00_00_02_Dwgs-B_GlenCanyonFireAlarm_11x17_08-31-2023.pdf
PDF 42 MB Posted
- Attached to
- GC26 FIRE ALARM SYSTEM REPLACEMENT
- Solicitation number
- 140R4026R0010
About this file
This is a technical drawing document for the Glen Canyon Fire Alarm System Replacement project located at Glen Canyon Dam in Arizona and Utah. The project encompasses fire detection and alarm system design, furnishing, and installation across multiple facilities: Glen Canyon Powerplant (Site A), Carl Hayden Visitor Center (Site B), Facility Workshop and Service Building (Site C), and Government Project Warehouse (Site D). The primary scope includes designing and installing new fire detection and alarm systems at Sites A, B, and C, with Site D excluded from new system requirements. A new remote monitoring system must be installed in the control room at Site A to provide remote supervision of Sites B, C, and D, utilizing existing communication infrastructure including spare fiber optic cable between Sites A and C, and Plain Old Telephone Service (POTS) lines between Sites A and D.
The technical documentation includes comprehensive system specifications with a Siemens MXL Series fire alarm control unit, multiple floor terminal junction boxes (FTJB1-FTJB8) distributed across nine levels, notification devices including horns and strobes, initiating devices such as smoke detectors, flame detectors, beam detectors, and manual pull stations, and a Digital Alarm Communication Receiver (DACR) for remote monitoring. The system incorporates detailed wiring diagrams, device location plans at multiple elevations, sequence of operation matrices, and equipment loading charts. Supporting contractors identified include Hiller Systems Inc. as the general contractor and fire protection engineer, Industrial West Electric Inc. as the electrical contractor, and Kinetic Systems Inc. as the HVAC contractor. The related federal solicitation (140R4026R0010) for GC26 Fire Alarm System Replacement was issued by the Department of the Interior Bureau of Reclamation, with a scheduled site visit on Tuesday, June 23 at 0800 Arizona time.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
.0
S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
7- D
-T
L
O C A
TI
O N
M A P.
D W
G
LA
S T
S A V
ED
D A
TE
-0 8-
LA
S T
S A V
ED
B Y
V M
IL
LA
N A G
U
IL
A R
C O
LO
R A D
O R
IV
ER
S
TO
R A G
E
PR
O
JE
C T
M
ID
D
LE
R
IV
ER
D
IV
IS
IO
N
G
LE
N
C A N
YO
N
U N
IT
A R
IZ
O N
A
U
TA
H
G
LE
N C
A N
YO
N
P O
W
ER
PL
A N
T
FI
R E
A
LA
R M
S
YS
TE
M
R
EP
LA
C
EM
EN
T
GENERAL
LOCATION MAP
DENVER, CO
557-D-60169
2023-08-21
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
V. MILLAN-AGUILAR
V. MILLAN-AGUILAR
T. GRIESS
Todd Griess, P.E.
GM, ELECTRICAL CONTROLS GROUP
GLEN CANYON POWERPLANT (SITE A)
CARL HAYDEN VISITOR CENTER (SITE B)
GOVERNMENT PROJECT WAREHOUSE (SITE D)
FACILITY WORKSHOP AND SERVICE BUILDING
(SITE C)
NOTES
1. DESIGN, FURNISH, AND INSTALL A NEW FIRE DETECTION
AND ALARM SYSTEM AT THE GLEN CANYON POWERPLANT
(SITE A), CARL HAYDEN VISITOR CENTER (SITE B), AND AT
THE FACILITY WORKSHOP AND ARMORY SERVICE BUILDING
(SITE C). THE GOVERNMENT PROJECT WAREHOUSE (SITE D)
DOES NOT REQUIRE A NEW FIRE DETECTION AND ALARM
SYSTEM.
2. DESIGN, FURNISH, AND INSTALL A NEW REMOTE
MONITORING SYSTEM IN THE CONTROL ROOM OF SITE A,
FOR THE REMOTE SUPERVISION OF THE FOLLOWING SITES:
2.1. SITE B.
2.2. SITE C.
2.3. SITE D.
3. THERE IS EXISTING COMMUNICATION INFRASTRUCTURE
BETWEEN THE FOLLOWING SITES:
3.1. SITE A TO SITE C HAS SPARE FIBER AVAILABLE.
3.2. SITE A TO SITE D HAS A PLAIN OLD TELEPHONE
SERVICE (POTS) LINE AVAILABLE.
Elizabeth Morley, P.E.
TODD GRIESS Digitally signed by TODD GRIESS Date: 2023.08.28 14:12:36 -06'00'
NOTES
1. ITEMS FOLLOWED BY AN (*) INDICATE EXISTING
EQUIPMENT. THESE ITEMS SHALL NOT BE MODIFIED EXCEPT
AS REQUIRED TO TIE THE REMOTE FACUS TO THE DACR.
