15F06724R0000013_P00001_NCR_JOC.pdf

PDF 171 KB Posted

Attached to
FBI National Capital Region (NCR) Job Order Contract (JOC)
Solicitation number
15F06724R0000013
Issued by

About this file

This document is an amendment to solicitation 15F06724R0000013 for a Federal Bureau of Investigation (FBI) National Capital Region (NCR) Job Order Contract (JOC). The JOC is a competitive local small business set-aside limited to businesses with an active Top Secret facilities clearance and located within a 50-mile radius of the J. Edgar Hoover building in Washington, D.C. The total contract minimum guarantee is $50,000, with a not-to-exceed amount of $24.5M or a 5-year term, whichever is reached first. The amendment updates Sections B, C, L, and M of the solicitation. Proposals are due electronically by March 5, 2024, and questions are due by March 15, 2024. The solicitation is for Firm-Fixed Price IDIQ construction and maintenance services to be performed during standard and non-standard work hours.

View the file

Other files

File Type Posted
SECTION B - SUPPLIES OR SERVICE AND PRICECOST (Amendment P00001).pdf PDF
Attachment H - Questions (Answered 20MAR24).pdf PDF
SECTION L Instructions Conditions and Notices to Offerors (Amendment P00001).pdf PDF
SECTION C -PERFORMANCE WORK STATEMENT JEH JOC (Amendment P00001).pdf PDF
Attachment P Wage Determination DC20240002 (as of 23 Feb 24).pdf PDF
SECTION M - EVALUATION CRITERIA (Amendment P00001).pdf PDF
Attachment K - LAR_SF_85_Completion_Guide.pdf PDF
Attachment F - Surety Form.pdf PDF
SECTION C -PERFORMANCE WORK STATEMENT JEH JOC.pdf PDF
Attachment G - Financial Questionnaire.pdf PDF
Attachment H - Questions Template.xlsx XLSX spreadsheet
Attachment B Joint Venture Partner Form.pdf PDF
Attachment E - Acquisition Risk Questions.pdf PDF
15F06724R0000013_NCR_JOC.pdf PDF
SECTION L Instructions Conditions and Notices to Offerors.pdf PDF
Attachment C-Past Performance Questionaire.pdf PDF
SECTION F - DELIVERIES OR PERFORMANCE.pdf PDF
SECTION H - SPECIAL CONTRACT REQUIREMENTS.pdf PDF
SECTION B - SUPPLIES OR SERVICE AND PRICECOST.pdf PDF
SECTION M - EVALUATION CRITERIA.pdf PDF
Attachment L - RSA Badge Request Form.pdf PDF
Attachment J - FD-857a NDA.pdf PDF
Attachment D - Past Performance Information (PPI) Contract Reference Sheet.docx DOCX document
SECTION G - CONTRACT ADMINISTRATION DATA.pdf PDF
Attachment A - CTC - FBI DC.pdf PDF
Attachment N FD-816 Access of Non-FBI Personnel to FBI Facilities Background Data Information Form.pdf PDF
SECTION E - INSPECTION AND ACCEPTANCE.pdf PDF
Attachment M - SF-85 FBI LAR Form.pdf PDF
Attachment I Ethics Fact Sheet.pdf PDF
Attachment O Coeffecient Explained.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15F06724R0000013/P00001 Page 1 of 36

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 36

2. AMENDMENT/MODIFICATION NUMBER

P00001

3. EFFECTIVE DATE

03/20/2024

4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

15F067CODE

FEDERAL BUREAU OF INVESTIGATION

FAU - FACILITIES ACQUISITION UNIT

935 PENNSYLVANIA AVE, NW

WASHINGTON, DC 20535-0001

6. ISSUED BY FBI_HQCODE

FBI Headquarters 935 Pennsylvania Avenue, NW ARU Room WB-3000 Washington, DC 20535-0001

Accounts Receivable Unit, Debt Collection Team

(O) (202) 324-6885

(F) (202) 324-2504 Accounts.Receivable@ic.fbi.gov

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NUMBER

15F06724R0000013

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

03/04/2024

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to: 1. Update Section B - Supplies or Service and Price/Cost, C - Statement of Work, Section L - Instructions, Conditions, and Notices to Offerors, and Section M - Evaluation Criteria.

ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Logan Swiger

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

03/20/2024 Previous edition unusable STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

15F06724R0000013/P00001 Page 2 of 36

Table of Contents

Section Description Page Number

1 Solicitation, Offer and Award 2 Commodity or Services Schedule 3 Special Contract Requirements

FBI-0021 Providing Deoxyribonucleic Acid (DNA) Sample for Elimination (Nov 2023) 4 Contract Clauses

52.202-1 Definitions (Jun 2020) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-7 Anti-Kickback Procedures (Jun 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation On Payments to Influence Certain Federal Transactions (Jun 2020) 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.204-2 Security Requirements (Mar 2021) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Nov 2021) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Nov 2021) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.210-1 Market Research (Nov 2021) 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) 52.211-18 Variation in Estimated Quantity (Apr 1984) 52.215-2 Audit and Records-Negotiation (Jun 2020) 52.215-8 Order of Precedence - Uniform Contract Format (Oct 1997) 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data (Aug 2011) 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-Modifications (Jun 2020) 52.215-12 Subcontractor Certified Cost or Pricing Data (Jun 2020) 52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications (Jun 2020) 52.215-15 Pension Adjustments and Asset Reversions (Oct 2010) 52.215-17 Waiver of Facilities Capital Cost of Money (Oct 1997) 52.215-19 Notification of Ownership Changes (Oct 1997) 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications (Nov 2021) 52.219-8 Utilization of Small Business Concerns (Sep 2023) 52.219-9 Small Business Subcontracting Plan (Sep 2023) 52.219-14 Limitations on Subcontracting (Oct 2022) 52.222-1 Notice to the Government of Labor Disputes (Feb 1997) 52.222-3 Convict Labor (June 2003) 52.222-4 Contract Work Hours and Safety Standards--Overtime Compensation (May 2018) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (Jul 2021) 52.222-9 Apprentices and Trainees (July 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988)

15F06724R0000013/P00001 Page 3 of 36

52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination - Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-19 Child Labor-Cooperation with Authorities and Remedies (Nov 2023) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sept 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-30 Construction Wage Rate Requirements--Price Adjustment (None or Separately Specified Method) (Aug 2018) 52.222-35 Equal Opportunity for Veterans (Jun 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) 52.222-37 Employment Reports on Veterans (Jun 2020) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-50 Combating Trafficking in Persons (Nov 2021) 52.222-54 Employment Eligibility Verification (May 2022) 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Sep 2013) 52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) 52.223-6 Drug-Free Workplace (May 2001) 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) 52.223-15 Energy Efficiency in Energy-Consuming Products (May 2020) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (Aug 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) 52.223-19 Compliance With Environmental Management Systems (May 2011) 52.223-20 Aerosols (Jun 2016) 52.223-21 Foams (Jun 2016) 52.224-1 Privacy Act Notification (Apr 1984) 52.224-2 Privacy Act (Apr 1984) 52.224-3 Privacy Training (Jan 2017) 52.225-1 Buy American-Supplies (Oct 2022) 52.225-9 Buy American-Construction Materials (Oct 2022) 52.225-11 Buy American-Construction Materials under Trade Agreements (Nov 2023) 52.225-12 Notice of Buy American Requirement--Construction Materials Under Trade Agreements (May 2014) 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises (June 2000) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-3 Patent Indemnity (Apr 1984) 52.227-4 Patent Indemnity-Construction Contracts (Dec 2007) 52.227-17 Rights in Data - Special Works (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance-Work on a Government Installation (Jan 1997) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Nov 2021) 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) 52.228-12 Prospective Subcontractor Requests for Bonds (Dec 2022)

