This document set consists of engineering design drawings and specifications for Reach 3 of the Navajo-Gallup Water Supply Project, a San Juan Lateral water transmission line in New Mexico managed by the Bureau of Reclamation. The project involves construction of approximately 4.4 miles of buried water transmission pipeline with associated appurtenances from Station 3302+00 to Station 3744+56.27. The pipeline ranges from 48 inches to 36 inches in diameter and includes reinforced concrete miter bends, sectionalizing butterfly valves with filling lines, air valves, blowoffs, buried manholes, and connection infrastructure at a water treatment plant regulating tank site.

Construction requirements include open-cut crossings at maintained and unmaintained roads with specified compaction percentages (85-95%), gravel resurfacing for maintained road replacements, utility relocations including a 4-inch NTUA waterline removal, buried utility coordination with overhead powerlines at three locations, and horizontal directional drilling (HDD) bore crossings where specified. The project involves complex geology with mixed rock and non-rock conditions requiring varied miter bend placement strategies documented in comprehensive data tables. Key construction details specify 75-foot-wide right-of-way throughout most segments, temporary safety fencing and monitoring at the terminal section, trench box requirements between certain stations, and manifold trenches using CLSM (Controlled Low-Strength Material). All elevations reference NAVD88 vertical datum and New Mexico State Plane Coordinate System West Zone (NAD83). The design was completed by Jacobs Engineering with a dated February 2026 baseline, requiring contractor verification of final angles, slopes, and measurements prior to construction.

View the file

Other files

File Type Posted
Sol_140R4026B0001_Amd_0006.pdf PDF
140R4026B0001_-_Updated_Questions_and_Answers_24JUNE26_0006.pdf PDF
Sol_140R4026B0001_Amd_0005.pdf PDF
140R4026B0001_-_Updated_Questions_and_Answers_0005.pdf PDF
Sol_140R4026B0001_Amd_0004.pdf PDF
Attachment_2_2_-_00_00_02_NGWSP_BLK_2-3_Drawings_06092026_0003.pdf PDF
Attachment_1_2_-_00_00_01A_NGWSP_BLK_2-3_Specifications_06092026_0003.pdf PDF
140R4026B0001_-_Solicitation_Amendment_0003_0003.pdf PDF
Sol_140R4026B0001_Amd_0003.pdf PDF
140R4026B0001_-_Questions_and_Answers_0002.pdf PDF
Attachment_1_1_-_00_00_01A_NGWSP_BLK_2-3_Specifications_05192026_0002.pdf PDF
Sol_140R4026B0001_Amd_0002.pdf PDF
140R4026B0001_-_Solicitation_Amendment_002_0002.pdf PDF
BLK_2-3_-_Site_Visit_Sign_In_Sheet_0001.pdf PDF
BLK_2-3_-_Site_Visit_Powerpoint_0001.pdf PDF
Sol_140R4026B0001_Amd_0001.pdf PDF
140R4026B0002_-_Solicitation_Amendment_1_0001.pdf PDF
Attachment_5_-_WD_NM20260040_Heavy_-_San_Juan_County__NM.pdf PDF
140R4026B0001_-_Solicitation.pdf PDF
Attachment_1_-_00_00_01A_NGWSP_BLK_2-3_Specifications.pdf PDF
Sol_140R4026B0001.pdf PDF
Attachment_3_-_00_00_02A_BLK_2-3_Geotech_Drawings_and_Logs.pdf PDF
Attachment_6_-_WD_NM20260046_Building_-_San_Juan_County__NM.pdf PDF
Attachment_2_-_00_00_02_NGWSP_BLK_2-3_Drawings.pdf PDF
Attachment_4_-_Small_Business_Subcontracting_Plan.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3320+00 3330+00 3340+00 3350+00

El ev at io n

Stations

3310+00 3320+00

48B75

PIPE

C O

M B

IN

ED

M

IT

ER

B

EN

D V

ER

TI

C A L

Δ

1°

'4 4"

C O

M B

IN

ED

Δ

1°

9'

1"

C O

M B

IN

ED

M

IT

ER

B

EN

D V

ER

TI

C A L

Δ

0°

'0 8"

C O

M B

IN

ED

Δ

' 4 8"

48B125 48B15048B125 48B175

B U

R

IE

D M

A N

H O

LE

Qal

Qal

Qal

Kpc

Kpc

TP

R 3-

-2

El ev

.3

Pr oj

2.0

T.D. 9.2

SM

SS

SC

TP

R 3-

-3

El ev

.1

Pr oj

R t.

5.

9'

4.5

T.D. 6.7

SM

SS

TP

R 3-

-4

El ev

.1

Pr oj

R t.

4.

5'

4.5

T.D. 6.7

SM

SS

48B100

Original ground surface

SAN JUAN

LATERAL

WATER

TREATMENT

PLANT

REGULATING

TANK SITE

(60809)

C O

N N

EC

T

TO

S

A N

J U

A N

LA

TE

R A L

W A

TE

R

TR

EA

TM

EN

T

PL

A N

T R

EG

U

LA

TI

N

G T

A N

K S

IT

E

FL

A N

G E

B

EG

IN

R

EA

C H

H

G L

EL

.9

H G

L

EL

.9

El. 5367.52

El. 5367.52 S=-0.03466

El. 5319.05

S=-0.01818

M ai nt ai ne d

R oa d

El. 5419.45

El. 5404.90

El. 5400.30

El. 5388.40

El. 5384.00

El. 5419.45

El. 5416.30 El. 5361.80 El. 5354.00

El. 5350.60

El. 5327.90

El. 5325.60

U nm ai nt ai ne d R oa d

B U

R

IE

D M

A N

H O

LE

PIPE Original ground surface

S=-0.03466

S=-0.05700

S=-0.01150

S=-0.04241

S=-0.01803

S=0.00000

S=-0.02100

S=-0.01576

S=-0.00504

S=-0.02481

S=-0.00590

O ve rh ea d U til ity

B ur ie d

W at er lin e O w ne r:

N

TU

A

To p of p ip e:

U nk no w n

O ve rh ea d U til ity

B ur ie d

W at er lin e O w ne r:

N

TU

A

To p of p ip e:

6.