2. DRAWINGS ARE BASED ON "TYPICAL" EQUIPMENT
INFORMATION AND DO NOT REPRESENT FINAL DESIGN
INFORMATION OR DRAWING DETAILS. CONTRACTOR TO
VERIFY EXISTING CONDITIONS.
3. NOT ALL CONNECTIONS TO THE EXISTING TELEPHONE
SYSTEM ARE SHOWN.
4. CONTRACTOR TO UTILIZE COMPATIBLE CABLES AND
NETWORKING EQUIPMENT TO INTEGRATE THE DACR WITH
THE FIRE ALARM PANELS.
AL
W
AY
S
TH
IN
K
SA
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
.0
S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
7- D
-T
N
ET
W
O R K D
IA
G
R A M
.D W
G
LA
S T
S A V
ED
D A
TE
-0 8-
LA
S T
S A V
ED
B Y
V M
IL
LA
N A G
U
IL
A R
C O
LO
R A D
O R
IV
ER
S
TO
R A G
E
PR
O
JE
C T
M
ID
D
LE
R
IV
ER
D
IV
IS
IO
N
G
LE
N
C A N
YO
N
U N
IT
A R
IZ
O N
A
U
TA
H
G
LE
N C
A N
YO
N
P O
W
ER
PL
A N
T
FI
R E
A
LA
R M
S
YS
TE
M
R
EP
LA
C
EM
EN
T
COMMUNICATION
SYSTEM
NETWORK DIAGRAM
DENVER, CO
557-D-60170
2023-08-21
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
V. MILLAN-AGUILAR
V. MILLAN-AGUILAR
T. GRIESS
Todd Griess, P.E.
GM, ELECTRICAL CONTROLS GROUP
EXPLANATION
POTS PLAIN OLD TELEPHONE SERVICE
FACU FIRE ALARM CONTROL UNIT
DACR DIGITAL ALARM COMMUNICATION RECEIVER
Elizabeth Morley, P.E.
DIGITAL ALARM COMMUNICATION RECEIVER (DACR)
CONTROL
ROOM
COMPUTER
WORKSTATION
RS-232
CAT3
FACU
EXISTING
TELEPHONE
PANEL
TCB*
EXISTING
TELEPHONE
PANEL
TWA*
FACU
EXISTING
POTS LINE*
EXISTING
SILENT
KNIGHT
FACU*
EXISTING
MULTI-MODE
FIBER*
MULTI-MODE
FIBER
EXISTING
MULTI-MODE
FIBER*
ETHERNET/
FIBER
CONVERTER
MULTI-MODE
FIBER
CAT5e
EXISTING
FIBER PATCH PANEL
ECA*
MULTI-MODE
FIBER
EXISTING
FIBER
PATCH
PANEL
VCN2*
ETHERNET/
FIBER
CONVERTER
MULTI-MODE
FIBER
CAT5e
GLEN CANYON POWERPLANT CONTROL ROOM
FACILITY WORKSHOP
AND ARMORY SERVICES
BUILDING
CARL HAYDEN
VISITOR CENTER
GOVERNMENT PROJECT
WAREHOUSE
EXISTING
FIBER
PATCH
PANEL
FBB*
CAT3
CAT5e
ETHERNET/
FIBER
CONVERTER
ETHERNET/
FIBER
CONVERTER
CAT5e
TODD GRIESS Digitally signed by TODD GRIESS Date: 2023.08.28 14:15:31 -06'00'
Se ctio n
FOR INFORMATION ONLY
GLEN CANYON DAM
PAGE, ARIZONA
SIEMENS MXL SERIES - FIRE ALARM
ADVANCED FIRE PROTECTION SYSTEM
Inc Systems Hiller
DESIGNERS & INSTALLERS
FIRE DETECTION & SUPPRESSION
CONTRACT NO.: 04CC408055
GENERAL CONTRACTOR
HILLER SYSTEMS INC.
INDUSTRIAL WEST ELECTRIC, INC.
ELECTRICAL CONTRACTOR
HVAC CONTRACTOR
KINETIC SYSTEMS, INC.
833 PRINCIPAL LANE
CHESAPEAKE, VIRGINIA 23320
TEL: (757)-549-9123
FAX: (757)-549-1083
FAX: (623) 561-5197
TEL: (623) 561-5168
GLENDALE, AZ 85308
20926 NORTH 67TH STREET
PHOENIX, AZ 85017
2825 WEST THOMAS ROAD
TEL: (602) 685-2000
FAX: (602) 685-2297
PACE COLLABORATIVE
5151 BONNEY ROAD
FAX: (757) 671-8712
TEL: (757) 499-7223
VIRGINIA BEACH, VA 23462
MECHANICAL ENGINEERING
FIRE PROTECTION ENGINEERING
HUGHES ASSOCIATES, INC.
