This document is an amendment to a solicitation for the Navajo-Gallup Water Supply Project Pumping Plants 2 and 3. The amendment updates the Continuation of Section B to reflect the current New Mexico Gross Receipts Tax rate of 6.6250%. Price Schedule 1 includes estimated quantities and unit pricing for construction services and equipment required for Pumping Plant No. 2. Price Schedule 2 similarly includes estimated quantities and unit pricing for Pumping Plant No. 3. Required construction services and equipment include items such as concrete, steel, electrical systems, piping, valves, generators, security and fire systems. Offerors are to submit pricing for the total proposed price of each price schedule, less applicable taxes. The solicitation was issued by the Bureau of Reclamation with the Department of the Interior listed as the administering agency.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R4022R0010 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Salt Lake City UT 84138

R40

125 South State Street, Room 8100 Regional Office Upper Colorado Region Bureau of Reclamation

05/18/20220004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/28/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is issued to:

1. Update Continuation of Section B to update the New Mexico Gross Receipt Tax (NMGRT) to

6.6250%. Use the Continuation of Section B in this amendment for your pricing when you submit your proposal.

Legacy Doc #: BOR

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Ashton Jones

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation Document No.

140R4022R0010

Document Title

NGWSP PP 2 & 3

Continuation of Section B – Supplies or Services and Price

SECTIONB–SuppliesorServicesandPricesNavajo‐GallupWaterSupplyProjectSan
JuanLateralPumpingPlantsNo.2andNo.3NewMexico

PRICE SCHEDULES

Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only part of the Price Schedules.

Offers are subject to the terms and conditions of this solicitation.

Quantities in Price Schedules are estimated quantities for comparison of offers only. Except as provided in contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. Contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

See contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1-1 and 2-1.

Definitions:

CLIN – Contract Line Item Number

Note: In accordance with Section 7-9-3.3 of New Mexico Statutes Annotated (NMSA) 1978 and Section 402 of Navajo Nation’s Business Activity Tax Statute, it is Contractor’s responsibility to ensure that all applicable New Mexico Gross Receipts Tax and Navajo Nation Gross Receipts Tax are included in their price proposal.

In accordance with FAR 52.232-5 (Payments under Fixed-Price Construction Contracts) (b)(2), payment may be approved for materials delivered to Contractor at locations other than the site if Contractor obtains CO approval prior to making arrangements for obtaining the materials. Contractor shall also be required to complete a “Materials on Hand Certificate” which will certify:

Materials described for use on identified contract.

Materials are clearly marked to identify that they belong to contract cited.

Full title for those materials vested in Prime Contractor sited.

Materials are free of liens and encumbrances.

Materials are properly store, secured, and protected against loss or damage.

PRICE SCHEDULE 1 (Pumping Plant No. 2)