AUGER BORE

.6

.5

Qal

Kpc

Kpc

Qal

D H

PN

M

-2 1-

El ev

.0

T.D. 19.5

3.3

SM

SS

TP

R 3-

-1

El ev

.3

Pr oj

R t.

7.

9'

2.0

T.D. 5.0

SM

SS

TP

R 2-

-2

El ev

.0

Pr oj

R t.

7.

3'

2.5

T.D. 6.0

SM

SS

O ve rh ea d U til ity

M A

TC

H L

IN

E

S

TA

0+

NAVAJO-GALLUP

WATER SUPPLY

PROJECT

REACH 3

CONSTRUCTION

ROW

75'

75'

SAN JUAN LATERAL

WATER TREATMENT

PLANT REGULATING

TANK SITE (60809)

WITH ACCESS ROAD

(60808)

5370 53

50 5340

54405420

Indian Service Route 36

NAVAJO-GALLUP WATER

SUPPLY PROJECT

REACH 2, see (60782)

3302+00

BEGIN REACH 3

N=2081444.94 E=2538277.31

3307+12 Buried Waterline

3304+44 Overhead Utility Owner: NTUA Height: 31.5' @ 41°F Skew Δ: 96°38" Lt.

KV: 7.97 kV

3313+62 Maintained Road, see Note 2

3331+13 Overhead Utility Owner: NTUA Height: 23.3' @ 30°F Skew Δ: 70°56' Lt.

KV: 7.97 kV

3340+33 Overhead Utility Owner: APS Height: 29.3' @ 30°F Skew Δ: 68°37' Lt.

KV: Unknown

3348+99 Unmaintained Road

3303+57 Buried Waterline to be removed, see (60809)

3339+83

BEGIN BORE

3340+83

END BORE

Qal Qal

DHPNM-21-1

TPR3-21-1

TPR3-21-2

TPR3-21-3

TPR3-21-4

TPR2-22-21

ISR ROW

3312+80.64

COMBINED MITER BEND

Δ=11°15'00" HORIZ.

N=2081589.66 E=2537206.72

3315+24.51

COMBINED MITER BEND

Δ=10°40'29" HORIZ.

N=2081574.56 E=2536963.39

T29N, R15W T29N, R16W

19 24 18 13

3311+98.59 Section Tie

3343+12.30 Section Tie

T29N, R16W

N1 4 S24 S1

4 S13

C S13

C S24W1 4 S19

E1 4 S13

N1 4 S19

3338+50.75

4 Section Tie

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -1

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

A M

A R N

ER

¦D_DT¦

¦STATUS¦

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

R

EA

C H

L

IN

E

PI

PE

PLAN AND PROFILE

BEGINNING TO STA.

3350+00

DENVER, CO

1695-D-60783

2026-04-13

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

J. DeHaan

J. DeHaan

K. Pelzer

Marner, Andrew (Andy) J P.E.

Steen, Timothy M

PROFILE

PLAN

0 400'200'

TE

C H

A

PP

R

S U

B M

IT

TE

D

A

PP

R O

V

ED

GEOLOGY

C hr is B ey er

K ri st op he r G ra ha m

C hr is B ey er

S up er vi so ry

G eo lo gi st

OPEN-CUT CROSSINGS

Station Road / Wash % Compaction

3313+28 to 3313+95 Maintained Road 95 3348+63 to 3349+35 Unmaintained Road 95

NOTES

1. General Notes, Symbols, Abbreviations, and Pipe Classification apply to all plan and profile drawings. (60249)

2. Maintained road requires gravel and asphalt replacement, see

Specifications.

3. For bored crossing details, see (62468).

CONSTRUCTION ROW

Station Width (Ft.)

Start End Left Right 3302+00 3370+00 75 75

R

EV

N O

¦R_DT¦ £RA£

D

R em ov ed a ug er b or e fo r po w er lin e cr os si ng a t S ta tio n

El ev at io n

Stations

3550+00 3560+00 3570+00 3580+00 3590+00 3600+00

M

IT

ER

B

EN

D

Δ

5°

'1 0"

C O

M B

IN

ED

M

IT

ER

B

EN

D V

ER

TI

C A L

Δ

0°

'0 4"

C O

M B

IN

ED

Δ

9°

'3 9"

H G

L

EL

.9

H G

L

EL

.9

B U

R

IE

D M

A N

H O

LE

El. 5140.13

U nm ai nt ai ne d R oa d

U nm ai nt ai ne d R oa d

U nm ai nt ai ne d R oa d

U nm ai nt ai ne d R oa d

Original ground surface

El. 5060.09

6" A

IR

V

A

LV

E W

IT

H

M A N

H O

LE

S

EC

TI

O

N A

LI

Z

IN

G V

A

LV

E 6"

B

LO

W O

FF

W

IT

H

M A N

H O

LE

H

G L

EL

.9

6" A

IR

V

A

LV

E W

IT

H

M A N

H O

LE

6" B

LO

W

O

FF

PIPE

42B37542C375 42B350 42C37542D425 42B350

El. 5133.30

El. 5096.90

El. 5137.50

El. 5133.50 El. 5131.80

El. 5120.20 El. 5123.30

El. 5123.80

El. 5071.00

El. 5083.10

El. 5060.20

El. 5068.60

W as h C ro ss in g

42C350

42B375

S=0.02194

KmKm

Kpl

KmKplKmf

Qal

Qal

Qal

TP

R 3-

-2

9.5 T.D. 10.0

SS

SC

El ev

.9

Pr oj

R t.

.4

TP

R 3-

-2

2.0

TD. 2.5

SM

SS

El ev

.6

Pr oj

R t.

4.

1'

D H

PN

M

-2 1-

6.8

TD. 19.5

CLSTNE/SHALE

(CL)S

El ev

.6

Pr oj

R t.

7.