FAX: (410) 737-8688
TEL: (410) 737-8677
BALTIMORE, MD 21227
3610 COMMERCE DRIVE, SUITE 817
WWW.HILLERSYSTEMSINC.COM
AS-BUILTS
F
BR
BP
DSM
RM
MM
S
SYMBOL LEGEND
ANN
P
FCP
INSTALLATION NOTES
FCCP
CZM
LT
D
STAIRWELL PRESSURIZATION SEQUENCE OF OPERATION
SMOKE PURGE OPERATION
ELEVATOR RECALL
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
G E
N E
R A
L N
O T
E S
O
P E
R A
T
IO
N A
L N
O T
E S
F
IR
E D
E T
E C
T
IO
N
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
6/13/05
AS-BUILT
MAIN FACP
WIRING LEGEND
EQUIPMENT LIST
FLOOR TERMINAL JUNCTION BOX
FIRE FIGHTERS COMMAND & CONTROL PANEL
REMOTE LCD ANNUNCIATOR
NOTIFICATION DEVICES
INITIATING DEVICES
GLEN CANYON DAM
NOTIFICATION CKT LOADING TABLE
LINEAR DETECTOR PANEL
DEVICE CURRENT DRAW CHART
DEVICE NAMING LEGEND
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
E Q
U
IP
M E
N T
L
IS
T A
N D
N A
C L
O A
D C
H A
R T
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
6/13/05
SEQUENCE OF OPERATION MATRIX
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
S E
Q U
E N
C E
O F
O P
E R
A T
IO
N
S M
A T
R
IX
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
SYSTEM RISER DIAGRAM
MXL
FTJB8
ELEVATION 3257.25
ELEVATIONS 3262.87 & 3279.12
ELEVATION 3244.24
FTJB7
ELEVATIONS 3199.79, 3211, 3222 & 3233
ELEVATIONS 3188.50
ELEVATIONS 3168.50
ELEVATIONS 3153.50
ELEVATIONS 3138.50
ELEVATIONS 3124.50
FTJB6
FTJB5FTJB4
FTJB3
FTJB2
FTJB1
FCCPANN
LT
ZONE #1
ZONE #2
ZONE #3
ZONE #4
ZONE #5
ZONE #6
LINEAR DETECTOR
ZONES TO CABLE TRAYS
MM
MM
MM
MM
MM
MM
TO REPORT TO FACP
MONITOR MODULES
LEVEL B
LEVEL A
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 7
LEVEL 8
LEVEL 9
ELEVATIONS 3262.87 & 3279.12
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
S Y
S T
E M
R
IS
E R
D
IA
G R
A M
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
S Y
S T
E M
AS-BUILT
APPROXIMATE GRAPHIC SCALE IN FEET
PLAN VIEW - ELEVATION 3124.75
P P P P
PPP
P
P
BP
BP
BP
BR
BR
BR
RM
RM
RM
RM
RM
CZM
CZM
CZM
30 0 30 60 90
S
LEVEL B
S
MM
RM
S
S
DEVICE NAMING LEGEND
WIRING LEGEND
NOTIFICATION CIRCUIT
MAXIMUM WIRE DISTANCE
NOTIFICATION CKT LOADING TABLE
ELEVATION 3124.75
D E
V
IC
E L
O C
A T
IO
N
W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
AS-BUILT
PLAN VIEW - ELEVATION 3138.50
906030030
APPROXIMATE GRAPHIC SCALE IN FEET
P
S
P P P
LEVEL A
MM
MM
MM
MM
S
MM
MM MM
MM
MM
MM
MM
MM
MM
MM MM
MM
MM
MM
MM MM
MM
MM
MM
DEVICE NAMING LEGEND
WIRING LEGEND
ELEVATION 3138.50
NOTIFICATION CKT LOADING TABLE
MAXIMUM WIRE DISTANCE
NOTIFICATION CIRCUIT
D E
V
IC
E L
O C
A T
IO
N
W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
AS-BUILT
PLAN VIEW - ELEVATION 3153.50
APPROXIMATE GRAPHIC SCALE IN FEET
MM
LT
S
P
P P P P P P P
P P P
P
P
S
PPP
P
SS
MM
MMRM RMRM
RM RM
RM RM
RM
RMRM
RM RM
RM RM
RM
RMRM
RM RM
RM RM RMRM
RM
RM
RM
RMRMRM RMRMRMRM RM
LEVEL 1
S S
S
S
MM
S S
SS
SS
SS
SS
SS
S
S
RM
P
RM RM RM RM RM RM
RM
PS
DM
P
S
MM LT
LTMM
MM LT
LTMM
MM LT
LTMM
MM LT
LTMM
S
S
DEVICE NAMING LEGEND