15F06724R0000013/P00001 Page 4 of 36

52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) 52.229-3 Federal, State and Local Taxes (Feb 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-16 Progress Payments (Nov 2021) 52.232-17 Interest (May 2014) 52.232-18 Availability of Funds (Apr 1984) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.233-1 Disputes (May 2014) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-1 Performance of Work by the Contractor (Apr 1984) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-4 Physical Data (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.236-16 Quantity Surveys (Apr 1984) 52.236-17 Layout of Work (Apr 1984) 52.236-21 Specifications and Drawings for Construction (Feb 1997) 52.236-26 Preconstruction Conference (Feb 1995) 52.242-5 Payments to Small Business Subcontractors (Jan 2017) 52.242-13 Bankruptcy (July 1995) 52.242-14 Suspension of Work (Apr 1984) 52.243-4 Changes (June 2007) 52.243-5 Changes and Changed Conditions (Apr 1984) 52.244-2 Subcontracts (Jun 2020) 52.244-6 Subcontracts for Commercial Products and Commercial Services (Dec 2023) 52.245-1 Government Property (Sep 2021) 52.245-9 Use and Charges (Apr 2012) 52.246-17 Warranty of Supplies of a Noncomplex Nature (June 2003) 52.246-18 Warranty of Supplies of a Complex Nature (May 2001) 52.246-20 Warranty of Services (May 2001) 52.246-21 Warranty of Construction (Mar 1994) 52.248-3 Value Engineering-Construction (Oct 2020) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012) 52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements) (Apr 2012) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.249-14 Excusable Delays (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991) 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) 52.203-14 Display of Hotline Poster(s) (Nov 2021)

15F06724R0000013/P00001 Page 5 of 36

52.204-15 Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) 52.216-18 Ordering (Aug 2020) 52.216-22 Indefinite Quantity (Oct 1995) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) 52.219-28 Post-Award Small Business Program Rerepresentation (Sep 2023) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) 52.232-9 Limitation on Withholding of Payments (Apr 1984) 52.247-12 Supervision, Labor, or Materials (Apr 1984) 52.246-12 Inspection of Construction (Aug 1996) 52.242-15 Stop-Work Order (Aug 1989) 52.242-17 Government Delay of Work (Apr 1984) 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) 52.217-8 Option to Extend Services (Nov 1999) 52.216-19 Order Limitations (Oct 1995) 52.217-9 Option to Extend the Term of the Contract (Mar 2000) 52.232-25 Prompt Payment (Jan 2017) 52.252-6 Authorized Deviations in Clauses (Nov 2020)

5 Attachments 6 Solicitation Provisions 7 Representations and Certifications

52.236-28 Preparation of Proposals-Construction (September 2019) 52.215-6 Place of Performance (Oct 1997) 52.204-8 Annual Representations and Certifications (Dec 2022) 52.209-5 Certification Regarding Responsibility Matters (Aug 2020) 52.209-7 Information Regarding Responsibility Matters (Oct 2018) 52.222-25 Affirmative Action Compliance (Apr 1984)

15F06724R0000013/P00001 Page 6 of 36

Section 2 - Commodity or Services Schedule

Firm-Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) Job Order Contract( JOC).

Firm Fixed Price

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 07/01/2024 - 06/30/2025

Base Period

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 07/01/2024 - 06/30/2025

Base Period

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 07/01/2024 - 06/30/2025

Base Period

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

15F06724R0000013/P00001 Page 7 of 36

0004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 07/01/2024 - 06/30/2025

Base Period

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 07/01/2024 - 06/30/2025

Base Period

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0006 Project Manager

PSC: Y1JZ

Line Period of Performance: 07/01/2024 - 06/30/2025

Base Period

Previous :

Change: 0

Current : 12

MO $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 07/01/2025 - 06/30/2026

