This is a Statement of Work (SOW) for septic and vault pumping services at Point Reyes National Seashore in West Marin County, California, under Solicitation #140P8425Q0020. The contractor must provide personnel, equipment, proper licensing, and expertise to pump septic tanks and vault toilets throughout the park, with an estimated annual volume of 120,000 gallons from multiple sites ranging in size from 1,200 to 16,000 gallons. The contract structure includes a base year covering April 21, 2026 through April 20, 2027, plus four option years extending through April 20, 2031. Pricing shall be based on a per-trip cost model, with 78 anticipated trips per year, including weekly pumping (approximately 50 gallons) of a park-owned portable toilet at KPH Marine Radio Station in Inverness, California.
The contractor is responsible for all waste disposal in compliance with County and State regulations at permitted disposal sites, complete cleanup of any spills or leakage, and maintaining vehicles and equipment free of leaks and non-native vegetation. Park personnel will provide escort access through locked gates and notify the contractor via six authorized individuals with a minimum 48-hour response time required and 24-hour response for emergencies. The contractor must complete and submit a Septic Pumping and Disposal Log after each service call to designated park staff, with payment requests submitted electronically through the U.S. Department of Treasury's Invoice Processing Platform (IPP) within 30 days of work completion. Water will not be provided by the park.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Point Reyes National Seashore
Septic Pumping FY26
Solicitation #140P8425Q0020
The Contractor shall furnish the necessary personnel, equipment, licensure, and expertise to successfully provide septic & vault pumping services to all requested locations within Point
Reyes National Seashore (the Park), West Marin County, California.
A base year purchase order with four (4) option years is anticipated. The Request for Quotation
(RFQ) will include:
• one base line item for the 2026/2027 service period of April 21st, 2026 – April 20th 2027
• one option item for the 2027/2028 service period of April 21st, 2027 – April 20th 2028
• one option item for the 2028/2029 service period of April 21st, 2028 – April 20th 2029
• one option item for the 2029/2030 service period of April 21st, 2029 – April 20th 2030
• one option item for the 2030/2031 service period of April 21st, 2030 – April 20th 2031
Requirement Details: The estimated volume of wastewater to be pumped annually is 120,000 gallons, from multiple sites within the Park. Gallons to be pumped vary, depending on usage and park visitation. Septic tanks and vault toilets are located throughout Point Reyes National Seashore. Septic tanks and vaults range in size from 1,200-gallons to 16,000-gallons. See “Locations and Volume Information” spreadsheet, and the Maps for septic and vault toilet locations (these are separate attachments to the Solicitation). Not all sites shown on the maps will get pumped under this contract. The first pumping is estimated to start on April 21st, 2026.
Additional pumping will be performed on call, on an as needed basis throughout the year. The contractor will base their annual pricing on a per trip cost, assuming there will be 78 anticipated number of trips per year.
One park owned portable toilet will be pumped on a weekly basis (about 50 gallons). This toilet is located at KPH Marine Radio Station (NDOC) 17400 Sir Francis Drake Blvd, Inverness, CA 94937.
See attached “Anticipated Annual Pumping Totals by Location” spreadsheet. The spreadsheet shows the locations and number of times the Park anticipates pumping each site. However, the Park may request service under this contract for any location listed in the Park as needed.
Point Reyes National Seashore authorized personnel will call/notify the Contractor of the vaults and or septic tanks to be pumped. This will include the order of priority as well as dates of desired pumping. A minimum response time of 48 hours is required, with 24-hour response required in the event of notification of an emergency situation. Notification of pumping will only be made by:
Jason Briggs - Facility Manager
Alexander Bernhardt - Buildings and Utilities Supervisor
Jesse Macklin - Maintenance Mechanic Work Leader
Nathaniel Radmacher - Park Utility System Operator
Elizabeth Chico - Contracting Officer
Brenda Lewis - Contract Specialist
Any changes or additions to the park staff authorized to provide the Contractor with this notification shall be communicated to the Contractor and authorized in writing solely by the
Contracting Officer.
Park personnel will escort pumping trucks to locations that require access through locked gates.
Park personnel will be available to escort to other locations if requested by the Contractor.
Disposal of wastes by the Contractor will be done according to all County / State regulations at a State / County permitted disposal site. The Contractor is responsible for the arrangement and disposal of all waste. The Contractor will be responsible for complete clean up any leakage or spillage that occurs in relation to pumping operations. Any materials/trash removed during pumping shall be properly bagged and disposed of outside the Park.
Contractor vehicles and all equipment must be free of leaks and in safe, legal operating condition.
The Contractor is responsible for the complete cleanup of all vehicle/equipment spills or leaks within Point Reyes National Seashore. Contractor vehicles/equipment must be free of any non-native vegetative material. Water is not provided by the Park.
Per the California Water Quality Control Board; the Contractor will maintain, throughout the contract period, a Septic Pumping and Disposal Log (as shown on last page of this document).
This form will be mailed, faxed, OR emailed after each callout to:
alexander_bernhardt@nps.gov AND jesse_macklin@nps.gov
Or
1 Bear Valley Road mailto:alexander_bernhardt@nps.gov mailto:jesse_macklin@nps.gov
Point Reyes Station, CA 94956
Attn: Alexander Bernhardt
Or
Fax: 415-464-5166
Payment requests must be submitted electronically through the U. S. Department of the
Treasury's Invoice Processing Platform System (IPP) at https://www.ipp.gov/. DTR shall submit all invoices through www.ipp.gov within 30 days of the completion of work. Failure of the contractor to upload an attached copy of the invoice and any requested documentation through IPP.gov will result in invoice being rejected.
POINT REYES NATIONAL SEASHORE
SEPTAGE PUMPING AND DISPOSAL LOG
(2026/2027)
DRIVERS
INITIAL
DATE SOURCE VOLUME
GAL.
SLUDGE
PUMPERS
NAME
DISPOSAL
SITE
COMPLETE AND MAIL REPORT AFTER EACH CALLOUT.
Mail Report To:
1 Bear Valley Road
Point Reyes Station, CA 94956
Attn: Alexander Bernhardt alexander_bernhardt@nps.gov
415-464-5166 Fax mailto:alexander_bernhardt@nps.gov
File details come from the government source that posted it. Updated .