A7 Attachment 2 Revised Page 37_153-D-60037_0007.pdf

PDF 28 KB Posted

Attached to
Big Sandy Dam Reservoir Enlargement
Solicitation number
140R4020R0015
Issued by

About this file

This drawing depicts the design of a feeder canal headworks structure. It shows the layout of a 42-inch diameter concrete encased HDPE pipe inlet, with a square slide gate and stem. Dimensions and elevations are provided for project elements including the inlet structure, backwall, guardrail, riprap, waterstops, and corbel. Notes indicate this is sheet 2 of 2 for the design, and revisions changed the inlet structure elevation and waterstop layout.

The related federal contract opportunity is a solicitation from the Department of the Interior Bureau of Reclamation for the Big Sandy Dam Reservoir Enlargement project. The solicitation number is 140R4020R0015 and it is seeking bids for construction of the reservoir enlargement. No further details are provided on response dates, pricing terms, set asides or other contract requirements.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5' - 0"

13' - 0"

1' - 7 1/4" 1' - 7 1/4" ø 42" 3"

42" Dia. concrete encased HDPE pipe, see (60040)

2' - 6"

El. 6766.82

El. 6755.07

Inlet structure, symmetrical about

42" Square slide gate and gate stem not shown, see (60062)

El. 6745.8

3"

6" PVC

waterstop

1'

1'

"Riprap not shown, see (60033)

Corbel

CJ CJ

Blockout for gate stem, see (60062)

Backwall

Upstream edge

0.5' Lean concrete not shown

Guardrail not shown

6" PVC

Waterstop

9"

2' - 6"

Spring line El. 6752.32

6" PVC

waterstop

6"

Ty p.

6"

Ty p.

1/

2"

D

C

B

D

C

B

A

RECLAMATION

Managing Water in the West

A

SA

FE

TY

AL

W

AY

S

TH

IN

K

BU

RE

AU

O

F

RE

CL

AM

AT

IO

N U

.S

D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

RI

O

R

DESIGNED

CHECKED

DRAWN

TECH. APPR.

APPROVED

ED

EN

P R

O

JE

C T

B

IG

S A

N D

Y D

A M

RE

SE

RV

O

IR

E

N

LA

RG

EM

EN

T

MICHAEL HIEBERT

MICHAEL HIEBERT

CARLY STARK

JONATHAN EAST, P.E.

WALTER HEYDER, P.E.

Peer Reviewer - WATERWAYS AND CONCRETE DAMS

GROUP 2

DENVER, CO 2019-03-11

FEEDER CANAL

HEADWORKS

ELEVATION

153-D-60037

0 1' 2' 4'60036

B ELEVATION

SHEET 2 OF 2

NOTES

1. For additional NOTES and REFERENCE DRAWINGS, see (60036).

RE

V

N O

ST

A. D

-0

6-

Jo na th an

Ea st

,P .E

Re vi s e d in le t s t ru ct ur e el ev at io n.

RE

V

N O

ST

A. D

-1

0-

Jo na th an

Ea st

,P .E

M od i fi ed w at e r st op la yo ut

JONATHAN EAST, P.E.

WALTER HEYDER, P.E.

153-D-60037 ShtNo Rev2: 37

File details come from the government source that posted it. Updated .