This pricing schedule outlines the janitorial services required for facilities at the Grand Coulee Dam in Washington state over a four year period. The schedule provides item numbers, descriptions, quantities, units, and pricing for over 150 line items across four option years. Services include cleaning various buildings in the industrial and power plant areas totaling over 1 million square feet, as well as visitor centers, offices, restrooms, and grounds. The related federal contract opportunity is solicitation number 140R1723R0002 issued by the Department of the Interior Bureau of Reclamation seeking proposals for janitorial services at the Grand Coulee Dam location. The anticipated contract period is one base year with four optional consecutive one-year extensions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R1723R0002_Amd_0008.pdf | ||
| Sol_140R1723R0002_Amd_0007.pdf | ||
| Sol_140R1723R0002_Amd_0006.pdf | ||
| Sol_140R1723R0002_Amd_0005.pdf | ||
| Sol_140R1723R0002_Amd_0004.pdf | ||
| Sol_140R1723R0002_Amd_0003.pdf | ||
| 2023-2028_CBA_Agreement_-_Signed_0003.pdf | ||
| Sol_140R1723R0002_Amd_0002.pdf | ||
| Attachment_-_Past_Performance_Questionnaire_0002.docx | DOCX document | |
| Sol_140R1723R0002_Amd_0001.pdf | ||
| 2__Pricing_Schedule_0001.xlsx | XLSX spreadsheet | |
| WD_2015-5541_Jul_27_2023_Rev_20.pdf | ||
| 3__Floor_Mat_Chart.xlsx | XLSX spreadsheet | |
| Sol_140R1723R0002.pdf | ||
| 1__Cleaning_Schedule.xlsx | XLSX spreadsheet | |
| WD_2015-5557_Jul_27_2023_Rev_22.pdf | ||
| WD_2015-5559_Jul_27_2023_Rev_20.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| Janitorial Services Base Year | |||||
| Item No. | Description | Quantity | Unit | Unit Price | Amount |
| Industrial Area | $ | $ | |||
| Administration Building | 12 | MO | $ | $ | |
| Procurement/Property Office Building | 12 | MO | $ | $ | |
| Security/Dispatch Building | 12 | MO | $ | $ | |
| Warehouse A & B Offices & Restrooms | 12 | MO | $ | $ | |
| Machine Shops, Industrial Area | $ | $ | |||
| Machine Shop, Restroom, Corridor, Stairs, Lunch Room, & Kitchen (Fabrication) | 12 | MO | $ | $ | |
| Machine Shop Addition | 12 | MO | $ | $ | |
| Boilermaker Shop | 12 | MO | $ | $ | |
| Pipe Shop Industrial Area | 12 | MO | $ | $ | |
| Sheet Metal Shop Industrial Area | 12 | MO | $ | $ | |
| Shop Area | 12 | MO | $ | $ | |
| Restroom, Office, & Locker Rooms | 12 | MO | $ | $ | |
| Mechanical Repair Shop, Office, & Restrooms (Vehicles) | 12 | MO | $ | $ | |
| Assembly Building | 12 | MO | $ | $ | |
| Driller's Office & Restrooms | 12 | MO | $ | $ | |
| Labors & Carpenter Shop | 12 | MO | $ | $ | |
| Labors Quarters, Industrial Area Office Lunch Room & Restroom | 12 | MO | $ | $ | |
| Carpenter Shop & Work Area | 12 | MO | $ | $ | |
| Paint Shop (Warehouse III) | 12 | MO | $ | $ | |
| Visitor Arrival Center | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Left Powerplant | $ | $ | |||
| Control Bay | 12 | MO | $ | $ | |
| Service Bay | 12 | MO | $ | $ | |
| Power Plant | 12 | MO | $ | $ | |
| Pump Generating Plant | |||||
| Pump/Generating Plant & Office Wing | 12 | MO | $ | $ | |
| Pump Generating Plant Tourist Facilities | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Right Powerplant | $ | $ | |||