6'

16.2

SHALE

TP

R 3-

-2

6.5

T.D. 7.5

SC

SHALE

El ev

.8

Pr oj

R t.

4.

5'

.9

42B400S=0.01095

S= 0.

S=0.01533

S=0.0

S=0.00138

S=-0.00791

S=-0.02035

S=0.00539 S=0.00122

S=0.00644

S=0.0

S=0.01431

El. 5123.42

MATCH LINE STA 3550+00

NAVAJO-GALLUP

WATER SUPPLY

PROJECT

REACH 3

75'

CONSTRUCTION

ROW

M A

TC

H L

0+

75'

5080 50

Kch Kmf

Kmf

35°

Kmf Qal

Qal

Kpl

Kpl

Qal

N8 W

DHPNM-21-9

TPR3-21-21

TPR3-21-23

TPR3-21-22

Qal

Qal

29NE N1

0W

3559+04 Unmaintained Road

3563+05 Unmaintained Road

3570+53 Unmaintained Road

3578+34 Unmaintained Road

3558+42 Wash Crossing

3555+96.91

COMBINED MITER BEND

Δ=29°47'33" HORIZ.

N=2075742.67 E=2517371.08

3558+02.40

MITER BEND

Δ=45°00'00" N=2075582.59 E=2517242.31

3573+57.75

MITER BEND

Δ=27°48'09" N=2075415.04 E=2515696.46

T2 9N

, R

W

T29N, R16W

C S29

T2 9N

, R

W

3567+15.78 Section Tie

3596+53.45

4 Section Tie

3597+59

4 Section Tie

E1 4 S2

N1 4 S29

W 1 4

S2

S1 4 S29

28 2921 20

W 1 4

S2

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -6

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

A M

A R N

ER

¦D_DT¦

¦STATUS¦

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

R

EA

C H

L

IN

E

PI

PE

PLAN AND PROFILE

STA. 3550+00 TO

STA. 3600+00

DENVER, CO

1695-D-60788

2026-04-13

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

J. DeHaan

J. DeHaan

K. Pelzer

Marner, Andrew (Andy) J P.E.

Steen, Timothy M

PROFILE

PLAN

0 400'200'

TE

C H

A

PP

R

S U

B M

IT

TE

D

A

PP

R O

V

ED

GEOLOGY

C hr is B ey er

K ri st op he r G ra ha m

C hr is B ey er

S up er vi so ry

G eo lo gi st

OPEN-CUT CROSSINGS

Station Road / Wash % Compaction

3558+17 to 3558+67 Wash 85 3558+76 to 3559+31 Unmaintained Road 95 3561+82 to 3564+27 Unmaintained Road 95 3570+28 to 3570+76 Unmaintained Road 95 3578+09 to 3578+85 Unmaintained Road 95

CONSTRUCTION ROW

Station Width (Ft.)

Start End Left Right 3542+29 3710+50 75 75

R

EV

N O

¦R_DT¦ £RA£

D

A dd ed m is si ng m ite r be nd a ng le in fo rm at io n fo r S ta tio n at io n

Stations

3600+00 3610+00 3620+00 3630+00 3640+00 3650+00

El. 5140.13

C O

M B

IN

ED

M

IT

ER

B

EN

D V

ER

TI

C A L

Δ

2°

'4 1"

C O

M B

IN

ED

Δ

0°

'0 7"

H G

L

EL

.9

H G

L

EL

.9

6" B

LO

W

O

FF

.6

6" A

IR

V

A

LV

E W

IT

H

M A N

H O

LE

6" A

IR

V

A

LV

E W

IT

H

M A N

H O

LE

42B35042B325 42C325 42C35042B32542C325

Km

Km

Km

Km

Km

Km

Qal

Qal

Qal

TP

R 3-

-2

2.0

T.D. 3.8

SM

SHALE

El ev

.9

Pr oj

R t.

.7

TP

R 3-

-2

2.0

T.D. 3.8

SC

SHALE

El ev

.5

Pr oj

Lt

4.

4'

TP

R 3-

-2

1.2

T.D. 6.5

SC

El ev

.5

Pr oj

R t.

.2

3.5

CL

D H

PN

M

-2 1-

5.2

TD. 19.5

CL

El ev

.3

Pr oj

Lt

4.

6'

SHALE

TP

R 3-

-2

T.D. 4.0

SC

El ev

.7

Pr oj

R t.

1.

8'

SHALE

Original ground surface

42B375

S=-0.02437

S=-0.03301

S=-0.01580

S=0.03306

S=0.02194

S=0.01783 S=-0.02244

S=-0.00904 S=-0.00267

S=-0.02917 El. 5116.50

El. 5133.80

El. 5146.50

El. 5159.50

El. 5148.80

El. 5161.30

El. 5147.50

El. 5155.60 El. 5154.40

El. 5109.50

El. 5108.83

PIPE

S ta rt W as h

C ro ss in g

B U

R

IE

D M

A N

H O

LE

U nm ai nt ai ne d R oa d

42B350

S=-0.00742

O ve rh ea d U til ity

M ai nt ai ne d

R oa d

42B350

U nm ai nt ai ne d R oa d

U nm ai nt ai ne d R oa d

MATCH LINE STA 3600+00

NAVAJO-GALLUP

WATER SUPPLY PROJECT

REACH 3

CONSTRUCTION

ROW

W.E.

5136.1

M A

TC

H L

0+

Artesian well and pond.

Qal

Qal

Qal

Qal

DHPNM-21-10

TPR3-21-27

TPR3-21-24

TPR3-21-25

TPR3-21-26

75'

75'

3633+18 Overhead Utility Owner: NTUA Height: 22.8' @ 39°F Skew Δ: 154°55" Lt.

KV: 7.97 kV

3635+91 Unmaintained Road

3632+42 Unmaintained Road

3630+48 Unmaintained Road

3648+68 Start Wash Crossing

3607+18.68

COMBINED MITER BEND

Δ=40°02'07" HORIZ.

