This solicitation is for a Federal Bureau of Investigation National Capital Region Job Order Contract to provide construction and related services. The total contract value is not to exceed $24.5 million over five years. Offerors must have an active Top Secret facility clearance and be located within 50 miles of the J. Edgar Hoover Building in Washington, D.C. The minimum guarantee is $50,000. Proposals are due by March 5, 2024 and must be submitted electronically to the points of contact listed. Questions regarding the solicitation are due by March 15, 2024 and must be submitted to the points of contact via email using the provided template. The awarded contract will have a base period of performance from July 2024 to June 2025 with four optional one-year extension periods.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15F06724R0000013 Page 1 of 38
SOLICITATION,OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER
15F06724R0000013
SEALED BID (IFB)
INVITATION FOR BID
X NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
2. TYPE OF SOLICITATION 3. DATE ISSUED
03/04/2024
PAGE OF PAGES
1 38
IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
CODE 15F067
FEDERAL BUREAU OF INVESTIGATION
FAU - FACILITIES ACQUISITION UNIT
935 PENNSYLVANIA AVE, NW
WASHINGTON, DC 20535-0001
7. ISSUED BY
FEDERAL BUREAU OF INVESTIGATION
FEDERAL BUREAU OF INVESTIGATION
935 PENNSYLVANIA AVE, NW
ROOM 6823
WASHINGTON, DC 20535-0001
8. ADDRESS OFFER TO
9. FOR
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
A. Project Title: Federal Bureau of Investigation (FBI) National Capital Region (NCR) Job Order Contract (JOC). B. This acquisition is a competitive local small business set-aside limited to businesses with an ACTIVE Top Secret facilities clearance and within a 50-mile radius of the J. Edgar Hoover (JEH) building located at 935 Pennsylvania Ave NW, Washington D.C. 20535. Interested offers must have an active Top Secret facilities clearance and an office within a 50 mile radius of JEH to be considered for award. C. The Total Contract minimum guarantee is $50,000.
D. The total amount of this contract is not-to-exceed a monetary amount of $24.5M or a total term of 5 years (as extended through the exercise of options), whichever is reached first. E. Please reference Section L, (Instructions, Conditions and Notices to Offerors) for proper preparation of the offer and to Section M, (Evaluation Factors for Award). F. Proposals are due electronically to the FBI by March 5, 2024, 5:00pm EST. Hand carried proposals are not permitted at this facility. Early submissions are encouraged. The Government will begin validating proposals as they are received. Submit Proposals to: Mrs. Logan Swiger: lswiger@fbi.gov Mr. Andre Wilson: alwilson6@fbi.gov
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving7 TBD
X award, notice to proceed. This performance period is X mandatory negotiable. (See 52.211-10.)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).
YES X NO
12b. CALENDAR DAYS
Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
17:00US/
Eastern a.
04/05/2024
b. An offer guarantee is, X is not required.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.
90d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
15F06724R0000013 Page 2 of 38
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ___________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
17.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE
UNITED STATES CODE AT
26. ADMINISTERED BY FBI_HQ
FBI Headquarters 935 Pennsylvania Avenue, NW ARU Room WB-3000 Washington, DC 20535-0001
Accounts Receivable Unit, Debt Collection Team
(O) (202) 324-6885
(F) (202) 324-2504 Accounts.Receivable@ic.fbi.gov
Send all invoices via IPP, NOT central_invoices@fbi.gov
27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
X 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
Logan Swiger
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY 03/04/2024
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
15F06724R0000013 Page 3 of 38
Table of Contents
Section Description Page Number
1 Solicitation, Offer and Award 2 Commodity or Services Schedule 3 Special Contract Requirements
FBI-0021 Providing Deoxyribonucleic Acid (DNA) Sample for Elimination 4 Contract Clauses
