14-09-CS27009-Stage I-26360490-Davis Bacon Contract Addendum.pdf
PDF 195 KB Posted
- Solicitation number
- CS27009-Stage 1
- Issued by
- Weber County, Utah
About this file
This Davis-Bacon Contract Addendum applies to a construction project for the State of Utah Division of Facilities Construction and Management (DFCM) involving the construction of a new veterans memorial cemetery in Washington Terrace, Utah. The project, designated as Project #26360490, encompasses site improvements, utility infrastructure, hardscape, irrigation and landscaping installation, and building construction, with a construction cost estimate of $12,000,000.00. The addendum establishes prevailing wage requirements applicable to all federally funded construction work under the contract, mandating that all laborers and mechanics employed by contractors and subcontractors be paid wages at not less than those prevailing on similar projects in the locality as determined by the United States Secretary of Labor in accordance with the Davis-Bacon Act.
The addendum specifies comprehensive labor standards including minimum wage requirements, payroll documentation and submission procedures, record-keeping obligations for a three-year period, and provisions governing the employment of apprentices and trainees. Contractors must submit weekly payrolls accompanied by a Statement of Compliance, maintain detailed records containing worker information and wage data, and ensure compliance with Copeland Act requirements. The contract includes provisions for withholding of funds by HUD or its designee to ensure payment of prevailing wages and fringe benefits, overtime compensation requirements for work exceeding 40 hours per week at one and one-half times the basic rate for contracts exceeding $100,000, and liquidated damages of $10 per calendar day for violations. Contractors must insert all Davis-Bacon provisions into subcontracts and are responsible for ensuring subcontractor compliance. Non-Federal prevailing wage rates are inapplicable and shall not be enforced against contractors when such rates exceed the applicable wage rate determined by the Secretary of Labor.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DAVIS-BACON CONTRACT ADDENDUM
Labor Standards: Davis-Bacon and Related Acts
If the total amount of this contract exceeds $2,000, the federal labor standards set forth in the clause below shall apply to the construction work to be performed under the contract. All laborers and mechanics employed by contractors and subcontractors on federally funded construction projects are required to be paid wages at not less than those prevailing on projects of a character similar in the locality, as determined by the United States Secretary of Labor in accordance with subchapter IV of Chapter 31 of title 40 of the United States Code.
Determinations regarding the applicable prevailing wages are contained at the Department of Labor’s official website: www.wdol.gov.
(a) Minimum Wages.
(1) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949, in the construction of development of the project) will be paid unconditionally and not less often than once a week and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR Part 3) the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determinations of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics. Contributions made or costs reasonably anticipated for bona fide fringe benefits under Section 1(b) (2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of 29 CFR 5.5 (a) (1) (iv);
also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs, which cover the regular weekly period, Such laborers and mechanics shall be paid not less than the appropriate wage rate and fringe benefits in the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR Part 5.5 (a) (4). Laborers or mechanics performing work in more than one classification for the time actually worked therein; provided that the employer’s payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under 29 CFR 5.5 (a)(1)(11) and the Davis-Bacon poster (WH-1321) shall be posted at all times by the Contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers.
http://www.wdol.gov/
(2) (i) Any class of laborers or mechanics that is not listed in the wage determination and that is to be employed under the contract shall be classified in conformance with the wage determination. HUD shall approve an additional classification and wage rate and fringe benefits therefore only when all the following criteria have been met:
(A) The work to be performed by the classification requested is not performed by a classification in the wage determination;
(B) The classification is utilized in the area by the construction industry;
and
(C) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
(ii) If the Contractor and the laborers and mechanics to be employed in the classification (if known) or their representatives, and HUD or its designee agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by HUD or its designee to the Administrator of the Wage and Hour Division, Employee Standards Administration, U.S. Department of Labor, Washington, D.C. 20210. The administrator, or an authorized representative, will approve, modify or disapprove every additional classification action within 30 days of receipt and so advise HUD or its designee or will notify HUD or its designee within the 30-day period that additional time is necessary.
(iii) In the event the Contractor, the laborers or mechanics to be employed in the classification or their representatives, and HUD or its designee do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), HUD or its designee shall refer the questions, including the views of all interested parties and the recommendation of HUD or its designee, to the Administrator of the Wage and Hour Division for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise HUD or its designee or will notify HUD or its designee with the 30-day period that additional time is necessary.
