2__Pricing_Schedule_0008.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
Janitorial Services for Grand Coulee Dam, WA
Solicitation number
140R1723R0002
Issued by

About this file

This pricing schedule outlines the janitorial services required for facilities at the Grand Coulee Dam in Washington state over a four year period. The schedule provides item numbers, descriptions, quantities, units, and pricing for over 150 line items across four option years. Services include cleaning various buildings in the industrial and power plant areas totaling over 1 million square feet, as well as visitor centers, offices, restrooms, and grounds. The related federal contract opportunity is solicitation number 140R1723R0002 issued by the Department of the Interior Bureau of Reclamation seeking proposals for janitorial services at the Grand Coulee Dam location. The anticipated contract period is one base year with four optional consecutive one-year extensions.

View the file

Other files

File Type Posted
Sol_140R1723R0002_Amd_0008.pdf PDF
Sol_140R1723R0002_Amd_0007.pdf PDF
Sol_140R1723R0002_Amd_0006.pdf PDF
Sol_140R1723R0002_Amd_0005.pdf PDF
Sol_140R1723R0002_Amd_0004.pdf PDF
Sol_140R1723R0002_Amd_0003.pdf PDF
2023-2028_CBA_Agreement_-_Signed_0003.pdf PDF
Sol_140R1723R0002_Amd_0002.pdf PDF
Attachment_-_Past_Performance_Questionnaire_0002.docx DOCX document
Sol_140R1723R0002_Amd_0001.pdf PDF
2__Pricing_Schedule_0001.xlsx XLSX spreadsheet
WD_2015-5541_Jul_27_2023_Rev_20.pdf PDF
3__Floor_Mat_Chart.xlsx XLSX spreadsheet
Sol_140R1723R0002.pdf PDF
1__Cleaning_Schedule.xlsx XLSX spreadsheet
WD_2015-5557_Jul_27_2023_Rev_22.pdf PDF
WD_2015-5559_Jul_27_2023_Rev_20.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

Janitorial Services Base Year
Item No.DescriptionQuantityUnitUnit PriceAmount
Industrial Area$$
Administration Building12MO$$
Procurement/Property Office Building12MO$$
Security/Dispatch Building12MO$$
Warehouse A & B Offices & Restrooms12MO$$
Machine Shops, Industrial Area$$
Machine Shop, Restroom, Corridor, Stairs, Lunch Room, & Kitchen (Fabrication)12MO$$
Machine Shop Addition12MO$$
Boilermaker Shop12MO$$
Pipe Shop Industrial Area12MO$$
Sheet Metal Shop Industrial Area12MO$$
Shop Area12MO$$
Restroom, Office, & Locker Rooms12MO$$
Mechanical Repair Shop, Office, & Restrooms (Vehicles)12MO$$
Assembly Building12MO$$
Driller's Office & Restrooms12MO$$
Labors & Carpenter Shop12MO$$
Labors Quarters, Industrial Area Office Lunch Room & Restroom12MO$$
Carpenter Shop & Work Area12MO$$
Paint Shop (Warehouse III)12MO$$
Visitor Arrival Center$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Left Powerplant$$
Control Bay12MO$$
Service Bay12MO$$
Power Plant12MO$$
Pump Generating Plant
Pump/Generating Plant & Office Wing12MO$$
Pump Generating Plant Tourist Facilities$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Right Powerplant$$
Control Bay12MO$$
Service Bay12MO$$
Power Plant12MO$$
Third Powerplant12MO$$
Third Powerplant Tourist Facilities$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Main Dam$$
Block 84 Elevator, Tower & Landings May Through September5MO$$
Block 84 Elevator, Tower & Landings October Through April7MO$$
Elevator & Tower- Blocks 11,31,64,119 ,& 1212MO$$
Block 54 Restrooms12MO$$
Field Office: One Trailer12MO$$
Engineering & Construction Building12MO$$
Switchyards$$
Switchyards: 115-Kv, 230-Kv, 500-Kv12MO$$
230-Kv Relay House12MO$$
Tourist Facilities Comfort Station$$
April Through September6MO$$
Litter Removal$$
May Through October (Summer)6MO$$
November Through April (Winter)6MO$$
Permanent Outstations (10)$$
7 Cleaned Once per Week12MO$$
2 Cleaned Twice a Week12MO$$
Magnetometer. Building, November 1st through February 28/29th4MO$$
Magnetometer. Building, March 1st through October 31st8MO$$
Fire Station$$
First Floor12MO$$
Second Floor12MO$$
Shooting Range$$
Shooting Range Classroom Trailers (3 Ea)12MO$$
Restroom/Shower Trailer April - November8MO$$
Restroom/Shower Trailer December - March4MO$$
Entry Rugs$$
3'x4" Floor Mats1Lump Sum$$
4'x6' Floor Mats1Lump Sum$$
Windows, Exterior & Interior3Per Yr.$$
Strip and Wax Quarterly4Per Yr.$$
Strip and Wax Semi-Annual2Per Yr.$$