52.202-1 Definitions (Jun 2020) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-7 Anti-Kickback Procedures (Jun 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation On Payments to Influence Certain Federal Transactions (Jun 2020) 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights (Jun 2020) 52.204-2 Security Requirements (Mar 2021) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Nov 2021) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Nov 2021) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.210-1 Market Research (Nov 2021) 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) 52.211-18 Variation in Estimated Quantity (Apr 1984) 52.215-2 Audit and Records-Negotiation (Jun 2020) 52.215-8 Order of Precedence - Uniform Contract Format (Oct 1997) 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data (Aug 2011) 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-Modifications (Jun 2020) 52.215-12 Subcontractor Certified Cost or Pricing Data (Jun 2020) 52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications (Jun 2020) 52.215-15 Pension Adjustments and Asset Reversions (Oct 2010) 52.215-17 Waiver of Facilities Capital Cost of Money (Oct 1997) 52.215-19 Notification of Ownership Changes (Oct 1997) 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications (Nov 2021) 52.219-8 Utilization of Small Business Concerns (Oct 2018) 52.219-9 Small Business Subcontracting Plan (Nov 2021) 52.219-14 Limitations on Subcontracting (Sep 2021) 52.222-1 Notice to the Government of Labor Disputes (Feb 1997) 52.222-3 Convict Labor (June 2003) 52.222-4 Contract Work Hours and Safety Standards--Overtime Compensation (May 2018) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (Jul 2021) 52.222-9 Apprentices and Trainees (July 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination - Debarment (May 2014)
15F06724R0000013 Page 4 of 38
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-19 Child Labor--Cooperation with Authorities and Remedies (Jan 2022) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sept 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-30 Construction Wage Rate Requirements--Price Adjustment (None or Separately Specified Method) (Aug 2018) 52.222-35 Equal Opportunity for Veterans (Jun 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) 52.222-37 Employment Reports on Veterans (Jun 2020) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-50 Combating Trafficking in Persons (Nov 2021) 52.222-54 Employment Eligibility Verification (May 2022) 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Sep 2013) 52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) 52.223-6 Drug-Free Workplace (May 2001) 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) 52.223-15 Energy Efficiency in Energy-Consuming Products (May 2020) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (Aug 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) 52.223-19 Compliance With Environmental Management Systems (May 2011) 52.223-20 Aerosols (Jun 2016) 52.223-21 Foams (Jun 2016) 52.224-1 Privacy Act Notification (Apr 1984) 52.224-2 Privacy Act (Apr 1984) 52.224-3 Privacy Training (Jan 2017) 52.225-1 Buy American-Supplies (Nov 2021) 52.225-9 Buy American-Construction Materials (Nov 2021) 52.225-11 Buy American-Construction Materials under Trade Agreements (Nov 2021) 52.225-12 Notice of Buy American Requirement--Construction Materials Under Trade Agreements (May 2014) 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises (June 2000) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-3 Patent Indemnity (Apr 1984) 52.227-4 Patent Indemnity-Construction Contracts (Dec 2007) 52.227-17 Rights in Data - Special Works (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance-Work on a Government Installation (Jan 1997) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Nov 2021) 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) 52.228-12 Prospective Subcontractor Requests for Bonds (May 2014) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) 52.229-3 Federal, State and Local Taxes (Feb 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-16 Progress Payments (Nov 2021) 52.232-17 Interest (May 2014) 52.232-18 Availability of Funds (Apr 1984)
15F06724R0000013 Page 5 of 38
52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.233-1 Disputes (May 2014) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-1 Performance of Work by the Contractor (Apr 1984) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-4 Physical Data (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.236-16 Quantity Surveys (Apr 1984) 52.236-17 Layout of Work (Apr 1984) 52.236-21 Specifications and Drawings for Construction (Feb 1997) 52.236-26 Preconstruction Conference (Feb 1995) 52.242-5 Payments to Small Business Subcontractors (Jan 2017) 52.242-13 Bankruptcy (July 1995) 52.242-14 Suspension of Work (Apr 1984) 52.243-4 Changes (June 2007) 52.243-5 Changes and Changed Conditions (Apr 1984) 52.244-2 Subcontracts (Jun 2020) 52.244-6 Subcontracts for Commercial Products and Commercial Services (Jan 2022) 52.245-1 Government Property (Sep 2021) 52.245-9 Use and Charges (Apr 2012) 52.246-17 Warranty of Supplies of a Noncomplex Nature (June 2003) 52.246-18 Warranty of Supplies of a Complex Nature (May 2001) 52.246-20 Warranty of Services (May 2001) 52.246-21 Warranty of Construction (Mar 1994) 52.248-3 Value Engineering-Construction (Oct 2020) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012) 52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements) (Apr 2012) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.249-14 Excusable Delays (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991) 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) 52.203-14 Display of Hotline Poster(s) (Nov 2021) 52.204-15 Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) 52.216-18 Ordering (Aug 2020) 52.216-22 Indefinite Quantity (Oct 1995) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020)