CLIN Section Supplies or Services Quantity and Unit

Unit Price Amount

1-1 WBR

1452.232-

Mobilization and Preparatory Work

For the lump sum of $

1-2 01 31 30 Contract Document Management System

For the lump sum of $

1-3 01 33 26 Electrical Drawings and Data For the lump sum of $

1-3A 01 51 00 Construction Temporary Electric Power months

1-3B 01 51 00 Testing and Commissioning Temporary Electric Power

6 months $ $

1-4 01 56 15 Underground Utility Line Investigations

For the lump sum of $

1-5 01 78 30 As-built and Final Drawings For the lump sum of $65,000

1-6 01 78 30 Operations and Maintenance (O&M) Manuals PP No. 2

For the lump sum of $260,000

1-7 01 80 15 Commissioning For the lump sum of $

1-8 03 20 00 Concrete Reinforcing 99,000 lb $ $

1-9 03 30 00 Concrete 740 yd3 $ $

1-10 03 35 10 Concrete Floor Hardener 6,400 ft2 $ $

1-11 03 48 00 Plant-Precast Concrete Structures For the lump sum of $

1-12 04 22 10 Reinforced Concrete Unit Masonry Assemblies

For the lump sum of $

1-13 05 50 00 Metal Fabrications For the lump sum of $

1-14 06 82 10 Fiberglass Reinforced Plastic (FRP) Fabrications

For the lump sum of $

1-15 07 19 20 Silane Water Repellent For the lump sum of $

Quantity and Unit

Unit Price Amount

1-16 10 14 00 Signage For the lump sum of $

1-17 10 44 20 Fire Extinguishers For the lump sum of $

1-18 10 51 00 Lockers For the lump sum of $

1-19 13 34 21 Metal Building System For the lump sum of $

1-20 21 22 00 Clean Agent Fire Extinguishing System

For the lump sum of $

1-21 22 13 16 Plant Piping Systems For the lump sum of $

1-22 22 14 30 Sump Pumping Systems For the lump sum of $

1-23 23 00 00 Heating, Ventilating, and Air- Conditioning (HVAC) System

For the lump sum of $

1-24 25 00 01 System Control and Monitoring For the lump sum of $

1-25 26 05 10 Conductors and Cables 23,000 lin ft

1-26 26 05 13 Medium-Voltage Power Cable 2,000 lin ft

1-27 26 05 13 Medium-Voltage Power Cable Accessories

For the lump sum of $

1-28 26 05 20 Ground Cable 1,200 lin ft

1-29 26 05 20 Ground Rods 11 each $ $

1-30 26 05 20 Electrical Ground Resistance Test For the lump sum of $

1-31 26 05 33 Electrical Conduit 4,000 lin ft

1-32 26 05 33 Fabricated Sheet Steel Boxes, Wiring Troughs, and Precast Handholes

Quantity and Unit

Unit Price Amount

1-33 26 05 36 Cable Trays 550 lin ft $ $

1-34 26 12 19 Pad Mounted Transformer For the lump sum of $

1-35 26 17 20 Metal-Clad Switchgear Assembly For the lump sum of $

1-36 26 18 39 Medium-Voltage Motor Controllers

For the lump sum of $

1-37 26 22 12 Dry-Type Transformer For the lump sum of $

1-38 26 24 13 Switchboards For the lump sum of $

1-39 26 24 41 Distribution Panelboards For the lump sum of $

1-40 26 26 10 Transformer Load Center For the lump sum of $

1-41 26 27 40 Wiring Devices For the lump sum of $

1-42 26 32 10 Diesel Engine-Generator Set (Pumping Plant No. 2)

For the lump sum of $

1-43 26 42 10 Corrosion Monitoring Systems For the lump sum of $

1-44 26 42 11 Submerged Galvanic Anode Cathodic Protection System for Welded Tanks