Option Year One

Janitorial Services Option Year One
Item No.DescriptionQuantityUnitUnit PriceAmount
Industrial Area$$
Administration Building12MO$$
Procurement/Property Office Building12MO$$
Security/Dispatch Building12MO$$
Warehouse A & B Offices & Restrooms12MO$$
Machine Shops, Industrial Area$$
Machine Shop, Restroom, Corridor, Stairs, Lunch Room, & Kitchen (Fabrication)12MO$$
Machine Shop Addition12MO$$
Boilermaker Shop12MO$$
Pipe Shop Industrial Area12MO$$
Sheet Metal Shop Industrial Area12MO$$
Shop Area12MO$$
Restroom, Office, & Locker Rooms12MO$$
Mechanical Repair Shop, Office, & Restrooms (Vehicles)12MO$$
Assembly Building12MO$$
Driller's Office & Restrooms12MO$$
Labors & Carpenter Shop12MO$$
Labors Quarters, Industrial Area Office Lunch Room & Restroom12MO$$
Carpenter Shop & Work Area12MO$$
Paint Shop (Warehouse III)12MO$$
Visitor Arrival Center$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Left Powerplant$$
Control Bay12MO$$
Service Bay12MO$$
Power Plant12MO$$
Pump Generating Plant
Pump/Generating Plant & Office Wing12MO$$
Pump Generating Plant Tourist Facilities$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Right Powerplant$$
Control Bay12MO$$
Service Bay12MO$$
Power Plant12MO$$
Third Powerplant12MO$$
Third Powerplant Tourist Facilities$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Main Dam$$
Block 84 Elevator, Tower & Landings May Through September5MO$$
Block 84 Elevator, Tower & Landings October Through April7MO$$
Elevator & Tower- Blocks 11,31,64,119 ,& 1212MO$$
Block 54 Restrooms12MO$$
Field Office: One Trailer12MO$$
Engineering & Construction Building12MO$$
Switchyards$$
Switchyards: 115-Kv, 230-Kv, 500-Kv12MO$$
230-Kv Relay House12MO$$
Tourist Facilities Comfort Station$$
April Through September6MO$$
Litter Removal$$
May Through October (Summer)6MO$$
November Through April (Winter)6MO$$
Permanent Outstations (10)$$
7 Cleaned Once per Week12MO$$
2 Cleaned Twice a Week12MO$$
Magnetometer. Building, November 1st through February 28/29th4MO$$
Magnetometer. Building, March 1st through October 31st8MO$$
Fire Station$$
First Floor12MO$$
Second Floor12MO$$
Shooting Range$$
Shooting Range Classroom Trailers (3 Ea)12MO$$
Restroom/Shower Trailer April - November8MO$$
Restroom/Shower Trailer December - March4MO$$
Entry Rugs$$
3'x4" Floor Mats1Lump Sum$$
4'x6' Floor Mats1Lump Sum$$
Windows, Exterior & Interior3Per Yr.$$
Strip and Wax Quarterly4Per Yr.$$
Strip and Wax Semi-Annual2Per Yr.$$