| Control Bay | 12 | MO | $ | $ | |
| Service Bay | 12 | MO | $ | $ | |
| Power Plant | 12 | MO | $ | $ | |
| Third Powerplant | 12 | MO | $ | $ | |
| Third Powerplant Tourist Facilities | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Main Dam | $ | $ | |||
| Block 84 Elevator, Tower & Landings May Through September | 5 | MO | $ | $ | |
| Block 84 Elevator, Tower & Landings October Through April | 7 | MO | $ | $ | |
| Elevator & Tower- Blocks 11,31,64,119 ,& 12 | 12 | MO | $ | $ | |
| Block 54 Restrooms | 12 | MO | $ | $ | |
| Field Office: One Trailer | 12 | MO | $ | $ | |
| Engineering & Construction Building | 12 | MO | $ | $ | |
| Switchyards | $ | $ | |||
| Switchyards: 115-Kv, 230-Kv, 500-Kv | 12 | MO | $ | $ | |
| 230-Kv Relay House | 12 | MO | $ | $ | |
| Tourist Facilities Comfort Station | $ | $ | |||
| April Through September | 6 | MO | $ | $ | |
| Litter Removal | $ | $ | |||
| May Through October (Summer) | 6 | MO | $ | $ | |
| November Through April (Winter) | 6 | MO | $ | $ | |
| Permanent Outstations (10) | $ | $ | |||
| 7 Cleaned Once per Week | 12 | MO | $ | $ | |
| 2 Cleaned Twice a Week | 12 | MO | $ | $ | |
| Magnetometer. Building, November 1st through February 28/29th | 4 | MO | $ | $ | |
| Magnetometer. Building, March 1st through October 31st | 8 | MO | $ | $ | |
| Fire Station | $ | $ | |||
| First Floor | 12 | MO | $ | $ | |
| Second Floor | 12 | MO | $ | $ | |
| Shooting Range | $ | $ | |||
| Shooting Range Classroom Trailers (3 Ea) | 12 | MO | $ | $ | |
| Restroom/Shower Trailer April - November | 8 | MO | $ | $ | |
| Restroom/Shower Trailer December - March | 4 | MO | $ | $ | |
| Entry Rugs | $ | $ | |||
| 3'x4" Floor Mats | 1 | Lump Sum | $ | $ | |
| 4'x6' Floor Mats | 1 | Lump Sum | $ | $ | |
| Windows, Exterior & Interior | 3 | Per Yr. | $ | $ | |
| Strip and Wax Quarterly | 4 | Per Yr. | $ | $ | |
| Strip and Wax Semi-Annual | 2 | Per Yr. | $ | $ |
Option Year One
| Janitorial Services Option Year One | |||||
| Item No. | Description | Quantity | Unit | Unit Price | Amount |
| Industrial Area | $ | $ | |||
| Administration Building | 12 | MO | $ | $ | |
| Procurement/Property Office Building | 12 | MO | $ | $ | |
| Security/Dispatch Building | 12 | MO | $ | $ | |
| Warehouse A & B Offices & Restrooms | 12 | MO | $ | $ | |
| Machine Shops, Industrial Area | $ | $ | |||
| Machine Shop, Restroom, Corridor, Stairs, Lunch Room, & Kitchen (Fabrication) | 12 | MO | $ | $ | |
| Machine Shop Addition | 12 | MO | $ | $ | |
| Boilermaker Shop | 12 | MO | $ | $ | |
| Pipe Shop Industrial Area | 12 | MO | $ | $ | |
| Sheet Metal Shop Industrial Area | 12 | MO | $ | $ | |
| Shop Area | 12 | MO | $ | $ | |
| Restroom, Office, & Locker Rooms | 12 | MO | $ | $ | |
| Mechanical Repair Shop, Office, & Restrooms (Vehicles) | 12 | MO | $ | $ | |
| Assembly Building | 12 | MO | $ | $ | |
| Driller's Office & Restrooms | 12 | MO | $ | $ | |
| Labors & Carpenter Shop | 12 | MO | $ | $ | |
| Labors Quarters, Industrial Area Office Lunch Room & Restroom | 12 | MO | $ | $ | |
| Carpenter Shop & Work Area | 12 | MO | $ | $ | |
| Paint Shop (Warehouse III) | 12 | MO | $ | $ | |
| Visitor Arrival Center | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Left Powerplant | $ | $ | |||
| Control Bay | 12 | MO | $ | $ | |
