1502000 C Facility ELEVATORS.doc

DOC document 116 KB Posted

Attached to
Elevator Maintenance and Repair Federal contract opportunity
Solicitation number
N40085-21-R-2501
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Maintenance and Repair, newest first.
File Type Posted
N40085-21-R-2501 Amendment 1.pdf PDF
0200000 C Management and AdministratioElevators.docx DOCX document
Elevator FAP Facility Investment.doc DOC document
J-020000-15 ELINS ELEVATORS.xls XLS spreadsheet
J-0200000-05 Oil Log Blk.pdf PDF
J-0200000-08 - ASSET INFORMATION v2 - 2017-04-26.xlsx XLSX spreadsheet
N40085-21-R-2501 Solicitation.pdf PDF
0200000 15020000 J Management and Administration ELEVATORS.doc DOC document
Elevators PAP.doc DOC document
J-0200000-05 Battery Replacement log.docx DOCX document
J-0200000-07 - SERVICE PROVIDER INFORMATION v1 - 2013-07-07.xlsx XLSX spreadsheet
J-0200000-10 - CHARACTERISTIC METER READING INFORMATION v2 - 2016-09-30.xlsx XLSX spreadsheet
J-1502000-03 BASE MAP.pdf PDF
J-15020000-02 Elevator inventory.xlsx XLSX spreadsheet
1502000 M ELEVATORS.doc DOC document
J-0200000-05 Maintenance Summary Report.xlsx XLSX spreadsheet
J-0200000-05 On site Labor Summary Report reviewed.xls XLS spreadsheet
J-0200000-13 Installation Spill Control Plan.pdf PDF
NEPA_elevators_signed.pdf PDF
0100000 C General Info Elevators.doc DOC document
0200000 15020000 F Management and Administration ELEVATORS.doc DOC document
J-0200000-05 Elev Hist.xlsx XLSX spreadsheet
J-0200000-05 Quality Inspection and Surveillance report reviewed.xls XLS spreadsheet
J-0200000-05 Service Order Summary Report.xlsx XLSX spreadsheet
J-0200000-09 - ASSET SPECIFICATION v1 - 2016-01-20.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1502000 – Facility Investment Table of Content

Spec Item
Title
1
General Information
1.1
Concept of Operations
2
Management and Administration
2.1
Definitions and Acronyms
2.2
Personnel
2.2.1
Certification, Training, and Licensing
2.3
Special Requirements
2.3.1
Workmanship and Material Standards
2.3.2
Historical Preservation
2.4
References and Technical Documents
3
Recurring Work
3.1
Service Orders
3.1.1
Emergency Service Orders
3.1.2
Urgent Service Orders
3.1.3
Routine Service Orders
3.2
Preventive Maintenance (PM) Program
3.2.1
Vertical Transportation Equipment (VTE)
3.3
Inspection, Testing, and Certification Program
3.3.1
Vertical Transportation Equipment (VTE)
3.4
Other Recurring Services Program
3.4.1
VTE Start-up & Shutdown
4
Non-recurring Work

1502000 – Facility Investment

Spec Item
Title
Description
1
General Information
The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Facility Investment services for Vertical Transportation Equipment (VTE) and installed equipment and systems at Naval Submarine Base New London, CT, and Garden City Naval Air Station, NY.
1.1
Concept of Operations
The intent of 1502000 Facility Investment is to specify the requirements for Sustainment, Restoration, and Modernization (SRM) sub-functions only. The Facility Investment requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work. Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that is accomplished through other Navy programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of Facility Investment.

The Contractor shall perform maintenance, repair, alteration, demolition and minor construction for the following:

Building Systems -Vertical Transportation Equipment (VTE)

1502000 – Facility Investment

Spec Item
Title
Description
2
Management and Administration
2.1
Definitions and Acronyms
Definitions and Acronyms are listed in J-1502000-01.
2.2
Personnel
The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the FI function.
2.2.1
Certification, Training, and Licensing
All maintenance and repair shall be performed by personnel trained and certified by the OEM.

Personnel performing inspections and tests on VTEs must be qualified per NAVFAC MO-118.

