This drawing package is for a Feeder Canal Headworks Inlet Structure for the Big Sandy Dam Reservoir Enlargement project. The drawings show plans and sections for a concrete inlet structure with a 42-inch diameter HDPE pipe. Reinforcing details and references to other drawings are provided for items including the inlet headwall, concrete encasement for the pipe, slide gate, and pipe guardrail. The project is part of the Big Sandy Dam Reservoir Enlargement being conducted by the Bureau of Reclamation within the Department of the Interior. Solicitation 140R4020R0015 was issued for the overall project.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36' - 6"

Inlet headwall

0.5' Lean concrete

42" Dia. concrete encased HDPE pipe, see (60040)

Earthwork not shown, see (60033)

1' - 6"

El. 6750.32

El. 6766.82

0.5' Lean concrete

4'

1' - 6"

1'

El. 6750.07

Slope

6' - 0"

OCJ

El. 6755.07

Concrete blockout for slide gate, El. 6745.82

1'

6" a t St a.

.8

2:1

6" PVC Waterstop

A A

5'

36' - 6"

1' - 6"

Feeder Canal Headworks

42" Dia. concrete encased HDPE pipe, see (60040)

Riprap not shown, see (60033)

Symmetrical about

Feeder canal, Sta. 3+54.39

Feeder canal, Sta. 3+92.39

B

El. 6755.07 (Typ.)

OCJ

Pipe guardrail, see drawing 40-D-6592 for details.

Pipe guardrail

1' - 6"

6" PVC

waterstop

CJ

6" PVC

waterstop

CJ

Blockout for gate stem

1' - 6"

1'

6"

9" (T yp

3"

9"

Feeder canal, Sta. 3+55.89

El. 6766.82

9"

6" PVC Waterstop

42" Dia. concrete encased HDPE pipe, see (60040)

10"

El. 6750.32

Spring line, El. 6752.32

HDPE thrust restraint

Lean concrete

HDPE thrust restraint

Ct.J

4"

1' - 4"

Concrete blockout for 42" x 42" slide gate, see (60062)

Ct.J

6" PVC Waterstop

5/8"

1 3/8"

3"

1'

1' - 6"

Gate stem not shown, see (60062)

4" Dia. blockout for gate stem

OCJ

Dimension to be verified to fit gate stem, see (60062)

1'

D

C

B

D

C

B

A

RECLAMATION

Managing Water in the West

A

SA

FE

TY

AL

W

AY

S

TH

IN

K

BU

RE

AU

O

F

RE

CL

AM

AT

IO

N U

.S

D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

RI

O

R

DESIGNED

CHECKED

DRAWN

TECH. APPR.

APPROVED

ED

EN

P R

O

JE

C T

B

IG

S A

N D

Y D

A M

RE

SE

RV

O

IR

E

N

LA

RG

EM

EN

T

MICHAEL HIEBERT

MICHAEL HIEBERT

CARLY STARK

JONATHAN EAST, P.E.

WALTER HEYDER, P.E.

Peer Reviewer - WATERWAYS AND CONCRETE DAMS

GROUP 2

DENVER, CO 2019-03-11

FEEDER CANAL

HEADWORKS

INLET STRUCTURE PLAN

AND SECTIONS

153-D-60036

A SECTION

PLAN - INLET

ISOMETRIC

(NOT TO SCALE)

NOTES

REFERENCE DRAWINGS

1. For general notes for concrete outline and reinforcement, see 40-D-60003.

2. For minimum requirements for detailing reinforcement, see 40-D-60004 (Table 4.5-60).

3. Design of reinforcement is based on reinforcing steel having a minimum specified yield strength of 60,000 psi and having a minimum compressive strength of 4,500 psi @ 28 days.

4. Concrete reinforcement not shown, see (60038).

5. Chamfer all exposed edges 3/4" unless otherwise shown.

6. For general notes for pipe guardrail, see 40-D-6592.

7. Measurements between the HDPE pipe and surrounding concrete are taken from the outside pipe diameter.

FEEDER CANAL HEADWORKS EXCAVATION __________________________ 153-D-60032

FEEDER CANAL HEADWORKS BACKFILL _____________________________ 153-D-60033

FEEDER CANAL HEADWORKS PLAN AND PROFILE _____________________ 153-D-60035

FEEDER CANAL HEADWORKS INLET REINFORCEMENT __________________ 153-D-60038

FEEDER CANAL HEADWORKS CONDUIT PLAN AND SECTIONS ____________ 153-D-60040

FEEDER CANAL HEADWORKS 42"x42" SLIDE GATE ____________________ 153-D-60062

2'0 4' 8'

2'0 4' 8'

2 DETAIL

1 DETAIL

0 1' 2'

SHEET 1 OF 2

Corbel

Inlet headwall

(NOT TO SCALE)

RE

V

N O

ST

A. D

-0

6-

Jo na th an

Ea st

,P .E

Re vi s e d in le t s t ru ct ur e el ev at io n.

Ad ju st ed th ru s t re st ra in t th ic kn e s s an d lo c a tio n.

RE

V

N O

ST

A. D

-0

8-

Jo na th an

Ea st

,P .E

Re vi s e d gu ar d r ai lc en te rli ne di st a n ce fr om co rb e l fa ce to

3"

JONATHAN EAST, P.E.

WALTER HEYDER, P.E.

153-D-60036 ShtNo: 36

File details come from the government source that posted it. Updated .