| Service Bay | 12 | MO | $ | $ | |
| Power Plant | 12 | MO | $ | $ | |
| Pump Generating Plant | |||||
| Pump/Generating Plant & Office Wing | 12 | MO | $ | $ | |
| Pump Generating Plant Tourist Facilities | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Right Powerplant | $ | $ | |||
| Control Bay | 12 | MO | $ | $ | |
| Service Bay | 12 | MO | $ | $ | |
| Power Plant | 12 | MO | $ | $ | |
| Third Powerplant | 12 | MO | $ | $ | |
| Third Powerplant Tourist Facilities | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Main Dam | $ | $ | |||
| Block 84 Elevator, Tower & Landings May Through September | 5 | MO | $ | $ | |
| Block 84 Elevator, Tower & Landings October Through April | 7 | MO | $ | $ | |
| Elevator & Tower- Blocks 11,31,64,119 ,& 12 | 12 | MO | $ | $ | |
| Block 54 Restrooms | 12 | MO | $ | $ | |
| Field Office: One Trailer | 12 | MO | $ | $ | |
| Engineering & Construction Building | 12 | MO | $ | $ | |
| Switchyards | $ | $ | |||
| Switchyards: 115-Kv, 230-Kv, 500-Kv | 12 | MO | $ | $ | |
| 230-Kv Relay House | 12 | MO | $ | $ | |
| Tourist Facilities Comfort Station | $ | $ | |||
| April Through September | 6 | MO | $ | $ | |
| Litter Removal | $ | $ | |||
| May Through October (Summer) | 6 | MO | $ | $ | |
| November Through April (Winter) | 6 | MO | $ | $ | |
| Permanent Outstations (10) | $ | $ | |||
| 7 Cleaned Once per Week | 12 | MO | $ | $ | |
| 2 Cleaned Twice a Week | 12 | MO | $ | $ | |
| Magnetometer. Building, November 1st through February 28/29th | 4 | MO | $ | $ | |
| Magnetometer. Building, March 1st through October 31st | 8 | MO | $ | $ | |
| Fire Station | $ | $ | |||
| First Floor | 12 | MO | $ | $ | |
| Second Floor | 12 | MO | $ | $ | |
| Shooting Range | $ | $ | |||
| Shooting Range Classroom Trailers (3 Ea) | 12 | MO | $ | $ | |
| Restroom/Shower Trailer April - November | 8 | MO | $ | $ | |
| Restroom/Shower Trailer December - March | 4 | MO | $ | $ | |
| Entry Rugs | $ | $ | |||
| 3'x4" Floor Mats | 1 | Lump Sum | $ | $ | |
| 4'x6' Floor Mats | 1 | Lump Sum | $ | $ | |
| Windows, Exterior & Interior | 3 | Per Yr. | $ | $ | |
| Strip and Wax Quarterly | 4 | Per Yr. | $ | $ | |
| Strip and Wax Semi-Annual | 2 | Per Yr. | $ | $ |
Option Year Two
| Janitorial Services Option Year Two | |||||
| Item No. | Description | Quantity | Unit | Unit Price | Amount |
| Industrial Area | $ | $ | |||
| Administration Building | 12 | MO | $ | $ | |
| Procurement/Property Office Building | 12 | MO | $ | $ | |
| Security/Dispatch Building | 12 | MO | $ | $ | |
| Warehouse A & B Offices & Restrooms | 12 | MO | $ | $ | |
| Machine Shops, Industrial Area | $ | $ | |||
| Machine Shop, Restroom, Corridor, Stairs, Lunch Room, & Kitchen (Fabrication) | 12 | MO | $ | $ | |
| Machine Shop Addition | 12 | MO | $ | $ | |
| Boilermaker Shop | 12 | MO | $ | $ | |
| Pipe Shop Industrial Area | 12 | MO | $ | $ | |
| Sheet Metal Shop Industrial Area | 12 | MO | $ | $ | |
| Shop Area | 12 | MO | $ | $ | |
| Restroom, Office, & Locker Rooms | 12 | MO | $ | $ | |
| Mechanical Repair Shop, Office, & Restrooms (Vehicles) | 12 | MO | $ | $ | |
| Assembly Building | 12 | MO | $ | $ | |
| Driller's Office & Restrooms | 12 | MO | $ | $ | |
| Labors & Carpenter Shop | 12 | MO | $ | $ | |
