A7 Attachment 3 Revised Page 38_153-D-60038_0007.pdf

PDF 69 KB Posted

Attached to
Big Sandy Dam Reservoir Enlargement
Solicitation number
140R4020R0015
Issued by

About this file

This document provides reinforcement plans and details for the feeder canal headworks inlet structure for the Big Sandy Dam Reservoir Enlargement project. The Bureau of Reclamation is soliciting bids under solicitation number 140R4020R0015 for construction of the feeder canal headworks inlet structure. The plans show slab and corbel reinforcement for the inlet structure, including both top and bottom reinforcement for the slab between the inlet structure and concrete encased HDPE pipe. Reinforcement is designed based on a minimum yield strength of 60,000 psi for reinforcing steel and a compressive strength of 4,500 psi for concrete at 28 days. The document references related drawings for general concrete notes, minimum detailing requirements, and plans/profiles of the feeder canal headworks and inlet structure.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D 60047

D 60047

B 60047

B 60047

C 60047

C 60047

Concrete encased HDPE pipe reinforcement not shown, see (60041)

Feeder canal, Sta. 3+54.39

Feeder canal, Sta. 3+92.39

Corbel reinforcement not shown

3"

3"

1' - 0"

#8

1' - 0"

#8

6"

6"

2-#8@1-0

1' - 0"

4-

8@

DETAIL 1

Inlet structure, reinforcement symmetrical about

CJ

CJ

OCJ

4-

8@

6"

6-#8@1-0

1' - 0"

29-#8@1-0

6-#8@1-0

1' - 0" 6"#8

E 60047

29-#8@1-0

6" 6"

3-

8@

3-

8@ 6 6"

8@

#8

8@

A 60039

A 60039

Concrete encased HDPE pipe reinforcement not shown, see (60041)

Feeder canal, Sta. 3+54.39

Feeder canal, Sta. 3+92.39

Corbel reinforcement not shown

3"

#8

1' - 0"

#8

6"

6"

1' - 0"

2-#8@1-0

7-

8@

CJ

CJ

OCJ

4-

8@

1' - 0"

6-#8@1-0

1' - 0"

29-#8@1-0

6-#8@1-0

1' - 0"

29-#8@1-0

Concrete blockout for slide gate

0"

0"

6"

8@

6"

4-

8@

6"

Inlet structure reinforcement, symmetrical about

8@

60039

60039

Inlet headwall reinforcement not shown

4" blockout for gate stem

1'

1/ 4"

3-

6@ 1-

3"

4"3" 2-#6@1-0 bf *

#6 bf

#6 tf

4"3"

Inlet wingwall reinforcement not shown

CJ

CJ

OCJ

3" 4-#6@9 tf

6"

3-

6@ 1-

D

C

B

D

C

B

A

RECLAMATION

Managing Water in the West

A

SA

FE

TY

AL

W

AY

S

TH

IN

K

BU

RE

AU

O

F

RE

CL

AM

AT

IO

N U

.S

D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

RI

O

R

DESIGNED

CHECKED

DRAWN

TECH. APPR.

APPROVED

ED

EN

P R

O

JE

C T

B

IG

S A

N D

Y D

A M

RE

SE

RV

O

IR

E

N

LA

RG

EM

EN

T

MICHAEL HIEBERT

MICHAEL HIEBERT

CARLY STARK

JONATHAN EAST, P.E.

WALTER HEYDER, P.E.

Peer Reviewer - WATERWAYS AND CONCRETE DAMS

GROUP 2

DENVER, CO 2019-03-21

FEEDER CANAL

HEADWORKS

INLET STRUCTURE

REINFORCEMENT PLANS

AND DETAIL

153-D-60038

ISOMETRIC - (NOT TO SCALE)

NOTES

REFERENCE DRAWINGS

1. For general notes for concrete outline and reinforcement, see 40-D-60003.

2. For minimum requirements for detailing reinforcement, see 40-D-60004

(Table 4.5-60).

3. Design of reinforcement is based on reinforcing steel having a minimum specified yield strength of 60,000 psi and having a minimum compressive strength of 4,500 psi @ 28 days.

4. Chamfer all exposed edges 3/4" unless otherwise shown.

5. * Indicates measurement taken along slope.

6. Waterstop, guardrail, and gate features not shown unless noted otherwise.

FEEDER CANAL HEADWORKS PLAN AND PROFILE _________________________ 153-D-60035

FEEDER CANAL HEADWORKS INLET STRUCTURE PLAN AND SECTIONS ________ 153-D-60036

FEEDER CANAL HEADWORKS CONDUIT REINFORCEMENT___________________ 153-D-60041

SHEET 1 OF 3

PLAN - (SHOWING SLAB REINFORCEMENT - BOTTOM FACE ONLY)

PLAN - (SHOWING SLAB REINFORCEMENT - TOP FACE ONLY)

2 DETAIL - (CORBEL REINFORCEMENT)1

RE

V

N O

ST

A. D

-0

6-

Jo na th an

Ea st

,P .E

M ad e m in or ca llo ut ad ju st m en ts

RE

V

N O

ST

A. D

-1 0-

Jo na th an Ea st ,P

.E

M od i fi ed to p a n d bo tt om fa ce sl a b re in f o rc em en t fo r w at er st op be tw ee n in le t st ru c t ur e an d co nc re te en ca se d H

D

PE

pi pe

JONATHAN EAST, P.E.

WALTER HEYDER, P.E.

153-D-60038 ShtNo Rev2: 38

File details come from the government source that posted it. Updated .