Option Year Two

Janitorial Services Option Year Two
Item No.DescriptionQuantityUnitUnit PriceAmount
Industrial Area$$
Administration Building12MO$$
Procurement/Property Office Building12MO$$
Security/Dispatch Building12MO$$
Warehouse A & B Offices & Restrooms12MO$$
Machine Shops, Industrial Area$$
Machine Shop, Restroom, Corridor, Stairs, Lunch Room, & Kitchen (Fabrication)12MO$$
Machine Shop Addition12MO$$
Boilermaker Shop12MO$$
Pipe Shop Industrial Area12MO$$
Sheet Metal Shop Industrial Area12MO$$
Shop Area12MO$$
Restroom, Office, & Locker Rooms12MO$$
Mechanical Repair Shop, Office, & Restrooms (Vehicles)12MO$$
Assembly Building12MO$$
Driller's Office & Restrooms12MO$$
Labors & Carpenter Shop12MO$$
Labors Quarters, Industrial Area Office Lunch Room & Restroom12MO$$
Carpenter Shop & Work Area12MO$$
Paint Shop (Warehouse III)12MO$$
Visitor Arrival Center$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Left Powerplant$$
Control Bay12MO$$
Service Bay12MO$$
Power Plant12MO$$
Pump Generating Plant
Pump/Generating Plant & Office Wing12MO$$
Pump Generating Plant Tourist Facilities$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Right Powerplant$$
Control Bay12MO$$
Service Bay12MO$$
Power Plant12MO$$
Third Powerplant12MO$$
Third Powerplant Tourist Facilities$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Main Dam$$
Block 84 Elevator, Tower & Landings May Through September5MO$$
Block 84 Elevator, Tower & Landings October Through April7MO$$
Elevator & Tower- Blocks 11,31,64,119 ,& 1212MO$$
Block 54 Restrooms12MO$$
Field Office: One Trailer12MO$$
Engineering & Construction Building12MO$$
Switchyards$$
Switchyards: 115-Kv, 230-Kv, 500-Kv12MO$$
230-Kv Relay House12MO$$
Tourist Facilities Comfort Station$$
April Through September6MO$$
Litter Removal$$
May Through October (Summer)6MO$$
November Through April (Winter)6MO$$
Permanent Outstations (10)$$
7 Cleaned Once per Week12MO$$
2 Cleaned Twice a Week12MO$$
Magnetometer. Building, November 1st through February 28/29th4MO$$
Magnetometer. Building, March 1st through October 31st8MO$$
Fire Station$$
First Floor12MO$$
Second Floor12MO$$
Shooting Range$$
Shooting Range Classroom Trailers (3 Ea)12MO$$
Restroom/Shower Trailer April - November8MO$$
Restroom/Shower Trailer December - March4MO$$
Entry Rugs$$
3'x4" Floor Mats1Lump Sum$$
4'x6' Floor Mats1Lump Sum$$
Windows, Exterior & Interior3Per Yr.$$
Strip and Wax Quarterly4Per Yr.$$
Strip and Wax Semi-Annual2Per Yr.$$

Option Year Three

Janitorial Services Option Year Three
Item No.DescriptionQuantityUnitUnit PriceAmount
Industrial Area$$
Administration Building12MO$$
Procurement/Property Office Building12MO$$
Security/Dispatch Building12MO$$
Warehouse A & B Offices & Restrooms12MO$$
Machine Shops, Industrial Area$$
Machine Shop, Restroom, Corridor, Stairs, Lunch Room, & Kitchen (Fabrication)12MO$$
Machine Shop Addition12MO$$
Boilermaker Shop12MO$$
Pipe Shop Industrial Area12MO$$
Sheet Metal Shop Industrial Area12MO$$
Shop Area12MO$$
Restroom, Office, & Locker Rooms12MO$$
Mechanical Repair Shop, Office, & Restrooms (Vehicles)12MO$$
Assembly Building12MO$$
Driller's Office & Restrooms12MO$$
Labors & Carpenter Shop12MO$$
Labors Quarters, Industrial Area Office Lunch Room & Restroom12MO$$
Carpenter Shop & Work Area12MO$$
Paint Shop (Warehouse III)12MO$$
Visitor Arrival Center$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Left Powerplant$$
Control Bay12MO$$
Service Bay12MO$$
Power Plant12MO$$
Pump Generating Plant
Pump/Generating Plant & Office Wing12MO$$
Pump Generating Plant Tourist Facilities$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Right Powerplant$$
Control Bay12MO$$
Service Bay12MO$$
Power Plant12MO$$
Third Powerplant12MO$$
Third Powerplant Tourist Facilities$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Main Dam$$
Block 84 Elevator, Tower & Landings May Through September5MO$$
Block 84 Elevator, Tower & Landings October Through April7MO$$
Elevator & Tower- Blocks 11,31,64,119 ,& 1212MO$$
Block 54 Restrooms12MO$$
Field Office: One Trailer12MO$$
Engineering & Construction Building12MO$$
Switchyards$$
Switchyards: 115-Kv, 230-Kv, 500-Kv12MO$$
230-Kv Relay House12MO$$
Tourist Facilities Comfort Station$$
April Through September6MO$$
Litter Removal$$
May Through October (Summer)6MO$$
November Through April (Winter)6MO$$
Permanent Outstations (10)$$
7 Cleaned Once per Week12MO$$
2 Cleaned Twice a Week12MO$$
Magnetometer. Building, November 1st through February 28/29th4MO$$
Magnetometer. Building, March 1st through October 31st8MO$$
Fire Station$$
First Floor12MO$$
Second Floor12MO$$
Shooting Range$$
Shooting Range Classroom Trailers (3 Ea)12MO$$
Restroom/Shower Trailer April - November8MO$$
Restroom/Shower Trailer December - March4MO$$
Entry Rugs$$
3'x4" Floor Mats1Lump Sum$$
4'x6' Floor Mats1Lump Sum$$
Windows, Exterior & Interior3Per Yr.$$
Strip and Wax Quarterly4Per Yr.$$
Strip and Wax Semi-Annual2Per Yr.$$

