Attachment_6_Section_B___Price_Schedules_1-6_updated_4_17_26_0004.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
WY MT Rockfall Risk Mitigation IDIQ 2026
Solicitation number
140R6026R0002
Issued by

About this file

This is a pricing schedule template for an Indefinite Delivery Indefinite Quantity (IDIQ) contract solicitation for rockfall risk mitigation services in Wyoming and Montana. The document provides five annual price schedules (2026-2030) plus a seed task order schedule for the Guernsey Dam North Spillway project, requiring vendors to submit unit prices and quantities for eleven line items plus a lump-sum design fee on each schedule.

The eleven primary contract line items (CLINs 1-11) cover specialized rope access technician crews (fully burdened at 180 crew hours annually), materials including galvanized bolts, mesh, cable/rope, anchors, rockfall barrier systems, wet-mix reinforced shotcrete, steel fiber reinforcement, strip-drain, and horizontal drains. CLIN 12 on Schedules 1-5 requires a lump-sum price for rockfall design services. The seed task order (Schedule 6) includes mobilization, 400 crew hours of rope access technicians, equipment rental, the same material items at different quantities, and travel costs with GSA per diem and lodging rates. Vendors must indicate which states (Montana and/or Wyoming) they are applying for award and are notified that unit prices for CLINs 1-11 on Schedules 1-5 represent maximum values that will be charged for any single task order issued during each ordering period. All prices currently display as $0.00 as this is a blank template awaiting vendor submissions for the Department of the Interior Bureau of Reclamation solicitation numbered 140R6026R0002.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Vendors:
Instructions:
1. For CLINS 1 - 11 on each Schedule 1 - 5, Vendors should enter both the quantity (COLUMN C) and the unit price (COLUMN E), and the Total will automatically fill
2. For CLIN 12 on each Schedule 1 - 5, Vendors should enter a lump sum to complete a Rockfall Design (COLUMN E) for a rockfall mitigation effort based on quantities for CLINs 1-11 (COLUMN C), and the Total will automtically fill
3. For CLINS 1 - 10 on Schedule 6, Vendors should enter both their proposed quantity (COLUMN C) and the unit price (COLUMN E) for the proposed seed task order, and the Total will automatically fill
4. For CLIN 11 on Schedule 6 - Vendors should enter a lump sum to complete a Rockfall Design (COLUMN E) for the Task Order rockfall mitigation effort based on quantities for CLINs 1-10 (COLUMN C), and the Total will automtically fill
5. Vendors are notified that Schedules 1 -5 Unit Prices for CLINs 1-11 shall be reflective of MAXIMUM VALUES that will ever be charged for any single task issued during that ordering period
6. Vendors shall indicate below by marking below each state with an X, which states for which they are proposing for award.
Please mark with an X which States you are applying to receive award for:
MontanaWyoming

Schedule 1

Price Schedule 1 - 2026 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimated QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of four (4) Rope Acces Technicians. Three (3) may be Level I or II certified SPRAT or IRATA rope access technicians, and one (1) shall be a Level III SPRAT or IRATA rope access supervisor (FULLY BURDENED)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh, or equivalent1500SF$0.00
1-51/2" Diameter Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000CY$0.00
1-9Steel Fiber Reinforcement6000SF$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall Mitigation1LS$0.00
Total of Schedule 1$0.00

Schedule 2

Price Schedule 2 - 2027 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimated QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of four (4) Rope Acces Technicians. Three (3) may be Level I or II certified SPRAT or IRATA rope access technicians, and one (1) shall be a Level III SPRAT or IRATA rope access supervisor (FULLY BURDENED)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh, or equivalent1500SF$0.00
1-51/2" Diameter Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000CY$0.00
1-9Steel Fiber Reinforcement6000SF$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall Mitigation1LS$0.00
Total of Schedule 2$0.00

Schedule 3

Price Schedule 3 - 2028 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimated QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of four (4) Rope Acces Technicians. Three (3) may be Level I or II certified SPRAT or IRATA rope access technicians, and one (1) shall be a Level III SPRAT or IRATA rope access supervisor (FULLY BURDENED)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh, or equivalent1500SF$0.00
1-51/2" Diameter Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000CY$0.00
1-9Steel Fiber Reinforcement6000SF$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall Mitigation1LS$0.00
Total of Schedule 3$0.00

Schedule 4

Price Schedule 4 - 2029 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimated QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of four (4) Rope Acces Technicians. Three (3) may be Level I or II certified SPRAT or IRATA rope access technicians, and one (1) shall be a Level III SPRAT or IRATA rope access supervisor (FULLY BURDENED)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh, or equivalent1500SF$0.00
1-51/2" Diameter Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000CY$0.00
1-9Steel Fiber Reinforcement6000SF$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall Mitigation1LS$0.00
Total of Schedule 4$0.00

Schedule 5

Price Schedule 5 - 2030 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimated QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of four (4) Rope Acces Technicians. Three (3) may be Level I or II certified SPRAT or IRATA rope access technicians, and one (1) shall be a Level III SPRAT or IRATA rope access supervisor (FULLY BURDENED)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh, or equivalent1500SF$0.00
1-51/2" Diameter Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000CY$0.00
1-9Steel Fiber Reinforcement6000SF$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall Mitigation1LS$0.00
Total of Schedule 5$0.00

Schedule 6 - Seed Task Order

Seed Task order - Guernsey Dam North Spillway Rockfall Mitigation
Price Schedule 6 - 2026 (Performance Dates Upon Award of Contract)
#Services/MaterialsQuantityUnit of MeasureUnit PriceAmount
1Mobilization and Preparation (see WBR 1452.232-81 ALT II)1LS
2Provide a crew of four (4) Rope Acces Technicians. Three (3) may be Level I or II certified SPRAT or IRATA rope access technicians, and one (1) shall be a Level III SPRAT or IRATA rope access supervisor (FULLY BURDENED)400Crew Hours$0.00
3Equipment Rental30Day$0.00
4#8 Grade 150 All-Thread Galvanized Bolt100LF$0.00
5#11 Grade 150 All-Thread Galvanized Bolt100LF$0.00
63mm Mesh, or equivalent40,000SF$0.00
71/2" Diameter Cable / Rope800LF$0.00
8Anchors100Each$0.00
9Wet-Mix Reinforced Shotcrete100CY$0.00
10Steel Fiber Reinforcement100SF$0.00
11Design of Rockfall Mitigation1LS$0.00
$0.00
$0.00
$0.00
Total of Schedule 1$0.00
Location of Task Order:
GSA Per Diem Rate Approved for Location:
GSA Lodging Rate Approved or Location:
Number of Days on Site (Include Arrival and Departure Days):
Airfare:Total$0.00
Rental Car Rate:Total Days$0.00
Per Diem First Day (3/4)GSA 1st Day Per Diem$0.00
Per Diem Full DayGSA Full Per Diem$0.00
Per Diem Last Day (3/4)GSA Last Day Per Diem$0.00
Lodging Total (Excludes Taxes):Daily Rate$0.00
Total of Travel Items$0.00
Other Direct Costs As Listed Below
QuantityUnit of MeasureUnit Price
$0.00
$0.00
$0.00
$0.00
$0.00
Total Other Direct Costs$0.00

Grand Total of First Task Order $0.00