15-10-CS27009-Stage I-26360490-Build America, Buy America Requirements.pdf

PDF 116 KB Posted

Attached to
DFCM Construction - VBS Construction Stage I - Department of Veterans and Military Affairs - Northern Utah Veterans Cemetery - Project #26360490
Solicitation number
CS27009-Stage 1
Issued by
Weber County, Utah

About this file

This document is a Build America, Buy America Act (BABA) requirements file applicable to the State of Utah Division of Facilities Construction and Management (DFCM) construction project for the Northern Utah Veterans Cemetery in Washington Terrace, Utah. The project involves construction of a new veterans memorial cemetery with site improvements, utility infrastructure, hardscape, irrigation, landscaping installation, and building construction, with an estimated construction cost of $12,000,000. The BABA requirements mandate that contractors comply with domestic content procurement preferences for all materials incorporated into the infrastructure project, with specific standards for iron, steel, manufactured products, and construction materials.

The contractor and all subcontractors, materialmen, and suppliers must ensure that only domestic construction materials are used in project performance, with all manufacturing processes occurring in the United States unless exceptions or waivers have been granted. For manufactured products, the cost of domestic components must exceed 55 percent of the total component cost, while iron and steel products must be wholly or predominantly produced domestically. Specific construction material standards apply to non-ferrous metals, plastic and polymer-based products, glass, fiber optic cable, optical fiber, lumber, drywall, and engineered wood. Waivers may be requested in writing when applying the Buy America Preference would be inconsistent with public interest, when materials are not available in sufficient quantities or satisfactory quality in the United States, or when domestic content inclusion would increase overall project costs by more than 25 percent. Waiver requests require public comment periods of at least 15 days and must be reviewed by the Made in America Office.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirement to comply with Build America, Buy America Act (BABA)

Contractor Requirement to comply with Build America, Buy America Act (BABA). The Contractor agrees that only domestic construction materials will be used (by the Contractor, subcontractors, materialmen, and suppliers) in compliance with the requirements of Build America, Buy America Act (BABA) in the performance of this CONTRACT, except in instances where an exception or waivers has been granted in accordance with the Build America, Buy America Act.

Applicability to Federal Grant Project. The Buy America preference under BABA and 2 CFR part 184 applies to all Federal financial assistance as defined in 2 CFR 200.1 or successor regulations — whether or not funded through IIJA — where funds are appropriated or otherwise made available and used for a project for infrastructure. See 2 CFR 184.2(a), 200.1, and 200.322(c). For the purposes of this memorandum, Federal financial assistance means assistance that non-Federal entities receive or administer in the form of grants, cooperative agreements, non-cash contributions or donations of property, direct assistance, loans, loan guarantees, and other types of financial assistance.

The term “non-Federal entity” includes States, local governments, territories, Indian tribes, Institutions of Higher Education (IHE), and nonprofit organizations.

Buy America Preference. Recipients of an award of Federal financial assistance from a program for infrastructure are hereby notified that none of the funds provided under this award may be used for an infrastructure project unless:

(1) All iron and steel used in the project are produced in the United States - this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;

(2) All manufactured products used in the project are produced in the United States - this means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard that meets or exceeds this standard has been established under applicable law or regulation for determining the minimum amount of domestic content of the manufactured product; and

(3) All construction materials are manufactured in the United States - this means that all manufacturing processes for the construction material occurred in the United States. The construction material standards are listed below.

Incorporation into an infrastructure project. The Buy America Preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America Preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project, but are not an integral part of the structure or permanently affixed to the infrastructure project.

Categorization of articles, materials, and supplies. An article, material, or supply should only be classified into one of the following categories: (i) Iron or steel products; (ii) Manufactured products; (iii) Construction materials; or (iv) Section 70917(c) materials. An article, material, or supply should not be considered to fall into multiple categories. In some cases, an article, material, or supply may not fall under any of the categories listed in this paragraph. The classification of an article, material, or supply as falling into one of the categories listed in this paragraph must be made based on its status at the time it is brought to the work site for incorporation into an infrastructure project. In general, the work site is the location of the infrastructure project at which the iron, steel, manufactured products, and construction materials will be incorporated.

Application of the Buy America Preference by category. An article, material, or supply incorporated into an infrastructure project must meet the Buy America Preference for only the single category in which it is classified.

Determining the cost of components for manufactured products. In determining whether the cost of components for manufactured products is greater than 55 percent of the total cost of all components, use the following instructions:

(a) For components purchased by the manufacturer, the acquisition cost, including transportation costs to the place of incorporation into the manufactured product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(b) For components manufactured by the manufacturer, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (a), plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the manufactured product.