(iv) The wage rate (including fringe benefits where appropriate) determined pursuant to subparagraphs (b) (2) (ii) or (iii) of this clause shall be paid to all workers performing in the classification under this contract from the first day on which work is performed in the classification.
(3) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the Contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof.
(4) If the Contractor does not make payments to a trustee or other third person, the
Contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program provided that the Secretary of Labor has found, upon the written request of the Contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the Contractor to set aside, in a separate account, assets for the meeting of obligations under the plan or program.
(b) Withholding of funds. HUD or its designee shall, upon its own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the Contractor under this contract or any other Federal contract with the same prime Contractor, or any other federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime Contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including any apprentices, trainees and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee or helper, employed or working on the site of the work or, under the United States Housing Act of 1937 or under the Housing Act of 1949, in the construction (or development of the project), all or part of the wages required by the contract, HUD or its designee may, after written notice to the Contractor, file such action as may be necessary to cause the suspension of any further payment, advance or guarantee of funds until such violations have ceased. HUD or its designee may, after written notice to the Contractor, disburse such amounts withheld for and on account of the Contractor or subcontractor to the respective employees to whom they are due. The Comptroller General shall make such disbursements in the case of direct Davis-Bacon Act contracts.
(c) Payrolls and basic records.
(1) Payrolls and basic records relating thereto shall be maintained by the Contractor during the course of work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work (or, under the United States Housing Act of 1937 or under the Housing Act of 1949, in the construction or development of the project). Such records shall contain the name, address and Social Security number of each such worker; his or her correct classification;
hourly rates if wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b) (2) (b) of the Davis-Bacon Act); daily and weekly number of hours worked; deductions made; and actual wages paid. Whenever the Secretary of Labor has found, under 29 CFR 5.5 (a) (1) (iv), that the wages of any laborer or mechanic include the amount of costs reasonably anticipated in providing benefits under a plan or program described in section 1 (b) (2) (b) of the Davis-Bacon Act, the Contractor, shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected and records that show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees and the ratios and wage rates prescribed in the applicable programs.
(2) (i) The Contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the Contracting Officer for transmission to HUD or its designee. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under subparagraph (c) (1) of this clause. This information may be submitted in any form desired. Optional Form WH-347 (Federal Stock Number 029-005-00014-1) is available for this purpose and may be purchased from the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402. The prime Contractor is responsible for the submission of copies of payrolls by all subcontractors.
(ii) Each payroll submitted shall be accompanied by a “Statement of Compliance” signed by the Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following:
(A) That the payroll for the payroll period contains the information required to be maintained under paragraph (c) (1) of this clause, and that such information is correct and complete.
(B) That each laborer or mechanic (including each helper, apprentice and trainee) employed on the contract during the payroll has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly, from the full wages earned, other than permissible deductions as set forth in 29 CFR Part 3; and
(C) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract.
(iii) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirements for submission of the “Statement of Compliance” required by subparagraph (c)
(2) (iii) of this clause.
(iv) The falsification of any of the above certifications may subject the
Contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 3729 of Title 31 of the United States Code.
(3) The Contractor or subcontractor shall make the records required under subparagraph (d) (1) available for inspection, copying or transcription by authorized representatives of HUD or its designee, the Contracting Officer or the Department of Labor and shall permit such representatives to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit the required records or to make them available, HUD or its designee may, after written notice to the Contractor, take such actions as may be necessary to cause the suspension of any further payment, advance or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be ground for debarment action pursuant to 29 CFR 5.12.
(d) (1) Apprentices. Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Bureau of Apprenticeship and Training, or with a State Apprenticeship Agency recognized by the Bureau, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program who is not individually registered in the program, but who has been certified by the Bureau of Apprenticeship and Training or a State Apprentice Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ration of apprentices to journeyman on the job site in any craft classification shall not be greater than the ratio permitted to the Contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated in this paragraph, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a Contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman’s hourly rate) specified in the Contractor’s or subcontractor’s registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice’s level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits listed on the wage determination for the applicable classification. If the Administrator of the Wage and Hour Division determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Bureau of Apprenticeship and Training, or a State Apprenticeship Agency recognized by the Bureau, withdraws approval of an apprenticeship program, the Contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
(2) Trainees. Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration the ratio of trainees to journeyman on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee’s level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed in the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate in the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate in the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate in the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the Contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
(3) Equal employment opportunity. The utilization of apprentices, trainees and journeyman under this clause shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR Part 30.