Option Period 1

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

15F06724R0000013/P00001 Page 8 of 36

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 07/01/2025 - 06/30/2026

Option Period 1

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 07/01/2025 - 06/30/2026

Option Period 1

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 07/01/2025 - 06/30/2026

Option Period 1

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $

Previous : 1

Change: 0

15F06724R0000013/P00001 Page 9 of 36

Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 07/01/2025 - 06/30/2026

Option Period 1

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1006 Program Manager

PSC: Y1JZ

Line Period of Performance: 07/01/2025 - 06/30/2026

Option Period 1

Previous :

Change: 0

Current : 12

MO $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 07/01/2026 - 06/30/2027

Option Period 2

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 07/01/2026 - 06/30/2027

Option Period 2

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access

Previous : 1

Change: 0

15F06724R0000013/P00001 Page 10 of 36 to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 07/01/2026 - 06/30/2027

Option Period 2

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 07/01/2026 - 06/30/2027

Option Period 2

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 07/01/2026 - 06/30/2027

Option Period 2

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2006 Program Manager

PSC: Y1JZ

Line Period of Performance: 07/01/2026 - 06/30/2027

Option Period 2

Previous :

Change: 0

Current : 12

MO $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through

Previous : 1

Change: 0

15F06724R0000013/P00001 Page 11 of 36

Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 07/01/2027 - 06/30/2028

Option Period 3

Current : 1

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 07/01/2027 - 06/30/2028

Option Period 3

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 07/01/2027 - 06/30/2028

Option Period 3

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 07/01/2027 - 06/30/2028

Option Period 3

Previous : 1

Change: 0

15F06724R0000013/P00001 Page 12 of 36

QUANTITY

UNIT UNIT PRICE AMOUNT

3005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 07/01/2027 - 06/30/2028

Option Period 3

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3006 Program Manager

PSC: Y1JZ

Line Period of Performance: 07/01/2027 - 06/30/2028

Option Period 3

Previous :

Change: 0

Current : 12

MO $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 07/01/2028 - 06/30/2029

Option Period 4

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 07/01/2028 - 06/30/2029

Option Period 4

Previous : 1

Change: 0

15F06724R0000013/P00001 Page 13 of 36

QUANTITY

UNIT UNIT PRICE AMOUNT

4003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 07/01/2028 - 06/30/2029

Option Period 4

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 07/01/2028 - 06/30/2029

Option Period 4

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 07/01/2028 - 06/30/2029

Option Period 4

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4006 Program Manager

PSC: Y1JZ

Line Period of Performance: 07/01/2028 - 06/30/2029

Option Period 4

Previous :

Change: 0

MO $________ $_________________

15F06724R0000013/P00001 Page 14 of 36

Current : 12

Section 3 - Special Contract Requirements

Clauses By Full Text

FBI-0021 Providing Deoxyribonucleic Acid (DNA) Sample for Elimination (Nov 2023)

FBI employees, contractors, and service providers may interact with evidence or federal deoxyribonucleic acid (DNA) database samples in Laboratory Division (LD) space or their work may require them to enter LD examination areas where evidence or DNA database samples are processed or examined. As a result, evidence may inadvertently become contaminated with their DNA.

Per the Federal Bureau of Investigation Laboratory Elimination Deoxyribonucleic Acid (DNA) Database Policy Directive (1149D), LD is collecting DNA samples to identify FBI employees, contractor, or service provider DNA profiles in the event of sample contamination. A contractor or service provider funded by this procurement action is required to provide a DNA sample which will be processed for DNA and used to detect contamination on forensic evidence. The DNA results will be protected, i.e. anonymized, maintained in a secure database with controlled access, and used only by authorized DNA personnel for the sole purpose of detecting contamination. The remaining collected sample will be stored in a secure location for potential processing with future DNA technologies, if appropriate. If the contractor or service provider's DNA profile is detected during evidence analysis, it will be identified as sample contamination rather than reported as a possible perpetrator to law enforcement.