WIRING LEGEND
ELEVATION 3153.50
NOTIFICATION CKT LOADING TABLE
MAXIMUM WIRE DISTANCE
NOTIFICATION CIRCUIT
D E
V
IC
E L
O C
A T
IO
N
W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
AS-BUILT
PLAN VIEW - ELEVATION 3168.50
APPROXIMATE GRAPHIC SCALE IN FEET
P
RM
RM
S
P P P
PPP
S
S S
S S
P
F
RM
LEVEL 2
S
SS
S
S
RM
MM
RM
RM
RM
DM
PS
RM
RMRM
RMRM
RMRM
RM
DEVICE NAMING LEGEND
WIRING LEGEND
NOTIFICATION CIRCUIT
MAXIMUM WIRE DISTANCE
NOTIFICATION CKT LOADING TABLE
ELEVATION 3168.50
D E
V
IC
E L
O C
A T
IO
N
W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
AS-BUILT
PLAN VIEW - ELEVATION 3188.50
APPROXIMATE GRAPHIC SCALE IN FEET
RM
RM
RM
RM
RM
RM
P
P P P P
P
P
P
S
S
S S
S S
S S
S
BR
BR
CZM
BP
CZM
BR
BR BR
BP BP
CZM
LEVEL 3
CZM
RM
RM
S
CZM
CZM
BP
BP
BP
BR
BR
DEVICE NAMING LEGEND
WIRING LEGEND
ELEVATION 3188.50
NOTIFICATION CKT LOADING TABLE
MAXIMUM WIRE DISTANCE
NOTIFICATION CIRCUIT
D E
V
IC
E L
O C
A T
IO
N
W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
AS-BUILT
PLAN VIEW - ELEVATION 3199.75 PLAN VIEW - ELEVATION 3211.00 PLAN VIEW - ELEVATION 3222.25 PLAN VIEW - ELEVATION 3233.50
APPROXIMATE GRAPHIC SCALE IN FEET
S S
S S S
S S S
S S S
S
P P P P
RM RM RM RM
LEVEL 4 LEVEL 5 LEVEL 6 LEVEL 7
DEVICE NAMING LEGEND
WIRING LEGEND
NOTIFICATION CIRCUIT
MAXIMUM WIRE DISTANCE
NOTIFICATION CKT LOADING TABLE
ELEVATION 3199.75, 3211.00, 3222.25 & 3233.50
D E
V
IC
E L
O C
A T
IO
N
W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
AS-BUILT
PLAN VIEW - ELEVATION 3244.24
APPROXIMATE GRAPHIC SCALE IN FEET
RM
RM
RM
RM
RM
RM
S
S
S
S S
S S S S
S S
SS
S S
MM
S S
S
S
S S
S S
SSSSSS
S S
D
D
D
D
S
P
P
P
P
LEVEL 8
P
S
S
RM
RM
RMRM
RMDMPS
DEVICE NAMING LEGEND
WIRING LEGEND
NOTIFICATION CIRCUIT
MAXIMUM WIRE DISTANCE
NOTIFICATION CKT LOADING TABLE
ELEVATION 3244.24
D E
V
IC
E L
O C
A T
IO
N
W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
AS-BUILT
PLAN VIEW - ELEVATION 3257.25
APPROXIMATE GRAPHIC SCALE IN FEET
RM
RM
RM
RM
RM
D
D
D
S
S
S
S
S
S
S S
S S
S
S
P S S S S
P
S S
S S
S
S S
S S
S
SS
S
S S
S
S S
S
S S
S S
S
LEVEL 9
FTJB8
P
DEVICE NAMING LEGEND
WIRING LEGEND
ELEVATION 3257.25
NOTIFICATION CKT LOADING TABLE
MAXIMUM WIRE DISTANCE
NOTIFICATION CIRCUIT
D E
V
IC
E L
O C
A T
IO
N
W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
AS-BUILT
PLAN VIEW - ELEVATION 3267.87 PLAN VIEW - ELEVATION 3279.12
APPROXIMATE GRAPHIC SCALE IN FEET
RM
S
S
P
P
RM
S S
RM
RM
RM
RM
RM
RM
RM
PS
DM
DEVICE NAMING LEGEND
WIRING LEGEND
NOTIFICATION CKT LOADING TABLE
ELEVATION 3262.87, 3267.87 &3279.12
NOTIFICATION CIRCUIT
MAXIMUM WIRE DISTANCE
D E
V
IC
E L
O C
A T
IO
N
W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
AS-BUILT
SIEMENS MXL TYPICAL FIRE ALARM CONTROL PANEL WIRING - LEVEL 8
ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
F
IR
E A
L A
R M
C O
N T
R O
L P
A N
E L
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
FLOOR TERMINAL JUNCTION BOX #1 - LEVEL B
PAD-3
PAD-3
PAD-3
12VDC
BATTERY BATTERY
12VDC 12VDC
