Attachment_6_Section_B___Price_Schedules_1-6_updated_3_31_26_0003.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- WY MT Rockfall Risk Mitigation IDIQ 2026
- Solicitation number
- 140R6026R0002
About this file
This is a pricing template and instruction document for an Indefinite Delivery Indefinite Quantity (IDIQ) contract for rockfall risk mitigation services in Wyoming and Montana (Solicitation 140R6026R0002). Vendors must complete six price schedules covering performance years 2026 through 2030, with a seventh schedule for a seed task order at Guernsey Dam North Spillway. The contract involves comprehensive rockfall mitigation services including rope access technician crews (with specific SPRAT or IRATA certification requirements), materials such as galvanized bolts, stainless steel cable, mesh, anchors, shotcrete application, and design services. Vendors are instructed to enter only unit rates for CLINs 1-11 on Schedules 1-5, with totals auto-calculating based on government-provided estimated quantities. For CLIN 12 (Design of Rockfall Mitigation), vendors must specify both hours and hourly rates. The pricing guidance emphasizes that Schedules 1-5 represent maximum values that will ever be charged for any task order issued during each ordering period.
The seed task order in Schedule 6 covers a specific 2026 project including mobilization, a four-person rope access crew for 400 crew hours, equipment rental, materials procurement, and design services, with additional line items for travel costs including per diem, lodging, airfare, and rental car expenses based on GSA rates. Vendors must indicate their geographic coverage by marking either Montana, Wyoming, or both states on the submission. The spreadsheet template contains pre-populated estimated quantities for each line item across all schedules, with all pricing fields currently showing $0.00 pending vendor submission. The Department of Interior Bureau of Reclamation is the procuring agency.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Vendors:
| Instructions: | ||
| 1. For CLINS 1 - 11 on each Schedule 1 - 5 - Vendors should enter ONLY the Unit Rate (COLUMN E), and the Total will automatically fill | ||
| 2. For CLIN 12 on each Schedule 1 - 5 Vendors should enter both the number of Hours (COLUMN C) and the Hourly Rate (COLUMN E) and the Total will automtically fill | ||
| 3. For CLINS 1 - 11 on Schedule 6 - Vendors should enter ONLY the Unit Rate (COLUMN E) for the proposed task order, and the Total will automatically fill | ||
| 4. For CLIN 12 on Schedule 6 - Vendors should enter both the number of Hours (COLUMN C) and the Hourly Rate (COLUMN E) for the proposed task order, and the Total will automatically fill | ||
| 5. Vendors are reminded that Schedules 1 -5 Shall be reflective of MAXIMUM VALUES that will ever be charged for any task issued during that ordering period | ||
| 6. Vendors shall indicate below by marking below each state with an X, which states for which they are proposing for award. | ||
| Please mark with an X which States you are applying to receive award for: | ||
| Montana | Wyoming |
Schedule 1
| Price Schedule 1 - 2026 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimated Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of four (4) Rope Acces Technicians. Three (3) may be Level I or II certified SPRAT or IRATA rope access technicians, and one (1) shall be a Level III SPRAT or IRATA rope access supervisor (FULLY BURDENED) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh, or equivalent | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | CY | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | 1 | LS | $0.00 | |
| Total of Schedule 1 | $0.00 |
Schedule 2
| Price Schedule 2 - 2027 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimated Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of four (4) Rope Acces Technicians. Three (3) may be Level I or II certified SPRAT or IRATA rope access technicians, and one (1) shall be a Level III SPRAT or IRATA rope access supervisor (FULLY BURDENED) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh, or equivalent | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | CY | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | 1 | LS | $0.00 | |
| Total of Schedule 2 | $0.00 |
Schedule 3
| Price Schedule 3 - 2028 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimated Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of four (4) Rope Acces Technicians. Three (3) may be Level I or II certified SPRAT or IRATA rope access technicians, and one (1) shall be a Level III SPRAT or IRATA rope access supervisor (FULLY BURDENED) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh, or equivalent | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | CY | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | 1 | LS | $0.00 | |
| Total of Schedule 3 | $0.00 |
Schedule 4
| Price Schedule 4 - 2029 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimated Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of four (4) Rope Acces Technicians. Three (3) may be Level I or II certified SPRAT or IRATA rope access technicians, and one (1) shall be a Level III SPRAT or IRATA rope access supervisor (FULLY BURDENED) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh, or equivalent | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | CY | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | 1 | LS | $0.00 | |
| Total of Schedule 4 | $0.00 |
Schedule 5
| Price Schedule 5 - 2030 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimated Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of four (4) Rope Acces Technicians. Three (3) may be Level I or II certified SPRAT or IRATA rope access technicians, and one (1) shall be a Level III SPRAT or IRATA rope access supervisor (FULLY BURDENED) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh, or equivalent | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | CY | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | 1 | LS | $0.00 | |
| Total of Schedule 5 | $0.00 |
Schedule 6 - Seed Task Order
| Seed Task order - Guernsey Dam North Spillway Rockfall Mitigation | |||||
| Price Schedule 6 - 2026 (Performance Dates Upon Award of Contract) | |||||
| # | Services/Materials | Quantity | Unit of Measure | Unit Price | Amount |
| 1 | Mobilization and Preparation (see WBR 1452.232-81 ALT II) | 1 | LS | ||
| 2 | Provide a crew of four (4) Rope Acces Technicians. Three (3) may be Level I or II certified SPRAT or IRATA rope access technicians, and one (1) shall be a Level III SPRAT or IRATA rope access supervisor (FULLY BURDENED) | 400 | Crew Hours | $0.00 | |
| 3 | Equipment Rental | 30 | Day | $0.00 | |
| 4 | #8 Grade 150 All-Thread Galvanized Bolt | 100 | LF | $0.00 | |
| 5 | #11 Grade 150 All-Thread Galvanized Bolt | 100 | LF | $0.00 | |
| 6 | 3mm Mesh, or equivalent | 40,000 | SF | $0.00 | |
| 7 | Anchors | 100 | Each | $0.00 | |
| 8 | Wet-Mix Reinforced Shotcrete | 100 | CY | $0.00 | |
| 9 | Steel Fiber Reinforcement | 100 | SF | $0.00 |
| 10 | Design of Rockfall Mitigation | 1 | LS | $0.00 |
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| Total of Schedule 1 | $0.00 |
| Location of Task Order: |
| GSA Per Diem Rate Approved for Location: |
| GSA Lodging Rate Approved or Location: |
| Number of Days on Site (Include Arrival and Departure Days): |
| Airfare: | Total | $0.00 | |
| Rental Car Rate: | Total Days | $0.00 | |
| Per Diem First Day (3/4) | GSA 1st Day Per Diem | $0.00 | |
| Per Diem Full Day | GSA Full Per Diem | $0.00 | |
| Per Diem Last Day (3/4) | GSA Last Day Per Diem | $0.00 | |
| Lodging Total (Excludes Taxes): | Daily Rate | $0.00 | |
| Total of Travel Items | $0.00 |
| Other Direct Costs As Listed Below | ||||
| Quantity | Unit of Measure | Unit Price | ||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| Total Other Direct Costs | $0.00 |
Grand Total of First Task Order $0.00
File details come from the government source that posted it. Updated .