N=2073536.72 E=2512910.55

3612+78.69 Δ=2°54'33" N=2073595.69 E=2512353.82

3618+28.69 Δ=6°59'03" N=2073681.29 E=2511810.68

E 14 S30 W

14 S29

29 30 20 19

T2 9N

, R

W

32 31 29 30

C S29

C S30

3626+24.27 Section Tie

3635+80.80

4 Section Tie 3639+80

Maintained Road

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -7

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

A M

A R N

ER

¦D_DT¦

¦STATUS¦

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

R

EA

C H

L

IN

E

PI

PE

PLAN AND PROFILE

STA. 3600+00 TO

STA. 3650+00

DENVER, CO

1695-D-60789

2026-04-13

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

J. DeHaan

J. DeHaan

K. Pelzer

Marner, Andrew (Andy) J P.E.

Steen, Timothy M

PROFILE

PLAN

0 400'200'

TE

C H

A

PP

R

S U

B M

IT

TE

D

A

PP

R O

V

ED

GEOLOGY

C hr is B ey er

K ri st op he r G ra ha m

C hr is B ey er

S up er vi so ry

G eo lo gi st

OPEN-CUT CROSSINGS

Station Road / Wash % Compaction

3630+16 to 3630+80 Unmaintained Road 95 3635+52 to 3636+30 Unmaintained Road 95 3639+50 to 3640+10 Maintained Road 95 3648+68 to 3653+18 Wash, See Note 1 85

NOTES

1. Wash Crossing continues on next page.

2. Maintained road requires gravel replacement, see Specifications.

CONSTRUCTION ROW

Station Width (Ft.)

Start End Left Right 3542+29 3710+50 75 75

R

EV

N O

¦R_DT¦ £RA£

D

R em ov ed a ug er b or e fo r po w er lin e cr os si ng a t S ta tio n at io n

Stations

3700+00 3710+00 3720+00 3730+00 3740+00 3750+00

42B325 42B300

C O

M B

IN

ED

M

IT

ER

B

EN

D

.1

6" A

IR

V

A

LV

E W

IT

H

M A N

H O

LE

C O

M B

IN

ED

M

IT

ER

B

EN

D V

ER

TI

C A L

Δ

0°

'0 1"

C O

M B

IN

ED

Δ

°3 1'

C O

M B

IN

ED

M

IT

ER

B

EN

D

C O

M B

IN

ED

Δ

C O

M B

IN

ED

B

EN

D

V

ER

TI

C A L

Δ

0°

'3 8"

C O

M B

IN

ED

Δ

9°

'0

0"

H G

L

EL

.9

.2

EN

D

R

EA

C H

B

LI

N D

F

LA

N G

E C O

N N

EC

T

TO

S

JL

W

TP

se e

N ot e

H G

L

EL

.9

Km

Km

Km

Km

Qal

Qal

Qal

TP

R 3-

-3

T.D. 4.5

El ev

.3

Pr oj

R t.

1.

2'

3.5

TP

R 3-

-3

T.D. 3.2

El ev

.9

Pr oj

R t.

5.

8'

1.1 SC

SHALE

TP

R 3-

-3

T.D. 5.2

El ev

.4

Pr oj

R t.

1.

7'

1.2 SC

SHALE

TP

R 3-

-3

T.D. 4.8

El ev

.9

Pr oj

Lt

.2

1.8

SC

SHALE

SC

SHALE

B U

R

IE

D M

A N

H O

LE

U nm ai nt ai ne d R oa d

El. 5183.00

El. 5183.00

El. 5157.00

El. 5160.70

El. 5187.00

El. 5142.50

PIPE

Original ground surface

S=-0.00379

S=0.00000

S=0.02686

S=0.00925

S=0.01094

.2

TA

PE

R

2" T

O

6"

42B350

00 37

42B325

TRENCH

BOX

42B325

O ve rh ea d U til ity

.2

200.0' Restrained

Length

M A

TC

H

LIN

E S

TA

3700+

NAVAJO-GALLUP WATER

SUPPLY PROJECT

REACH 3

75'

CONSTRUCTION

ROW

ro un d u tili ty

Embk

Qal

Qal

DHWTP3-18-10

DHWTP3-17-3

Qal

Qal

Qal

Qal

TPR3-21-31

TPR3-21-32

TPR3-21-33

TPR3-21-34

75'

3744+56.27

END REACH 3

CONNECT TO SJL WTP

N=2076598.04 E=2499570.3851

5220 5230

3707+02 Overhead Utility Owner: NTUA Height: 27.1' @ 34°F Skew Δ: 85°05" Lt.

KV: 7.97 kV

22'

3700+07 Unmaintained Road

SAN JUAN LATERAL

WATER TREATMENT

PLANT, BY OTHERS

3707+56.91 Δ=11°33'53" N=2075790.57 E=2503168.78

3733+44.14

COMBINED MITER BEND

Δ=9°29'46" HORIZ.

N=2076474.74 E=2500674.43

3744+00.00

COMBINED MITER BEND

Δ=10°31'42" HORIZ. ±

N=2076582.19 E=2499624.35

N1 4 S25 S1

4 S24

C S25

30 25 19 24

25 26 24 23

E 14 S26

T29N, R17W

T29N, R17W

T29N, R17W

3707+77.30

4 Section Tie

3735+14.46 Section Tie

W 14 S24

N1 4 S26

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -9

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

A M

A R N

ER

¦D_DT¦

¦STATUS¦

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

R

EA

C H

L

IN

E

PI

PE

PLAN AND PROFILE

STA. 3700+00 TO END

DENVER, CO

1695-D-60794

2026-04-13

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

J. DeHaan

J. DeHaan

K. Pelzer

Marner, Andrew (Andy) J P.E.