15F06724R0000013 Page 6 of 38
52.219-28 Post-Award Small Business Program Rerepresentation (Sep 2021) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) 52.232-9 Limitation on Withholding of Payments (Apr 1984) 52.247-12 Supervision, Labor, or Materials (Apr 1984) 52.246-12 Inspection of Construction (Aug 1996) 52.242-15 Stop-Work Order (Aug 1989) 52.242-17 Government Delay of Work (Apr 1984) 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) 52.217-8 Option to Extend Services (Nov 1999) 52.216-19 Order Limitations (Oct 1995) 52.217-9 Option to Extend the Term of the Contract (Mar 2000) 52.232-25 Prompt Payment (Jan 2017) 52.252-6 Authorized Deviations in Clauses (Nov 2020)
5 Attachments 6 Solicitation Provisions 7 Representations and Certifications
52.236-28 Preparation of Proposals-Construction (September 2019) 52.215-6 Place of Performance (Oct 1997) 52.204-8 Annual Representations and Certifications (May 2022) 52.209-5 Certification Regarding Responsibility Matters (Aug 2020) 52.209-7 Information Regarding Responsibility Matters (Oct 2018) 52.222-25 Affirmative Action Compliance (Apr 1984)
15F06724R0000013 Page 7 of 38
Section 2 - Commodity or Services Schedule
Firm-Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) Job Order Contract( JOC).
Firm Fixed Price
SCHEDULE OF SUPPLIES/SERVICES
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
0001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 07/01/2024 - 06/30/2025
Base Period
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
0002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 07/01/2024 - 06/30/2025
Base Period
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
0003 NON-PRE-PRICED
STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 07/01/2024 - 06/30/2025
Base Period
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
15F06724R0000013 Page 8 of 38
0004 NON-PRE-PRICED
NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 07/01/2024 - 06/30/2025
Base Period
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
0005 Minimal Design
Labor Categories:
Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $
PSC: Y1JZ
Line Period of Performance: 07/01/2024 - 06/30/2025
Base Period
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
0006 Project Manager
PSC: Y1JZ
Line Period of Performance: 07/01/2024 - 06/30/2025
Base Period
12 MO $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
1001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 07/01/2025 - 06/30/2026
Option Period 1
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
15F06724R0000013 Page 9 of 38
1002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 07/01/2025 - 06/30/2026
Option Period 1
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
1003 NON-PRE-PRICED
STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 07/01/2025 - 06/30/2026
Option Period 1
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
1004 NON-PRE-PRICED
NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 07/01/2025 - 06/30/2026
Option Period 1
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
1005 Minimal Design
Labor Categories:
Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $
1 LT $________ $_________________
15F06724R0000013 Page 10 of 38
IT/Communications Engineer: $
PSC: Y1JZ
Line Period of Performance: 07/01/2025 - 06/30/2026
Option Period 1
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
1006 Program Manager
PSC: Y1JZ
Line Period of Performance: 07/01/2025 - 06/30/2026
Option Period 1
12 MO $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
2001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 07/01/2026 - 06/30/2027
Option Period 2
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
2002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 07/01/2026 - 06/30/2027
Option Period 2
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
2003 NON-PRE-PRICED
STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 07/01/2026 - 06/30/2027
15F06724R0000013 Page 11 of 38
Option Period 2
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
2004 NON-PRE-PRICED
NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 07/01/2026 - 06/30/2027
Option Period 2