(End of Clause)

Section 4 - Contract Clauses

Clauses By Reference

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title Fill-ins (if applicable)

52.202-1 Definitions (Jun 2020)

52.203-3 Gratuities (Apr 1984)

52.203-5 Covenant Against Contingent Fees (May 2014)

52.203-7 Anti-Kickback Procedures (Jun 2020)

15F06724R0000013/P00001 Page 15 of 36

Clause Title Fill-ins (if applicable)

52.203-8 Cancellation, Rescission, and Recovery of Funds for

Illegal or Improper Activity (May 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity

(May 2014)

52.203-12 Limitation On Payments to Influence Certain Federal

Transactions (Jun 2020)

52.203-13 Contractor Code of Business Ethics and Conduct (Nov

2021)

52.203-17 Contractor Employee Whistleblower Rights (Nov 2023)

52.204-2 Security Requirements (Mar 2021)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper (May 2011)

52.204-9 Personal Identity Verification of Contractor Personnel

(Jan 2011)

52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards (Jun 2020)

52.204-13 System for Award Management Maintenance (Oct 2018)

52.204-14 Service Contract Reporting Requirements (Oct 2016)

52.204-21 Basic Safeguarding of Covered Contractor Information

Systems (Nov 2021)

52.209-6 Protecting the Government's Interest When

Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Nov 2021)

52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters (Oct 2018)

52.209-10 Prohibition on Contracting with Inverted Domestic

Corporations (Nov 2015)

52.210-1 Market Research (Nov 2021)

52.211-10 Commencement, Prosecution, and Completion of Work

(Apr 1984)

Calendar Days: "(determined by each task order award)"

15F06724R0000013/P00001 Page 16 of 36

No Later Than: "(determined by each individual task order award)"

52.211-18 Variation in Estimated Quantity (Apr 1984)

52.215-2 Audit and Records-Negotiation (Jun 2020)

52.215-8 Order of Precedence - Uniform Contract Format (Oct

1997)

52.215-10 Price Reduction for Defective Certified Cost or Pricing

Data (Aug 2011)

52.215-11 Price Reduction for Defective Certified Cost or Pricing

Data-Modifications (Jun 2020)

52.215-12 Subcontractor Certified Cost or Pricing Data (Jun 2020)

52.215-13 Subcontractor Certified Cost or Pricing Data-

Modifications (Jun 2020)

52.215-15 Pension Adjustments and Asset Reversions (Oct 2010)

52.215-17 Waiver of Facilities Capital Cost of Money (Oct 1997)

52.215-19 Notification of Ownership Changes (Oct 1997)

52.215-21 Requirements for Certified Cost or Pricing Data and

Data Other Than Certified Cost or Pricing Data-

Modifications (Nov 2021)

52.219-8 Utilization of Small Business Concerns (Sep 2023)

52.219-9 Small Business Subcontracting Plan (Sep 2023)

52.219-14 Limitations on Subcontracting (Oct 2022)

52.222-1 Notice to the Government of Labor Disputes (Feb 1997)

52.222-3 Convict Labor (June 2003)

52.222-4 Contract Work Hours and Safety Standards--Overtime

Compensation (May 2018)

52.222-6 Construction Wage Rate Requirements (Aug 2018)

52.222-7 Withholding of Funds (May 2014)

52.222-8 Payrolls and Basic Records (Jul 2021)

15F06724R0000013/P00001 Page 17 of 36

52.222-9 Apprentices and Trainees (July 2005)

52.222-10 Compliance with Copeland Act Requirements (Feb

1988)

52.222-11 Subcontracts (Labor Standards) (May 2014)

52.222-12 Contract Termination - Debarment (May 2014)

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014)

52.222-14 Disputes Concerning Labor Standards (Feb 1988)

52.222-15 Certification of Eligibility (May 2014)

52.222-19 Child Labor-Cooperation with Authorities and Remedies

(Nov 2023)

52.222-21 Prohibition of Segregated Facilities (Apr 2015)

52.222-26 Equal Opportunity (Sept 2016)

52.222-27 Affirmative Action Compliance Requirements for

Construction (Apr 2015)

52.222-30 Construction Wage Rate Requirements--Price

Adjustment (None or Separately Specified Method) (Aug

2018)

