This is an evaluation matrix document for design services related to Jacksonville Electric Authority (JEA)'s Brandy Branch to Normandy 230kV Transmission Line project in Jacksonville, Florida. JEA is soliciting experienced design and construction teams to perform all engineering, permitting, surveying, design, structure and material procurement, and construction services for installing a new overhead 230kV transmission circuit (circuit 979) between the existing Brandy Branch substation at 15701 Beaver Street West and the Normandy Substation at 9801 Crystal Springs Road in Jacksonville. The solicitation due date is September 15, 2026. Bidders are required to provide detailed project schedules reflecting design, permitting, material procurement, and construction phases with a desired in-service date of September 29, 2028, with the project start date of December 7, 2026. Key schedule milestones include 10% design completion by February 26, 2027, 30% design by April 9, 2027, and final design by September 30, 2027.
The evaluation matrix allocates 100 points across multiple criteria: Professional Staff Experience (15 points), Similar Project Experience with three reference projects (30 points), Project Schedule (20 points), Design Approach (15 points), Construction Approach and Resource Availability (15 points), and Jacksonville Small Emerging Business (JSEB) participation (5 points). Bidders must submit four key team member resumes demonstrating relevant experience, professional licensing, and project-specific expertise. Similar project experience must include three successfully completed or in-progress Engineering, Procurement, and Construction projects with 115kV or above overhead transmission lines completed within NESC Light or Medium Loading Districts in the past ten years. JSEB participation in the initial design scope work is incentivized, with points awarded based on the percentage of work subcontracted to JSEB firms, with the full 5 points awarded if the bidder itself qualifies as a JSEB. Liquidated damages will be enforced if the indicated in-service date is not met.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Brandy Branch to Normandy
| Evaluation Matrix | |||||
| Design Services for the Brandy Branch to Normandy 230kV Transmission Line | Bidder: | Evaluator: | Score: | 100 | |
| Does Proposer meet Minimum Qualifications? | YES | ||||
| (Accept) | NO |
(Reject)
Professional Staff Experience
Four (4) key primary team member resumes will be evaluated. Each resume shall be two (2) pages maximum. Resume must state education, years of experience, licenses/certifications, which reference projects they worked on including the role on that project, brief description of role on this project, key professional roles and/or publications further demonstrating depth of relevant experience. 15 Resume Titles Depth of Experience
Analyze past project experience, technical abilities, publications, and overall capabilities.
(0 - 5 points) Years of Experience
1 Point for every 4 years of relevant experience (must be experience relevant to the role), up to 20 years Formula = (# of Years / 4) (0 - 5 points) Professional Licensing
5 Points for Florida PE License for Engineering roles, 0 points for no Florida PE 5 points for PMP or PE License for Manager roles, 0 points for no PMP or PE
(0 - 5 points) Professional Staff Experience Average Score
| Overall Project Manager | 5 | 5 | 5 | 15 |
| Construction Superintendent or Manager | 5 | 5 | 5 | |
| Lead Substation Engineer | 5 | 5 | 5 | |
| Lead Transmission Engineer | 5 | 5 | 5 |
Similar Project Experience
This criterion assesses the bidders past work experience, by grading three (3) similar projects. The bidder shall have successfully completed (as the engineering firm, contractor, or both) or be in the performance of completing three (3) similar transmission line Engineering, Procurement, and Construction projects located in the NESC Light or Medium Loading Districts within the past ten (10) years ending on 9/15/2026. A similar project is defined as the following:
| - | Project must be an Engineering, Procurement, and Construction project that delivered the complete design, material procurement, and construction services for a new overhead transmission line. |
| - | Circuit voltage at or above 115kV phase to phase |
30 Reference #1 (10 points) Highly relevant experience including design and construction of a new 115kV or above overhead transmission line within existing and new transmission corridor and along public road right of way. Use of spun concrete and steel transmission poles, Showcase modifications to exisitng circuits, including crossings of other transmission cirucits. Design Includes EMF and EMC study examples.
Fully reflects the scope and complexity of this project
(8-10 points) Some relevant experience, but does not fully reflect the scope or complexity of this project.
(5-7 points) Minimal to no comparable experience to the scope and complexity of this project.
| (0-4 points) | 10 | ||
| Reference #2 (10 points) | Highly relevant experience including design and construction of a new 115kV or above overhead transmission line within existing and new transmission corridor and along public road right of way. Use of spun concrete and steel transmission poles, Showcase modifications to exisitng circuits, including crossings of other transmission cirucits. Design Includes EMF and EMC study examples. |
Fully reflects the scope and complexity of this project
(8-10 points) Some relevant experience, but does not fully reflect the scope or complexity of this project.
(5-7 points) Minimal to no comparable experience to the scope and complexity of this project.
| (0-4 points) | 10 | ||
| Reference #3 (10 points) | Highly relevant experience including design and construction of a new 115kV or above overhead transmission line within existing and new transmission corridor and along public road right of way. Use of spun concrete and steel transmission poles, Showcase modifications to exisitng circuits, including crossings of other transmission cirucits. Design Includes EMF and EMC study examples. |
Fully reflects the scope and complexity of this project
(8-10 points) Some relevant experience, but does not fully reflect the scope or complexity of this project.
(5-7 points) Minimal to no comparable experience to the scope and complexity of this project.