Steen, Timothy M

PROFILE

PLAN

0 400'200'

TE

C H

A

PP

R

S U

B M

IT

TE

D

A

PP

R O

V

ED

GEOLOGY

C hr is B ey er

K ri st op he r G ra ha m

C hr is B ey er

S up er vi so ry

G eo lo gi st

OPEN-CUT CROSSINGS

Station Road / Wash % Compaction

3699+83 to 3700+31 Unmaintained Road, See Note 1 95

NOTES

1. Compaction for the unmaintained road continued from previous page.

2. Connection to the San Juan Lateral Water

Treatment Plant is based on the 100% design prepared by Jacobs dated February 2026. Contractor to measure and verify final angles and slope.

3. Working HGL for Station 3744+56.27 based on flows listed in HGL Elevation Table below are based on a minimum water level of 16.3 feet (El. 5447.2) in the San Juan Lateral Water Treatment Plant Regulating Tank at the beginning of Reach 3.

4. Trench box required between Station 3710+00 to 3712+00.

HGL ELEVATION TABLE

FLOW (MGD) ELEVATION (FT)

3.1 5446.3

6.2 5443.8

19.5 5416.2

46.5 5274.7

CONSTRUCTION ROW

Station Width (Ft.)

Start End Left Right 3542+29 3710+50 75 75 3710+50 3711+25 75 22** 3711+25 3744+56.27 75 75

**Temporary safety fencing and monitoring required, see Specifications

R

EV

N O

¦R_DT¦ £RA£

D

R em ov ed a ug er b or e fo r po w er lin e cr os si ng a t S ta tio n

2'-0" 2'-0"

2' -0

2'

-0

2' -0

2'

-0

Outline of valve box

Outline of valve box

Butterfly valve operator

3" Std. steel post, see Typical Barrier Post

Butterfly valve operator

1 12" Std. steel pipe, weld to vertical post

WELDED RECTANGULAR BARRIER

See Typical Barrier Post Installation detail

6"

6" standard pipe valve box

Lockable lid, see Specifications

Ground surface

Square nut operator

Notch pipe as required to obtain snug and overlapping fit

DETAIL1 (PROFILE VIEW)

Valve ID Plate, see Detail 2

Cap or fill posts with concrete

2" Std. steel pipe

3" Std. steel post

Finished ground surface

Concrete

TYPICAL BARRIER POST

INSTALLATION DETAIL

1' -6

1'

-6

9" Min.

6"

1'-8"

C ol la r

H L

1" Gap of flange

1'-8"

10'

Split-sleeve, restrained flexible coupling

AWWA manually operated butterfly valve, suitable for buried service, see NOTES

Split-sleeve, restrained flexible coupling Split-sleeve, restrained flexible coupling

Collar, see (60803)

Steel pipe

6" Filling line, see Sections B-B and C-C

See Detail 1

6" Filling line connection

6" AWWA manually operated butterfly valve, suitable for buried service, see NOTES

A

B C

Steel pipe

Split-sleeve, restrained flexible coupling

A

B C

Station as shown on the Plan and Profiles and in Data Table on (60801)

Steel pipe

PLAN

1.0' Min.

1.0' Min.

6" Filling line connection

Line pipe

Compacted backfill 95%

Collar, see (60803)

Split-sleeve, restrained flexible coupling

Split-sleeve, restrained flexible coupling

Split-sleeve, restrained flexible coupling

Articulating steel pipe

Reinforcement not shown CLSM

AWWA manually operated butterfly valve, suitable for buried service, see NOTES

6" Filling line, see Sections B-B and C-C

Compacted backfill 95%

Valve box for buried valve

See Detail 1

SECTIONA

5"

1'-1" 1'-0"

Flanges, see NOTES Steel collar per

AWWA M-11

Filling Line

6" Std.

steel pipe

Pl 6", 90° Std.

steel welding elbow

Orifice plate, see (60800)

Grooved-end type coupling

Steel pipe

SECTIONB

1'-6" 7"

Welding pad, per AWWA M-11

Filling line

6" Std.

steel pipe

Pl 6", 90° Std.

steel welding elbow

Grooved-end type coupling

Steel Pipe

SECTIONC

Valve#_

8"

6"

Flow Direction 6" BFV Fill Line

VALVE ID PLATE2

(4) - 14" dia. x 1 - 1 4" 316 stainless steel hammer drive anchors. Install per manufacturer's recommendations

See Note 2

2" text

Exterior aluminum sign (name plate)

AL

W

AY

S

TH

IN

K

SA

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -1

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

A M

A R N

ER

¦D_DT¦

¦STATUS¦

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

LI

N

E

PI

PE

SECTIONALIZING VALVE

INSTALLATION

PLAN, SECTIONS AND

DETAILS

DENVER, CO

1695-D-60802

2026-04-13

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

A. MARNER

A. MARNER

K. PELZER

Marner, Andrew (Andy) J P.E.

Steen, Timothy M

NOTES

1. Drawing not to scale.

2. See Specifications on exact label text required for each valve.

3. All sectionalizing valves will require a bypass.

4. For pipe trench earthwork details, see (60795).

5. The minimum steel cylinder thickness for the section of line pipe with the valve outlet shall be the thickness of the steel line pipe. For the steel line pipe thickness see the Specifications.

6. Piping next to butterfly valves may require 1" oversizing so that the applied interior lining will not reduce the inside dimension to a smaller size which could prevent the butterfly valve from opening. Valve bypass piping shall be epoxy lined.

7. For collar details, see (60803).

8. Flange class shall meet pressure requirement designated by adjacent line pipe. Flange drilling shall match mating flange.

9. For Flange and Valve ratings, see notes (60799).

10. Dissimilar metals require a dielectric coupling for electrical isolation.

OPERATING CRITERIA

1. High performance Bypass butterfly valve shall be fully open when operated.

2. Excavation around blocking shall not occur when the pipeline is under hydrostatic pressure.

R

EV

N O

¦R_DT¦ £RA£

D

R ev is ed v al ve id p la te a nc ho rs t o st ai nl es s st ee l.

Manifold trench, CLSM.

(Pipe not shown)

Compacted backfill, see Note 9.

Gravel surfacing

Riprap

Tank 1 Tank 2

1.7% 3:1

3:1 4.5%4.5%

4.0'

Existing ground

13.5'

Qal

Kpc

EL. 5417.4

1.5:1 Typ.