BATTERY BATTERY
12VDC
SET SET SET SET
PSR-1
PAD-3 DIP SWITCH
SETTINGS
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
F L
O O
R T
E R
M
IN
A L
J U
N C
T
IO
N B
O X
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
SETTINGS
PAD-3 DIP SWITCH
PSR-1
SETSETSET
BATTERY
12VDC12VDC
BATTERYBATTERY
12VDC
PAD-3
FLOOR TERMINAL JUNCTION BOX #2 - LEVEL A
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
F L
O O
R T
E R
M
IN
A L
J U
N C
T
IO
N B
O X
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
PSR-1
SETSETSETSET
12VDC
BATTERYBATTERY
12VDC12VDC
BATTERYBATTERY
12VDC
PAD-3
PAD-3
PAD-3
FLOOR TERMINAL JUNCTION BOX #3 - LEVEL 1
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
F L
O O
R T
E R
M
IN
A L
J U
N C
T
IO
N B
O X
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
FLOOR TERMINAL JUNCTION BOX #4 - LEVEL 2
PAD-3
PAD-3
12VDC
BATTERY BATTERY
12VDC 12VDC
BATTERY BATTERY
12VDC
SET SET SET SET
PSR-1
PAD-3 DIP SWITCH
SETTINGS
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
F L
O O
R T
E R
M
IN
A L
J U
N C
T
IO
N B
O X
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
FLOOR TERMINAL JUNCTION BOX #5 - LEVEL 2
PAD-3
PAD-3
12VDC
BATTERY BATTERY
12VDC 12VDC
BATTERY BATTERY
12VDC
SET SET SET SET
PSR-1
PAD-3 DIP SWITCH
SETTINGS
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
F L
O O
R T
E R
M
IN
A L
J U
N C
T
IO
N B
O X
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
PSR-1
SETSETSETSET
12VDC
BATTERYBATTERY
12VDC12VDC
BATTERYBATTERY
12VDC
PAD-3
FLOOR TERMINAL JUNCTION BOX #6 - LEVEL 7
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
F L
O O
R T
E R
M
IN
A L
J U
N C
T
IO
N B
O X
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
PSR-1
SETSETSETSET
12VDC
BATTERYBATTERY
12VDC12VDC
BATTERYBATTERY
12VDC
PAD-3
PAD-3
PAD-3
FLOOR TERMINAL JUNCTION BOX #7 -LEVEL 8
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
F L
O O
R T
E R
M
IN
A L
J U
N C
T
IO
N B
O X
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
FLOOR TERMINAL JUNCTION BOX #8 - LEVEL 9
PAD-3
PAD-3
12VDC
BATTERY BATTERY
12VDC 12VDC
BATTERY BATTERY
12VDC
SET SET SET SET
PSR-1
PAD-3 DIP SWITCH
SETTINGS
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
F L
O O
R T
E R
M
IN
A L
J U
N C
T
IO
N B
O X
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
R
G
LE
N C
A N
YO
N
D A M
FI
R E
PR
O
TE
C
TI
O N
S
YS
TE
M
DE
SI
GN
ER
S
IN
ST
AL
LE
RS
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
FI
RE
D
ET
EC
TI
ON
S
UP
PR
ES
SI
ON
H ill er TE L:
(7
9-
FA
X
7)
-5
-1
Sy st em s
In c
R
R
G R A
PH
IC
A
N N
U N
C
IA
TO
R
FI
R E
A
LA
R M
C O
N
TR
O L
PA
N
EL
EX
TI
N G
U
IS
H
IN
G A
G
EN
T
PA
N
EL
FI
R
EF
IG
H
TE
R S C
O M
M A N
D P
A N
EL
LE
G
EN
D
FC
C P
EXA
N
N
FC
P
S M
O K E
D
ET
EC
TO
R
FI
R E
A
LA
R M
M A N
U A L
PU
LL
S
TA
TI
O
N
S
PR
IN
K
LE
R S
YS
TE
M T
A M
PE
R S
W
IT
C H
B
EA
M D
ET
EC
TO
R
FL
A M
E D
ET
EC
TO
R
D U
C T
S M
O K E
D
ET
EC
TO
R
YRRRRR
D
EV
IC
E
PL
A N
V
IE
W
E
LE
V A
TI
O N
8.