(0-4 points) 10
Project Schedule
This criterion assesses the completeness and clarity of the proposed project schedule. The bidder must provide an overall detailed design, permitting, material procurement, and construction schedule. The schedule should reflect the interfaces between key workgroups, disciplines, or crafts involved in the execution of the project and identify the critical path. The schedule should demonstrate realistic planning, dependencies, and effective time management to meet JEA’s milestone dates and outage time frames identified in the technical specifications. Incomplete or unclear schedules may result in lower evaluation scores. Some points will be awarded based on how close the bidder can meet an in-service date of 9/29/2028. If selected, JEA will hold the bidder to their indicated in-service date, and liquidated damages will be enforced if the date is not met. 20 Evaluate:
*Schedule provided by the bidder.
*Start Date is 12/07/2026 *10% Design by 2/26/2027 *30% Design by 4/09/2027 *Final Design by 9/30/2027 *Outages in the Fall and Spring Months per specs *Desired ISD date is 9/29/2028 (20 points)
Comprehensive and realistic task breakdown, including clear durations, dependencies, and resource allocation. Clearly identifies key project milestones, aligns with critical path, and meets JEA's milestones/ISD.
(16 - 20 points) Adequate breakdown of tasks, durations, and dependencies with some level of detail. Milestones are identified but may lack clarity or lack full alignment with the critical path. The schedule meets JEA's milestones and ISD or identifies a realistic ISD.
(11 - 15 points) Incomplete or unrealistic task breakdown with unclear durations and dependencies. Key milestones are missing or poorly defined, and the schedule does not align with critical project phases. The timeline fails to meet JEA's ISD or offers no alternate ISD.
(0 - 10 points) 20
Design Approach
This criterion assesses how the bidder will design/ manage the project and will evaluate the engineering firm's overall capabilities. The bidder should demonstrate full understanding of the project scope for designing the new transmission circuit and performing needed modifications to existing transmission circuits and substations. There should be a clear layout of how the bidder will approach the project from start to finish. The bidder will need to demonstrate the process that they will use to procure all needed poles, conductor, and framing materials in time for construction. There should be a clear indication of what staff the engineering firm will provide, their organization’s structure, and why they would be the best fit for executing this project successfully for JEA. 15 Evaluate:
*Overall design plan *Anticipated design and management staff, and organization's structure *Material lead times to sucessfully complete the project on or before the ISD *cost savings to JEA *Demonstrated clear understanding of project scope (15 points) Comprehensive design plan that demonstrates how the project will be designed and managed from start to finish. Clear indication and details of available design, support, and management staff along with an organization structure. Demonstrates a clear and well thought out process that will be used to procure all structures, conductor, and framing materials. Demonstrates clear understanding of project scope.
(12 - 15 points) Adequate design plan that demonstrates how the project will be designed and managed from start to finish. Provides some details for available design, support, and management staff along with an organization structure. Demonstrates an acceptable process that will be used to procure all structures, conductor, and framing materials. Demonstrates basic understanding of project scope.
(8 - 11 points) Incomplete or inadequate design plan that demonstrates how the project will be designed and managed from start to finish. Provides sminimal or no details for available design, support, and management staff along with an organization structure. Does not demonstrate a process that will be used to procure all structures, conductor, and framing materials. Lacks basic understanding of project scope.
| (0 - 7 points) | 15 | |
| 15 | ||
| Construction Approach and Resource Availability |
This criterion assesses whether the proposal fully addresses clear, complete responses to the scope of work to include demonstration of resource availability to complete the work in accordance with the schedule. The bidder will need to demonstrate and prove that they can successfully construct the proposed project. The bidder may include a presentation of prior work that demonstrates appropriate staffing and equipment levels to meet a project schedule. Submissions missing required information or failing to comply with instructions may be scored lower. 15 Evaluate:
*Overall support plan *Anticipated staff to sucessfully complete the project on or before the ISD *Anticipated equipment to sucessfully complete the project on or before the ISD (15 points) Provides a detailed and logical sequence of work and detailed breakdown of resource allocation that will be used for project construction to maintain all milestones.
(12 - 15 points) Provides a generic sequence of work or lacks details and basic outline of resources allocation that will be used for project construction.
(8 - 11 points) Provides no sequence of work or lacks an outline of resources allocation that will be used for project construction.
(0 - 7 points) 15
Jacksonville Small Emerging Business (JSEB)
JEA will award points for utilizing a Jacksonville Small Emerging Business (JSEB) in the performance of the initial design scope of work. This can include surveying, SUE, geotechnical engineering, permitting, and design tasks. Future JSEB participation will be required for construction services, the amount to be determined by JEA and the bidder during design prior to development of the 60% GMP. At this time, do not include JSEB participation for construction. Points will be assessed based on the percentage of work to be subcontracted to a JSEB firm for the initial design scope of work only. The bidder is to indicate the percentage of work that they will subcontract to a JSEB firm in their proposals. Submissions missing required information will be scored lower. 5 Evaluate:
*Overall JSEB commitment *Bidder = JSEB, award 5 Points *Subcontractor is JSEB at ≥ 5%, award 4 points *Subcontractor is JSEB at ≥ 4%, award 3 points *Subcontractor is JSEB at ≥ 3%, award 2 points *Subcontractor is JSEB at ≥ 2%, award 1 point *Subcontractor is JSEB at ≥ 1%, award 0 points (5 points) Bidder = JSEB, award 5 Points
(5 points) Subcontractor is JSEB at ≥ 5%, award 4 points
(4 points) Subcontractor is JSEB at ≥ 4%, award 3 points Subcontractor is JSEB at ≥ 3%, award 2 points Subcontractor is JSEB at ≥ 2%, award 1 point Subcontractor is JSEB at ≥ 1%, award 0 points
(0-3 points) 5
Total points 100