0.5:1 Typ.

EL. 5422.45.0' Typ.

Top of bedrock

Manifold trench, CLSM

Compacted backfill, see

Note 9. Compacted backfill, see Note 9.

Existing ground

Gravel surfacing

Riprap

3:1

3:12.2%

4.0'

Qal

Kpc

1.5:1 Typ.0.5:1 Typ. 1.5:1

Typ.

EL. 5417.4

EL. 5417.4

EL. 5419.5

Manifold trench, CLSM

Top of bedrock

NAVAJO-GALLUP WATER

SUPPLY PROJECT REACH 2

(60782)

Indian Service Route 36

ACCESS ROAD

(60808)

SAN JUAN LATERAL WATER

TREATMENT PLANT

REGULATING TANK 1

(62472 & 62480)

EDGE OF GRAVEL SURFACING

NAVAJO-GALLUP

WATER SUPPLY PROJECT

REACH 3 (60783)

FENCING

See 40-D-7016

DH DHMLT-23-1

DH DHMLT-23-2

DH DHMLT-23-3

TP

TP TP

DH DHMLT-23-4

DH DHMLT-23-5

DH DHMLT-23-6

SAN JUAN LATERAL WATER

TREATMENT PLANT

REGULATING TANK 2

(62472 & 62479)

5420S.P. Coordinate N: 2081462.02 E: 2538531.45

ELECTRICAL PANEL

CONCRETE PAD

(62485)

Existing 4" Ø NTUA waterline to be relocated

543154325433

5431.0 HP

5430.9 HP

5429.8

5429.3

5428.8 LP5428.7 LP

5428.7 LP5430.1 HP5430.1 HP

-1.0% -1.0%

-1.0%

-2.1% -2.1%

-2.0% -2.0%

-1.2%

-2 .8

% -2.5% -3.

4% -3.7%

-1.4%

-1 .3

TOC=5430.45

TOC=5430.40

TOC=5430.36

-0.5%

-0.5%

62.5' 93.0' 74.5'

51.0'

34.8'

A

TOC = 5430.9

TOC = 5430.9

B

B

C

C

D

D

C1

L1

L2

L3

L4

L5

30' ACCESS

GATE

A

Tank overflow drain apron (62474)

C2

Parcel Line Table

Line #

L1

L2

L3

L4

L5

Length

54.00

229.93

102.00

229.93

6.00

Direction

S7° 41' 55"W

S82° 18' 05"E

N7° 41' 55"E

N82° 18' 05"W

S7° 41' 55"W

Curve Table

Curve #

C1

C2

Length

23.56

23.56

Radius

15.00

15.00

Delta ∆

90°00'00"

90°00'00"

Chord Direction

S37° 18' 05"E

S52° 41' 55"W

Chord Length

21.21

21.21

Tank

Tank Floor

Compacted subgrade

Top of gravel

6" Slope per plan

Non-woven geotextile fabric

Extend non-woven geotextile fabric to top of gravel

SECTIONC NOT TO SCALE

6" Min.

6" Gravel surface

Non-woven geotextile

Compacted backfill2.0' Min.

Existing subgrade

GRAVEL SURFACING DETAIL

NOT TO SCALE

Gravel

Riprap

LEGEND

Tank 2

Qal

Kpc

Manifold trench, CLSM

Compacted backfill, see Note 9.

1.5:1 Typ.

1.5:1 Typ.

3:1

3:1 1.7%0.5%

Tank overflow drain apron (62474)

Riprap

Existing ground

EL. 5417.4

0.5:1 Typ.

5.0' Typ.

Top of bedrock

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

A. Marner

A. Marner

K. Pelzer

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -2

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

A M

A R N

ER

¦D_DT¦

¦STATUS¦

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

S A N

J U

A N

L A

TE

R A L

W A

TE

R T

R

EA

TM

EN

T

PL

A N

T R

EG

U

LA

TI

N

G T

A N

K S

SITE AND

GRADING PLAN

SECTIONS

DENVER, CO

1695-D-60809

2026-05-18

NOTES

1. See (62474) for concrete tank overflow and drain apron information.

2. See 40-D-60002 for guard post details.

3. Line and curve table dimensions and bearings are labeled to the gravel yard extents. All linear measurement is in ground.

4. All control points are shown in New Mexico State Plane

Coordinate System, West Zone (NAD83) horizontal datum. A grid to ground scale factor of 1.000286319627 was used.

5. Contractor to verify existing grades and utilities prior to construction in accordance with the Specifications. Notify COR of any conflicts or discrepancies immediately.

6. Yard elevations are shown to top of gravel unless otherwise specified.

7. All vertical elevations are based on the NAVD88 vertical datum.

8. All contours shown are based off of lidar data provided by Atlantic and survey elevations provided by the Four Corners Construction Office.

9. Excavation and compacted backfill beneath the tank footprints shall extend to the surface of competent bedrock or at least 1 foot beneath the lowest foundation element, whichever is greater.

0 60'30'

PLAN - SAN JUAN LATERAL WATER TREATMENT PLANT REGULATING TANK SITE

ABBREVIATIONS

ME - Match existing HP - High point LP - Low point GB - Grade break FFE - Finished floor elevation FES - Flared end section TOB - Top of berm TOC - Top of concrete

SECTIONA HOR: 1" = 30' VERT: 1"= 6'

SECTIONB HOR: 1" = 30' VERT: 1"= 6'

SECTIOND HOR: 1" = 30' VERT: 1"= 6'

AL

W

AY

S

TH

IN

K

SA

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -1

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

A M

A R N

ER

¦D_DT¦

¦STATUS¦

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

LI

N

E

PI

PE

CONCRETE BLOCKED

MITER BENDS

DATA TABLES

DENVER, CO

1695-D-60810

2026-04-14

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

J. DEHAAN

M. SUTER

D. L. GESUNDHEIT

Marner, Andrew (Andy) J P.E.

