This is a Statement of Work for portable toilet placement and service at Zion National Park, effective January 1, 2027 through December 31, 2031 (base year plus four option years). The National Park Service seeks a contractor to furnish all labor, materials, supplies, and parts to maintain portable toilet facilities in high visitor use areas, supplementing existing restroom facilities to accommodate millions of annual visitors.
The contractor must deliver and maintain portable toilets in safe, clean, sanitary condition at designated locations throughout Washington County, with units meeting a minimum 60-gallon capacity requirement. Core requirements include interior sanitization with disinfectant at each service, dual toilet paper dispensers and wall-mounted waterless hand soap dispensers stocked during each service, pumping and servicing per standard commercial practices and specified frequency, graffiti removal within 24 hours of notification, replacement of damaged units within 24 hours, quarterly reporting of gallons removed by month, and compliance with all OSHA standards and NPS safety protocols. The contractor must provide a Safety Plan and Spill Plan for park review post-award. Specific service frequencies and unit quantities vary by location and month as detailed in the attached Monthly Price Schedule. Emergency services are authorized under separate CLINs (0011–0051 for base year through option year four) with 24-hour response requirements for emergency placements and emergency servicing approved by the Contracting Officer or Contracting Officer Representative. Monthly invoicing must be submitted as a pencil copy to the Contracting Officer's Representative (Matthew MacKay) for approval before submission through the Integrated Procurement Platform. The contract includes a transition period from award through December 31, 2026, allowing the incoming contractor to place units before the January 1, 2027 operational start date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140PP027Q0019_Amd_0003.pdf | ||
| Monthly_Pricing_Schedule_11_18_2026_0003.xlsx | XLSX spreadsheet | |
| Portable_Toilet_Map_(1)_0003.png | PNG image | |
| MASTER_Q_A_11_18_2026_0003.xlsx | XLSX spreadsheet | |
| Sol_140PP027Q0019_Amd_0002.pdf | ||
| A04_-_Revised_Statement_of_Work_0002.docx | DOCX document | |
| Attachment_4_-_Monthly_Price_Schedule_0002.xlsx | XLSX spreadsheet | |
| MASTER_Q_A_0002.xlsx | XLSX spreadsheet | |
| Sol_140PP027Q0019_Amd_0001.pdf | ||
| Attachment_3_-_Q_A_Document.xlsx | XLSX spreadsheet | |
| Attachment_2_-_Applicable_Wage_Determinations.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| Attachment_5_-_Subcontracting_Worksheet.docx | DOCX document | |
| Sol_140PP027Q0019.pdf | ||
| Attachment_4_-_Monthly_Price_Schedule.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Portable Toilet Placement and Service
ZION NATIONAL PARK
November 18, 2026
1. INTRODUCTION:
The National Park Service has a need to place and service temporary toilet facilities in high visitor use areas to supplement existing restroom facilities. The contractor shall furnish all labor, materials, supplies, and parts to maintain portable toilets in a safe operating condition and in accordance with the specifications outlined in this Statement of Work (SOW).
2. BACKGROUND:
Zion National Park provides access to millions of visitors each year. Due to the ever-increasing number of visitors, it is necessary to supplement existing toilet facilities with portable toilets. This will ensure the health, safety, and enjoyment of the Parks visitors.
3. SPECIFIC TASKS OR REQUIREMENTS:
1) Furnish all labor, materials, and supplies to maintain portable toilets in a safe operating condition and in accordance with the following specifications. Skilled, trained personnel shall be used by the awardee of this contract and supervised by the contractor
2) Maintain the units in a clean, orderly, and sanitary manner.
3) Graffiti or other surface markings shall be removed within 24 hours of notification to the contractor. If markings are identified by the Contractor before the government, the Contractor shall notify the COR of the discovery whereby the government will direct the contractor to remove the markings, thereby starting the 24 hour response window.
4) Units shall be free of litter and routinely maintained.
5) Interior surfaces shall be wiped down and sanitized with a disinfectant cleaning product with every service.
6) Units shall be equipped with dual toilet paper dispensers which shall be adequately stocked with each service.
7) Units shall be equipped with wall-mounted waterless hand soap dispensers and shall be adequately stocked with each service.
8) Pumping and servicing of units will be scheduled to maintain the health and safety of the user, per standard commercial practices/frequency. (See reporting requirements in Paragraph 11 below).
