This document is an Addendum No. 2 for Request for Proposal (RFP) 2000004161 issued by the Fairfax County Department of Procurement & Material Management in Virginia. The RFP concerns Stormwater Management, Maintenance and Reporting, with the proposal due date extended to October 17, 2025 at 11:00 A.M. The addendum includes Attachment 1, which provides detailed responses to nine questions from potential bidders regarding specific technical specifications and requirements, such as maximum sizes for BMP plates, debris cages, Bilco doors, and guidelines for cleaning various stormwater management systems.
The addendum clarifies pricing and measurement units for certain line items, including CCTV inspection (to be measured in linear feet) and parging of pipes/drainage structures. It also confirms that bidders should submit pricing for all line items within a task area, though they are not required to bid on every task. Offerors are instructed to download revised BidTables from the Bonfire procurement portal to ensure proper submission of their proposals. The document maintains a professional tone and provides specific technical guidance to help potential contractors understand the detailed requirements of the stormwater management project.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Procurement & Material Management
12000 Government Center Parkway, Suite 427
Fairfax, VA 22035-0013
Website: www.fairfaxcounty.gov/procurement
Phone (703) 324-3201, TTY: 711, Fax: (703) 324-3681
DATE: September 23, 2025
ADDENDUM NO. 2
TO: ALL PROSPECTIVE OFFERORS
REFERENCE: RFP 2000004161
TITLE: Stormwater Management, Maintenance and Reporting
DUE DATE/TIME: October 17, 2025 @ 11:00 A.M. (Revised)
The referenced Request for Proposal is amended as follows:
1. The Due Date has been extended to October 17, 2025 @ 11:00 A.M.
2. Refer to Attachment 1 for answers to questions received.
All other terms and conditions remain the same.
Cynthia Parker, VCA Contract Specialist II
THIS ADDENDUM IS ACKNOWLEDGED AND IS CONSIDERED A PART OF THE SUBJECT
REQUEST FOR PROPOSAL:
Name of Firm
(Signature) (Date)
A SIGNED COPY OF THIS ADDENDUM SHOULD ACCOMPANY THE PROPOSAL BY WAY
OF UPLOAD TO FAIRFAX COUNTY’S PROCUREMENT PORTAL AT
HTTPS://FAIRFAXCOUNTY.BONFIREHUB.COM.
NOTE: SIGNATURE ON THIS ADDENDUM DOES NOT SUBSTITUTE FOR YOUR
SIGNATURE ON THE ORIGINAL RFP DOCUMENT. THE ORIGINAL PROPOSAL DOCUMENT
MUST BE SIGNED.
A D D E N D U M
C o u n t y o f F a i r f a x , V i r g i n i a http://www.fairfaxcounty.gov/procurement https://fairfaxcounty.bonfirehub.com/
RFP 2000004161
Addendum No. 2
ATTACHMENT 1
Q1. #3-13-Furnish and Install Galvanized Low-Flow BMP Plate/Debris Cage. What is the maximum size (LxWxH) of the BMP plate/debris cage?
A1. Assume trash rack no larger than 18” x 18” x 18” and plate no larger than 18” x 18.”
Anything larger should be priced at cost for the rack and plate, plus labor and materials for installation.
Q2. #3-16 and 17 – Complete Bilco Door with Frame and Hinges (Traffic and Non-Traffic
Bearing). What is the maximum size of the Bilco Doors?
A2. 4’ x 4’ access hatch (doors). Anything larger should be priced at cost for the door system, plus labor and materials for installation.
Q3. #3-25 – Concrete Modular Systems – Cleaning. What is the maximum depth of debris to be removed?
A3. Assume one day of vactor/crew and up to two loads of material removed per day.
Additional effort should be prorated accordingly.
Q4. #3-26 – Underground Detention Systems – Maintenance and Cleaning. What is the maximum depth of debris to be removed?
A4. Assume one day of vactor/crew and up to two loads of material removed per day.
Additional effort should be prorated accordingly.
Q5. #3-27 – ADS StormTech Isolator Row – Cleaning. What is the maximum depth of debris to be removed?
A5. Assume one day of vactor/crew and up to two loads of material removed per day.
Additional effort should be prorated accordingly.
Q6. #3-28 – CONTECH Stormfilter – Cleaning without Cartridge Replacement. What is the maximum depth of debris to be removed?
A6. Assume one day of vactor/crew and up to two loads of material removed per day.
Additional effort should be prorated accordingly.
Q7. #3-42 – ADS BayFilter – Cleaning without Cartridge Replacement. What is the maximum depth of debris to be removed?
A7. Assume one day of vactor/crew and up to two loads of material removed per day.
Additional effort should be prorated accordingly.
Q8. #3-54 – Sand Filter – Cleaning. What is the maximum depth of debris to be removed?
A8. Assume one day of vactor/crew and up to two loads of material removed per day.
Additional effort should be prorated accordingly.
Q9. CONTECH StormFilter – Replace Gate Valves on Underdrain Pipes. Is this supposed to be a gate valve to dewater a sand filter? What is the maximum diameter pipe for the gate valve?
A9. Assume no larger than 6 to 8” underdrain pipe with a dewatering gate valve on any Stormfilter or equivalent underground detention and filtering practice, including sand filters.
RFP 2000004161
Addendum No. 2
ATTACHMENT 1
Q10. #5-8 – CCTV Inspection per LF. The pricing unit is listed as HR. Are you looking for an LF or HR rate?
A10. The pricing unit for CCTV Inspection should be LF. The Price Schedule has been revised.
Q11. The Task Area pricing sheets column one “Not Bidding.” Does this mean you do not have to provide pricing for every line item listed in the task area?
A11. You should submit pricing for all line items for a task. However, you do not need to submit pricing for all tasks. Offerors should download the revised BidTables in Bonfire to submit offers properly.
Q12. #3-13 – Parge Existing Pipes/Drainage Structures Using Non-Shrink Grout. The unit of measure shows CY. Is CY correct or should it be SY?
A12. We elected to go with a smaller volume unit of measure for parging given the likelihood of applying less than a CY for most parging jobs for Task Area 3. This is specific to TA 3 only. Parge Existing Pipes/Drainage Structures Using Non-Shrink Group is listed as #3-12. This line-item has been revised on the Price Schedule and Attachment E to CF UOM.