Steen, Timothy M

* Concrete Block is required when restrained length 'W' is listed as N.A.

REACH 2 MITER BENDS

P.I. STATION TYPE OF

PLACEMENT

HEAD (ft) ANGLE DIRECTION D (IN)

MIN.

COVER

(FT)

L1 (FT) W (FT)

2002+23.34 ROCK 125 30° 0' 52" HORIZONTAL 48 10.8 10 2

2003+59.56 ROCK 125 73° 13' 38" HORIZONTAL 48 16.2 10 6

2006+38.32 NON ROCK 125 41° 19' 56" HORIZONTAL 48 9.3 10 5

2007+22.00 NON ROCK 125 9° 23' 37" CONVEX DOWN 48 9.8 10 1

2015+61.67 NON ROCK 150 46° 3' 32" HORIZONTAL 48 14.5 10 5

2020+61.81 NON ROCK 200 33° 45' 9" COMBINED 48 6.2 10 9

2025+24.48 ROCK 200 43° 38' 50" HORIZONTAL 48 9.4 10 5

2027+85.00 ROCK 200 10° 11' 6" CONVEX UP 48 6.9 10 5

2029+64.00 ROCK 200 13° 17' 23" CONVEX DOWN 48 12.7 10 2

2032+32.00 NON ROCK 200 9° 55' 5" CONVEX UP 48 6.9 10 6

2061+13.33 NON ROCK 275 40° 4' 59" HORIZONTAL 48 3.8 20 15

2067+65.12 ROCK 275 11° 19' 6" COMBINED 48 4.7 10 2

2071+00.00 ROCK 275 13° 53' 39" CONVEX UP 48 15.4 10 7

2072+00.00 NON ROCK 300 8° 38' 19" CONVEX DOWN 48 8.2 10 3

2076+81.69 NON ROCK 300 10° 31' 16" HORIZONTAL 48 5 10 4

2085+00.00 NON ROCK 300 10° 36' 1" HDD BEND 48 6.3 85 95

2095+00.00 NON ROCK 300 11° 12' 3" HDD BEND 48 8 75 84

2103+16.11 NON ROCK 300 30° 37' 46" HORIZONTAL 48 3.8 15 12

2109+56.30 NON ROCK 300 30° 27' 39" COMBINED 48 9 15 N.A.

2136+77.13 NON ROCK 350 40° 9' 56" COMBINED 48 7.3 20 17

2149+65.46 NON ROCK 350 17° 26' 52" HORIZONTAL 48 8.7 10 6

2153+60.95 NON ROCK 375 23° 5' 22" COMBINED 48 7.5 10 10

2156+30.42 NON ROCK 375 25° 47' 21" HORIZONTAL 48 5.4 15 14

2157+30.00 NON ROCK 375 7° 59' 1" HDD BEND 48 6.4 90 103

2180+40.00 NON ROCK 475 11° 8' 26" HDD BEND 48 7.1 110 134

2181+25.65 NON ROCK 475 33° 8' 24" HORIZONTAL 48 7.2 20 19

2186+30.47 NON ROCK 475 26° 45' 6" HORIZONTAL 48 6.8 20 16

2190+40.00 NON ROCK 475 8° 25' 35" CONVEX DOWN 48 9.2 10 4

2190+80.00 NON ROCK 475 8° 6' 7" CONVEX UP 48 3.7 25 26

2237+90.00 ROCK 175 10° 32' 5" HDD BEND 48 8 45 35

2239+75.00 ROCK 175 6° 51' 20" CONVEX DOWN 48 7.9 10 1

2241+30.74 ROCK 175 17° 35' 6" COMBINED 48 6.3 10 3

2244+92.00 ROCK 175 9° 4' 19" CONVEX DOWN 48 7.5 10 1

2252+06.00 ROCK 175 9° 35' 59" CONVEX DOWN 48 5.7 10 1

2253+37.00 ROCK 175 7° 47' 14" CONVEX UP 48 6.9 10 4

2255+90.00 ROCK 175 10° 43' 54" CONVEX DOWN 48 6.1 10 1

2257+40.00 ROCK 175 9° 38' 56" CONVEX UP 48 7.2 10 4

2260+02.54 ROCK 175 11° 28' 1" COMBINED 48 7.2 10 1

2270+90.00 ROCK 175 11° 30' 12" CONVEX UP 48 8.6 10 5

2271+94.00 ROCK 125 22° 12' 21" CONVEX DOWN 48 5.7 10 2

2273+45.00 ROCK 125 9° 7' 4" CONVEX UP 48 3.9 10 4

2279+39.00 ROCK 125 15° 55' 58" CONVEX DOWN 48 5.7 10 1

2280+10.00 ROCK 125 8° 51' 22" CONVEX UP 48 4 10 4

2281+75.00 ROCK 125 12° 25' 4" CONVEX UP 48 6.7 10 4

2282+37.00 ROCK 125 16° 38' 45" CONVEX DOWN 48 5.3 10 1

2286+97.94 ROCK 100 78° 53' 51" COMBINED 48 5.2 10 N.A.

REACH 3 MITER BENDS

P.I. STATION TYPE OF

PLACEMENT

HEAD (ft) ANGLE DIRECTION D (IN)

MIN.