For the lump sum of $

1-45 26 51 00 Interior Lighting For the lump sum of $

1-46 26 52 00 Emergency and Exit Lighting For the lump sum of $

1-47 26 56 00 Exterior Lighting For the lump sum of $

1-48 27 30 01 Telephone System For the lump sum of $

1-49 28 10 01 Security and Surveillance System For the lump sum of $

1-50 28 31 00 Fire Detection and Alarm For the lump sum of $

1-51 31 02 10 Water for Dust Abatement 130 MGal $

Quantity and Unit

Unit Price Amount

1-52 31 02 30 Dust Palliative 4.6 Acre $ $

1-53 31 23 10 Common Excavation for Site and Structure Foundations

9,600 yd3 $ $

1-54 31 23 10 Rock Excavation for Site and Structure Foundations

1,750 yd3 $ $

1-55 31 23 10 Processing of Site and Foundation Materials

13,500 yd3

1-56 31 23 10 Compacted Backfill for Site and Structure Foundations

13,500 yd3

1-57 31 23 50 Earthwork for Roads 305 yd3 $ $

1-58 31 24 18 Gravel Drain Material for Water Storage Tanks

550 yd3 $ $

1-59 31 32 36 HDPE Geomembrane for Water Storage Tanks

950 yd2 $ $

1-60 31 37 00 Riprap 16 yd3 $ $

1-61 32 15 10 Gravel Surfacing 1,100 yd3 $ $

1-62 32 31 01 Fence Grounding For the lump sum of

1-63 32 31 10 Chain Link Fence 960 lin ft $

1-64 32 31 70 Cattle Guards 1 each $ $

1-65 32 91 60 Erosion Control Blanket 180 yd2 $ $

1-66 32 92 20 Seeding 2.9 Acre $ $

1-67 33 09 13 Pressure Differential Flowmeter Systems

For the lump sum of

Quantity and Unit

Unit Price Amount

1-68 33 11 15

PVC Pipe Drains for Water Storage Tanks

300 lin ft $

1-69 33 12 71 Vertical Pumping Units For the lump sum of

1-70 33 16 14 Air Chambers and Air Compressors

For the lump sum of $

1-71 33 16 40 Water Storage Tanks For the lump sum of $

1-72 35 21 95 Steel Manifold Piping For the lump sum of $

1-73 35 22 14 Valves and Equipment For the lump sum of $

1-74 46 33 00 Chlorine Residual Sample System For the lump sum of $

1-75 46 33 00 Mixers For the lump sum of $

Subtotal FOR PRICE SCHEDULE 1 $_________________

Estimated NMGRT at 6.6250% for Price Schedule 1 (if applicable) $_________________

Estimated Navajo Nation Taxes at 6.00% for Price Schedule 1 (if applicable) $_________________

TOTAL FOR PRICE SCHEDULE 1 $_________________

PRICE SCHEDULE 2 (Pumping Plant No. 3)

Quantity and Unit

Unit Price Amount

2-1

WBR

1452.232-

Mobilization and Preparatory Work

For the lump sum of $

2-2 01 31 30 Contract Document Management System

For the lump sum of $

2-3 01 33 26 Electrical Drawings and Data For the lump sum of $

2-3A 01 51 00 Construction Temporary Electric Power

36 months $ $

2-3B 01 51 00 Testing and Commissioning Temporary Electric Power

6 months $ $

2-4 01 56 15 Underground Utility Line Investigations

For the lump sum of $

2-5 01 78 30 As-built and Final Drawings For the lump sum of $65,000

2-6 01 78 30 Operations and Maintenance (O&M) Manuals PP No. 3

For the lump sum of $260,000

2-7 01 80 15 Commissioning For the lump sum of $

2-8 03 20 00 Concrete Reinforcing 105,000 lb $ $

2-9 03 30 00 Concrete 810 yd3 $ $

2-10 03 35 10 Concrete Floor Hardener 6,400 ft2 $ $

2-11 03 48 00 Plant-Precast Concrete Structures For the lump sum of $

2-12 04 22 10 Reinforced Concrete Unit Masonry Assemblies

For the lump sum of $

2-13 05 50 00 Metal Fabrications For the lump sum of $

2-14 06 82 10 Fiberglass Reinforced Plastic (FRP) Fabrications

For the lump sum of $

2-15 07 19 20 Silane Water Repellent For the lump sum of $

2-16 10 14 00 Signage For the lump sum of $

2-17 10 44 20 Fire Extinguishers For the lump sum of $

2-18 10 51 00 Lockers For the lump sum of $

2-19 13 34 21 Metal Building System For the lump sum of $

2-20 21 22 00 Clean Agent Fire Extinguishing Systems

Quantity and Unit

Unit Price Amount

2-21 22 13 16 Plant Piping Systems For the lump sum of $

2-22 22 14 30 Sump Pumping Systems For the lump sum of $

2-23 23 00 00 Heating, Ventilating, and Air- Conditioning (HVAC) System

For the lump sum of $

2-24 25 00 01 System Control and Monitoring For the lump sum of $

2-25 26 05 10 Conductors and Cables 26,000 lin ft

2-26 26 05 13 Medium-Voltage Power Cable 3,200 lin ft

2-27 26 05 13 Medium-Voltage Power Cable Accessories

For the lump sum of $

2-28 26 05 20 Ground Cable 1,600 lin ft

2-29 26 05 20 Ground Rods 13 each $ $

2-30 26 05 20 Electrical Ground Resistance Test For the lump sum of $

2-31 26 05 33 Electrical Conduit 6,400 lin ft

2-32 26 05 33 Fabricated Sheet Steel Boxes, Wiring Troughs, and Precast Handholes