PL
A N
V
IE
W
E
LE
V A
TI
O N
4.
RR
RR
R R
RR
RRR
R
R
R
PL
A N
V
IE
W
E
LE
V A
TI
O N
8.
PL
A N
V
IE
W
E
LE
V A
TI
O N
3.
R
R
R
R
R
R R
R
R
R
R
R R
R R
R
R R
R
R
R
R
R
R
R
R R R
R
R
R
R
R
R
R R
PL
A N
V
IE
W
E
LE
V A
TI
O N
4.
EL
.2
PL
A N
V
IE
W
E
LE
V A
TI
O N
8.
S
TA
IR
W
EL
L
R
EM
O
TE
C O
N
TR
O L
S M
O K E
EX
H
A U
S T
O
FF
IC
E
FL
O
O R
G
EN
ER
A
TO
R F
LO
O
R
C O
N
TR
O L
R O
O M
F
LO
O R
A
LA
R M
/T R O
U B
LE
A C K N
O W
LE
D
G E
S
IL
EN
C E
D R
IL
L
R
ES
ET
A C
TI
O N
O N
O
FF
G
O
FF
PU
R G
E
O
FF
O
FF
O
FF
PU
R G
E
PU
R G
E
PU
R G
E
R
R
R
EL
.7
R R
R
R
RR
EL
.0
R R
R
PO
W
ER
O
N G
LA
M
P
TE
S T
A N
N
R
EL
.5
R
R
FC
C P
R
R R
RRR
R R
R
R R
R
RR
R
PL
A N
V
IE
W
E
LE
V A
TI
O N
7.
EL
.8
R
R
R
R R
RR
R
FC
P
R
R
R R
R
RR
R
R R
R
EX
R
R
R
R
R R
R
RRRR
R
R
R
R
RR
R
R R
RR
EL
.8
R
R
R
R
R
R
R
RR
RR
EL
.1
R R R
R
RR
R
RRR
R
RR
R
FI
R
E
AL
AR
M
A N
N U
N C
IA
TO
R L
AY
O
U T
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
F
IR
E F
IG
H
T E
R S
C M
D
C T
R L
P A
N E
L
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
FIREFIGHTERS COMMAND & CONTROL PANEL TYPICAL WIRING
LEVEL 3
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
F
IR
E F
IG
H
T E
R S
C M
D
C T
R L
P A
N E
L W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
FIREFIGHTERS COMMAND & CONTROL PANEL TYPICAL WIRING (CONTD)
