This is a Base Bid Form for Fort Bend Independent School District (FBISD) in Texas for CSP Contract No. 26-036KB BP048, which covers HVAC, mechanical, electrical, and plumbing (MEP) system repairs and upgrades across multiple middle schools and high schools in West Zone 3. The project scope includes repairs and upgrades to existing MEP systems within the district's campuses. The District anticipates a project timeline of 456 calendar days from the executed contract and issuance of Notice to Proceed, though contractors may propose shorter completion timelines for consideration. Contractors must acknowledge receipt of all contract documents, including the base bid form dated December 18, 2025, prepared by Fort Bend ISD and Corgan Associates, Inc., and any associated addenda (ADD-01 through ADD-08). Proposals must remain open for 60 days following the proposal opening date, and selected contractors must sign the agreement and submit contract security within 10 calendar days of the Owner's Notice of Award.
The bid submission requires a lump sum price for the complete project along with unit pricing for specific MEP components including HVAC piping (various sizes from 1" to 6"), HVAC piping insulation, domestic cold and hot water lines (DCW/DHW), DCW/DHW insulation, and ductwork insulation. The contract includes liquidated damages provisions of $1,000 per calendar day for failure to achieve substantial completion on schedule and an additional $250 per day for non-completion of punch list items and contract closeout beyond 60 days after substantial completion. The form specifies that allowances totaling $0 are to be included in the base bid, with any markup procedures defined in the Supplementary Conditions Section 3.8. Contractors must certify that proposals are genuine and not made in collusion and that they have examined site conditions and all legal requirements affecting project performance.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RETURN THIS DOCUMENT IN CSP BID/PROPOSAL PACKAGE
BASE BID FORM – P a g e | 1
SECTION AC
PACKAGE “A” BASE BID PROPOSAL FORM – CSP STIPULATED SUM
CSP No: CSP 26-036KB BP 048 - BP Name: HVAC MEP West Zone 3
FORT BEND INDEPENDENT SCHOOL DISTRICT
Submitted by: _______________________________________________________________________
Date: ______________________ Phone Number: __________________________________________
Vendors are required to respond to all requests identified in the Solicitation and indicate their acceptance or objection to the terms of the Solicitation and these General Provsisions must be clearly indicated in
Vendor’s Solicatiation Response. No-bid is deemed non-responsive by FBISD.
Having examined Proposal and Contract Documents prepared by Fort Bend ISD and Corgan Associates, Inc. dated 12/18/2025 and having examined site conditions, the undersigned proposes to furnish all labor, equipment and materials and perform all work for the completion of the above-named project for the sum indicated below.
I. DESCRIPTION: Repairs and upgrades to the mechanical, electrical, and plumbing systems within existing middle schools and high schools across multiple campuses
(BP048).
Undersigned agrees to complete the work for the lump sum amounts of:
_______________________________________________________________________________Dollars
(Amount written in words governs)
(Amount in figures)
II. PROJECT TIMELINES
The District anticipates that this project will take 456 calendar days to complete. Contractor agrees the work will be substantially completed within 456 calendar days from executed contract and issuance of Notice to Proceed.
Should the Contractor anticipate lower calendar days to complete this project, please indicate below. The District will consider contractor proposed lower calendar days and incorporate into contract if deemed appropriate.
CONTRACTOR’S PROPOSED DAYS TO COMPLETE BP 048_________________
BASE BID FORM – P a g e | 2
III. LIQUIDATED DAMAGES:
The undersigned understands that liquidated damages as defined in the Supplementary Conditions will be included in the form of Agreement Between Owner and Contractor and that the contractor will be bound thereto.
Contractor accepts the provisions of the Contract as to liquidated damages in the event of failure to complete the work on time. Liquidated damages shall be the sum of $1,000.00 per day for each calendar day that Substantial Completion is delayed for each project.
Further, the Contractor acknowledges that additional liquidated damages in the sum of $250.00 per day for each calendar day shall be imposed for non-completion of punch list items and contract close-out within sixty (60) calendar days after Substantial Completion.
IV. ALLOWANCES:
Allowances are to be included in the Contractor’s base bid for each project in the following amounts:
A. $0 N/A
B. $0 N/A
Contractor should include allowance and markup in the base bid. Section 3.8 of the
Supplementary Conditions defines the procedures for markups.