Personnel working with or on electrical or electronic equipment must be trained and certified per NAVFAC MO-200.

Personnel performing work in HAZMAT/HAZWASTE must complete the HAZMAT/HAZWASTE handling course or have a minimum of one year of experience working with HAZMAT/HAZWASTE.

All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require an inspector certified by a governing directive shall be qualified at the journeyman level.

The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.

2.3
Special Requirements
2.3.1
Workmanship and Material Standards
The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex.

Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks. Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.

The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area. All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.

The Contractor shall replace parts on VTE equipment from the OEM or of equivalent value. Written documentation shall be submitted by the contractor if the original equipment is not available.

2.3.2
Historical Preservation
Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, state and local historical policies and regulations.
2.4
References and Technical Documents
References and Technical Documents are listed in J-0200000-03.

1502000 – Facility Investment

Spec Item
Title
Performance Objective
Related Information
Performance Standard
3
Recurring Work
The Contractor shall maintain, repair, and alter Vertical Transportation Equipment (VTE) to ensure they are fully functional and in normal working condition.

The Contractor shall develop, implement, and execute a Trouble Call, Maintenance Program, Inspection, Testing, and Certification Program, and Other Recurring Service Program to maintain and repair VTE.

The Contractor shall maintain all maintenance, repair, and alteration data and warranty records in the technical library and CMMS in accordance with Annex 2.

The Contractor shall provide all necessary keys, test instruments, equipment, and tools required to perform maintenance and repair.

All work shall be performed by trained/qualified personnel in accordance with the current version of ASME A17.1 (2013) and Maintenance Control Program.

The current facility inventory for FI is provided in J-1502000-02.

Site maps are provided in J-1502000-03.

VTE systems are in normal working condition and function properly in accordance with specified standards.

3.1
Service Orders
The Contractor shall perform service order work in a timely manner and ensure

VTE are restored to a safe, normal working condition and function properly.

The Contractor shall receive service orders in accordance with the work reception requirements in Annex 2.

The Contractor shall schedule and perform service orders in a way that minimize disruptions to customers and Government operations.

The Contractor shall perform service orders to accomplish any work identified within the entire boundary of the installation and will include a wide variety of work. Samples of required work and historical service order workload are provided in J-1502000-04.

Descriptions of the classifications of service orders (emergency, urgent, and routine) are provided in the Definitions and Acronyms in J-1502000-01.

The Contractor shall maintain sufficient materials and equipment on hand to support service order work requirements. Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete service order work within the time limits specified.

The Government may combine multiple repair requirements received for the same trade in the same building or structure at the same time into one service order as long as the service order threshold is not exceeded.

The Contractor shall notify the KO upon identification that the service order will exceed the liability limits specified below in accordance with reporting requirements in Annex 2.

Service orders shall not exceed $2,000.00 in total cost (combined labor and material)

If non-recurring work is issued for repairs, the Government will only pay for the portion of labor and/or material that exceeds the service order limits. See J-1502000-08 for examples.

The Contractor shall submit a Service Order Summary Report per Section F.

Service order work is responded to and completed within the specified time.

VTE systems are restored to normal working condition in accordance with ASME and OEM specifications, including recertification if applicable.

When repair is complete the VTE does not present danger to personnel or equipment.

3.1.1
Emergency Service Orders
The Contractor shall respond to emergency service orders and arrest emergent conditions to minimize and mitigate damage to facilities, installed equipment and systems and danger to personnel.
The Contractor shall perform emergency service orders 24 hours a day, seven days a week throughout the contract period.

The Contractor shall respond to emergency service orders with the appropriate service personnel and equipment to commence work immediately.

Emergency service orders are limited to a ceiling of $2,000 in total cost (combined labor and material) The Contractor shall remain at the work site until the emergency has been arrested.

The emergency service order is complete once the emergency has been arrested. The Government may issue an urgent or routine service order or non-recurring work task order for the follow-on work required to repair/restore the facility, ground structure, personal property equipment or installed equipment and system.

Emergency service orders responded to within two hours of receipt of call during regular Government working hours and four hours of receipt of calls outside of regular Government working hours.

Emergency service orders are arrested within 24 hours of receipt of call.

Work is continued without interruption until emergent condition is arrested.

3.1.2
Urgent Service Orders
The Contractor shall complete urgent service orders in a timely manner and ensure facilities, installed equipment and systems are restored to a safe, normal working condition and function properly.
The Contractor shall perform urgent service orders to repair deficiencies without extended delay, therefore preventing further damage facilities, equipment, and installed equipment and systems.

Urgent service orders service orders are limited to a ceiling of $2,000 in total cost (combined labor and material) Urgent service orders responded to within four hours of receipt of call during normal working hours and the end of the next business day after normal working hours

Urgent service orders are completed within five working days unless materials are not readily available and the KO agrees to extend completion time to 21 working days.

3.1.3
Routine Service Orders
The Contractor shall complete routine service orders in a timely manner and ensure facilities, installed equipment and systems are restored to a safe, normal working condition and function properly.
The Contractor shall perform routine service orders to repair deficiencies and return facilities, installed equipment and systems to normal working condition.

Routine service orders are limited to $2,000 in total cost (combined labor and material) Performance of routine service orders is not required outside of Government regular working hours.

Routine service orders are completed within 30 calendar days.

Routine service orders are responded to by the end of the next business day.

3.2
Preventive Maintenance (PM) Program
The Contractor shall develop and implement a PM program for facilities, installed equipment and systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The Contractor shall develop and submit a Preventive Maintenance Program Plan per Section F.

The Contractor is fully responsible for and shall perform any repairs, including replacement, discovered during scheduled maintenance work up to a total of $2000 per occurrence in direct material and labor cost under recurring work portion of the contract. Incidental repairs work performed under maintenance are not considered a service order.

Notification of repair work exceeding the incidental repairs limit shall be submitted to the KO within two hours of identification. Service orders or non-recurring work may be issued for repairs exceeding the incidental repairs limit.

The Contractor shall not use breakdown maintenance as part of the PM program.

The PM program shall provide an economical approach for manufacturers’ recommended procedures, OEM standards, NAVFAC MO-118, and maintenance required to satisfy equipment warranties and keep facilities, and installed equipment and systems in normal working condition.

Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program. These changes will be made at no additional cost to the Government.

The elevator technician will inspect, clean and keep the sump pumps in the elevator pits in good working order. Clean and dispose of any debris in the sump pump pits. Clean strainers on pumps, and test pumps for proper operation.

As part of the PM program, the Contractor shall perform equipment condition assessments to support the Infrastructure Condition Assessment Program (ICAP).

The Contractor shall assess and document equipment condition annually. Depending on the type of equipment, as related by Uniformat Classification, the Contractor must assess the condition of one to 12 meters. The description of meter groups for each Uniformat Classification is listed in J-1502000-05. The general direct condition rating guidance is shown in J-1502000-06 and condition rating guidance specific to each meter group is provided in J-1502000-07.

Direct condition ratings shall be reported as specified in the Computerized Maintenance Management Systems (CMMS) Spec Item in Annex 0200000.

The PM program inventories are provided in J-1502000-02.

The Contractor shall submit a monthly PM work schedule, unaccomplished maintenance report, and maintenance summary report per section F.

Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

3.2.1
Vertical Transportation Equipment (VTE)
The Contractor shall perform maintenance on VTE to ensure safe, reliable operation.
The Contractor shall maintain VTE in accordance with manufacturers’ recommended procedures, OEM standards, and NAVFAC MO-118 required to satisfy equipment warranties and keep facilities, installed equipment and systems in normal working condition.

The Contractor shall notify the facility occupants prior to any type of work on VTEs.

The Contractor shall not use breakdown maintenance as part of the maintenance program.

If the KO determines that the objective and standards are not met, the Contractor shall adjust or modify the Contractor’s maintenance program at no additional cost to the Government.

All batteries for emergency DC lowering systems on hydraulic elevators and for all car emergency lights and phones replaced according to OEM recommendations. Batteries shall be replaced prior to their expiration date according to the OEM. Replacement batteries shall have a date listed on them.

