QUESTIONS.pdf

PDF 136 KB Posted

Attached to
SCRO-REPLACE BOILERS BUILDING 346 Federal contract opportunity
Solicitation number
15B50023Q00000004
Issued by
Department of Justice Bureau of Prisons South Central Regional Office

About this file

This document contains questions and answers regarding a solicitation to replace boilers in Building 346 at the South Central Regional Office of the Department of Justice Bureau of Prisons. Currently installed are two RBI boilers, models FB1500, with 10 HP pumps and a 14-inch flue integrated into the building automation system maintained by APS Building Services. The solicitation seeks replacement boilers of approximately the same size with new pumps and utilizes the existing 14-inch flue. As-built plans will be provided after award.

View the file

Other files for this federal contract opportunity

Other files attached to SCRO-REPLACE BOILERS BUILDING 346, newest first.
File Type Posted
QUESTIONS.pdf PDF
Amendment 00004.pdf PDF
Amendment 004- Building 346 Replace Boilers SOW_1.pdf PDF
Building 346 Replace Boilers SOW_1 - REVISED.pdf PDF
3500.291.pdf PDF
Amendment 00003.pdf PDF
Site Visit 9-5-2023.pdf PDF
Amendment 00002.pdf PDF
Boiler Pictures.pdf PDF
Amendment 00001.pdf PDF
04. Building 346 Replace Boilers SOW_1.pdf PDF
BRQ 15B50023Q00000004.pdf PDF
INSTRUCTIONS TO OFFERORS.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. 15B50023Q00000004

SCRO-REPLACE BOILERS BUILDING 346

Questions

1. What boiler system is currently in place? Make & model number or photos of the boiler tags will work.

Currently in place are 2 RBI boilers - model FB1500 see attached for model and serial numbers

2. The basis of design covers multiple boiler sizes, does the government know what size boiler they wish to have installed?

We would like to have installed units with approximately the same size boiler.

3. The largest flue recommended by the manufacture is 8”, the statement of work calls for a 14” flue, please expand on what is required for this project.

Currently installed is a 14" flue that penetrates through 2 additional floors and the roof.

4. Can we get some photos of the boiler room.

See attached

5. What size pumps are currently in installed? Make & number or a photo of the pump tag will work.

2 - 10 hp motors see attached for model and serial numbers

6. We are assuming there is two pumps that need replaced, please confirm.

There is a pump tied to each boiler that will need to be replaced to ensure flow through the boiler.

7. Are the current boiler systems integrated into an automated building control system? If so, can we get the contact information of the contractor servicing / maintaining the controls system?

the boilers are integrated into the building automation system, the company that maintains the system is APS building Services. The contact is Kenny Farmer and the number is 972-387-3334

8. Are there any as-built plans for the existing system? If so it would be helpful to have a copy of them.

Available upon request after award.

File details come from the government source that posted it. Updated .