Attachment_6_Section_B___Price_Schedules_1-6_updated_3_17_26_0001.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
WY MT Rockfall Risk Mitigation IDIQ 2026
Solicitation number
140R6026R0002
Issued by

About this file

This is a pricing schedule template for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for rockfall risk mitigation services in Wyoming and Montana, spanning 2026-2030. The document provides five annual price schedules (Schedules 1-5) for the ordering periods 2026 through 2030, plus a seed task order (Schedule 6) for the Guernsey Dam North Spillway project. Vendors must submit unit rates only for CLINs 1-11 on each schedule; for CLIN 12 (Design of Rockfall Mitigation), vendors must provide both hourly rates and estimated hours. All unit prices on Schedules 1-5 represent maximum values that will be charged for any task orders issued during those respective ordering periods.

The required services and materials include rope access technician crews (three Level I or II certified technicians and one Level III supervisor), structural components (#8 and #11 grade bolts, stainless steel cable, anchors), protective systems (3mm mesh, rockfall barriers, strip-drain), and remediation work (wet-mix reinforced shotcrete with steel fiber reinforcement and drilled PVC horizontal drains). The seed task order specifies quantities for the Guernsey Dam North Spillway project and includes provisions for travel costs (airfare, rental car, per diem based on GSA rates, and lodging). Vendors must indicate which states (Montana and/or Wyoming) they are applying to receive award for by marking with an X. All cost cells currently display $0.00 and require vendor completion.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Vendors:

Instructions:
1. For CLINS 1 - 11 on each Schedule 1 - 5 - Vendors should enter ONLY the Unit Rate (COLUMN E), and the Total will automatically fill
2. For CLIN 12 on each Schedule 1 - 5 Vendors should enter both the number of Hours (COLUMN C) and the Hourly Rate (COLUMN E) and the Total will automtically fill
3. For CLINS 1 - 11 on Schedule 6 - Vendors should enter ONLY the Unit Rate (COLUMN E) for the proposed task order, and the Total will automatically fill
4. For CLIN 12 on Schedule 6 - Vendors should enter both the number of Hours (COLUMN C) and the Hourly Rate (COLUMN E) for the proposed task order, and the Total will automatically fill
5. Vendors are reminded that Schedules 1 -5 Shall be reflective of MAXIMUM VALUES that will ever be charged for any task issued during that ordering period
6. Vendors shall indicate below by marking below each state with an X, which states for which they are proposing for award.
Please mark with an X which States you are applying to receive award for:
MontanaWyoming

Schedule 1

Price Schedule 1 - 2026 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimated QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDENED)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh1500SF$0.00
1-51/2" Diameter Stainless Steel Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000SF/IN$0.00
1-9Steel Fiber Reinforcement6000SF/IN$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall MitigationHR$0.00
Total of Schedule 1$0.00

Schedule 2

Price Schedule 2 - 2027 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimated QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDENED)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh1500SF$0.00
1-51/2" Diameter Stainless Steel Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000SF/IN$0.00
1-9Steel Fiber Reinforcement6000SF/IN$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall MitigationHR$0.00
Total of Schedule 2$0.00

Schedule 3

Price Schedule 3 - 2028 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimated QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDENED)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh1500SF$0.00
1-51/2" Diameter Stainless Steel Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000SF/IN$0.00
1-9Steel Fiber Reinforcement6000SF/IN$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall MitigationHR$0.00
Total of Schedule 3$0.00

Schedule 4

Price Schedule 4 - 2029 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimated QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDENED)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh1500SF$0.00
1-51/2" Diameter Stainless Steel Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000SF/IN$0.00
1-9Steel Fiber Reinforcement6000SF/IN$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall MitigationHR$0.00
Total of Schedule 4$0.00

Schedule 5

Price Schedule 5 - 2030 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimated QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDENED)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh1500SF$0.00
1-51/2" Diameter Stainless Steel Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000SF/IN$0.00
1-9Steel Fiber Reinforcement6000SF/IN$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall MitigationHR$0.00
Total of Schedule 5$0.00

Schedule 6 - Seed Task Order

Seed Task order - Guernsey Dam North Spillway Rockfall Mitigation
Price Schedule 6 - 2026 (Performance Dates Upon Award of Contract)
#Services/MaterialsQuantityUnit of MeasureUnit PriceAmount
1Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDENED)400Crew Hours$0.00
2Equipment Rental30Each$0.00
3#8 Grade 150 All-Thread Galvanized Bolt100LF$0.00
4#11 Grade 150 All-Thread Galvanized Bolt100LF$0.00
53mm Mesh40,000SF$0.00
6Anchors100Each$0.00
7Wet-Mix Reinforced Shotcrete100SF/IN$0.00
8Steel Fiber Reinforcement100SF/IN$0.00
Design of Rockfall Mitigation1HR$0.00
$0.00
$0.00
$0.00
Total of Schedule 1$0.00
Location of Task Order:
GSA Per Diem Rate Approved for Location:
GSA Lodging Rate Approved or Location:
Number of Days on Site (Include Arrival and Departure Days):
Airfare:Total$0.00
Rental Car Rate:Total Days$0.00
Per Diem First Day (3/4)GSA 1st Day Per Diem$0.00
Per Diem Full DayGSA Full Per Diem$0.00
Per Diem Last Day (3/4)GSA Last Day Per Diem$0.00
Lodging Total (Excludes Taxes):Daily Rate$0.00
Total of Travel Items$0.00
Other Direct Costs As Listed Below
QuantityUnit of MeasureUnit Price
$0.00
$0.00
$0.00
$0.00
$0.00
Total Other Direct Costs$0.00

Grand Total of First Task Order $0.00