The Contractor shall submit a hydraulic oil log, recycling report, battery replacement log and elevator history reports per Section F.

Facilities, installed equipment and systems are maintained in normal working condition, including recertification if applicable.

Facilities, installed equipment and systems are maintained to maximize useful life.

No unscheduled system outages due to missed or improper maintenance.

3.3
Inspection, Testing, and Certification Program
The Contractor shall provide inspection, testing, and certification services to ensure they are safe, fully functional, and operational.
The Contractor shall develop an inspection, testing, and certification program

The Contractor shall submit an inspection, testing, and certification program summary report per Section F.

The Contractor shall submit an inspection, testing and certification schedule and a copy of all the equipment certifications per Section F.

The Contractor shall submit certification reports semi- annually per Section F.

The Contractor is fully responsible for and shall perform any repairs, including replacement, discovered during inspection, testing, and certification work up to $2000 per occurrence in direct material and labor cost under recurring work portion of the contract. Incidental repairs work performed are not considered a service order.

Note: 5-year tests are done in the 4th option year.

All certifications are current.

Testing, inspection, and certification services performed and completed in accordance with the inspection, testing, and certification program and schedule.

Testing, inspection, and certification services performed in accordance with applicable references.

3.3.1
Vertical Transportation Equipment (VTE)
The Contractor shall prepare, inspect, test, and operate all VTE systems to ensure they are safe, fully functional, and operational to support Government Certification.
The Contractor shall perform all inspections and tests for certification in the presence of a Government provided inspector.

The Contractor shall provide five working days advance notification to the KO when VTE is ready for testing and certification for coordination with the Government provided inspector.

An elevator Tech will be provided to test all elevators with smoke detectors and sprinkler flow switches (with; Fire alarm Tech & Elev. Inspector). Fire recall Service- phases 1 & 2 & flow switches may need to be tested after hours annually in all activities. Testing will include the Base year and all four Option years.

The Contractor shall submit the Inspection and Test Report for Vertical Transportation Equipment (VTE) per Section F.

The VTE system inventory including date of latest certification is provided in J-1502000-02 The contractor shall comply with the inspection and testing criteria defined in the most current ASME A17.1 specifically parts 1 and 8 and Maintenance Control Program.

Notification of repair work necessary to maintain certification is reported to the Government within two hours of identification.

VTE inspection and testing is completed when due.

Inspection and testing of VTE performed and completed in accordance with the inspection and testing program and schedule.

VTE prepared for inspection and certification in accordance with NAVFAC MO-118.

3.4
Other Recurring Services Program
The Contractor shall develop and implement another recurring services program for facilities, equipment and installed equipment and systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
Other recurring services include, but not limited to shut down and startup of VTE.

The Contractor shall submit an Other Recurring Services Program Summary Report per Section F.

Other recurring services are accomplished in accordance with the Contractor's program and work schedule.

Services are performed in accordance with manufacturers’ recommended procedures and OEM standards.

3.4.1
VTE Start-Up and Shutdown

The Contractor shall perform start-up and shutdown to ensure proper operation if necessary for other contractors/public works personnel to accomplish work.

The Contractor shall perform start-up and shutdown of VTE systems when directed by the KO.

The Contractor may be required to shut down or start up VTE to assist in the completion of others assigned work. The frequency shall be scheduled but not limited to normal government working hours.

The VTE Systems inventory is provided in J-1502000-02.

Start-up and shutdown work schedule will be negotiated with the KO

Services are performed in accordance with manufacturers’ recommended procedures and OEM standards.

1502000 – Facility Investment

Spec Item
Title
Performance Objective
Related Information
Performance Standard
4
Non-recurring Work
Non-recurring work will be ordered as a task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
Refer to Non-recurring work ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance Standards for Non-recurring work will be the same as those in Spec Item 3 where applicable.
Performance Standards for Non-recurring work will be the same as those in Spec Item 3 where applicable.

Task orders will be completed in time frame awarded, unless a formal request is submitted and approved by the KO.