For the lump sum of $

2-33 26 05 36 Cable Trays 550 lin ft $ $

2-34 26 12 19 Pad Mounted Transformer For the lump sum of $

2-35 26 17 20 Metal-Clad Switchgear Assembly For the lump sum of $

2-36 26 18 39 Medium-Voltage Motor Controllers

For the lump sum of $

2-37 26 22 12 Dry-Type Transformer For the lump sum of $

2-38 26 24 13 Switchboards For the lump sum of $

2-39 26 24 41 Distribution Panelboards For the lump sum of $

2-40 26 27 40 Wiring Devices For the lump sum of $

2-41 26 32 10 Diesel Engine-Generator Set at Pumping Plant No. 3

2-42 26 42 10 Corrosion Monitoring Systems For the lump sum of $

Quantity and Unit

Unit Price Amount

2-43 26 42 11 Submerged Galvanic Anode Cathodic Protection System for Welded Tanks

For the lump sum of $

2-44 26 51 00 Interior Lighting For the lump sum of $

2-45 26 52 00 Emergency and Exit Lighting For the lump sum of $

2-46 26 56 00 Exterior Lighting For the lump sum of $

2-47 27 30 01 Telephone System For the lump sum of $

2-48 28 10 01 Security and Surveillance System For the lump sum of $

2-49 28 31 00 Fire Detection and Alarm For the lump sum of $

2-50 31 02 10 Water for Dust Abatement 240 MGal $

2-51 31 02 30 Dust Palliative 8.7 Acre $ $

2-52 31 23 10 Common Excavation for Site and Structure Foundations

7,000 yd3 $ $

2-53 31 23 10 Rock Excavation for Site and Structure Foundations

24,000 yd3 $ $

2-54 31 23 10 Processing Site and Foundation Materials

15,500 yd3 $ $

2-55 31 23 10 Compacted Backfill for Site and Structure Foundations

15,500 yd3 $ $

2-56 31 23 50 Earthwork for Roads 2,650 yd3 $ $

2-57 31 24 18 Gravel Drain Material for Water Storage Tank

550 yd3 $ $

2-58 31 32 36 HDPE Geomembrane for Water Storage Tanks

950 yd2 $ $

2-59 31 37 00 Riprap 35 yd3 $ $ 2-60 32 15 10 Gravel Surfacing 2,400 yd3 $ $

2-61 32 31 01 Fence Grounding For the lump sum of

2-62 32 31 10 Chain Link Fence 1,300 lin ft $

2-63 32 91 60 Erosion Control Blanket 3,200 yd2 $ $

2-64 32 92 20 Seeding 5.4 Acre $ $

Quantity and Unit

Unit Price Amount

2-65 33 09 13 Pressure Differential Flowmeter Systems

For the lump sum of

2-66 33 11 15 PVC Pipe Drains for Water Storage Tanks

300 lin ft $

2-67 33 12 71 Vertical Pumping Units For the lump sum of $

2-68 33 16 14 Air Chambers and Air Compressors

For the lump sum of

2-69 33 16 40 Water Storage Tanks For the lump sum of $

2-70 33 42 30 24-Inch Diameter Corrugated Metal Pipe Culvert

80 lin ft $

2-71 35 21 95 Steel Manifold Piping For the lump sum of $

2-72 35 22 14 Valves and Equipment For the lump sum of

2-73 46 33 00 Mixers For the lump sum of $

Subtotal FOR PRICE SCHEDULE 2 $_________________

Estimated NMGRT at 6.6250% for Price Schedule 2 (if applicable) $_________________

Estimated Navajo Nation Taxes at 6.00% for Price Schedule 2 (if applicable) $_________________

TOTAL FOR PRICE SCHEDULE 2 $_________________

For Evaluation purposes only per solicitation Section M.2:

Total Proposed Price Schedule 1, less NMGRT and Navajo Nation Taxes $________________________

Total Proposed Price Schedule 2, less NMGRT and Navajo Nation Taxes $________________________

Total Evaluated Price $ ________________________

END OF SUPPLIES OR SERVICES AND PRICES