52.222-35 Equal Opportunity for Veterans (Jun 2020)

52.222-36 Equal Opportunity for Workers with Disabilities (Jun

2020)

52.222-37 Employment Reports on Veterans (Jun 2020)

52.222-40 Notification of Employee Rights Under the National

Labor Relations Act (Dec 2010)

52.222-50 Combating Trafficking in Persons (Nov 2021)

52.222-54 Employment Eligibility Verification (May 2022)

52.222-55 Minimum Wages for Contractor Workers Under

Executive Order 14026 (Jan 2022)

52.223-2 Affirmative Procurement of Biobased Products Under

Service and Construction Contracts (Sep 2013)

15F06724R0000013/P00001 Page 18 of 36

52.223-3 Hazardous Material Identification and Material Safety

Data (Feb 2021)

52.223-5 Pollution Prevention and Right-to-Know Information

(May 2011)

52.223-6 Drug-Free Workplace (May 2001)

52.223-11 Ozone-Depleting Substances and High Global Warming

Potential Hydrofluorocarbons (Jun 2016)

Substance(s): "all"

52.223-12 Maintenance, Service, Repair, or Disposal of

Refrigeration Equipment and Air Conditioners (Jun

2016)

52.223-15 Energy Efficiency in Energy-Consuming Products (May

2020)

52.223-17 Affirmative Procurement of EPA-designated Items in

Service and Construction Contracts (Aug 2018)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging

While Driving (Jun 2020)

52.223-19 Compliance With Environmental Management Systems

(May 2011)

52.223-20 Aerosols (Jun 2016)

52.223-21 Foams (Jun 2016)

52.224-1 Privacy Act Notification (Apr 1984)

52.224-2 Privacy Act (Apr 1984)

52.224-3 Privacy Training (Jan 2017)

52.225-1 Buy American-Supplies (Oct 2022)

52.225-9 Buy American-Construction Materials (Oct 2022)

52.225-11 Buy American-Construction Materials under Trade

Agreements (Nov 2023)

52.225-12 Notice of Buy American Requirement--Construction

Materials Under Trade Agreements (May 2014)

52.226-1 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises (June 2000)

15F06724R0000013/P00001 Page 19 of 36

52.227-1 Authorization and Consent (Jun 2020)

52.227-2 Notice and Assistance Regarding Patent and Copyright

Infringement (Jun 2020)

52.227-3 Patent Indemnity (Apr 1984)

52.227-4 Patent Indemnity-Construction Contracts (Dec 2007)

52.227-17 Rights in Data - Special Works (Dec 2007)

52.228-2 Additional Bond Security (Oct 1997)

52.228-5 Insurance-Work on a Government Installation (Jan

1997)

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors (Nov 2021)

52.228-11 Individual Surety-Pledge of Assets (Feb 2021)

52.228-12 Prospective Subcontractor Requests for Bonds (Dec

2022)

52.228-14 Irrevocable Letter of Credit (Nov 2014)

52.228-15 Performance and Payment Bonds-Construction (Jun

2020)

52.229-3 Federal, State and Local Taxes (Feb 2013)

52.232-5 Payments under Fixed-Price Construction Contracts

(May 2014)

52.232-16 Progress Payments (Nov 2021) (l) Date: "30 DAYS"

52.232-17 Interest (May 2014)

52.232-18 Availability of Funds (Apr 1984)

52.232-23 Assignment of Claims (May 2014)

52.232-27 Prompt Payment for Construction Contracts (Jan 2017)

52.232-33 Payment by Electronic Funds Transfer-System for

Award Management (Oct 2018)

52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)

52.233-1 Disputes (May 2014)

52.233-3 Protest after Award (Aug 1996)

15F06724R0000013/P00001 Page 20 of 36

52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)

52.236-1 Performance of Work by the Contractor (Apr 1984) PercentofWork: "15%"

52.236-2 Differing Site Conditions (Apr 1984)

52.236-3 Site Investigation and Conditions Affecting the Work

(Apr 1984)