LEVEL 3
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
F
IR
E F
IG
H
T E
R S
C M
D
C T
R L
P A
N E
L W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
REMOTE COMMAND AND CONTROL STATION / RCC-1 - LEVEL 3
ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
R E
M O
T E
A N
N U
N C
IA
T
IO
N
R
C C
-1
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
LINEAR THERMAL DETECTOR PANEL & WIRING DETAILS - LEVEL 1
ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
L
IN
E A
R T
H E
R M
A L
D E
T E
C T
O R
W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
ILI-1 IONIZATION TYPE
MSI-20B MANUAL PULL STATION
SLC LOOP FROM
DEVICE
PREVIOUS ADDRESSABLE
SLC LOOP TO
DEVICE
NEXT ADDRESSABLE
TRI-S SINGLE INPUT MODULE
TRI-R RELAY MODULE
NEXT ADDRESSABLE
DEVICE
SLC LOOP TOSLC LOOP FROM
DEVICE
FACP OR PREVIOUS
NEXT ADDRESSABLE
DEVICE
SLC LOOP TO
PREVIOUS ADDRESSABLE
DEVICE
SLC LOOP FROM
AD-3I DUCT DETECTOR HOUSING
WITH ILI-1 ION DETECTOR
REMOTE
LED
TERMINAL
MOUNTED IN
BACKBOX
SS4-A/-2 FLAME DETECTOR
SMOKE DETECTOR IN DB-3S BASE
24VDC POWER
FROM FTJB
NEXT ADDRESSABLE
DEVICE
SLC LOOP TO
SLC LOOP FROM
DEVICE
PREVIOUS ADDRESSABLE
AND CZM-1B6 ZONE MODULE
PBA-1191 BEAM DETECTOR DETECTOR
TRI-S SINGLE INPUT MODULE
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
T Y
P
IC
A L
IN
IT
IA
T
IN
G
D E
V
IC
E W
IR
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
6/21305
4" SQUARE ELECTRICAL BOX
DETECTOR BASE
DETECTOR
DF-30 FLAME DETECTOR
4" SQUARE ELECTRICAL BOX
DETECTOR BASE
DETECTOR
ILI-1 ION SMOKE DETECTOR
DETECTOR
COVER
DETECTOR HOUSING
ILI-1 ION SMOKE DETECTOR IN AD-3I HOUSING
MSI-20B MANUAL PULL STATION
3-1/2" SINGLE GANG BOX
COVER
PULL STATION
PBA-1191 BEAM DETECTOR
BACK BOX PROVIDED W/EQUIPMENT
MOUNTING PLATE
TRANSMITTER
PBR-1191 REFLECTOR PLATE
BACK BOX PROVIDED W/EQUIPMENT
REFLECTOR
VERTICAL ADJUSTMENT RANGE OF THE OPTICAL SYSTEM - PBA-1191
REFLECTOR MOUNTING PARAMETERS
REFLECTOR MAX DEVIATION IS +/- 20°REFLECTOR
REFLECTOR
MAX DEVIATION IS +/- 20°
REFLECTOR
DETECTOR
PBA-1191
PBR-1191
REFLECTOR
280 FT.
REFLECTOR SIZING CHART
MAXIMUM DISTANCE OF 280 FEET OF COVERAGE
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
T Y
P
IC
A L
IN
IT
IA
T
IN
G
D E
V
IC
E M
O U
N T
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
STROBE
RSS-24MCW-FR
NAC CKT TO NEXT
DEVICE OR EOL
AS-24MCW-FR
HORN/STROBE
FACP
PREVIOUS DEVICE OR
NAC CKT FROM
AS-SERIES HORN STROBE AND RSS-SERIES STROBE NOTIF. APPLIANCE
DUAL SYNCHRONIZATION MODULE WIRINGDUAL SYNCHRONIZATION MODULE
NAC CKT FROM
PREVIOUS DEVICE OR
FACP/PAD-3
TO DEVICES
NAC CKT OUT
ON LEVEL
TO NEXT DSM
SYNC CKT
AS-SERIES HORN STROBE AND RSS-SERIES STROBE UNIVERSAL MTG PLATE
4" SQUARE ELECTRICAL BOX
UNIVERSAL MOUNTING PLATE
MANUAL STATION MOUNTING DETAILS
TYPICAL NOTIF. DEVICE &
VERIFY TEMPORAL CODE 3
PATTERN IS SELECTED
IS SELECTED
VERIFY MEDIUM TONE
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
N O
T
IF
. D E
V
IC
E W
IR
IN
G
M O
U N
T
IN
G
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
DC BAT
N GL
TRI-D DUAL INPUT MODULE
24 VDC AUXILIARY POWER SUPPLY WIRING DETAILS
TRI-R RELAY MODULE
CIRCUIT
TO FAN CONTROL
BAT FAIL DCAC FAIL
AC
Battery, 12vdc 12ah
Cover Fuse
Door to Door) Enclosure (from Wire Strap
250V
5A 250V
10A
Battery, 12vdc 12ah H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
A U
X . P
W R
S U
P P
L Y
F O
R F
A N
S H
U T
D O
W N
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
AS-BUILT
RA return air
Ceiling return with manual damper
Ceiling supply register
SA supply air
Acoustic lined duct
LOS - Limit Of Supply
Flexible connector
Piping flow direction arrow
9. Locate ducts, dampers, fans, access panels, controls, and equipment in as approved or directed by the Contracting Officers Representative.
move the lights if approved by the Contracting Officers Representative.
Install ductwork to avoid interference with access to equipment and the approximate locations shown, and to avoid interference with pipes, lights, and other existing equipment, or relocate the new equipment or
2. Fabricate mitered duct elbows with a minimum of 4 segments
3. Fabricate radius elbow with centerline radius no less than 1
4. Fabricate duct transition with side slopes where shown and no
5. Support all ducts sufficiently to prevent sagging and distortion.
6. Install turning vanes in all right angles and radius elbows
7. Install hangers so access to equipment is not obstructed.
in accordance with the SMACNA HVAC Duct Construction
8. Install dampers, access doors, and control equipment with adequate access for maintenance and/or replacement.
in rectangular ducts, unless otherwise noted.
Standards, 2nd Edition, 1995.
1. Furnish and install the ducts as shown and greater than 1 to 4.
for a 90 degree bend.
and 1/2 times the duct width or diameter.
Seal all wall openings and gaps in fire rated gypboard walls systems, or match the wall rating if a higher rating is required.
to match with 1-hr. fire rated, UL or FM certified, firestopping or match the wall rating if a higher rating is required.
readily accessible from removable ceiling panels by lights or existing equipment.
or ceiling access panels shown on the drawings.
The ceiling panels selected to provide access must not be obstructed
10. Damper access panels must be controls, and all required accessories to provide a complete
11. Furnish and install new ductwork, fans, dampers, access panels,
12. Seal all wall openings and gaps in concrete walls with 2-hr. fire rated, UL or FM certified, firestopping systems, GENERAL NOTES operating system.