V. UNIT PRICES – BASE BID
UNIT PRICES – Provide Unit Pricing for each of the following (refer to specifications)
01 ☐ HVAC Piping– (All Sizes) 1”, 1.5”, 2”, 2.5”, 3”, 3.5”, 4”, 6” ______________ add unit
02 ☐ HVAC Piping Insulation All sizes (1”, 1.5”, 2”, 2.5”, 3”, 3.5”, 4”, 6”) Chilled Water, heating Water, and Refrigerant Lines ______ add unit
03 ☐ DCW and DHW Lines (All Sizes) (3/4”, 1”, 1.5”, 2”, 2.5”, 3”, 3.5”, 4”)_________ add unit
04 ☐ DCW/DHW Insulation (All Sizes) (3/4”, 1”, 1.5”, 2”, 2.5”, 3”, 3.5”, 4”) ________ add unit
05 ☐ Ductwork Insulation ______________ add unit
VI. CHANGES IN THE WORK
The undersigned understands that changes in the work shall be performed in accordance with the
Supplementary Conditions.
VII. PROPOSAL EVALUATION WAIVER
By submitting a Proposal, the proposer indicated below agrees to waive any claim it has or may have against the Owner, Architect, Engineers, Consultants and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any proposal.
The proposer further agrees the Owner reserves the right to waive any requirements under the proposal documents or the Contract Documents, acceptance or rejection of any proposals, and recommendation or award of the contract.
BASE BID FORM – P a g e | 3
It is understood that the right is reserved by the Owner to reject any or all proposals, or waive any informalities in Receipt of Proposals.
The undersigned certifies that the amounts contained in this Competitive Sealed Proposal have been carefully checked and are submitted as correct and final; and additionally, agrees to comply with all provisions of the Proposal Form.
The undersigned CONTRACTOR proposes and agrees, if this Proposal is accepted, to enter into an Agreement with OWNER in the form included in the Contract Documents to complete all work as specified or indicated in the Contract Documents for the Contract Price and within the Contract
Time indicated in this Proposal and in accordance with the Contract Documents.
CONTRACTOR accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Proposal Security. This Proposal will remain open for sixty (60) days after the day of Proposal opening. CONTRACTOR will sign the
Agreement and submit the Contract Security and other documents required by the Contract documents within ten (10) calendar days after the date of the OWNER'S Notice of Award.
In submitting this Proposal, CONTRACTOR represents, as more fully set forth in the Agreement, that:
(a) Contractor has examined copies of all the Contract Documents and of the following addenda, receipt of which is hereby acknowledged, and also copies of the Advertisement or Invitation to
Submit Proposal.
________ ADD-01 dated ________ Total # pgs________ ADD-02 dated ________ Total # pgs________
________ ADD-03 dated ________ Total # pgs________ ADD-04 dated ________ Total # pgs________
________ ADD-05 dated ________ Total # pgs________ ADD-06 dated ________ Total # pgs________
________ ADD-07 dated ________ Total # pgs________ ADD-08 dated ________ Total # pgs________
(b) CONTRACTOR has examined the site and locality where the work is to be performed, the legal requirements (federal, state and local laws, ordinances, rules and regulations) and the conditions effecting cost, progress or performance of the work and has made such independent investigations as CONTRACTOR deems necessary.
(c) This PROPOSAL is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; CONTRACTOR has not directly or indirectly induced or solicited any other Contractor to submit a false or sham Proposal;
CONTRACTOR has not solicited or induced any person, firm or a corporation to refrain from submitting a proposal; and CONTRACTOR has not sought by collusion to obtain for himself any advantage over any other Contractor or over OWNER.
Type of Proposer’s Organization:
(Corporation, Co-Partnership, Individual, etc.)
BASE BID FORM – P a g e | 4
Proposer: _______________________________________________________
(Print or Type)
Signature of Proposer
Title of Office: _______________________________________________________
(Print or Type)
Legal Address: _______________________________________________________
Zip Code: ________________ Tel:(__________) _____________________
ATTEST:
(Secretary, if Proposer is a Corporation
SEAL:
(If Corporation)