(e) Compliance with Copeland Act requirements. The Contractor shall comply with the requirements of 29 CFR Part 3, which are hereby incorporated by reference in this contract.
(f) Contract termination; debarment. A breach of this contract clause may be grounds for termination of the contract and for debarment as a Contractor and a subcontractor as provided in 29 CFR 5.12
(g) Compliance with Davis-Bacon and related Act requirements. All rulings and interpretations of the Davis-Bacon and related Acts contained in 29 CFR parts 1, 3 and 5 are herein incorporated by reference in this contract.
(h) Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this clause shall not be subject to the general disputes clause of this contract.
Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in CFR Parts 5, 6 and 7. Disputes within the meaning of this clause include disputes between the Contractor (or any of its subcontractors) and the PHA/IHA, HUD, the U.S. Department of Labor or the employees or their representatives.
(i) Certification of eligibility.
(1) By entering into this contract, the Contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the Contractor’s firm is a person or firm ineligible to be awarded contracts by the United State Government by virtue of Section 3 (a) of the Davis-Bacon Act or 29 CFR 5.12 (a) (1).
(2) No part of this contract shall be subcontracted to any person or firm ineligible to be awarded contracts by the United States Government by virtue of Section 3 (a) of the Davis-Bacon Act or 29 CFR 5, 12 (a) (1).
(3) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18
U.S.C. 1001.
(j) Contract Work Hours and Safety Standards Act. The provisions of this paragraph (j) are applicable only where the amount of the prime contract exceeds $100,000. As used in this paragraph, the terms “laborers” and “mechanics” include watchmen and guards.
(1) Overtime requirements. No contractor or subcontractor contracting for any part of the contract work, which may require or involve the employment of laborers or mechanics, including watchmen and guards, shall require or permit any such laborer or mechanic in any workweek in which the individual is employed on such work to work in excess of 40 hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of 40 hours in such workweek.
(2) Violation; liability for unpaid wages liquidated damages. In the event of any violation of the provisions set forth in subparagraph (j)(1) of this clause, the Contractor and any subcontractor responsible therefore shall be liable for the unpaid wages. In addition, such Contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic (including watchmen and guards) employed in violation of the provisions set forth in subparagraph (j) (1) of this clause, in the sum of $10 for each calendar day on which such individual was required by provisions set forth in subparagraph
(j) (1) of this clause.
(3) Withholding for unpaid wages and liquidated damages. HUD or its designee shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any monies payable on account of work performed by the Contractor or subcontractor under any such contract or any Federal contract with the same prime Contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime Contractor, such sums as may be determined to be necessary to satisfy any liabilities in the provisions set forth in subparagraph (j) (2) of this clause.
(k) Subcontracts. The Contractor or subcontractor shall insert in any subcontracts all the provisions contained in this clause, and such other clauses as HUD or its designee may require, including appropriate instructions and a clause requiring the subcontractors to include these provisions in any lower tier subcontracts. The prime Contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all these provisions.
(l) Non-Federal Prevailing Wage Rates. Any prevailing wage rate (including basic hourly rate and any fringe benefits), determined under state law to be prevailing, with respect to any employee in any trade or position employed under the contract, is inapplicable to the contract and shall not be enforced against the contractor or any subcontractor, with respect to employees engaged under the contract whenever such non-Federal prevailing wage rate exceeds:
(i) the applicable wage rate determined by the Secretary of Labor pursuant to the
Davis-Bacon Act to be prevailing in the locality with respect to such trade;
(ii) an applicable apprentice wage rate based thereon specified in an apprenticeship program registered with the U.S. Department of Labor or a Department of Labor-recognized State Apprenticeship Agency; or
(iii) an applicable trainee wage rate based thereon specified in a Department of Labor-certified trainee program.
| Labor Standards: Davis-Bacon and Related Acts |
| (a) Minimum Wages. |
| (c) Payrolls and basic records. |
| (i) Certification of eligibility. |