| Labors Quarters, Industrial Area Office Lunch Room & Restroom | 12 | MO | $ | $ | |
| Carpenter Shop & Work Area | 12 | MO | $ | $ | |
| Paint Shop (Warehouse III) | 12 | MO | $ | $ | |
| Visitor Arrival Center | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Left Powerplant | $ | $ | |||
| Control Bay | 12 | MO | $ | $ | |
| Service Bay | 12 | MO | $ | $ | |
| Power Plant | 12 | MO | $ | $ | |
| Pump Generating Plant | |||||
| Pump/Generating Plant & Office Wing | 12 | MO | $ | $ | |
| Pump Generating Plant Tourist Facilities | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Right Powerplant | $ | $ | |||
| Control Bay | 12 | MO | $ | $ | |
| Service Bay | 12 | MO | $ | $ | |
| Power Plant | 12 | MO | $ | $ | |
| Third Powerplant | 12 | MO | $ | $ | |
| Third Powerplant Tourist Facilities | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Main Dam | $ | $ | |||
| Block 84 Elevator, Tower & Landings May Through September | 5 | MO | $ | $ | |
| Block 84 Elevator, Tower & Landings October Through April | 7 | MO | $ | $ | |
| Elevator & Tower- Blocks 11,31,64,119 ,& 12 | 12 | MO | $ | $ | |
| Block 54 Restrooms | 12 | MO | $ | $ | |
| Field Office: One Trailer | 12 | MO | $ | $ | |
| Engineering & Construction Building | 12 | MO | $ | $ | |
| Switchyards | $ | $ | |||
| Switchyards: 115-Kv, 230-Kv, 500-Kv | 12 | MO | $ | $ | |
| 230-Kv Relay House | 12 | MO | $ | $ | |
| Tourist Facilities Comfort Station | $ | $ | |||
| April Through September | 6 | MO | $ | $ | |
| Litter Removal | $ | $ | |||
| May Through October (Summer) | 6 | MO | $ | $ | |
| November Through April (Winter) | 6 | MO | $ | $ | |
| Permanent Outstations (10) | $ | $ | |||
| 7 Cleaned Once per Week | 12 | MO | $ | $ | |
| 2 Cleaned Twice a Week | 12 | MO | $ | $ | |
| Magnetometer. Building, November 1st through February 28/29th | 4 | MO | $ | $ | |
| Magnetometer. Building, March 1st through October 31st | 8 | MO | $ | $ | |
| Fire Station | $ | $ | |||
| First Floor | 12 | MO | $ | $ | |
| Second Floor | 12 | MO | $ | $ | |
| Shooting Range | $ | $ | |||
| Shooting Range Classroom Trailers (3 Ea) | 12 | MO | $ | $ | |
| Restroom/Shower Trailer April - November | 8 | MO | $ | $ | |
| Restroom/Shower Trailer December - March | 4 | MO | $ | $ | |
| Entry Rugs | $ | $ | |||
| 3'x4" Floor Mats | 1 | Lump Sum | $ | $ | |
| 4'x6' Floor Mats | 1 | Lump Sum | $ | $ | |
| Windows, Exterior & Interior | 3 | Per Yr. | $ | $ | |
| Strip and Wax Quarterly | 4 | Per Yr. | $ | $ | |
| Strip and Wax Semi-Annual | 2 | Per Yr. | $ | $ |
Option Year Three
| Janitorial Services Option Year Three | |||||
| Item No. | Description | Quantity | Unit | Unit Price | Amount |
| Industrial Area | $ | $ | |||
| Administration Building | 12 | MO | $ | $ | |
| Procurement/Property Office Building | 12 | MO | $ | $ | |
| Security/Dispatch Building | 12 | MO | $ | $ | |
| Warehouse A & B Offices & Restrooms | 12 | MO | $ | $ | |
| Machine Shops, Industrial Area | $ | $ | |||
| Machine Shop, Restroom, Corridor, Stairs, Lunch Room, & Kitchen (Fabrication) | 12 | MO | $ | $ | |
| Machine Shop Addition | 12 | MO | $ | $ | |
| Boilermaker Shop | 12 | MO | $ | $ | |
| Pipe Shop Industrial Area | 12 | MO | $ | $ | |
| Sheet Metal Shop Industrial Area | 12 | MO | $ | $ | |