CFM
NECK SIZE-CFM
BOD - Bottom of duct
FD - Motor-operated fire damper FSD - Combination fire and smoke rated damper
COR - Contracting Officer's Representative
CF - Centrifugal fan
CD - Motor-operated control damper
PF - Propeller Fan
TOD - Top of duct
DM - Motor-operator for existing operable louver with motor actutor
SE - Smoke Exhaust HE - Halon Exhaust
T - Thermostat CP - Centrifugal pump AC - Air conditioning unit
AFF - Above finished floor RA - Return Air OA - Outside Air MA - Mixed Air EA - Exhaust Air
SA - Supply Air
DESIGNATIONS
LOS LOS
H ill er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
H V
A C
A S
-B U
IL
T
D O
C U
M E
N T
A T
IO
N
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
3/2/05 er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
H V
A C
A S
-B U
IL
T
D O
C U
M E
N T
A T
IO
N
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
3/2/05 er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
H V
A C
A S
-B U
IL
T
D O
C U
M E
N T
A T
IO
N
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
3/2/05 er
D
ES
IG
N
ER
S
IN
ST
A
LL
ER
S
FI
R E
D
ET
EC
TI
O N
S
U
PP
R
ES
SI
O
N In c Sy st em s
PR
IN
C
IP
A L
LA
N
E C
H
ES
A
PE
A K
E, V
IR
G
IN
IA
TE
L:
(7
9-
FA
X
7) -5
-1
H V
A C
A S
-B U
IL
T
D O
C U
M E
N T
A T
IO
N
F
IR
E D
E T
E C
T
D A
L A
R M
S Y
S T
E M
G L
E N
C A
N Y
O N
D A
M F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M
3/2/05
1.50"
34.00"
0.75"
.0
0"
G O
V
ER
N M
EN
T
TI
TL
E B
LO
C K
S ee
N ot e
See Note 4
Trim line, see Note 5
Trim line, see Note 5
See Note 2
0.
0.
SHEET
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
PR
O
JE
C T
N A M
E D
IV
IS
IO
N
CITY, STATE
PRJ-STA-SEQ
YYYY-MM-DD
NUMBER
DRAWN
ACCEPTED
BUREAU OF RECLAMATION
U.S. DEPARTMENT OF THE INTERIOR
YAKIMA PROJECT
KENNEWICK DIVISION
DRAWN
MANUFACTURER OR CONTRACTOR
ACCEPTED
TITLE
1. Government will provide contractor with an electronic AutoCAD template to be used by manufacturer for submittal of manufacturer's/contractors drawing in Government format.
2. The manufacturer's title block and drawing revisions as a result of the submittal process, may be located anywhere outside of the trim lines. The location shown on this drawing is the Government's preferred area.
3. The manufacturer shall show the Government solicitation/specification number, the manufacturer's name, drawing and sheet number in this area.
4. Government drawing number(s) will be issued at the end of the submittal process and drawing will be entered into the Government's electronic drawing system by the Government.
5. Trim lines shall be shown on all submitted drawings.
NOTES
AL
W
AY
S
TH
IN
K
SA
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
S
TA
N D
A R D
D R A W
IN
G
S
S
TA
N D
A R D
A N
D T
YP
IC
A L
D
ES
IG
N
S
G O
V
ER
N M
EN
T
D R A W
IN
G
F O
R M
A T
DRAWING BORDER,
SAMPLE TITLE BLOCK,
AND SIGNATURE LINES
DENVER, CO
40-D-7102
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL -
S. NITTA
S. NITTA
D. CRAWFORD
-1 2-
D
E.
M en dl in
U
PD
A
TE
D T
IT
LE
B
LO
C K A
N D
S
IG
N A
TU
R E
LI
N
ES
-0 3-
D
B ar th el
R od ne y
J P.
E.
U
PD
A
TE
D T
IT
LE
B
LO
C K A
N D
S
IG
N A
TU
R E
LI
N
ES
-0 4-
D
U
PD
A
TE
D D
R A W
IN
G
T O
C U
R R
EN
T D
R A W
IN
G
R
EC
O R D
S S
YS
TE
M
M
IN
O R R
EV
IS
IO
N
S
1. Information Management Handbook (IMH - 2020), Chapter 2, Section 9.A.4 - "Sheet Border" and Figures G2, G3, and G4.
REFERENCE
R. BARTHEL, P.E.
R.W. LAFOND, P.E.
R el ea se d
B
C
D
5 4
3 2 1
A
B
3 2
C
D
ALWAYS THINK SAFETY
R el ea se
LAR M TA IOCE N
R el ea se
File details come from the government source that posted it. Updated .