Amendment_1_Attachment_7_Site_Visit_Info_and_Q-A_0001.pdf
PDF 115 KB Posted
- Attached to
- Replace Headquarters Roof, Redwood National Park
- Solicitation number
- 140P8424R0008
About this file
This document is an amendment to a Request for Proposals (RFP) issued by the National Park Service (NPS) at Redwood National Park for the replacement of the headquarters building roof. The amendment provides details on a pre-proposal site visit, including a summary of questions asked and answered. It confirms that a PVC membrane is an acceptable alternative to the specified TPO roofing, provides information on available as-built drawings, and clarifies requirements for flashing, insulation, and plumbing work. The solicitation has a North American Industry Classification System (NAICS) code of 238160 (Roofing Contractors) and is a Total Small Business Set-Aside. The contract is estimated to be between $250,000 and $500,000, with a 9-month period of performance from September 2024 through June 2025. Award will be made on a best value determination considering price and other factors. All eligible small businesses are encouraged to submit proposals, which will be due in accordance with the solicitation schedule.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REDWOOD NATIONAL PARK (REDW)
Solicitation no. 140P8424R0008 – Amendment no. 1 (8/8/24)
REPLACE HEADQUARTERS BUILDING ROOF
Solicitation Attachment no. 7:
Initial Pre-Proposal Site Visit Info and Q&A
NATIONAL PARK SERVICE
PACIFIC WEST REGION
SITE VISIT SUMMARY:
A pre-proposal visit was conducted on July 30, 2024. Participants met at 11:00 a.m. Pacific Standard Time (PDT) at NPS Headquarters Building at 1111 2nd Street, Crescent City, California. The project scope was reviewed at the meeting and potential contractors were given an opportunity to ask questions. Potential offerors followed NPS staff through the building to the roof top access and onto the roof to observe existing roof conditions. Questions asked during the site visit were recorded and answered below. The site visit concluded at approximately 12:30p.m. (PDT).
ATTENDEES:
• Brian Crowell, Engineer, REDW
• Patrick Pollard, Facility Manager, REDW
• Jason Haberman, Buildings Supervisor, REDW
• Duro-Last Roofing
• Red Sky Roofing, Crescent City, CA
PROJECT QUESTIONS FROM PRE-PROPOSAL SITE WALK:
1. Question: Is a PVC membrane an acceptable alternative to the specified TPO roofing?
Answer: Yes. A PVC membrane is acceptable. Plans and specifications have been updated to reflect this. Specification section 07 54 19 added to cover PVC membrane roof.
2. Question: Are as-built drawings available for the building? Answer: As-built plans including original 1974 plans and 2006 improvements are provided as part of this
Amendment 1.
3. Question: Is stainless steel flashing required? Answer Specification section 01 27 00
3.1.I CLIN 0009 updated to specify manufacturer coated 24-ga flashing is required.
4. Question: Is insulation part of the contract and was is the R value? Answer: Yes.
Reference plans and specifications. New rigid insulation is required on the roof (R-10 minimum). Spray foam insulation is required within the attic space (R-13 minimum).
5. Question: Is there a roof height change on the popouts (Ref 2/A400)? Answer: No. Detail
2/A400 has been modified in the Amendment 1 plans to remove reference to framing revisions at the popouts.
6. Question: Will gas lines on the roof require replacement? Answer: Plumbing on the roof will need to be removed as necessary to accommodate new membrane construction, then plumbing will be subsequently reinstalled by the contractor. Specification 01 27 00 has been revised to incorporate this clarification on CLIN 0002 and CLIN 0012.
7. Question: Can roofing extend up and over the parapet walls? Answer: Membrane system details are to be provided by the contractor as part of the roofing submittals.
Details should reflect industry standard details best suited for the new roof membrane based on existing building framing conditions.
PROJECT QUESTIONS RECEIVED VIA EMAIL:
8. Question: Has a hazardous waste survey on the roof been performed for asbestos and lead? Answer: A hazardous waste survey has not been performed. Reference specification section 02 41 20, including part 3.5. Should asbestos containing material be suspected or discovered, work shall be stopped and the Contracting Officer shall be immediately notified.
9. Question: Is a liquid applied roofing system an acceptable alternative? Answer: No. The project requirement is for a TPO or PVC membrane roof system.
10. Question: The solicitation includes a requirement for a California roofing license. We believe Redwood National Park operates under exclusive jurisdiction. Typically, when the NPS requires a state license, it is for locations under "concurrent jurisdiction". In our experience, when a park is operated under exclusive jurisdiction, the state license requirement has been removed. We request that NPS consider removing this requirement. Answer: NPS verified that Redwood National Park is concurrent jurisdiction so the requirement for the state license will remain in place. However, if a company does not have one, NPS encourages to submit a proposal anyway. Not having the license does not disqualify the offer. The other technical factors evaluated may outweigh the lack of the state license.