| Shop Area | 12 | MO | $ | $ | |
| Restroom, Office, & Locker Rooms | 12 | MO | $ | $ | |
| Mechanical Repair Shop, Office, & Restrooms (Vehicles) | 12 | MO | $ | $ | |
| Assembly Building | 12 | MO | $ | $ | |
| Driller's Office & Restrooms | 12 | MO | $ | $ | |
| Labors & Carpenter Shop | 12 | MO | $ | $ | |
| Labors Quarters, Industrial Area Office Lunch Room & Restroom | 12 | MO | $ | $ | |
| Carpenter Shop & Work Area | 12 | MO | $ | $ | |
| Paint Shop (Warehouse III) | 12 | MO | $ | $ | |
| Visitor Arrival Center | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Left Powerplant | $ | $ | |||
| Control Bay | 12 | MO | $ | $ | |
| Service Bay | 12 | MO | $ | $ | |
| Power Plant | 12 | MO | $ | $ | |
| Pump Generating Plant | |||||
| Pump/Generating Plant & Office Wing | 12 | MO | $ | $ | |
| Pump Generating Plant Tourist Facilities | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Right Powerplant | $ | $ | |||
| Control Bay | 12 | MO | $ | $ | |
| Service Bay | 12 | MO | $ | $ | |
| Power Plant | 12 | MO | $ | $ | |
| Third Powerplant | 12 | MO | $ | $ | |
| Third Powerplant Tourist Facilities | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Main Dam | $ | $ | |||
| Block 84 Elevator, Tower & Landings May Through September | 5 | MO | $ | $ | |
| Block 84 Elevator, Tower & Landings October Through April | 7 | MO | $ | $ | |
| Elevator & Tower- Blocks 11,31,64,119 ,& 12 | 12 | MO | $ | $ | |
| Block 54 Restrooms | 12 | MO | $ | $ | |
| Field Office: One Trailer | 12 | MO | $ | $ | |
| Engineering & Construction Building | 12 | MO | $ | $ | |
| Switchyards | $ | $ | |||
| Switchyards: 115-Kv, 230-Kv, 500-Kv | 12 | MO | $ | $ | |
| 230-Kv Relay House | 12 | MO | $ | $ | |
| Tourist Facilities Comfort Station | $ | $ | |||
| April Through September | 6 | MO | $ | $ | |
| Litter Removal | $ | $ | |||
| May Through October (Summer) | 6 | MO | $ | $ | |
| November Through April (Winter) | 6 | MO | $ | $ | |
| Permanent Outstations (10) | $ | $ | |||
| 7 Cleaned Once per Week | 12 | MO | $ | $ | |
| 2 Cleaned Twice a Week | 12 | MO | $ | $ | |
| Magnetometer. Building, November 1st through February 28/29th | 4 | MO | $ | $ | |
| Magnetometer. Building, March 1st through October 31st | 8 | MO | $ | $ | |
| Fire Station | $ | $ | |||
| First Floor | 12 | MO | $ | $ | |
| Second Floor | 12 | MO | $ | $ | |
| Shooting Range | $ | $ | |||
| Shooting Range Classroom Trailers (3 Ea) | 12 | MO | $ | $ | |
| Restroom/Shower Trailer April - November | 8 | MO | $ | $ | |
| Restroom/Shower Trailer December - March | 4 | MO | $ | $ | |
| Entry Rugs | $ | $ | |||
| 3'x4" Floor Mats | 1 | Lump Sum | $ | $ | |
| 4'x6' Floor Mats | 1 | Lump Sum | $ | $ | |
| Windows, Exterior & Interior | 3 | Per Yr. | $ | $ | |
| Strip and Wax Quarterly | 4 | Per Yr. | $ | $ | |
| Strip and Wax Semi-Annual | 2 | Per Yr. | $ | $ |
Option Year Four
| Janitorial Services Option Year Four | |||||
| Item No. | Description | Quantity | Unit | Unit Price | Amount |
| Industrial Area | $ | $ | |||
| Administration Building | 12 | MO | $ | $ | |
| Procurement/Property Office Building | 12 | MO | $ | $ | |
| Security/Dispatch Building | 12 | MO | $ | $ | |
| Warehouse A & B Offices & Restrooms | 12 | MO | $ | $ | |
