A7 Attachment 6 Revised Page 47_153-D-60047_0007.pdf
PDF 95 KB Posted
- Attached to
- Big Sandy Dam Reservoir Enlargement
- Solicitation number
- 140R4020R0015
About this file
This document contains engineering drawings and reinforcement details for a concrete inlet structure for the Big Sandy Dam Reservoir Enlargement project. Key details include reinforcement bar callouts and placement for the inlet structure walls, corbels, slabs, and wingwalls. Dimensions are provided for the inlet opening, reinforcement spacing, and concrete encased pipe diameter. The related solicitation is for the Big Sandy Dam Reservoir Enlargement project being conducted by the Bureau of Reclamation within the Department of the Interior. The solicitation number is 140R4020R0015.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8@
1-
8@
1-
Inlet, reinforcement symmetrical about
Corbel reinforcement not shown
#8
#8
0" (Typ.)
#6 tie
#8@6
#8@6
#8@6
#8@6
#8@6
#8@6 6"
6"
6"
6"
8@
1-
8@
1-
#8
#8 #8
#6 edge bar #6 tie #6 edge bar
#8
3"
#8@6
Inlet structure, reinforcement symmetrical about Wall reinforcement not shown
3-
8@ 1-nf
#8
3-
8@ 1-nf
#8
#8@6
#8 #8
#8@6 3"
#8@6
4-#8@6 ef
6"
4-#8@6 ef
4-#8@6 ef
6"
4-#8@6 ef
Inlet, reinforcement symmetrical about
4-#8@6 ef
4 1/4"
#6 Hoop ef
1'
4# 8@
1-nf
Wingwall reinforcement not shown
4-
8@ 1-nf
1'
8@ 1-nf
2-
8@ 1-nf
1'
2-
8@ 1-ff
1'
8@ 1-ff
1'
5-
8@ 1-ff
5-
8@ 1-ff
6"
4-#8@6 ef
4 1/4"
3"
6" PVC waterstop #6 Hoop ff
2 2
6"
#8@6 ff
#6 Hoop ff
8"
6"
Inlet headwall, reinforcement not shown
42" Dia. concrete encased pipe, see (60040)
El. 6766.82
OCJ
El. 6755.07
8@ 1-ef
8@ 1-ef
Corbel reinforcement not shown
Longitudinal slab reinforcement not shown
12-#8@1-0 ef
12-#8@1-0 ef
1' - 0"
1' - 0"
23-#8@6 ef
23-#8@6 ef
1' - 0"
5-#8@1-0 ef
1' - 0" 6-#8@1-0 ef
9"5 1/2"
8 7/8"5 1/2"
#6 edge bar ef
8"
D
C
B
D
C
B
A
RECLAMATION
Managing Water in the West
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
RI
O
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
ED
EN
P R
O
JE
C T
B
IG
S A
N D
Y D
A M
RE
SE
RV
O
IR
E
N
LA
RG
EM
EN
T
MICHAEL HIEBERT
MICHAEL HIEBERT
CARLY STARK
JONATHAN EAST, P.E.
WALTER HEYDER, P.E.
Peer Reviewer - WATERWAYS AND CONCRETE DAMS
GROUP 2
DENVER, CO 2019-03-21
FEEDER CANAL
HEADWORKS
INLET STRUCTURE
REINFORCEMENT
SECTIONS
153-D-60047
SHEET 3 OF 3
NOTES
1. For additional NOTES and REFERENCE DRAWINGS, see (60038).
60038
B SECTION
60038
D SECTION
60038
C SECTION
RE
V
N O
ST
A. D
-0
6-
Jo na th an
Ea st
,P .E
M ad e m in or ca llo ut ad ju st m en ts
RE
V
N O
ST
A. D
-1 0-
Jo na th an Ea st ,P
.E
Re vi s e d w at er st op an d re in fo rc em en t to a v oi d in te r f er en ce
Ad de d ho op to he ad w al l.
Ad de d
SE
CT
IO
N E, pr ev io us ly on
(6 an d ad de d di m en s i on fo r ho riz on ta lw in gw al l re in f o rc em en t .
JONATHAN EAST, P.E.
WALTER HEYDER, P.E.
60038
E ELEVATION - (WINGWALL REINFORCEMENT ONLY)
153-D-60047 ShtNo Rev2: 47
File details come from the government source that posted it. Updated .