COVER

(FT)

L1 (FT) W (FT)

3312+80.64 ROCK 100 11° 19' 51" COMBINED 48 9.2 10 2

3315+24.51 ROCK 100 10° 42' 48" COMBINED 48 5.9 10 2

3359+87.48 ROCK 175 12° 22' 51" COMBINED 48 4.1 10 2

3380+20.42 ROCK 200 11° 7' 20" HORIZONTAL 48 7.8 10 2

3381+96.42 ROCK 200 22° 30' 0" HORIZONTAL 48 8.7 10 3

3383+12.00 ROCK 200 22° 42' 3" HORIZONTAL 48 9.7 10 3

3397+02.88 ROCK 225 21° 1' 56" CONVEX UP 42 11.1 10 3

3412+40.00 ROCK 275 7° 45' 46" CONVEX DOWN 42 8.6 10 7

3413+00.00 ROCK 275 8° 12' 28" CONVEX UP 42 5.3 10 2

3416+50.00 ROCK 275 7° 8' 7" CONVEX DOWN 42 8.6 10 6

3417+55.00 ROCK 300 5° 28' 8" COMBINED 42 5.0 10 2

3427+70.15 NON ROCK 325 9° 50' 41" COMBINED 42 8.7 15 23

3432+28.00 NON ROCK 325 33° 23' 4" HORIZONTAL 42 7.9 10 8

3444+54.66 NON ROCK 325 10° 41' 57" HORIZONTAL 42 7.1 10 3

3462+58.22 ROCK 350 11° 15' 0" HORIZONTAL 42 5.5 10 3

3464+37.68 ROCK 350 11° 15' 0" HORIZONTAL 42 6.2 10 3

3466+37.73 ROCK 350 11° 15' 0" COMBINED 42 6.1 10 3

3468+17.19 ROCK 375 11° 15' 8" HORIZONTAL 42 5.5 10 3

3475+91.86 NON ROCK 375 33° 45' 0" HORIZONTAL 42 4.8 16 18

3491+13.37 NON ROCK 400 33° 45' 0" HORIZONTAL 42 5.7 15 16

3501+89.41 NON ROCK 400 21° 1' 44" CONVEX UP 42 6.0 10 10

3511+00.00 ROCK 425 12° 31' 55" CONVEX DOWN 42 7.6 10 16

3512+50.00 ROCK 425 5° 5' 50" COMBINED 42 4.5 10 2

3513+00.00 ROCK 425 17° 55' 52" CONVEX UP 42 7.1 10 4

3513+85.00 ROCK 425 15° 24' 35" CONVEX DOWN 42 8.5 10 18

3515+00.00 ROCK 425 9° 43' 39" CONVEX UP 42 14.6 10 2

3517+30.00 NON ROCK 425 12° 17' 11" HDD BEND 42 5.9 14 35

3536+13.00 NON ROCK 450 13° 12' 2" HDD BEND 42 20.7 10 8

3537+70.72 ROCK 450 66° 32' 48" COMBINED 42 15.2 10 14

3540+35.00 ROCK 425 12° 28' 58" CONVEX UP 42 14.1 11 9

3541+10.00 ROCK 425 5° 51' 57" COMBINED 42 14.0 11 2

3555+96.91 NON ROCK 425 29° 47' 39" HORIZONTAL 42 15.3 11 10

3558+02.40 NON ROCK 425 45° 0' 0" HORIZONTAL 42 16.3 14 14

3573+57.75 ROCK 375 27° 48' 9" CONVEX UP 42 4.8 10 6

3575+95.00 ROCK 375 5° 11' 10" CONVEX UP 42 3.6 10 9

3607+18.68 ROCK 325 40° 6' 7" COMBINED 42 7.3 10 7

3691+18.77 ROCK 350 12° 9' 59" HORIZONTAL 42 5.6 10 3

3707+56.91 ROCK 325 11° 33' 53" HORIZONTAL 42 4.1 10 2

3733+44.14 ROCK 300 9° 32' 0" COMBINED 42 7.4 10 2

3744+00.00 ROCK 300 10° 31' 50" COMBINED 42 5.3 10 2

R

EV

N O

¦R_DT¦ £RA£

D

U pd at ed m ite r be nd s to m at ch p ro fil es f or

R ea ch

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -1

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

A M

A R N

ER

¦D_DT¦

¦STATUS¦

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

R

EA

C H

L

IN

E

PI

PE

AUGER BORE

POWERLINE CROSSING

STA. 3331+13

DENVER, CO

1695-D-62467

2026-04-13

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

J. DeHaan

J. DeHaan

K. Pelzer

Marner, Andrew (Andy) J P.E.

Steen, Timothy M

R

EV

N O

¦R_DT¦ £RA£

D

C ha ng ed b or ed p ow er lin e cr os si ng t o op en c ut

AUGER BORE REMOVED

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -4

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

A M

A R N

ER

¦D_DT¦

¦STATUS¦

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

R

EA

C H

L

IN

E

PI

PE

AUGER BORE

POWERLINE CROSSING

STA. 3633+18

DENVER, CO

1695-D-62470

2026-04-13

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

J. DeHaan

J. DeHaan

K. Pelzer

Marner, Andrew (Andy) J P.E.

Steen, Timothy M

R

EV

N O

¦R_DT¦ £RA£

D

C ha ng ed b or ed p ow er lin e cr os si ng t o op en c ut

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -5

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

A M

A R N

ER

¦D_DT¦

¦STATUS¦

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

R

EA

C H

L

IN

E

PI

PE

AUGER BORE

POWERLINE CROSSING

STA. 3707+02

DENVER, CO

1695-D-62471

2026-04-13

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

J. DeHaan

J. DeHaan

K. Pelzer

Marner, Andrew (Andy) J P.E.

Steen, Timothy M

R

EV

N O

¦R_DT¦ £RA£

D

C ha ng ed b or ed p ow er lin e cr os si ng t o op en c ut

Sheets and Views
22 x 34
Updated 1695-D-62471-RD-5.PDF
Sheets and Views
22 x 34
Updated 1695-D-62470-RD-4.PDF
Sheets and Views
22 x 34
Updated 1695-D-62467-RD-1.PDF
Sheets and Views
22 x 34
Updated 1695-D-60810-RD-1.PDF
Sheets and Views
22 x 34
Updated 1695-D-60809-RD-2.PDF
Sheets and Views
60809
Updated 1695-D-60802-RD-1.PDF
Sheets and Views
22 x 34
Updated 1695-D-60794-RD-9.PDF
Sheets and Views
22 x 34
Updated 1695-D-60789-RD-7.PDF
Sheets and Views
22 x 34
Updated 1695-D-60788-RD-6.PDF
Sheets and Views
22 x 34

File details come from the government source that posted it. Updated .