9) Damaged or deficient units shall be replaced within 24 hours, at the direction of the CO. If damaged or deficient units are discovered by the contractor, the contractor shall notify the COR/CO whereby the government will direct the contractor to replace the unit, thereby starting the 24 hour replacement window.
10) Conduct regular inspections and maintenance to ensure units are in good working condition.
11) Contractor shall provide a quarterly report indicating “gallons removed, per month.” The Report shall be submitted to the COR and CO on 1 April, 1 July, 1 October, and 1 January of the Base and each exercised Option period thereafter. The means and methods of counting/tracking gallons removed is based on the “means and methods” of the contractor. The NPS has need/interest in cataloging this data for future “long term” solutions to the restroom issues at ZION.
12) Contractor shall provide for visitor safety and adhere to all OSHA Standards throughout the performance of the contract.
13) Contractor shall provide a Safety Plan for all operations and a Spill Plan to be reviewed by Park Safety Officer after award of the contract.
14) Report any conditions requiring work outside the scope of this contract to the Park COR.
15) Quantity of Portable Toilets needed, and locations may vary, according to Park’s needs. In the event additional quantities are required, the CO will exercise the Increased Quantities Clause and modify the contract to reflect the need for additional units not otherwise included in the Monthly Price Schedule. (See Section 5 below regarding emergency services, which are not part of this section of the SOW and do not fall under the Increased Quantities Clause authority).
4. PERFORMANCE REQUIREMENTS:
Contractor shall perform all work to include rental, delivery, routine pumping, cleaning, supplies, waste disposal, and removal of portable toilets to/from designated locations.
Septic pumping/cleaning is not a part of this contract.
All units shall be delivered and maintained in full operational condition.
The name of the portable toilet supplier/servicer shall be displayed on each unit.
Each unit has a minimum 60 gallon requirement, units delivered below this requirement will not be accepted.
ADA accessible toilets are not required.
Handwashing stations are not required.
5. EMERGENCY OPERATIONS (CLINS 0011, 0021, 0031, 0041, and 0051) During performance of this contract, the NPS may require the contractor to perform emergency services, which will include:
a. Emergency Placement. The NPS will provide the contractor with a request for emergency unit placement, which will include the specific location of the required unit, in writing.
The contractor shall deliver the unit(s) within 24 hours of receipt of the written notice for emergency placement.
Emergency Placement shall be billed against the Emergency NTE CLIN’s at the rate established in the Monthly Price Schedule incorporated into the award, depending on the current year of service:
CLIN 0011 – Base Year Emergency Work CLIN 0021 – Option Year 1 Emergency Work CLIN 0031 – Option Year 2 Emergency Work CLIN 0041 – Option Year 3 Emergency Work CLIN 0051 – Option year 4 Emergency Work
Note: The associated routine maintenance costs of any Emergency Placement unit must be modified into the contract, via a Request for Equitable Adjustment. The contractor is not required to service emergency placement units until such modification or verbal direction from the CO, is made part of the contract.
b. Emergency Services. The NPS will provide the contractor with a request for Emergency Service for any on-site units that require immediate servicing outside the scope of routine maintenance. This requirement can be initiated by either party (Government or Contractor) but must be approved by the Contracting Officer or Contracting Officer Representative, in writing, prior to executing such services.
Emergency Services shall take place within 24 hours of receipt of a written Notice to Proceed which may come from either the CO or the COR.
Emergency Services shall be billed against the Emergency NTE CLIN’s at the rate established in the Monthly Price Schedule incorporated into the award, depending on the current year of service (0011 for Base, 0021 for Option Year 1, etc).
c. Weeping Rock Location: The government anticipates renovations of the Comfort Station at Weeping Rock within FY27 and will require “emergency placement/removal” of additional units at the site to supplement the out of service Station during renovations. The government will issue a request for delivery once the construction dates are known. The contractor may provide and invoice for these units under the applicable Emergency CLIN (0011, 0021, 0031, 0041, or 0051).
6. GOVERNMENT FURNISHED PROPERTY (GFP):
No Government furnished property will be provided.
The Government will not provide any utilities under this contract, to include electrical, water, communications systems, or otherwise. It is the contractor’s responsibility to provide all required utilities under this contract effort using their own “means and methods.”
7. DELIVERABLE REQUIREMENTS:
Toilets shall be delivered to the locations noted within the Pricing Sheet at the quantities listed therein. Any quantities listed with “0” units may be required IAW Emergency Placement terms and conditions, as stated in Section 5 above.
8. SECURITY:
Access passes may be issued by the NPS, post-award to more easily access areas typically limited by park fees. Contractors do NOT have to pay any Park fees in the execution of this contract.
9. SAFETY:
Safety is an extremely important value of NPS and all efforts regarding NPS’ safety and Contractor safety is expected.
Contractor is required to meet or exceed all OSHA regulations. Failure to comply with OSHA regulations may result in removal from the jobsite and subsequent disqualification from performing deliveries at any NPS’ site.
NPS’ sites are designated as NON-SMOKING.
Contractor is required to notify the NPS’ Tactical Security Operations Supervisor and the Safety and Health Department of all incidents (as described below), including minor incidents, occurring in the course of performing any NPS’ deliveries whether on NPS’ premises or any other location. Contractor will use Contractor’s own safety reporting protocol.
Contractor must complete an incident investigation in accordance with the Contractor written policy to identify the cause(s) and any action needed to prevent recurrence. Initial findings shall be provided to the park within 24 hours of incident with final report provided within ten (10) calendar days. Joint incident investigations with Contractors’ Safety Representative may be required when deemed necessary by NPS’ Safety & Health Office.
Hazards identified by the contractor that are within the control of NPS shall be reported to the NPS’ Safety & Health Office and the PM immediately. These hazards will be investigated, and corrective measures taken, when appropriate.
NPS’ Safety and Health Department requires notification immediately (no later than 3 hours) following any incident resulting in the following:
· Any incident requiring the call and dispatching of emergency services
· Death
· Hospitalization (contractor employee, subcontractor, public, etc.)
· Damage to any vehicle which renders it inoperable
· Amputation of any body part
· Electrical Contact
· Fire or Arc Blast
· Injury resulting in an unconscious employee
· Safety system failures (slings breaking, support structures collapse, etc.)
· Near miss that could have reasonably resulted in any of the above.
Contractor shall also be responsible for ensuring that contract personnel adhere to any and all health and safety protocols that may be in place.
10. PERIOD AND PLACE OF PERFORMANCE:
1) This contract is for a base period of January 1, 2027 through December 31, 2027 and four option years with period of performance from January 1 through December 31 of each year. Total Period of Performance is January1, 2027 through December 31, 2031.
| 2) Place of performance is as follows: | Zion National Park | ||
| State Route 9 | |||
| Springdale, Utah 84767 |
UNIT LOCATIONS & QUANTITIES
See attached Monthly Quote Schedule.xlsx and annotated map(s), for locations and quantities.
Note: Work under this contract takes place under Washington County only.
11. REPORTS:
See Section V (Specific Tasks and Requirements) and Section VI (Performance Requirements) above.
12. NPS SPECIFIC SOW REQUIREMENTS:
The Contracting Officer is the duly appointed government representative, subject to their individual warranting levels, authorized to execute and administer this contract. Certain duties are delegable. Delegated duties will be identified in writing to the contractor prior to start of the contract. The primary delegation made will be to a “COR” or Contracting Officer’s Representative. Other authorities will be communicated prior to start of performance.
13. ADDITIONAL REQUIREMENTS:
CONTRACT ADMINISTRATION DATA
The Contracting Officer's Representative (COR) for this project is:
Matthew MacKay, National Park Service, Zion National Park Highway 9 Springdale, Utah 84767-1099 Telephone: (435) 772-0207.
The Contracting Officer for this project is:
Cole Johnson, CONOPS Central, National Park Service, DOI Cole_Johnson@ios.doi.gov
SPECIAL CONTRACT REQUIREMENTS Technical Direction
1) The COR will provide technical direction on contract performance. Technical direction includes:
| (a). Guidance to the Contractor which assists in accomplishing the Scope of Work. |
| (b). Comments on an approval of reports or other deliverables. |
2) Technical guidance from the COR will remain within the contract Scope of Work. The COR does not have the authority to issue technical direction which (1) institutes additional work outside the scope of the contract; (2) constitutes a change as defined in the "Changes" clause; (3) causes an increase or decrease in the estimated costs of the contract; (4) alters the period of performance; or (5) changes any of the other express terms or conditions of the contract.
3) Technical direction will be issued in writing by the COR or confirmed by them, in writing, five calendar days after verbal issuance.
14. INVOICING REQUIREMENTS
The contractor shall invoice not more than once per month by submitting a “pencil copy” of the invoice to the project COR for review/approval. The pencil copy must match the prices proposed on the Monthly Price Schedule. Once approved, the contractor shall submit the invoice in IPP IAW the IPP Clause of the Contract, for prompt payment.
Emergency Work: Any emergency work executed IAW Section 5 of the Statement of Work shall be invoiced based on the rates proposed in the Emergency Services section of the Monthly Price Schedule and shall be separately identified/included in the monthly invoice (if emergency work took place during the month, do not submit 2 invoices, please combine them into 1 citing the “actual” emergency work completed). The government will review/confirm any emergency work completed, for accuracy, prior to accepting the “combined” invoice.
15. CONTRACT TRANSITION PERIOD
Date of Award to 1 January 2027: From the date of award to the first required day of operational services, 1 January 2027, the contractor is authorized to place and service any units at any location required within the first month of performance, regardless of submittals approvals (plans). This is to ensure the overlap between the outgoing incumbent and incoming contractor is as seamless as possible.
The contractor is permitted to place portable toilets next to incumbent toilets while the incumbent performs their removal process. The contractor shall notify the COR and/or CO of any conflicts at specific site locations, during this transition period. Please allow the government to coordinate conflicts, where possible. Getting into direct conflict with an outgoing contractor is not advised.
End of Period of Performance: The contractor shall remove all units at the conclusion of this contract in preparation for transition to the next contractor’s unit placements. The removal period may overlap with the new unit placement under the next contract (if applicable).
16. THE MONTHLY PRICE SCHEDULE
The Monthly Price Schedule is a combined document that consists of both the “schedule” of units (their quantities, locations, and service tempo requirements) and the “all inclusive” fees comprising of placement, rental, and servicing, on a monthly basis. The prices contained therein are firm and fixed, to include option year prices.
This document provides the finer details of the contract, in terms of where units are placed, the quantity per week/month they are serviced, and also includes the rates for which Emergency Work shall be carried out IAW Section 5 above. The document is part of the contract Terms & Conditions.
Column B: Number of Units: This section indicates the number of units required to be in-place and routinely serviced on a month to month basis.
For units marked “0” under the quantity column, the 0 quantity serves 2 purposes:
a. To indicate that, while the location may be listed as 0 for a given month, the NPS may require the contractor to deliver a unit under Section 5 procedures above, based on the current park foot traffic and historical needs/use. Such deliveries will take place and be invoiced against IAW Section 5 procedures on an “as needed basis” and;
b. To indicate that the government does not require services for a previously placed unit. Such units must be locked during “0” months and are NOT required to be removed from the site until the end of the contract period of performance.
Column C: Serviced Per Week: This establishes the actual number of required services (cleaning, re-supplying, etc) per week. It is up to the contractor to decide specific days of providing these services, however, the COR may provide further guidance as special events take place or unforeseen conditions become present, at the Park. If it becomes clear that the service tempo chosen by the contractor is not sufficient, the CO may direct the contractor to perform services on specific days of the week. The contractor is firmly held to the Serviced Per Week number over the Services Per Month.
Column D: Serviced Per Month: This establishes the expected/estimated number of required services, per Month. This number may not mathematically match the “Serviced Per Week” requirement. The purpose is to ensure that on months that contain 5 weeks, services are provided by the contractor at the tempo prescribed in Column C: Serviced Per Week. The contractor is held to Serviced Per Week number, for all weeks within a given month.
Column E: Per Unit Rate: This establishes the per unit rate and comprises of an all-inclusive fee for delivery, cleaning, re-supply, etc for the specific unit. A fee is not required for any units marked “0” under Column B Number of Units. For any “locked” units (previously delivered but not required for the month), the government will not pay or authorize additional fees. The contractor’s fee’s, therefore, shall account for any locked months and spread the costs among other active unit fees, according to the contractor’s own means and methods, for pricing purposes.
Emergency Rates Box: The rates within this box establish the rates at which emergency services and emergency placement can be invoiced and establishes the “Not to Exceed” value of the Emergency CLIN.
Emergency Service: This establishes the price per service “rate” of any requested emergency services that may take place outside of routine maintenance. See Section 5 above.
Emergency Placement: This establishes the price per placement “rate” of any requested emergency unit placements. Note that any required placements at locations NOT identified in the Monthly Price Schedule (with a 0 count or above) can only be included in the contract via the Increased Quantities Clause, via SF30 Modification to the Contract. Such unit placements fall outside the direct scope of the contract and must, therefore, be added to the contract via a formal modification.
The “price per service” rate will be used when determining allowable invoicing amounts against the Emergency CLINS. The TOTAL within this section is used as the NTE Funded Value of the Emergency CLIN.