Construction material standards. The Buy America Preference applies to the following construction materials incorporated into infrastructure projects. Each construction material is followed by a standard for the material to be considered “produced in the United States.” Except as specifically provided, only a single standard should be applied to a single construction material.

(1) Non-ferrous metals. All manufacturing processes, from initial smelting or melting through final shaping, coating, and assembly, occurred in the United States.

(2) Plastic and polymer-based products. All manufacturing processes, from initial combination of constituent plastic or polymer-based inputs, or, where applicable, constituent composite materials, until the item is in its final form, occurred in the United States.

(3) Glass. All manufacturing processes, from initial batching and melting of raw materials through annealing, cooling, and cutting, occurred in the United States.

(4) Fiber optic cable (including drop cable). All manufacturing processes, from the initial ribboning (if applicable), through buffering, fiber stranding and jacketing, occurred in the United States. All manufacturing processes also include the standards for glass and optical fiber, but not for non-ferrous metals, plastic and polymer-based products, or any others.

5) Optical fiber. All manufacturing processes, from the initial preform fabrication stage through the completion of the draw, occurred in the United States.

(6) Lumber. All manufacturing processes, from initial debarking through treatment and planing, occurred in the United States.

(7) Drywall. All manufacturing processes, from initial blending of mined or synthetic gypsum plaster and additives through cutting and drying of sandwiched panels, occurred in the United States.

8) Engineered wood. All manufacturing processes from the initial combination of constituent materials until the wood product is in its final form, occurred in the United States.

Waivers

When necessary, recipients may apply for, and the agency may grant, a waiver from these requirements. The agency should notify the recipient for information on the process for requesting a waiver from these requirements.

When the Federal agency has made a determination that one of the following exceptions applies, the awarding official may waive the application of the Buy America Preference in any case in which the agency determines that:

(1) applying the Buy America Preference would be inconsistent with the public interest;

(2) the types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality; or

(3) the inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25 percent.

A request to waive the application of the Buy America Preference must be in writing. The agency will provide instructions on the format, contents, and supporting materials required for any waiver request. Waiver requests are subject to public comment periods of no less than 15 days and must be reviewed by the Made in America Office.

There may be instances where an award qualifies, in whole or in part, for an existing waiver described at [link to awarding agency web site with information on currently applicable general applicability waivers].

Definitions

“Buy America Preference” means the “domestic content procurement preference” set forth in section 70914 of the Build America, Buy America Act, which requires the head of each Federal agency to ensure that none of the funds made available for a Federal award for an infrastructure project may be obligated unless all of the iron, steel, manufactured products, and construction materials incorporated into the project are produced in the United States.

“Construction materials” means articles, materials, or supplies that consist of only one of the items listed in paragraph (1) of this definition, except as provided in paragraph (2) of this definition. To the extent one of the items listed in paragraph (1) contains as inputs other items listed in paragraph (1), it is nonetheless a construction material.

(1) The listed items are:

(i) Non-ferrous metals;

(ii) Plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables);

(iii) Glass (including optic glass);

(iv) Fiber optic cable (including drop cable);

(v) Optical fiber;

(vi) Lumber;

(vii) Engineered wood; and

(viii) Drywall.

(2) Minor additions of articles, materials, supplies, or binding agents to a construction material do not change the categorization of the construction material.

“Infrastructure” means public infrastructure projects in the United States, which includes, at a minimum, the structures, facilities, and equipment for roads, highways, and bridges; public transportation; dams, ports, harbors, and other maritime facilities; intercity passenger and freight railroads; freight and intermodal facilities; airports; water systems, including drinking water and wastewater systems; electrical transmission facilities and systems; utilities; broadband infrastructure; and buildings and real property; and structures, facilities, and equipment that generate, transport, and distribute energy including electric vehicle (EV) charging.

“Infrastructure project” means any activity related to the construction, alteration, maintenance, or repair of infrastructure in the United States regardless of whether infrastructure is the primary purpose of the project. See also paragraphs (c) and (d) of 2

CFR 184.4.

“Iron or steel products” means articles, materials, or supplies that consist wholly or predominantly of iron or steel or a combination of both.

“Manufactured products” means:

(1) Articles, materials, or supplies that have been:

(i) Processed into a specific form and shape; or

(ii) Combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies.

(2) If an item is classified as an iron or steel product, a construction material, or a Section 70917(c) material under 2 CFR 184.4(e) and the definitions set forth in 2 CFR 184.3, then it is not a manufactured product. However, an article, material, or supply classified as a manufactured product under 2 CFR 184.4(e) and paragraph (1) of this definition may include components that are construction materials, iron or steel products, or Section 70917(c) materials.

“Predominantly of iron or steel or a combination of both” means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components.

“Section 70917(c) materials” means cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives. See Section 70917(c) of the Build America, Buy America Act.