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
2005 Minimal Design
Labor Categories:
Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $
PSC: Y1JZ
Line Period of Performance: 07/01/2026 - 06/30/2027
Option Period 2
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
2006 Program Manager
PSC: Y1JZ
Line Period of Performance: 07/01/2026 - 06/30/2027
Option Period 2
12 MO $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
3001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 07/01/2027 - 06/30/2028
15F06724R0000013 Page 12 of 38
Option Period 3
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
3002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 07/01/2027 - 06/30/2028
Option Period 3
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
3003 NON-PRE-PRICED
STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 07/01/2027 - 06/30/2028
Option Period 3
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
3004 NON-PRE-PRICED
NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 07/01/2027 - 06/30/2028
Option Period 3
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
3005 Minimal Design
Labor Categories:
Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $
15F06724R0000013 Page 13 of 38
Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $
PSC: Y1JZ
Line Period of Performance: 07/01/2027 - 06/30/2028
Option Period 3
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
3006 Program Manager
PSC: Y1JZ
Line Period of Performance: 07/01/2027 - 06/30/2028
Option Period 3
12 MO $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
4001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 07/01/2028 - 06/30/2029
Option Period 4
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
4002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 07/01/2028 - 06/30/2029
Option Period 4
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
4003 NON-PRE-PRICED
STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless
15F06724R0000013 Page 14 of 38 otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 07/01/2028 - 06/30/2029
Option Period 4
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
4004 NON-PRE-PRICED
NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 07/01/2028 - 06/30/2029
Option Period 4
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
4005 Minimal Design
Labor Categories:
Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $
PSC: Y1JZ
Line Period of Performance: 07/01/2028 - 06/30/2029
Option Period 4
1 LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
4006 Program Manager
PSC: Y1JZ
Line Period of Performance: 07/01/2028 - 06/30/2029
Option Period 4
12 MO $________ $_________________
15F06724R0000013 Page 15 of 38
Section 3 - Special Contract Requirements
Clauses By Full Text
FBI-0021 Providing Deoxyribonucleic Acid (DNA) Sample for Elimination
Providing Deoxyribonucleic Acid (DNA) Sample for Elimination
FBI employees, contractors, and service providers may interact with evidence or federal deoxyribonucleic acid (DNA) database samples in Laboratory Division (LD) space or their work may require them to enter LD examination areas where evidence or DNA database samples are processed or examined. As a result, evidence may inadvertently become contaminated with their DNA. Per the Federal Bureau of Investigation Laboratory Elimination Deoxyribonucleic Acid (DNA) Database Policy Directive (1149D), LD is collecting DNA samples to identify FBI employees, contractor, or service provider DNA profiles in the event of sample contamination. A contractor or service provider funded by this procurement action is required to provide a DNA sample which will be processed for DNA and used to detect contamination on forensic evidence. The DNA results will be protected, i.e.
anonymized, maintained in a secure database with controlled access, and used only by authorized DNA personnel for the sole purpose of detecting contamination. The remaining collected sample will be stored in a secure location for potential processing with future DNA technologies, if appropriate. If the contractor or service provider's DNA profile is detected during evidence analysis, it will be identified as sample contamination rather than reported as a possible perpetrator to law enforcement.
15F06724R0000013 Page 16 of 38
Section 4 - Contract Clauses
Clauses By Reference
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov
Clause Title Fill-ins (if applicable)
52.202-1 Definitions (Jun 2020)
52.203-3 Gratuities (Apr 1984)
52.203-5 Covenant Against Contingent Fees (May 2014)
52.203-7 Anti-Kickback Procedures (Jun 2020)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity (May 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014)
52.203-12 Limitation On Payments to Influence Certain Federal Transactions
(Jun 2020)
52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021)
