the US Air Force, and not responsible for obtaining the actual certification as part of this build process and scope of work. | The contractor is responsible to ensure the vehicle meets the requirements and can provide all required weight/balance and materials engineering certificates needed to obtain the certification but will not be required to obtain the certification. | ||
| 13 | SOW | 10–11 Insurance | Please confirm the rationale for the required $25 million umbrella liability coverage, which significantly exceeds typical specialty vehicle industry requirements. Will lower limits be considered? | $25 million is not required. Anything $5 million or over is sufficient. | ||
| 14 | SOW | 12 Electrical Warranty | The SOW requires a lifetime warranty on all electrical components and wiring. Please define "lifetime" (vehicle service life, original ownership period, or another defined duration). | We would accept 3 year/50,000 miles instead of "lifetime" | ||
| 15 | SOW | 12 Electrical Warranty | Does the lifetime electrical warranty apply to commercial off-the-shelf components supplied by third-party manufacturers or only to Contractor-installed wiring and workmanship? | 3 year/50,000 miles warranty for all components and workmanship would be suffice. | ||
| 16 | SOW | 15 Console | (vi) states "The cab shall have radio wiring preinstalled to the specifications of section 4.4(w)(i)", but this section does not spell out any prewiring requirements for the cab, only workstations. Please clarify if there is a need for radio prewiring in the cab console. | Yes there are requirements for the wiring for 1 radio in the vehicle cab area | ||
| 17 | SOW | 16 & 33 Ladder | Is a fabricated aluminum ladder an acceptable substitute for the Zirco Quic ladder? | A standard fixed mount fabricated aluminum ladder is not an acceptable replacement for the Zirco Quic Ladder. If the fabricated aluminum ladder offers a similar "Out & Down" system that allows the ladder to move from a storage mode to an extended access mode that would be acceptable. | ||
| 18 | SOW | 17 Body Construction | The body construction specifications prescribe specific manufacturing methods (buck rivets, extrusion profiles, weld spacing, etc.). Will the Government accept alternate body construction techniques that achieve equal structural performance and durability? | Yes, if the vendor supplies details on the alternate methods for approval. | ||
| 19 | SOW | 25 Generator | Would the Government consider a hybrid lithium battery system that substantially reduces generator runtime, fuel consumption, and maintenance while maintaining required endurance? | Yes if the hybrid lithium battery system is able of producing 12kw of power for a minimum of 24 hours without interruption | ||
| 20 | SOW | 38 Insulation | Is rigid foam board insulation an acceptable alternate to fiberglass? | Yes | ||
| 21 | SOW | 50 Console | (vi) states "The cab shall have radio wiring preinstalled to the specifications of section | |||
| 4.6(u)(ii)", but this section does not spell out any prewiring requirements for the cab, only workstations. Please clarify if there is a need for radio prewiring in the cab console. | Yes there are requirements for the wiring for 1 radio in the vehicle cab area | |||||
| 22 | SOW | 61 Generator | Two questions: 1) 12KW generators are typically not required for Sprinter Van builds, we usually utilize the 8KW Cummins Onan paired with 30A shore power. Is the 12KW specified required or can we substitute for an 8KW? 2) Would the Government consider a hybrid lithium battery system that substantially reduces generator runtime, fuel consumption, and maintenance while maintaining required endurance, or even a full lithium battery system? | 12KW is required. A hybrid lithium battery system might be considered, but the system would have to be capable of producing 12kw of power for a minimum of 24 hours without interruption. |