| Machine Shops, Industrial Area | $ | $ | |||
| Machine Shop, Restroom, Corridor, Stairs, Lunch Room, & Kitchen (Fabrication) | 12 | MO | $ | $ | |
| Machine Shop Addition | 12 | MO | $ | $ | |
| Boilermaker Shop | 12 | MO | $ | $ | |
| Pipe Shop Industrial Area | 12 | MO | $ | $ | |
| Sheet Metal Shop Industrial Area | 12 | MO | $ | $ | |
| Shop Area | 12 | MO | $ | $ | |
| Restroom, Office, & Locker Rooms | 12 | MO | $ | $ | |
| Mechanical Repair Shop, Office, & Restrooms (Vehicles) | 12 | MO | $ | $ | |
| Assembly Building | 12 | MO | $ | $ | |
| Driller's Office & Restrooms | 12 | MO | $ | $ | |
| Labors & Carpenter Shop | 12 | MO | $ | $ | |
| Labors Quarters, Industrial Area Office Lunch Room & Restroom | 12 | MO | $ | $ | |
| Carpenter Shop & Work Area | 12 | MO | $ | $ | |
| Paint Shop (Warehouse III) | 12 | MO | $ | $ | |
| Visitor Arrival Center | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Left Powerplant | $ | $ | |||
| Control Bay | 12 | MO | $ | $ | |
| Service Bay | 12 | MO | $ | $ | |
| Power Plant | 12 | MO | $ | $ | |
| Pump Generating Plant | |||||
| Pump/Generating Plant & Office Wing | 12 | MO | $ | $ | |
| Pump Generating Plant Tourist Facilities | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Right Powerplant | $ | $ | |||
| Control Bay | 12 | MO | $ | $ | |
| Service Bay | 12 | MO | $ | $ | |
| Power Plant | 12 | MO | $ | $ | |
| Third Powerplant | 12 | MO | $ | $ | |
| Third Powerplant Tourist Facilities | $ | $ | |||
| May Through September (Summer) | 5 | MO | $ | $ | |
| October Through April (Winter) | 7 | MO | $ | $ | |
| Main Dam | $ | $ | |||
| Block 84 Elevator, Tower & Landings May Through September | 5 | MO | $ | $ | |
| Block 84 Elevator, Tower & Landings October Through April | 7 | MO | $ | $ | |
| Elevator & Tower- Blocks 11,31,64,119 ,& 12 | 12 | MO | $ | $ | |
| Block 54 Restrooms | 12 | MO | $ | $ | |
| Field Office: One Trailer | 12 | MO | $ | $ | |
| Engineering & Construction Building | 12 | MO | $ | $ | |
| Switchyards | $ | $ | |||
| Switchyards: 115-Kv, 230-Kv, 500-Kv | 12 | MO | $ | $ | |
| 230-Kv Relay House | 12 | MO | $ | $ | |
| Tourist Facilities Comfort Station | $ | $ | |||
| April Through September | 6 | MO | $ | $ | |
| Litter Removal | $ | $ | |||
| May Through October (Summer) | 6 | MO | $ | $ | |
| November Through April (Winter) | 6 | MO | $ | $ | |
| Permanent Outstations (10) | $ | $ | |||
| 7 Cleaned Once per Week | 12 | MO | $ | $ | |
| 2 Cleaned Twice a Week | 12 | MO | $ | $ | |
| Magnetometer. Building, November 1st through February 28/29th | 4 | MO | $ | $ | |
| Magnetometer. Building, March 1st through October 31st | 8 | MO | $ | $ | |
| Fire Station | $ | $ | |||
| First Floor | 12 | MO | $ | $ | |
| Second Floor | 12 | MO | $ | $ | |
| Shooting Range | $ | $ | |||
| Shooting Range Classroom Trailers (3 Ea) | 12 | MO | $ | $ | |
| Restroom/Shower Trailer April - November | 8 | MO | $ | $ | |
| Restroom/Shower Trailer December - March | 4 | MO | $ | $ | |
| Entry Rugs | $ | $ | |||
| 3'x4" Floor Mats | 1 | Lump Sum | $ | $ | |
| 4'x6' Floor Mats | 1 | Lump Sum | $ | $ | |
| Windows, Exterior & Interior | 3 | Per Yr. | $ | $ | |
| Strip and Wax Quarterly | 4 | Per Yr. | $ | $ | |
| Strip and Wax Semi-Annual | 2 | Per Yr. | $ | $ |