52.203-17 Contractor Employee Whistleblower Rights and Requirement To
Inform Employees of Whistleblower Rights (Jun 2020)
52.204-2 Security Requirements (Mar 2021)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content
Paper (May 2011)
52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
(Jun 2020)
52.204-13 System for Award Management Maintenance (Oct 2018)
52.204-14 Service Contract Reporting Requirements (Oct 2016)
52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Nov
2021)
15F06724R0000013 Page 17 of 38
Clause Title Fill-ins (if applicable)
52.209-6 Protecting the Government's Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment (Nov
2021)
52.209-9 Updates of Publicly Available Information Regarding Responsibility
Matters (Oct 2018)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov
2015)
52.210-1 Market Research (Nov 2021)
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) Calendar Days: "(determined by each task order award)"
No Later Than: "(determined by each individual task order award)"
52.211-18 Variation in Estimated Quantity (Apr 1984)
52.215-2 Audit and Records-Negotiation (Jun 2020)
52.215-8 Order of Precedence - Uniform Contract Format (Oct 1997)
52.215-10 Price Reduction for Defective Certified Cost or Pricing Data (Aug
2011)
52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-
Modifications (Jun 2020)
52.215-12 Subcontractor Certified Cost or Pricing Data (Jun 2020)
52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications (Jun 2020)
52.215-15 Pension Adjustments and Asset Reversions (Oct 2010)
52.215-17 Waiver of Facilities Capital Cost of Money (Oct 1997)
52.215-19 Notification of Ownership Changes (Oct 1997)
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than
Certified Cost or Pricing Data-Modifications (Nov 2021)
52.219-8 Utilization of Small Business Concerns (Oct 2018)
52.219-9 Small Business Subcontracting Plan (Nov 2021)
52.219-14 Limitations on Subcontracting (Sep 2021) (f)(1) End of Perf Period: "X"
15F06724R0000013 Page 18 of 38
52.222-1 Notice to the Government of Labor Disputes (Feb 1997)
52.222-3 Convict Labor (June 2003)
52.222-4 Contract Work Hours and Safety Standards--Overtime Compensation
(May 2018)
52.222-6 Construction Wage Rate Requirements (Aug 2018)
52.222-7 Withholding of Funds (May 2014)
52.222-8 Payrolls and Basic Records (Jul 2021)
52.222-9 Apprentices and Trainees (July 2005)
52.222-10 Compliance with Copeland Act Requirements (Feb 1988)
52.222-11 Subcontracts (Labor Standards) (May 2014)
52.222-12 Contract Termination - Debarment (May 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related
Regulations (May 2014)
52.222-14 Disputes Concerning Labor Standards (Feb 1988)
52.222-15 Certification of Eligibility (May 2014)
52.222-19 Child Labor--Cooperation with Authorities and Remedies (Jan 2022)
52.222-21 Prohibition of Segregated Facilities (Apr 2015)
52.222-26 Equal Opportunity (Sept 2016)
52.222-27 Affirmative Action Compliance Requirements for Construction (Apr
2015)
52.222-30 Construction Wage Rate Requirements--Price Adjustment (None or
Separately Specified Method) (Aug 2018)
52.222-35 Equal Opportunity for Veterans (Jun 2020)
52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020)
52.222-37 Employment Reports on Veterans (Jun 2020)
52.222-40 Notification of Employee Rights Under the National Labor Relations
Act (Dec 2010)
52.222-50 Combating Trafficking in Persons (Nov 2021)
52.222-54 Employment Eligibility Verification (May 2022)
15F06724R0000013 Page 19 of 38
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026
(Jan 2022)
52.223-2 Affirmative Procurement of Biobased Products Under Service and
Construction Contracts (Sep 2013)
52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021)
52.223-5 Pollution Prevention and Right-to-Know Information (May 2011)
52.223-6 Drug-Free Workplace (May 2001)
52.223-11 Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons (Jun 2016)
Substance(s): "all"
52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016)
52.223-15 Energy Efficiency in Energy-Consuming Products (May 2020)
52.223-17 Affirmative Procurement of EPA-designated Items in Service and
Construction Contracts (Aug 2018)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving
(Jun 2020)
52.223-19 Compliance With Environmental Management Systems (May 2011)
52.223-20 Aerosols (Jun 2016)
52.223-21 Foams (Jun 2016)
52.224-1 Privacy Act Notification (Apr 1984)
52.224-2 Privacy Act (Apr 1984)
52.224-3 Privacy Training (Jan 2017)
52.225-1 Buy American-Supplies (Nov 2021)
52.225-9 Buy American-Construction Materials (Nov 2021)
52.225-11 Buy American-Construction Materials under Trade Agreements (Nov
2021)
(b)(3): "TBD"
52.225-12 Notice of Buy American Requirement--Construction Materials Under
Trade Agreements (May 2014)
