Schedule_of_Values_for_Lagoon_1_amendment_03_0003.pdf
PDF 80 KB Posted
- Attached to
- Replace Sewage Lagoon Pond Liner, Lake Mead, AZ
- Solicitation number
- 140P8121R0005
About this file
This document contains a schedule of values for a liner replacement project at Katherine Landing Lagoon 1. The schedule outlines various line items and costs associated with replacing the pond liner, including mobilization, draining and preparation of the existing lagoon, removal and disposal of sludge and debris, installation of new liner materials and associated piping and valves, fencing, permits, bonds, and demobilization. It also includes an optional line item for additional sludge removal. The total base bid is provided along with the total cost including the optional line item. The schedule of values is for a fixed price contract between the National Park Service Pacific West Region and the contractor selected for the Replace Sewage Lagoon Pond Liner opportunity issued under solicitation number 140P8121R0005 to perform work at Lake Mead National Recreation Area in Arizona.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Number Contract Line Item Title Quantity Unit of
Measure Unit Price Total Price
10 Mobilization 1 LS
20 Draining of existing lagoon water 1 LS
30 Relocation, Storage and reinstallation of Aerators 1 LS
40 Removal of sludge and processing for shipment 200 tons
50 Testing of sludge materials 1 LS
60 Hauling and diposal of sludge 200 tons
Removal, disposal and hauling of other debris including pipes, valves, and concrete.
1 LS
Ductile Iron Pipe including installation and concrete supports
1 LS
90 Liner materials including delivery 1 LS
Liner material installation including grading, anchor trench, pipe boots and leak detection of system
1 LS
110 Leak detection manhole and piping including installation 1 LS
120 Valves and valve replacement 1 LS
130 Staff gauge replacement 1 LS
140 Fence removal and replacement 1 LS
150 Demobilization and Cleanup 1 LS
160 Permits - Environmental 1 LS
170 Bonds 1 LS
Total for Base Bid
Option A Removal of sludge and processing for shipment 100 Tons
Option A Hauling and diposal of sludge 100 Tons
Total for Option A
Schedule of Values Katherine Landing Lagoon 1 Liner Replacement
PMIS 266532
Total Price for Total of all option (Total bid plus Option A)
Total Price for Base Bid
140P8121R0005
Note: This is a firm fixed price requirement. All costs associated to perform the work in accordanceto the Statement of Work shall be included.
Note: For price evaluation purposes, the Total Bid Plus Option A will be evualated to determine price reasonableness.
Note: Option A will be reviewed for price reasonableness and may or may not be exercised at time of award.
Note: Prices should include labor, overhead and profit.