This document is Amendment 0007 to solicitation 140R4026R0010 issued by the Bureau of Reclamation's Upper Colorado Region for the Glen Canyon Fire System project. The amendment publishes final questions and answers addressing clarifications on pricing schedules, technical specifications, installation requirements, site conditions, and project administration for a fire alarm system upgrade at Glen Canyon Dam.
Key technical clarifications include: the pricing schedules in the Terms & Conditions document (Price Schedule A and Option Price Schedule B) are the accurate ones to use; new fire alarm conduit must comply with NFPA 70 and Section 26 05 33 specifications for raceways and boxes; new conduit does not require red paint; the contractor should assume no asbestos present unless conditions change; the existing fire alarm system will be phased out to allow reuse of existing conduits, raceways, and boxes; Glen Canyon will provide crane access and operators for high-altitude work requiring one-week advance scheduling; and patching and painting of surfaces caused by conduit removal is the government's responsibility. Administrative details specify that Glen Canyon (with Upper Colorado Basin Regional Office and Glen Canyon Dam Field Division as authority having jurisdiction) will review design drawings and material submittals within two to four weeks; provide CAD/PDF floor plans and fiber optic inspection reports upon contract award; the transformer deck is located on Level 3, Elevation 3188.5; and current code does not require elevator shaft detection. The contract performance period runs from October 1, 2026 to March 17, 2028. Offerors must acknowledge receipt of this amendment prior to the solicitation deadline or risk rejection.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Lisa Laughbon
See continuation page
Bureau of Reclamation Upper Colorado Region Regional Office 125 South State Street, Room 8100 Salt Lake City UT 84138
R40
140R4026R0010
07/01/2026
06/03/2026
1 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140R4026R0010/0007
The purpose of this amendment is to publish the final questions and answers for the Glen Canyon
Fire System solicitation.
1. The Price Schedule listed in the Terms &
Conditions document differs from the one shown in the Specifications. Which one is correct?
The complete price schedule includes both Price
Schedule A and Option Price Schedule B for the
Hybrid Mist Fire Suppression system. Therefore, the pricing schedules found in the Terms &
Conditions document are the accurate ones and should be included in proposals.
2. Is it acceptable to attach the new fire alarm conduit to existing other trade support systems like HVAC, cable tray etc?
Any new conduit for the fire alarm system shall be installed in accordance with NFPA 70. It is the responsibility of the contractor to properly support the conduit based on existing conditions and environmental conditions.
3. During the site visit it was noticed that the existing fire alarm system conduit currently installed is a combination of the EMT type and GRC type conduit depending on locations throughout the buildings. Can you please clarify which buildings and what areas within the buildings require the types of conduits mentioned?
Any new conduit must be installed in accordance with the specifications, and the type shall be in accordance with Section 26 05 33, Raceways and Boxes. Questions regarding a specific installation method may be submitted in an RFI and reviewed for technical acceptance.
4. Please confirm who has jurisdiction over the
Glen Canyon FA systems?
The authority having jurisdiction over Glen
Canyon FA systems is the Upper Colorado Basin
Regional Office and the Glen Canyon Dam Field
Division.
5. Does all new fire alarm conduit need to be painted red?
Continued...
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
New conduit for the fire alarm system is not required to be painted red
6. Please confirm the contractor is not to include any asbestos survey or removal in our bid.
Assume no asbestos, if conditions change, they will be addressed at that time.
7. During the site visit it was noticed that there are some beam light smoke detectors installed way up high in the power plant Turbin room, can BOR please confirm if the contractor would be able to use the buildings crane system with catwalk to replace these smoke detectors and associated conduit?
Access will be provided by use of the appropriate bridge crane. Glen Canyon will provide a crane operator for the work. Work will need to be scheduled one week in advance with the COR.
8. Spec section 01 11 22 paragraph 1.02 section
B Work Sequence Plan requests a method of keeping the existing fire alarm system in place until the new system is tested and ready to be put in service. Question: Is it mandatory that the complete new fire alarm system is installed prior to demolition of the old system, or can the new system be installed in phases which would allow the contractor to utilize existing conduit and boxes?
Because the new fire alarm system will require reusing existing conduits, raceways, and boxes, it is expected that the existing fire alarm system will need to be taken out in phases such to minimize impact on critical system interfaces. The Contractor is required to develop a detailed plan and schedule describing the phase out process. It will be anticipated that the existing fire panel will be taken out of service while the new panel is installed and tested. During this period, it will be necessary to inform and coordinate with Glen
Canyon staff.
9. Is it the contractor¿s responsibility to patch and paint holes in drywall and other
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C) surfaces caused by the removal of the existing fire alarm conduit, boxes, and panelboards?
The Glen Canyon crew will take care of all patching and painting of surfaces.
10. Will the BOR be providing a CAD or PDF file for the Facility building floor plan for design purposes once the contract is awarded?
Yes, to the extent that these documents exist.
11. During our site walk, we were able to identify 1 pair of available multimode fiber that we could utilize for communication between the Facility Workshop/Armory Services Building.
Is an inspection report containing information about distance and dB loss available for these?
All reports will be made available upon award of the contract.
12. We did not locate the fiber optic run from the visitor center to the control room on our site walk. Can we confirm that there are extra strands available and verify type? Would an inspection report containing information about distance and dB loss be available for these?
Contractor will need to coordinate once the contract is awarded with Glen Canyon staff about existing cables and connections. Any reports will become available upon award of the contract.
13. Please provide clarification on the Price
Schedule A CLIN item A-3 (As-Builts, Final, Drawing and Operations & Maintenance Manuals) quantity 2 each mean.
This means the contractor will provide 2 complete sets of As built drawings, 2 complete sets of final drawings, and 2 complete sets of
O&M manuals
14. What is the BOR review time for Design
Drawings and the review time for Material
Submittal.
Glen Canyon will endeavor to review all submittals within 2 weeks however; we reserve the right to take up to 4 weeks as needed
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C) depending on workload
15. Current code requires fire alarm detection located in the elevator shaft to be serviceable outside the shaft. ¿
Currently there are no initiating devices inside the elevator shaft. Current conditions do not require detection within the elevator hoist way. If detection is required, the contractor shall include this information in the appropriate submittal for technical approval.
16. ¿ drawings do not identify which floor is the transformer deck. Please confirm which floor/level the transformer deck is on.
The transformer deck is on Level 3, Elevation
3188.5.
Period of Performance: 10/01/2026 to
03/17/2028
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .