Attachment_6_Section_B___Price_Schedules_1-6_updated_3_17_26_0001.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- WY MT Rockfall Risk Mitigation IDIQ 2026
- Solicitation number
- 140R6026R0002
About this file
This is a pricing schedule template for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for rockfall risk mitigation services in Wyoming and Montana, spanning 2026-2030. The document provides five annual price schedules (Schedules 1-5) for the ordering periods 2026 through 2030, plus a seed task order (Schedule 6) for the Guernsey Dam North Spillway project. Vendors must submit unit rates only for CLINs 1-11 on each schedule; for CLIN 12 (Design of Rockfall Mitigation), vendors must provide both hourly rates and estimated hours. All unit prices on Schedules 1-5 represent maximum values that will be charged for any task orders issued during those respective ordering periods.
The required services and materials include rope access technician crews (three Level I or II certified technicians and one Level III supervisor), structural components (#8 and #11 grade bolts, stainless steel cable, anchors), protective systems (3mm mesh, rockfall barriers, strip-drain), and remediation work (wet-mix reinforced shotcrete with steel fiber reinforcement and drilled PVC horizontal drains). The seed task order specifies quantities for the Guernsey Dam North Spillway project and includes provisions for travel costs (airfare, rental car, per diem based on GSA rates, and lodging). Vendors must indicate which states (Montana and/or Wyoming) they are applying to receive award for by marking with an X. All cost cells currently display $0.00 and require vendor completion.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Vendors:
| Instructions: | ||
| 1. For CLINS 1 - 11 on each Schedule 1 - 5 - Vendors should enter ONLY the Unit Rate (COLUMN E), and the Total will automatically fill | ||
| 2. For CLIN 12 on each Schedule 1 - 5 Vendors should enter both the number of Hours (COLUMN C) and the Hourly Rate (COLUMN E) and the Total will automtically fill | ||
| 3. For CLINS 1 - 11 on Schedule 6 - Vendors should enter ONLY the Unit Rate (COLUMN E) for the proposed task order, and the Total will automatically fill | ||
| 4. For CLIN 12 on Schedule 6 - Vendors should enter both the number of Hours (COLUMN C) and the Hourly Rate (COLUMN E) for the proposed task order, and the Total will automatically fill | ||
| 5. Vendors are reminded that Schedules 1 -5 Shall be reflective of MAXIMUM VALUES that will ever be charged for any task issued during that ordering period | ||
| 6. Vendors shall indicate below by marking below each state with an X, which states for which they are proposing for award. | ||
| Please mark with an X which States you are applying to receive award for: | ||
| Montana | Wyoming |
Schedule 1
| Price Schedule 1 - 2026 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimated Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDENED) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | SF/IN | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF/IN | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | HR | $0.00 | ||
| Total of Schedule 1 | $0.00 |
Schedule 2
| Price Schedule 2 - 2027 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimated Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDENED) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | SF/IN | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF/IN | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | HR | $0.00 | ||
| Total of Schedule 2 | $0.00 |
Schedule 3
| Price Schedule 3 - 2028 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimated Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDENED) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | SF/IN | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF/IN | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | HR | $0.00 | ||
| Total of Schedule 3 | $0.00 |
Schedule 4
| Price Schedule 4 - 2029 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimated Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDENED) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | SF/IN | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF/IN | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | HR | $0.00 | ||
| Total of Schedule 4 | $0.00 |
Schedule 5
| Price Schedule 5 - 2030 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimated Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDENED) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | SF/IN | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF/IN | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | HR | $0.00 | ||
| Total of Schedule 5 | $0.00 |
Schedule 6 - Seed Task Order
| Seed Task order - Guernsey Dam North Spillway Rockfall Mitigation | |||||
| Price Schedule 6 - 2026 (Performance Dates Upon Award of Contract) | |||||
| # | Services/Materials | Quantity | Unit of Measure | Unit Price | Amount |
| 1 | Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDENED) | 400 | Crew Hours | $0.00 | |
| 2 | Equipment Rental | 30 | Each | $0.00 | |
| 3 | #8 Grade 150 All-Thread Galvanized Bolt | 100 | LF | $0.00 | |
| 4 | #11 Grade 150 All-Thread Galvanized Bolt | 100 | LF | $0.00 | |
| 5 | 3mm Mesh | 40,000 | SF | $0.00 | |
| 6 | Anchors | 100 | Each | $0.00 | |
| 7 | Wet-Mix Reinforced Shotcrete | 100 | SF/IN | $0.00 | |
| 8 | Steel Fiber Reinforcement | 100 | SF/IN | $0.00 |
| Design of Rockfall Mitigation | 1 | HR | $0.00 | |
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| Total of Schedule 1 | $0.00 |
| Location of Task Order: |
| GSA Per Diem Rate Approved for Location: |
| GSA Lodging Rate Approved or Location: |
| Number of Days on Site (Include Arrival and Departure Days): |
| Airfare: | Total | $0.00 | |
| Rental Car Rate: | Total Days | $0.00 | |
| Per Diem First Day (3/4) | GSA 1st Day Per Diem | $0.00 | |
| Per Diem Full Day | GSA Full Per Diem | $0.00 | |
| Per Diem Last Day (3/4) | GSA Last Day Per Diem | $0.00 | |
| Lodging Total (Excludes Taxes): | Daily Rate | $0.00 | |
| Total of Travel Items | $0.00 |
| Other Direct Costs As Listed Below | ||||
| Quantity | Unit of Measure | Unit Price | ||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| Total Other Direct Costs | $0.00 |
Grand Total of First Task Order $0.00