Option Year Four

Janitorial Services Option Year Four
Item No.DescriptionQuantityUnitUnit PriceAmount
Industrial Area$$
Administration Building12MO$$
Procurement/Property Office Building12MO$$
Security/Dispatch Building12MO$$
Warehouse A & B Offices & Restrooms12MO$$
Machine Shops, Industrial Area$$
Machine Shop, Restroom, Corridor, Stairs, Lunch Room, & Kitchen (Fabrication)12MO$$
Machine Shop Addition12MO$$
Boilermaker Shop12MO$$
Pipe Shop Industrial Area12MO$$
Sheet Metal Shop Industrial Area12MO$$
Shop Area12MO$$
Restroom, Office, & Locker Rooms12MO$$
Mechanical Repair Shop, Office, & Restrooms (Vehicles)12MO$$
Assembly Building12MO$$
Driller's Office & Restrooms12MO$$
Labors & Carpenter Shop12MO$$
Labors Quarters, Industrial Area Office Lunch Room & Restroom12MO$$
Carpenter Shop & Work Area12MO$$
Paint Shop (Warehouse III)12MO$$
Visitor Arrival Center$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Left Powerplant$$
Control Bay12MO$$
Service Bay12MO$$
Power Plant12MO$$
Pump Generating Plant
Pump/Generating Plant & Office Wing12MO$$
Pump Generating Plant Tourist Facilities$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Right Powerplant$$
Control Bay12MO$$
Service Bay12MO$$
Power Plant12MO$$
Third Powerplant12MO$$
Third Powerplant Tourist Facilities$$
May Through September (Summer)5MO$$
October Through April (Winter)7MO$$
Main Dam$$
Block 84 Elevator, Tower & Landings May Through September5MO$$
Block 84 Elevator, Tower & Landings October Through April7MO$$
Elevator & Tower- Blocks 11,31,64,119 ,& 1212MO$$
Block 54 Restrooms12MO$$
Field Office: One Trailer12MO$$
Engineering & Construction Building12MO$$
Switchyards$$
Switchyards: 115-Kv, 230-Kv, 500-Kv12MO$$
230-Kv Relay House12MO$$
Tourist Facilities Comfort Station$$
April Through September6MO$$
Litter Removal$$
May Through October (Summer)6MO$$
November Through April (Winter)6MO$$
Permanent Outstations (10)$$
7 Cleaned Once per Week12MO$$
2 Cleaned Twice a Week12MO$$
Magnetometer. Building, November 1st through February 28/29th4MO$$
Magnetometer. Building, March 1st through October 31st8MO$$
Fire Station$$
First Floor12MO$$
Second Floor12MO$$
Shooting Range$$
Shooting Range Classroom Trailers (3 Ea)12MO$$
Restroom/Shower Trailer April - November8MO$$
Restroom/Shower Trailer December - March4MO$$
Entry Rugs$$
3'x4" Floor Mats1Lump Sum$$
4'x6' Floor Mats1Lump Sum$$
Windows, Exterior & Interior3Per Yr.$$
Strip and Wax Quarterly4Per Yr.$$
Strip and Wax Semi-Annual2Per Yr.$$

File details come from the government source that posted it. Updated .