52.236-4 Physical Data (Apr 1984)

52.236-5 Material and Workmanship (Apr 1984)

52.236-6 Superintendence by the Contractor (Apr 1984)

52.236-7 Permits and Responsibilities (Nov 1991)

52.236-8 Other Contracts (Apr 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)

52.236-10 Operations and Storage Areas (Apr 1984)

52.236-11 Use and Possession Prior to Completion (Apr 1984)

52.236-12 Cleaning Up (Apr 1984)

52.236-13 Accident Prevention (Nov 1991)

52.236-14 Availability and Use of Utility Services (Apr 1984)

52.236-15 Schedules for Construction Contracts (Apr 1984)

52.236-16 Quantity Surveys (Apr 1984)

52.236-17 Layout of Work (Apr 1984)

52.236-21 Specifications and Drawings for Construction (Feb 1997)

52.236-26 Preconstruction Conference (Feb 1995)

52.242-5 Payments to Small Business Subcontractors (Jan 2017)

52.242-13 Bankruptcy (July 1995)

52.242-14 Suspension of Work (Apr 1984)

52.243-4 Changes (June 2007)

52.243-5 Changes and Changed Conditions (Apr 1984)

52.244-2 Subcontracts (Jun 2020) (d): "ALL"

52.244-6 Subcontracts for Commercial Products and Commercial

Services (Dec 2023)

15F06724R0000013/P00001 Page 21 of 36

52.245-1 Government Property (Sep 2021)

52.245-9 Use and Charges (Apr 2012)

52.246-17 Warranty of Supplies of a Noncomplex Nature (June

2003)

(b)(1): "one year after

Government acceptance. "

(c)(1): "a reasonable time."

52.246-18 Warranty of Supplies of a Complex Nature (May 2001)

52.246-20 Warranty of Services (May 2001) (b): "within 30 business days from the date of acceptance by the Government."

52.246-21 Warranty of Construction (Mar 1994)

52.248-3 Value Engineering-Construction (Oct 2020)

52.249-1 Termination for Convenience of the Government (Fixed-

Price) (Short Form) (Apr 1984)

52.249-2 Termination for Convenience of the Government (Fixed-

Price) (Apr 2012)

52.249-3 Termination for Convenience of the Government

(Dismantling, Demolition, or Removal of Improvements)

(Apr 2012)

52.249-10 Default (Fixed-Price Construction) (Apr 1984)

52.249-14 Excusable Delays (Apr 1984)

52.253-1 Computer Generated Forms (Jan 1991)

52.203-6 Restrictions on Subcontractor Sales to the Government

(Jun 2020)

52.203-14 Display of Hotline Poster(s) (Nov 2021)

52.204-15 Service Contract Reporting Requirements for Indefinite-

Delivery Contracts (Oct 2016)

52.204-18 Commercial and Government Entity Code Maintenance

(Aug 2020)

52.204-19 Incorporation by Reference of Representations and

Certifications (Dec 2014)

15F06724R0000013/P00001 Page 22 of 36

52.204-23 Prohibition on Contracting for Hardware, Software, and

Services Developed or Provided by Kaspersky Lab

Covered Entities (Dec 2023)

52.216-18 Ordering (Aug 2020) (a)From Date: "TBD"

(a)To Date: "TBD"

52.216-22 Indefinite Quantity (Oct 1995) (d): "TBD"

52.219-6 Notice of Total Small Business Set-Aside (Nov 2020)

52.219-28 Post-Award Small Business Program Rerepresentation

(Sep 2023)

52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan

2022)

52.232-9 Limitation on Withholding of Payments (Apr 1984)

52.247-12 Supervision, Labor, or Materials (Apr 1984)

Clauses By Full Text

52.246-12 Inspection of Construction (Aug 1996)

(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not--

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this-section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

15F06724R0000013/P00001 Page 23 of 36

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer.

The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may--

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(End of clause)

52.242-15 Stop-Work Order (Aug 1989)

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .