This file is a Master Questions and Answers document for solicitation 140PP027Q0019, addressing contractor inquiries regarding portable toilet services at Zion National Park. The document compiles 124 numbered questions submitted by potential bidders and official government responses, clarifying contract requirements, pricing structure, service specifications, and operational details.
The contract requires portable toilet services at ten park locations (East Entrance, East Tunnel, Petting Zoo, Temple, Big Bend, Shooting Range, Canyon Junction-1, Canyon Junction-2, Nature Center, and Oak Creek) over a five-year period (January 1, 2027–December 31, 2031), consisting of a base year (FY27) and four option years (FY28–FY31). Services include delivery, placement, pumping, cleaning, sanitizing, restocking supplies, routine maintenance, and removal of portable toilets. The pricing structure requires a single all-inclusive monthly fee per unit that encompasses rental, servicing, initial delivery, and final removal. Emergency services and emergency placements are separately priced as not-to-exceed CLINs (0011–0051) with estimated annual quantities of 300–320 emergency services and 15–30 emergency placements, requiring 24-hour response times. The small business size standard is $9.0 million under NAICS 562991. All waste must be hauled off-site by the contractor; no government water, power, or staging areas are provided. Service Contract Act wage determination 2015-5487 (Washington County, Utah) applies. The incumbent contractor is Wayne A. Levitz (Contract 140P1222P0018, valued at $315,957 with options). Award is anticipated in December 2026 for a January 1, 2027 start date, with pre-positioning of units permitted before contract start. Site visits were scheduled for November 12, 2026 (later corrected to December 2, 2026 at 10:00 AM Mountain Time) at the park's maintenance yard. The questions deadline was initially November 11, 2026, then extended to November 18, 2026 by close of business.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140PP027Q0019_Amd_0003.pdf | ||
| Monthly_Pricing_Schedule_11_18_2026_0003.xlsx | XLSX spreadsheet | |
| Portable_Toilet_Map_(1)_0003.png | PNG image | |
| Statement_of_Work_11_18_2026_0003.docx | DOCX document | |
| Sol_140PP027Q0019_Amd_0002.pdf | ||
| A04_-_Revised_Statement_of_Work_0002.docx | DOCX document | |
| Attachment_4_-_Monthly_Price_Schedule_0002.xlsx | XLSX spreadsheet | |
| MASTER_Q_A_0002.xlsx | XLSX spreadsheet | |
| Sol_140PP027Q0019_Amd_0001.pdf | ||
| Attachment_3_-_Q_A_Document.xlsx | XLSX spreadsheet | |
| Attachment_2_-_Applicable_Wage_Determinations.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| Attachment_5_-_Subcontracting_Worksheet.docx | DOCX document | |
| Sol_140PP027Q0019.pdf | ||
| Attachment_4_-_Monthly_Price_Schedule.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Questions & Answers Document | |||||||
| # | Contractor Question | Reference | Government Response | Reference | |||
| 1 | Example: The specifications state that wiring is to be used inside of the conduit. What type of wiring is to be used? | SOW 1.7.12, Drawings pg2 | Example: Wiring is to be copper AWG 12. SOW has been updated. | SOW 1.7.12 | |||
| 2 | Rows with 0 units (East Entrance, Petting Zoo, Temple, Canyon Junction-2): should these be priced at $0 or as a per-service rate only? How will they be evaluated? | Attachment 4 - Monthly Price Schedule | AMENDED 11/18: Any counts under Column B of the Monthly Price Schedule that contain a zero (0) are to be locked by the contractor and held on site for the duration of the contract PoP. They can be unlocked and used during the months they are required, in the Monthly Price Schedule. For any noted zeroes (0) where there was not previously a unit delivered, this does not apply as there will be not unit present, to lock. The government has added clearer language about this under the Monthly Price Schedule section of the 11.18.2026 SOW. | Revised Monthly Price Schedule & 11.18.2026 SOW | |||
| 3 | What do "Temple*" and "*Septic Cleaning" in April and October mean? Is septic or vault pumping at the Temple of Sinawava in scope, and how does it relate to contract 140P1225P0007? | Attachment 4 - Monthly Price Schedule | Septic requirement has been removed, per the Park. | CO RESPONSE | |||
| 4 | Are Emergency Service (300 or 320 per year) and Emergency Placement (15 or 30 per year) included in the Total Evaluated Price at those quantities? What response time is required for an "emergency"? | Attachment 4 - Monthly Price Schedule; Attachment 1 - SOW | Yes. Note the Pricing Sheet automatically incorporates the pricing added by the contractor in those highlighted "Emergency" sections to the total, overall, fee on the sheet. The CO will be utilizing the Total on that Sheet as the "Total Evaluated Price" as it pertains to quote evaluation.To make the Park's desire for this effort more contracturally feasible, the CO has added CLIN's 0011 to 0051 to the 1449 Schedule. The Emergency CLIN's on the 1449 Schedule will equal the total amounts quoted for both Emergency Services and Emergency Placement as listed on the Price Sheet. The Emergency CLINS (again CLINS 0011 to 0051) will be funded "NOT TO EXCEED" CLINS as T&M CLINS are currently not allowable under current DOI Policy. See revised Statement of Work, Section 5, entitled "Emergency Operations." See revised 1449 Schedule. | CO RESPONSE, Revised SOW 11/5/2026 Section 5, revised 1449 CLIN Schedule and Revised Monthly Price schedule | |||
| 5 | Are any units required to be ADA-accessible? Are hand-wash stations or hand sanitizer acceptable, or only waterless soap? | Attachment 1 - SOW | See SOW Section 3, para 7. | Revised SOW 11/5/2026 Section 3 Paragraph 7 | |||
| 6 | Size standard: the solicitation text states $7.5M while Block 10 states $9M. Please confirm the applicable size standard is $9.0M (NAICS 562991). | Solicitation 140PP027Q0019, Block 10 | Thank you - this was a CO clerical error and has been corrected to $9M per the SBA Table of Size Standards. | Revised 1449 Solicitation | |||
| 7 | Which waste disposal / dump stations are permitted? Does the park provide an in-park dump station available to the contractor? | Attachment 1 - SOW | Amended 11/18: No in-park dump station is available. It is the contractors responsiblilty to locate and confirm approved dump locations. This applies for trash/clutter found within the units, as well. | Zion National Park Response | |||
| 8 | Will a site visit be offered? Can the Government provide a map or coordinates for each unit location? | Attachment 1 - SOW; Attachment 4 | Amended 11/18/2026: A 2nd site visit is prepared for 12/2/2026 at 10AM Mountain Time. The NPS sincerely apologizes for the conflicts caused by the CO putting "1PM" in the Q&A and "10AM" on the Amendment. Human error. | CO RESPONSE, Revised 1449 Solicitation | |||
| 9 | What unit type is currently in place, and who owns the existing units (incumbent or NPS)? Is there a transition period at the January 1 start? | Attachment 1 - SOW | Amended 11/18: An incumbent (outside contractor) owns and services the existing portables (Contract 140P1222P0018 awarded to Wayne A. Levitz). There is space available at each location for the new portables to be placed during the transition. The new portables may be placed and locked at each location from contract award to Jan 1 to ensure no lapse in service. New units will be unlocked and ready for service on Jan 1. | ||||
| 10 | Please confirm that each tab of the Monthly Price Schedule applies to the performance year in its tab name (FY27 through FY31), with the unit quantities and monthly service counts shown for that tab. Several monthly headers still show 2026. Could corrected year labels be provided so the delivery and servicing schedules align with the 2027-2031 performance periods? | Attachment 4, FY27-FY31 Quote tabs, monthly headers; SOW section XI; solicitation base/option periods. | The NPS has corrected the year errors stated in the pricing sheet. | Revised Monthly Price Schedule | |||
| 12 | Does the required portable-toilet mix include ADA-accessible units? If so, please identify the applicable locations, quantities and periods in the Monthly Price Schedule, and any required unit specifications. | SOW section III and section XI; Attachment 4 location/quantity rows; solicitation technical factor 2, Product Data. | The NPS has clarified that ADA Toilets are NOT a requirement. See SOW Section 4. | Revised SOW 11/5/2026 Section 4 | |||
| 13 | Subcontracting arrangement and worksheet: We propose using a qualified local small-business subcontractor to provide the units and perform delivery, servicing, relocation, and removal, while [Contractor] retains contract administration and quality oversight. Please confirm whether this arrangement is permitted and explain the applicable calculation under Attachment 5, including how costs paid to a similarly situated subcontractor should be reported. | Attahment 5 - Subcontracting Worksheet | This is permissible, in general but the government will not do your homework for you. See Clause FAR 52.219-14. The Worksheet includes a mathematical breakdown of how it's factored. Please use the sheet or come up with one of your own. So long as your submission with your quote proves your firm meets the necessary requirements of limitations on subcontracting, the arrangement is permissible. | FAR Clause 52.219-14 | |||
| 15 | Additional services: Please clarify how emergency services, additional placements, and septic cleaning should be priced, whether the listed quantities are estimates, and how these items will be included in the evaluated total. | Attachment 4 & Attachment 1 - Statement of Work | This answer is similar to Q4 above, the NPS has drastically updated the SOW to better define emergency work under SOW Section 5, Emergency Opertations. Septic is no longer included as of Amendment 02. The listed quantities ARE estimates, however, the prices included by the contractor in the emergency sections on the price sheet will be used for evaluation purposes of the Total Evaluated Price. The Park originally desired such CLIN's to be "options" but given the potential quantities, the CO determined such CLIN's should not be options (as the government would have to write an SF30 modification every time the Park needs an emergency toilet or service delivered). Instead, the CO will write the Emergency CLINS as funded Lump Sum "Not to Exceed" (NTE) CLINS. This method removes the need for arduous option mods and is also the CO's way of "working with" the limitations the DOI has placed on using T&M CLINS, which are currently (Generally Speaking) not allowable under this administration. | CO RESPONSE, Revised SOW 11/5/2026 Section 5, Revised Monthly Price Schedule and 1449 CLIN Schedule | |||
| 17 | Question deadline: Please confirm the exact time and time zone for the November 11 close-of-business deadline. | Solicitation - Question Submission Instructions | The Questions Deadline has been updated to 11/18/2026 by COB. COB means Close of Business and the CO is not issuing a particular time. Submit remaining questions by the end of the day, please. They will be compiled and answered, the next business day. | 1449 Solicitation and CO RESPONSE. | |||
| 28 | Is there a park dump station or designated disposal facility the contractor may use for waste pumped from the units, or must all waste be hauled off-site? Will the park provide water or a staging area for contractor equipment? | SOW III.1, III.8, VII; Solicitation pg 5, 8 | All waste will be hauled off-site. Water will not be provided. | Zion National Park Response | |||
| 29 | The SOW does not specify the portable toilet type. Should all units be standard portable toilets, or are any ADA-accessible units, flushing units or handwashing stations required? If ADA units are needed, how many and at which locations? | SOW III.6, III.7; Solicitation pg 12; Attachment 4 | The SOW has been updated. ADA are not required. Handwashing stations are not required. A minimum of 60 gallons has been added to the SOW along with a requirement to have the name of the company somewhere on the unit. | Revised Statement of Work 11/5/2026. | |||
| 31 | Will NPS issue a corrected monthly schedule confirming all quantities, dates, locations, and service counts? Shooting Range shows once weekly but only twice monthly, and several option tabs retain old calendar years. | Attachment 4 (all tabs); SOW XI.1; Solicitation pg 11 | Amended 11/18: See revised Price Sheet/Schedule. The format and formulas within the Monthly Price Schedule have been redone, from the ground up, per direction from the CO to the Park. | Revised Monthly Price Schedule | |||
| 32 | Which controls when weekly and monthly service counts conflict? | Attachment 4 (Notes 1 & 8); Solicitation pg 11 | See Q31 answer above. The conflicts have been resovled per the CO's descretion. | CO RESPONSE | |||
| 35 | How are emergency services and placements ordered and paid under the annual fixed-price structure? Are rates per toilet or per dispatch, and what response times apply? | Attachment 4 (Emergency lines); SOW III.3, III.9, III.15; Solicitation pg 3, 5, 11, 12 | The prices on the Price Sheet for Emergency work are priced "per unit." The CO has added Section 5 Emergency Operations to the SOW to clarify what each of these means and has included response times therein. If the government suddenly needs a unit at Oak Creek in December 2027, for example, the Government would notify the contractor of the need and the expectation is to have that unit delivered within 24 hours of receipt of the notification. The contractor can then bill CLIN 0011 at the unit price proposed in Cell C173, as CLIN 0011 will be a funded NTE CLIN, set up to swiftly pay for such scenarios without having to issue an option or mod. Similar mechanics apply for Emergency Services. | Revised Monthly Price Schedule, Revised SOW 11/5/2026, and CO RESPONSE | |||
| 37 | May the contractor use a park disposal facility or water source? Please identify truck-access restrictions and permitted servicing hours. | SOW III.1, III.8, III.12, VII, X, XI.2; Solicitation pg 8, 15 | NO park disposal facility. The park is open 24 hours a day. Portable toilet locations are accessable at all times. | Zion National Park Response | |||
| 38 | How does this scope differ from 140P1222P0018? | SOW I–III, XI; Attachment 4; Contract 140P1222P0018 | The two are generally the same. This new scope clarifies the potential emergency need. | Zion National Park Response | |||
| 43 | Under DOI 1452.228-70, please confirm: (a) whether the insurance requirement is firm as written; (b) the minimum coverage amounts that apply to the prime contractor; (c) when the certificate of insurance must be demonstrated (with the quote, at award, or before performance begins); and (d) whether the performing subcontractor's coverage can satisfy the requirement, in whole or in part. | Solicitation clause 1452.228-70 | Amended 11/18: See Q&A #119. | CO RESPONSE & Clause 1452.228-70 | |||
| 44 | Questions below were submitted after Amendment 02 initial Q&A was posted. | Answers below are hereby submitted after Amendment 02 initial Q&A: | |||||
| 45 | Attachment 4 (Monthly Price Schedule) Note 1 says the monthly estimate is "the number of units times the number of services for each location times each unit's rate" (B×D×E). However, several location rows (e.g., FY27 Quote rows 24, 37, 52 and corresponding rows on other year tabs) use =PRODUCT(B:E), which also multiplies by column C "Serviced Per Week." Separately, the FY28 Quote tab labels months as 2023, FY30 as 2025, and FY31 as 2026, while the tab headers say FY2028/FY2030/FY2031. Please confirm the correct pricing formula and correct the year labels. Amd 0001 states NPS will more than likely post another amendment to fix the SOW and Pricing Document — when is that amendment expected? | Att. 4 Monthly Price Schedule (formulas and year labels); Amd 0001 item 2 | Amendment 02 was posted to resolve this issue. We're trying to keep this as simple as possible. Please input an "all inclusive rate" in the greyed cells (previously highlighted cells), per the notes on the bottom of the Monthly Price Schedule. The amounts SHOULD total on the bottom of each tab, for the year. If any errors remain to formulas, feel free to adjust (or remove them entirely and just put your numbers and totals in). | Revised Monthly Price Schedule | |||
| 46 | Attachment 4 marks Temple* in April and October of each year with "*Septic Cleaning," but the Statement of Work does not define "Septic Cleaning," what work it includes, whether it is priced separately from regular unit servicing, or how it relates to the Temple unit counts (which are 0 in those months). Please define "Septic Cleaning" and how it should be priced. | Att. 4 (Temple* / *Septic Cleaning rows); SOW (no definition) | Amendment 02 was posted to resolve this issue. Septic Cleaning requirements have been removed. | Solicitation Amendment 02 | |||
| 47 | Attachment 4 includes "Emergency Service" and "Emergency Placement" quantities (e.g., FY27: 300 and 15; option years: 320 and 30) noted as "if needed only," but the SOW does not define what constitutes an emergency service or emergency placement, or the required response time for either. SOW III.3 and III.9 address graffiti and damaged-unit repair/replacement within 24 hours, and SOW X addresses incident notice within 3 hours — none of those define the Att. 4 emergency line items. Please define Emergency Service and Emergency Placement and the required response times. | Att. 4 Emergency Service / Emergency Placement rows; SOW III.3, III.9, X | Amendment 02 was posted to resolve this issue. See Section 5 of the SoS. | Solicitation Amendment 02 | |||
| 48 | The Statement of Work requires pumping and servicing of units (SOW III.8) but is silent on where waste must be disposed of and whether a specific licensed disposal facility or Utah permit is required. Please identify the required or acceptable disposal site(s) and any licensing requirements. | SOW III.8; SOW (no disposal-site language) | Disposal cannot take place on Park grounds. The rest is up to the contractor to follow local, State, and Federal dumping requirements. | NPS Response | |||
| 49 | Please confirm the questions deadline "NLT 11 November 2026 by COB" is close of business Mountain Time (same zone as the quote due time of 12:00 PM MT), or specify the exact US Eastern time by which the completed Attachment 3 Q&A form must be received. | Sol. §II Questions regarding this solicitation | This was updated via Amendment 02 to 11/18. COB simply means "Close of Business." If not specified, questions may be submitted until 11:59PM that evening. | CO Response | |||
| 50 | Please clarify the required weekly and monthly servicing counts and provide a corrected schedule. The revised file still shows FY27 August Shooting Range as 1 per week / 2 per month, FY28 August East Tunnel as 2 per week / 4 per month, and FY31 December Nature Center as 2 per week / 12 per month. Which counts must be used for pricing and the draft service schedule? | Revised Attachment 4: FY27 C109:D109; FY28 C105:D105; FY31 C167:D167. MASTER Q&A 31–32. | Please see the 11.18.2026 Statement of Work, Section 16 entitled "The Monthly Price Schedule." This section speaks to any perceived disparities between "weekly servicing" vs "monthly service counts." The government simply wants to make sure the weekly cleanings take place, regardless of how many "weeks" are in a month. | Revised Monthly Price Schedule. 11.18.2026 SOW Section 16 The Monthly Price Schedule | |||
| 51 | Q&A 2 directs a removal charge when a previously placed unit changes to zero quantity. In FY27 October Oak Creek, B138 is zero and F138 calculates (B138*D138)*E138, so any removal rate entered in E138 becomes zero in the evaluated total. Where should this charge be entered without changing the Government formulas? Please provide the intended pricing treatment or a corrected workbook. | MASTER Q&A 2. Revised Attachment 4, FY27 B138:F138 and F184. | Any units marked 0 that have previously had a unit delivered shall be left in-place and locked. (See 11.18.2026 Statement of Work Section 16 entitled "The Monthly Price Schedule"). | 11.18.2026 Statement of Work Section 16 The Monthly Price Schedule. | |||
| 52 | Please confirm and correct the remaining period labels. FY30 A22 reads "Febuary 2025 (4)." Also, the Amendment 0002 SF30 continuation lists 01/01/2027–12/31/2027 for option emergency CLINs 0021, 0031, 0041 and 0051. Should these be calendar years 2028, 2029, 2030 and 2031, respectively, consistent with SOW section 10? | Revised Attachment 4, FY30 A22. Amendment 0002 SF30 continuation pages 3–4. Revised SOW section 10. | See revised Monthly Price Schedule. | Revised Monthly Price Schedule | |||
| 53 | Please provide a map or coordinates for each service location in the price schedule, including the shooting range, so bidders can estimate the route and disposal travel accurately. The site-visit section also says meeting coordinates are indicated below, but no coordinates appear on that page. Please provide the meeting point. The separate email asking about the conflicting visit time remains pending; no AmeriCare attendee has been confirmed. | MASTER Q&A 8. Amendment 0002, page 6, Site Visit. Revised Attachment 4 location rows. | Please see the attached Google map with marked locations. Please also see updated site visit coordination info on the 1449 Amended Solicitation. Please reach out to the CO or COR directly if any further questions persist at Cole_Johnson@ios.doi.gov or Matt_MacKay@nps.gov. A 2nd site visit is prepped for 12/2/2026 at 10AM Mountain time. | 1449 Amendment 03 | |||
| 54 | The SOW states no Government-furnished property will be provided. Please confirm whether any Government water source, power, or staging/storage area is available at any service location, or whether the contractor must haul all service water and stage all units and supplies off-park. | SOW Section VII (GFP) | It is the government's position that staging is not required or necessary for work of this nature. A pump truck can be used to clean out individual units. Otherwise, units are simply dropped off, locked, or removed at the end of the PoP. | Zion National Park Response | |||
| 55 | Are wheelchair-accessible (ADA-compliant) portable toilet units required at any location? The Monthly Price Schedule lists standard units only. If accessible units are required, please state the quantity, locations, and service frequency. | Attachment 4 - Monthly Price Schedule; SOW Section XI | No - ADA is not required. | NPS Response | |||
| 56 | During shuttle season, when the Zion Canyon Scenic Drive is closed to private vehicles, how do service and pump vehicles access the canyon locations (e.g., Big Bend, Temple, Nature Center)? Are park-issued permits, escorts, restricted service hours, or designated service windows required? | SOW Section XI; Attachment 4 note 'March begins Shuttle Service' | Contractor will be provided a code to the gate by simple request to the project Contracting Officer Representative. The government will not hold the contractor accountable if access issues arise. We'll resolve them swiftly, with tact. | CO Response | |||
| 57 | For the East Entrance and East Tunnel locations, do service/pump vehicles fall under the Zion-Mt. Carmel Tunnel vehicle size restrictions and escort requirements? If escorts are required, are escort fees the contractor's responsibility? | SOW Section XI; Attachment 4 | Tunnel operation locations are no longer required. See revised Monthly Price Schedule. The Park is undergoing several major changes, so we appreciate the flexibility here. | Zion National Park Response | |||
| 58 | The Monthly Price Schedule lists estimated quantities of 320 Emergency Services and 30 Emergency Placements. Are these Government estimates for evaluation purposes only? How are emergency services ordered, what response time is required for an emergency placement, and are emergency work orders paid at the quoted per-service and per-placement prices? | Attachment 4 - Monthly Price Schedule | See SOW Section 5 which incorporated/defined emergency service requirements. The CLIN's will be funded at the time of award as "Not to Exceed" CLINs based on your firm's input pricing on the Monthly Price Schedule within the emergency section toward the bottom of each tab. | SOW Section 5 and Monthly Price Schedule | |||
| 59 | Several locations (e.g., East Entrance, Petting Zoo, Oak Creek) show zero units in some months. When the Park activates a unit at a zero-quantity location, or adds units under FAR 52.217-6, what minimum advance notice will the contractor receive, and will added units be priced at the contract per-service rate for that location? | Attachment 4; FAR 52.217-6 | See Section 5 of the Statement of Work regarding time requirements for notification. As for FAR 52.217-6, the CO will provide required notices IAW the clause itself and via bilateral agreement of the parties. Note: FAR 52.217-6 is very unlikely to be used during the PoP; it's there just in case the crap hits the fan. | SOW Section 5 and FAR 52.217-6 Option for Increased Quantity | |||
| 60 | Do the 24-hour graffiti-removal and damaged-unit repair/replacement standards run on calendar hours including weekends and federal holidays, and does the clock begin at Government notification or at contractor discovery? | SOW Section III, items 3 and 9 | The park never shuts down - 24 hours from when the COR calls the contractor to request services. If the contractor notes damage/graffiti/etc first, they shall notify the COR and the COR will provide guidance. | Zion National Park Response | |||
| 61 | Which SCA occupational classification(s) does the Government anticipate applying to portable toilet service technicians under Wage Determination 2015-5487 (for example, 11150 Janitor, 23470 Laborer, or a truck driver classification)? | Attachment 2 - Wage Determination 2015-5487 Rev. 31 | Typically, if the wage rate is not specific enough within the SCA Wage Determination, the contractor may select a wage classification that is "close" to the required work class and propose it to the government for CO consideration. If no wage classifications come close to a portable toilet technician the CO may request a special classification from the DOL. 95% of the time, a special class is not required and a similar class is suitable. | CO Response | |||
| 62 | Given the subject-to-availability-of-funds notice, when does the Government anticipate making award? May the awardee access the sites before January 1, 2027 to place units so that full service is in place on the contract start date? | Solicitation - Subject to Availability of Funds Addendum; SOW Section XI | Award is anticipated December 2026 to be able to start work January 1st. The awardee may work directly with the Park to place units ahead of that time. | CO Response | |||
| 63 | What is the anticipated review and approval timeline for the post-award Safety Plan and Spill Plan, and may the contractor begin unit placement and servicing on January 1, 2027 while the plans are under review? | SOW Section III, item 13 | Units may be placed prior to plan approvals. See 11.18 SOW Transition section for details. | 11.18 Statement of Work Section 15 Contract Transition Period | |||
| 64 | Is there an incumbent contractor currently providing portable toilet services at Zion National Park? If so, please identify the incumbent and the current contract number. | General | Yes. The incumbent contract awarded for these services was 140P1222P0018 in the amount of $315,957.00 (with options). | ||||
| The incumbent firm’s name is Wayne A. Levitz. | CO Response | ||||||
| 65 | Amendment 02, page 2, item 5 and the revised solicitation, page 6, list the November 12, 2026 site visit at 10 a.m. Mountain Time. MASTER_Q_A_0002, question 8 (row 10), says 1 p.m. Please confirm the official start time and time zone, the meeting/check-in point shown as Maintenance Yard on page 7, and any advance registration deadline. No attendee or appointment is confirmed by this question. | Amendment 02 pp. 2, 6-7; MASTER_Q_A_0002 row 10 | Due to the errors between the intial Q&A posting and the Amendment language (1PM vs 10AM, specifically) the government is holding another site visit on 12/2/2026 at 10AM Mountain Time. | 1449 Solicitation - Site Visit | |||
| 67 | As an update to our November 6 schedule-validation question, the Amendment 02 workbook still has these weekly/monthly differences: FY27 Shooting Range August C109=1/D109=2; FY28 East Tunnel August C105=2/D105=4; FY31 Nature Center December C167=2/D167=12. FY31 November retains 5/10/15 monthly counts while other revised November tabs use 4/8/12, and FY30 A22 still says February 2025. Please confirm the required service counts and period labels in a corrected Government schedule. | Revised Monthly Price Schedule, cited cells; MASTER_Q_A_0002 questions 31-32 | See revised Monthly Price Schedule thereby rectifying these errors. | Revised Monthly Price Schedule | |||
| 68 | The revised FY27 tab changes East Tunnel from 1 unit to 0 and Petting Zoo from 0 to 1 for every month. Option-year tabs retain the East Tunnel units and zero Petting Zoo units. Please confirm that this base-year-only location change is intentional so suppliers can price the correct route. | Original and revised Monthly Price Schedule, FY27 versus FY28-FY31 unit-quantity columns | See revised Monthly Price Schedule thereby rectifying these errors. | Revised Monthly Price Schedule | |||
| 69 | The revised workbook annual totals in F181 already include the emergency total in F174. With emergency work now separately listed as CLINs 0011/0021/0031/0041/0051, please confirm that each regular-service CLIN uses the corresponding annual total less F174, and each emergency CLIN uses F174, so the SF1449 total equals FY27 F184 without double counting. Please clarify the evaluated-total wording in 52.212-2(b) against the Award Selection Process. | Revised Monthly Price Schedule F174/F181/F184; revised solicitation pp. 8, 14-15 | See revised Monthly Price Schedule thereby correcting the Park's Excel formulas. | Revised Monthly Price Schedule | |||
| 70 | Amendment 02 continuation pages 3-4 list January 1 through December 31, 2027 for the new emergency option CLINs as well as the base emergency CLIN. Please confirm/correct the option emergency periods to align with the applicable 2028, 2029, 2030 and 2031 option years. | Amendment 02 continuation pp. 3-4; revised SOW section 10 | Please see revised CLIN date structure on the SF30 for Amendment 03. The CO inadvertantly missed the fact that the CLINS showed 1 Jan 2027 to 30 Dec 2027 on EVERY CLIN, regardless of Option Period. Thanks for the catch! Their dates now correspond to their respective option periods as of Amendment 03. | SF30 Amendment 03 | |||
| 87 | "If Needed Only" Pricing | ||||||
| Attachment 4 states that items shown in red are "if needed only." Please confirm whether offerors should provide a unit/service rate for all red "if needed only" line items even though the evaluated quantity is currently zero. | Attachment 4 – Monthly Price Schedule | See revised Monthly Price Schedule and fill out the grey areas please. That includes the unit prices for emergency delivery and services. If the column B has a 0 and you input a price it will zero it out -- that is intended. See Q2 Answer above for additional details on zero's (0) and Statement of Work section entitled Monthly Price Schedule for further guidance. | Revised Monthly Price Schedule, Q2 Answer, and 11.18.2026 Statement of Work "Monthly Price Schedule." | ||||
| 88 | Emergency Service Definition | ||||||
| Please define an "Emergency Service" as used in Attachment 4. Does one Emergency Service represent pumping, cleaning, sanitizing, and restocking one portable toilet, one service visit/location, or another unit of measure? | Attachment 4 – Emergency Services | See SOW Section 5. | SOW Section 5 | ||||
| 90 | Emergency Response Time | ||||||
| What response time is required after NPS requests an Emergency Service or Emergency Placement? Please identify whether different response requirements apply during normal business hours, after hours, weekends, or holidays. | Attachment 4 – Emergency Services; Attachment 1 – SOW | See SOW Section 5. | SOW Section 5 | ||||
| 91 | Emergency Placement Definition | ||||||
| Please define what is included in the Emergency Placement unit price. Does Emergency Placement include delivery/setup only, or must the price also include the portable toilet rental period, subsequent servicing, and eventual pickup/removal? | Attachment 4 – Emergency Placements | The price includes Emergency placement only. "Routine maintenance" of emergency placed units will need to be modified into the contract. Such maintenance does not fall under the "Emergency Services" scope. The 11.18.2026 Statement of Work now clarifies this will be done via SF30 modification, however, the CO will likely direct the contractor to proceed with servicing (provided funds are available) emergency placed units until funds are physically obtained to issue the mod. | Contracting Methods | ||||
| 97 | Service-Count Calculations | ||||||
| If the "Serviced Per Week" and "Services Per Month" columns in Attachment 4 conflict, which column governs the contractor's required number of services and pricing obligation? | Attachment 4 – Service Frequency Columns | Weekly Services | Zion National Park Response | ||||
| 98 | Option-Year Date Labels | ||||||
| Please confirm that the fiscal/contract year identified on each Attachment 4 worksheet controls and that calendar-year references from prior years appearing within certain FY28–FY31 monthly tabs are template/copy-forward errors. | Attachment 4 – FY28–FY31 Worksheets | Confirmed, these were clerical. Please see revised Monthly Price Schedule. | Revised Monthly Price Schedule | ||||
| 99 | Vehicle and Site Access Restrictions | ||||||
| Please identify any site-specific access restrictions affecting servicing vehicles, including permitted service hours, shuttle-period restrictions, traffic restrictions, vehicle size/weight restrictions, tunnel restrictions, seasonal closures, or special permits required to access any listed service location. | Attachment 1 – Site Access / Service Locations | There are no size restrictions -- there is no tunnel access requirement, per the Park. Previous tunnel requirements have been removed. Should the NPS add the requirement later, the NPS and contractor can negotiate a modification, if necessary. | NPS Response | ||||
| 100 | January 1 Contract Transition | ||||||
| Please describe the anticipated transition from the incumbent contractor(s). Must all contractor-furnished units be fully delivered and operational by January 1, 2027, and will NPS permit coordination or pre-positioning prior to January 1 to allow an orderly transition? | Solicitation – Period of Performance; Attachment 1 | They need to be on site, ready to go, by 1/1/2027. This may result in brief overlap while the incumbent comes to remove their old units. There is enough space for more than one unit to be present at the same time. Also, please refer to SOW requirement to have your own units properly marked/identified as your firm will not be the only firm within the Park providing toilets at any given time. See 11.18.2026 SOW Section 15 "Contract Transition Period." | 11.18.2026 Statement of Work Section 15 Contract Transition Period. | ||||
| 101 | Incumbent Unit Removal | ||||||
| Will all incumbent-owned portable toilets be removed before the successful contractor's start of performance, or should the successful contractor anticipate a coordinated change-out period with existing units remaining temporarily onsite? | Attachment 1 – Equipment / Contract Transition | There's plenty of room to have more than one unit at each site. There will be no formal coordination between the outgoing and incoming contractor's required. Any conflicts that may arise shall be reported to the COR and/or CO for swift resolution. | 11.18.2026 Statement of Work Section 15 Contract Transition Period. | ||||
| 103 | Pricing Structure: Per Service or Per Month | ||||||
| Please confirm whether the pricing entered in Attachment 4 is intended to be a price per portable toilet per individual service, or a monthly price per portable toilet that includes the required number of services for that month. | Attachment 4 – Pricing / Monthly Price Schedule | See revised Monthly Price Schedule and SOW Section 16 "The Monthly Price Schedule." | Revised Monthly Price Schedule. 11.18.2026 SOW Section 16 The Monthly Price Schedule | ||||
| 104 | Rental Included in Service Pricing | ||||||
| Please confirm whether the quoted unit/service pricing must include the rental/availability of the contractor-furnished portable toilet in addition to pumping, cleaning, sanitizing, supplies, and routine maintenance. | Attachment 1 – Required Services; Attachment 4 | The NPS is requesting a single, all-inclusive, fee for each unit, for each month as required in the revised Monthly Price Schedule. | 11.18.2026 SOW Section 16 The Monthly Price Schedule | ||||
| 105 | Initial Delivery and Final Removal | ||||||
| Should initial delivery, placement/setup, and final removal/pickup of the regularly scheduled portable toilets be included in the unit/service pricing, or should those costs be priced separately? | Attachment 1 – Delivery / Removal; Attachment 4 | The NPS is requesting a single, all-inclusive, fee for each unit, for each month as required in the revised Monthly Price Schedule. Final removal should be included as part of your overall fees. This can be done by spreading the removal costs around to each unit, or by any means and methods the contractor chooses. Ultimately, the CO is evaluating prices not on a "monthly basis" but on a total CLIN basis. The total price for all Base, Options, and Emergency CLINs, combined, form a Total Evaluated Price and is the price the CO will use to determine the LPTA, not the monthly unit fees. The unit fees are important, because they add up to the contract's total FFP price, but the CO isnt looking at them, directly, for evaluation. The only monthly unit fees the CO more carefully considers are those within the Emergency work box, which, when added together, form the Not to Exceed value of the Emergency CLINs and establish the "unit rates" for emergency work on a case by case basis. | NPS Response. 11.18.2026 SOW Section 16 The Monthly Price Schedule. | ||||
| 106 | Additional Units Under FAR 52.217-6 | ||||||
| When NPS orders additional portable toilets under FAR 52.217-6, will those additional units and services be compensated at the corresponding contract-year unit rates identified in Attachment 4? | Solicitation – FAR 52.217-6; Attachment 4 | The CO incorporated this clause for any added toilets that DO NOT fall under Emergency Placement. In such a case, the CO would issue an RFP to the contractor and cite 52.217-6 as the authority to solicit for a priced modification. Use of such authority is not anticipated under this contract unless the Park suddenly needs units placed in "other locations" not specified in the Monthly Price Schedule. | FAR 52.217-6 Option for Increased Quantity | ||||
| 107 | Relocation of Existing Portable Toilets | ||||||
| If NPS requests relocation of an existing portable toilet from one park location to another, is that relocation included in the firm-fixed contract price, or will relocation be separately ordered and compensated? | Attachment 1 – Relocation / Scope of Work | Such a relocation request is unlikely, but will fall under the emergency placement rates in the schedule, provided the relocation is to an area already found on the Monthly Price Schedule. If a unit must be relocated to an area NOT listed on the Monthly Price Schedule, a formal RFP for modification must be issued. | CO Response | ||||
| 108 | Availability of Water | ||||||
| Will NPS provide access to potable or non-potable water within Zion National Park for cleaning and servicing operations, or should the contractor plan to furnish and transport all required water? | Attachment 1 – Cleaning / Servicing | Water will NOT be provided. Please see 11.18.2026 Statement of Work. | 11.18.2026 SOW Section 6 Government Furnished Property | ||||
| 109 | Quarterly Usage Reporting | ||||||
| The Statement of Work requires quarterly reports showing servicing and "quantity of use." Please clarify what NPS means by "quantity of use." Is the contractor expected to report service counts, estimated user counts, gallons pumped, waste volume, or another measurement? | Attachment 1 – Quarterly Reports | Pump trucks typically have a meter to track gallons pumped, though "metered" reporting is not necessarily "mandatory" -- the contractor shall report "gallons pumped per month" and submit totals in a quartly report to the COR and CO. See 11.18.2026 Statement of Work Section 3, Paragraph 11. | 11.18.2026 SOW Section 3 Para 11. | ||||
| 110 | Option-Year Pricing Adjustments | ||||||
| Please confirm that offerors may propose different fixed unit prices for each option year, including reasonable increases for anticipated non-labor operating costs, provided all option-year prices are stated in the original quotation. | Attachment 4 – Option-Year Price Schedules | Yes, that is expected based on inflation (and many other factors concerning multi-year contracts). Note that the government will not be reviewing your Indirect Costs (OH, G&A, and Profit) unless specifically requested by the CO to help prove "fair and reasonable price." The CO typically makes a Fair and Reasonable Determination based on receipt of competitive prices vs diving into specific labor rates, subcontracting, and Indirect Costs. | CO Response | ||||
| 111 | Wage Determination Price Adjustments | ||||||
| Please confirm how FAR 52.222-43 and/or FAR 52.222-44 will apply if the applicable Department of Labor wage determination increases during an option year, and whether qualifying wage and fringe-benefit changes will be handled through a contract price adjustment. | Solicitation – FAR 52.222-43 / 52.222-44 | The contractor may request a Wage Rate adjustment after the government has exercised its unilateral option. This is a standard Federal Contract process done via request from the Contractor. Changes to the option prices based on increases to the Wage Determination are not automatic, even though the CO will incorporate a revised WD within the unilateral option mod itself. It is up to the Contractor to request an increase in contract prices based on increases in Wage Rate Determinations affixed to the contract. | CO Response. FAR 52.222-43 | ||||
| 116 | Q&A #2 states that when a location goes from one or more units in a prior month to zero (0) units, the offeror should include a removal fee in that zero month, and that the Total Evaluated Price in cell F184 will reflect it. On the revised Monthly Price Schedule, however, Monthly Estimate is calculated as (Number of Units × Services Per Month) × Per Unit Rate (for example, cell F11 is =(B11*D11)*E11). When Number of Units is 0, that formula equals $0 even if a removal fee is entered in the Per Unit Rate column. Please confirm how offerors should enter removal fees so they are included in the Total Evaluated Price—for example, by overriding the formula in the zero month, by using a designated removal-fee line, or by another method the Government will specify. | Q&A #2; Attachment 4 – Monthly Price Schedule_0002 (formula in the Monthly Estimate column, e.g., F11) | Thank you - Question 2 has been amended after conversing with the Park. It is expected that any zero (0) counts (where a unit was previously required) will be locked and NOT removed from the Park. If your firm maintains "rental fees" during these "zero" periods, you may spread them among the other unit prices. The units marked 0 will all have $0 fees on the Monthly Price Schedule. This is by design. There's probably a better way of doing this, but given the limited resources and time the NPS has to get this project on this surprising complex contract, this is the best method we could come up with. | Zion National Park Response. CO Response | |||
| 117 | Q&A #8 asked whether the Government could provide a map or coordinates for each unit location. The response scheduled a site visit for November 12, 2026, but did not provide a map or coordinates. Firms that could not attend the visit still need location information to price delivery and servicing. Please provide a map or GPS coordinates for each location on the Monthly Price Schedule (East Entrance, East Tunnel, Petting Zoo, Temple, Big Bend, Shooting Range, Canyon Junction-1, Canyon Junction-2, Nature Center, and Oak Creek). | Q&A #8; Attachment 1 – Statement of Work; Attachment 4 – Monthly Price Schedule | A map is hereby provided showing unit locations, see attachments in the SAM.Gov solicitation announcement. A 2nd site visit has been scheduled for 12/2/2026 at 10AM Mountain Time. See solicitation Site Visit section, for details. The NPS sincerely apologizes for the conflicts caused by the CO's mention of 1PM on the Q&A vs 10AM on the Amendment 02 - Question 8 has been amended to speak to this resolved error as well. | 1449 Solicitation Attachments & Site Visit section. | |||
| 118 | Attachment 2 includes two Service Contract Act wage determinations: 2015-5487 (Washington County, Utah) and 2015-5495 (including Kane County, Utah). Please confirm which wage determination applies to each location on the Monthly Price Schedule, or otherwise identify which sites are in Washington County and which are in Kane County. | Attachment 2 – Applicable Wage Determinations; Attachment 4 – Monthly Price Schedule | See attached map with unit locations. Conversations with the Park held 11/18/2026 indicate that ALL units are actually within Washington County. The CO will only include Washington County WD in the final award. | 1449 Solicitation Attachments & Applicable Wage Determinations | |||
| 119 | This is a follow-up to Q&A #43, in which the Contracting Officer invited additional detail if use of subcontractor insurance is commercial practice, and confirmed that clause 1452.228-70 applies to the prime, that a certificate of insurance may be provided post-award, and that subcontractor coverage alone does not satisfy the clause. In commercial portable-toilet servicing, the firm that owns and services the units typically carries the primary liability and automobile coverage on those units and trucks. [Redacted], if awarded as prime with a local servicing subcontractor, would obtain and maintain a prime policy naming the Contractor and the United States of America, in not less than the amounts stated in 1452.228-70. Please confirm that a prime-maintained policy meeting those named-insured and limit requirements would satisfy the clause, even if the performing subcontractor also carries its own coverage, and whether the performing subcontractor may be listed as an additional insured on the prime policy. | Q&A #43; Solicitation clause 1452.228-70 | Yes, the prime-maintained policy meeting those named-insured and the limit requirements satisfies the clause. The purpose is to make sure the government (and the contractor) both have recourse in the event of significant damages or loss caused by the public. Note that insurance is not a "selection factor" for award. It is a term & condition of the contract clause itself. Provided your firm can prove you have the insurance required to cover losses (and not go after the government for said losses), it is acceptable. The performing sub may be listed as an additional insured on the prime policy, in my opinion as it fulfills the purpose and need of the clause. | CO Response | |||
| 120 | If the Park adds or removes units during a contract year (SOW III.15), how will the lump-sum price be adjusted — from the unit and service prices in Attachment 4, by contract modification in the month of the change? | SOW III.15; Attachment 4 | If the Park adds units NOT under the Emergency CLIN's (SOW Section 5) then a formal SF30 priced modification must be issued. The same applies if the Park entirely removes a toilet unit (in which case the government would seek a credit back to the government). | NPS Response | |||
| 121 | Zion National Park is subject to flash flooding, flood watches and warnings, and related road and area closures. (a) Are any of the current or anticipated portable toilet locations in Attachment 4 in areas subject to flooding, standing water, or wash crossings? (b) When weather or flooding prevents access for scheduled servicing, or prevents repair or replacement within 24 hours (SOW III.9), how will the Government handle the delayed service? | SOW III.9, III.13, III.15; Attachment 4 | Yes, the entirey of ZION National Park is subject to flooding, sans some of it's more relative high points. Standing water is not typically an issue in the locations identified. In Contracting floods, long-standing water, and unforseen wash crossings fall under "Acts of God" and are worked out depending on the unique cirucumstances of nature and the damages it's known to cause. Such cases are resolved between both parties, bilaterally, so that the contractor is "made whole." It's nobody's fault when the floods come. Stuff happens. I will not provide a direct "what if" scenario in the answer here, just be assured that we have tools to address such issues, if they arise. | CO Response | |||
| 122 | SOW III.4 requires the units to be kept free of litter. (a) Are trash receptacles currently provided at any of the locations in Attachment 4? (b) If not, may the contractor place outdoor trash containers at the units for visitor litter, and if so, are there Park requirements for the containers (for example, an animal-resistant design)? | SOW III.4; Attachment 4 | Trash receptacles are located at all sites that require them. The contractor is NOT permitted to place their own recepticles. | NPS Response | |||
| 123 | SOW III.4 requires graffiti or other surface markings to be removed within 24 hours of notification, and SOW III.9 requires damaged or deficient units to be repaired or replaced within 24 hours. Please provide the approximate number, per year in recent years, of (a) graffiti or surface-marking removals and (b) damage or deficiency call-outs that required a visit outside the scheduled services. | SOW III.4, III.9 | The estimated numbers provided in the emergency services box (at the bottom) of Attachment 4 Monthly Price Schedule are indicative of historical counts, albeit they are quite conservative (inflated to cover us in the very worst case scenarios). | NPS Response | |||
| 124 | How should offerors enter a removal charge when the prior month had a unit but the current month has zero? For example, the FY27 tab shows one Oak Creek unit in September (B125), zero in October (B138), and F138 multiplies the October rate by zero. Please identify the intended entry so the removal is included once in F184, or provide a revised schedule. | Amendment 0002, Master Q&A #2; revised Attachment 4, FY27 Quote B125, B138, E138, F138, F184. | See Q&A # 116. | NPS Response | |||
| NOTES FROM THE CONTRACTING OFFICER: | |||||||
| There have been many questions concerning price evaluation and this is concerning to any CO. To reiterate: per the solicitation Evaluation Criteria, the Total Evaluated Price for "selection purposes" is simply the total of CLINS 0010 through 0051 (previous versions had CLIN 0010 to CLIN 0050 before the CO added Emergency CLINS via Amendment). The CLIN Totals on the Monthly Price Schedule Summary Tab and the CLIN totals on your 1449 Price Schedule submission, should match. | |||||||
| There appear to be several "first timers" attempting to submit quotes to the government (this is great!). I wish to remind all offerors of the Technical submission requirements listed in the solicitation. There are 3. Please respond accordingly to each of them or your quote will be marked incomplete. These are a mandatory part of the "Technically Acceptable" portion of the "Lowest Price, Technically Acceptable" selection method. | |||||||
| If you've read through 124 Q&A's and made it down this far, note that I will consider additional questions submitted to me after the 11.18.2026 Questions Due Date on a case-by-case basis, via email. This is to ensure the NPS is capturing and/or correcting "everything possible" to obtain the most accurate and competitive quotes from you, the experts, in the industry. Note that any answers I choose to provide are not "official" unless I incorporate them into the contract via Amendment to the Solicitation. | |||||||
| 129 | |||||||
| 130 | |||||||
| 131 | |||||||
| 132 | |||||||
| 133 | |||||||
| 134 | |||||||
| 135 | |||||||
| 136 | |||||||
| 137 | |||||||
| 138 | |||||||
| 139 | |||||||
| 140 | |||||||
| 141 | |||||||
| 142 | |||||||
| 143 | |||||||
| 144 | |||||||
| 145 | |||||||
| 146 | |||||||
| 147 | |||||||
| 148 | |||||||
| 149 | |||||||
| 150 | |||||||
| 151 | |||||||
| 152 | |||||||
| 153 | |||||||
| 154 | |||||||
| 155 | |||||||
| 156 | |||||||
| 157 | |||||||
| 158 | |||||||
| 159 | |||||||
| 160 | |||||||
| 161 | |||||||
| 162 | |||||||
| 163 | |||||||
| 164 | |||||||
| 165 | |||||||
| 166 | |||||||
| 167 | |||||||
| 168 | |||||||
| 169 | |||||||
| 170 | |||||||
| 171 | |||||||
| 172 | |||||||
| 173 | |||||||
| 174 | |||||||
| 175 | |||||||
| 176 | |||||||
| 177 | |||||||
| 178 | |||||||
| 179 | |||||||
| 180 | |||||||
| 181 | |||||||
| 182 | |||||||
| 183 | |||||||
| 184 | |||||||
| 185 |
image1.png
File details come from the government source that posted it. Updated .