52.226-1 Utilization of Indian Organizations and Indian-Owned Economic
Enterprises (June 2000)
15F06724R0000013 Page 20 of 38
52.227-1 Authorization and Consent (Jun 2020)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement
(Jun 2020)
52.227-3 Patent Indemnity (Apr 1984)
52.227-4 Patent Indemnity-Construction Contracts (Dec 2007)
52.227-17 Rights in Data - Special Works (Dec 2007)
52.228-2 Additional Bond Security (Oct 1997)
52.228-5 Insurance-Work on a Government Installation (Jan 1997)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
(Nov 2021)
52.228-11 Individual Surety-Pledge of Assets (Feb 2021)
52.228-12 Prospective Subcontractor Requests for Bonds (May 2014)
52.228-14 Irrevocable Letter of Credit (Nov 2014)
52.228-15 Performance and Payment Bonds-Construction (Jun 2020)
52.229-3 Federal, State and Local Taxes (Feb 2013)
52.232-5 Payments under Fixed-Price Construction Contracts (May 2014)
52.232-16 Progress Payments (Nov 2021) (l) Date: "30 DAYS"
52.232-17 Interest (May 2014)
52.232-18 Availability of Funds (Apr 1984)
52.232-23 Assignment of Claims (May 2014)
52.232-27 Prompt Payment for Construction Contracts (Jan 2017)
52.232-33 Payment by Electronic Funds Transfer-System for Award Management
(Oct 2018)
52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)
52.233-1 Disputes (May 2014)
52.233-3 Protest after Award (Aug 1996)
52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)
52.236-1 Performance of Work by the Contractor (Apr 1984) PercentofWork: "15%"
52.236-2 Differing Site Conditions (Apr 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984)
15F06724R0000013 Page 21 of 38
52.236-4 Physical Data (Apr 1984)
52.236-5 Material and Workmanship (Apr 1984)
52.236-6 Superintendence by the Contractor (Apr 1984)
52.236-7 Permits and Responsibilities (Nov 1991)
52.236-8 Other Contracts (Apr 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (Apr 1984)
52.236-10 Operations and Storage Areas (Apr 1984)
52.236-11 Use and Possession Prior to Completion (Apr 1984)
52.236-12 Cleaning Up (Apr 1984)
52.236-13 Accident Prevention (Nov 1991)
52.236-14 Availability and Use of Utility Services (Apr 1984)
52.236-15 Schedules for Construction Contracts (Apr 1984)
52.236-16 Quantity Surveys (Apr 1984)
52.236-17 Layout of Work (Apr 1984)
52.236-21 Specifications and Drawings for Construction (Feb 1997)
52.236-26 Preconstruction Conference (Feb 1995)
52.242-5 Payments to Small Business Subcontractors (Jan 2017)
52.242-13 Bankruptcy (July 1995)
52.242-14 Suspension of Work (Apr 1984)
52.243-4 Changes (June 2007)
52.243-5 Changes and Changed Conditions (Apr 1984)
52.244-2 Subcontracts (Jun 2020) (d): "ALL"
52.244-6 Subcontracts for Commercial Products and Commercial Services (Jan
2022)
52.245-1 Government Property (Sep 2021)
52.245-9 Use and Charges (Apr 2012)
52.246-17 Warranty of Supplies of a Noncomplex Nature (June 2003) (b)(1): "one year after
Government acceptance. "
(c)(1): "a reasonable time."
15F06724R0000013 Page 22 of 38
52.246-18 Warranty of Supplies of a Complex Nature (May 2001)
52.246-20 Warranty of Services (May 2001) (b): "within 30 business days from the date of acceptance by the Government."
52.246-21 Warranty of Construction (Mar 1994)
52.248-3 Value Engineering-Construction (Oct 2020)
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short
Form) (Apr 1984)
52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr
2012)
52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements) (Apr 2012)
52.249-10 Default (Fixed-Price Construction) (Apr 1984)
52.249-14 Excusable Delays (Apr 1984)
52.253-1 Computer Generated Forms (Jan 1991)
52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020)
52.203-14 Display of Hotline Poster(s) (Nov 2021)
52.204-15 Service Contract Reporting Requirements for Indefinite-Delivery
Contracts (Oct 2016)
52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020)
52.204-19 Incorporation by Reference of Representations and Certifications (Dec
2014)
52.204-23 Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab and Other Covered Entities
(Nov 2021)
52.216-18 Ordering (Aug 2020) (a)From Date: "TBD"
(a)To Date: "TBD"
52.216-22 Indefinite Quantity (Oct 1995) (d): "TBD"
52.219-6 Notice of Total Small Business Set-Aside (Nov 2020)
52.219-28 Post-Award Small Business Program Rerepresentation (Sep 2021) (h)(1) is: "X"
15F06724R0000013 Page 23 of 38
(h)(1) NAICS Code: "236220"
(h)(1) Contract Number: "TBD"
52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022)
52.232-9 Limitation on Withholding of Payments (Apr 1984)
52.247-12 Supervision, Labor, or Materials (Apr 1984)
Clauses By Full Text
52.246-12 Inspection of Construction (Aug 1996)
(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not--
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this- section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.