B09 Project Specifications Revised_0001.pdf
PDF 4 MB Posted
- Attached to
- Replace Sewage Lagoon Pond Liner, Lake Mead, AZ
- Solicitation number
- 140P8121R0005
About this file
This document outlines the requirements for replacing the pond liner in Pond 1 at Katherine Landing in Lake Mead National Recreation Area. The scope of work includes removing the existing liner and pipes, installing a new dual-layer liner system with leak detection, replacing associated valves, removing accumulated sludge, and refurbishing infrastructure. Contractors must be licensed in Arizona and obtain permits from the Arizona Department of Environmental Quality. The performance period is 180 calendar days with a 60-day start for on-site construction. The National Park Service is the contracting agency. Interested parties should visit the site and account for all necessary measurements, surveys and quantities in their bids.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKE MEAD NATIONAL RECREATION AREA
BOULDER CITY, NEVADA
KATHERINE LANDING LAGOON LINERS POND 1 REPLACEMENT
PMIS- 266532
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
5-20-2021
Table of Contents
DIVISION 1 - GENERAL REQUIREMENTS
SECTION PAGE No.
01110 SUMMARY OF WORK 3
01270 DEFINITIONS OF BID ITEMS 16
01310 PROJECT MANAGEMENT AND COORDINATION 17
01330 SUBMITTALS 20
01360 ACCIDENT PREVENTION 24
01400 QUALITY REQUIREMENTS 27
01510 TEMPORARY SERVICES 30
01560 BARRIERS 33
01570 TEMPORARY CONTROLS 34
01600 PRODUCT REQUIREMENTS 36
01770 CLOSEOUT PROCEDURES 38
DIVISION 2 – SITE CONSTRUCTION
SECTION PAGE No.
2000 DESCRIPTION OF SITE 44
DIVISION 1 GENERAL REQUIREMENTS
SECTION 01110 SUMMARY OF WORK
1.1 EXISTING CONDITIONS
The Project location is the Lake Mead National Recreation Area. The site is located in Katherine Landing developed area outside of Bullhead City, Arizona.
Existing Conditions: The lagoon system consists of four lagoon cells. All raw sewage is pumped via lift station from the developed area and subsequently flows by gravity into the primary treatment pond designated as Cell #1. After retention in the primary aeration pond, any overflow currently goes into Cell #2 and Cell #3 which is a lined located just to the west side of pond 1. The existing liner in Cell #1 is torn near the 2-3 foot water level thereby limiting storage capacity. The Katherine Landing wastewater lagoon system, constructed in the early 1980’s, provides for disposal of all sanitary sewage from the residential, commercial and maintenance facilities encompassing the marina area. The wastewater facility is responsible for complete retention of all sanitary sewage. Cell 1 has been removed from service which has limits the capacity and treatment capability.
1.2 GENERAL PROJECT STATEMENT
A. The project requires design and construction services to replace the current compromised liner system in pond 1, as well as associated valves that are used to divert wastewater to and from pond 1.
B. Conceptual drawings and details are being provided to describe the design and construction services needed.
C. A site visit will be scheduled with each of the interested respondents. Measurements, surveys and quantities shall be obtained for the bid package by the contractor.
1.3 SCOPE OF WORK
The scope of work for this contract consists of:
A. Design: Provide a design through project submittals showing the contractor’s plan for this project.
B. An Arizona Department of Environmental Quality (ADEQ) permit will be needed for this project.
1. The contractor shall have the project permitted by Arizona Department of
Environmental Quality (ADEQ).
2. Provide to the CO/COR, a copy of the permit application and any approvals from
ADEQ.
3. The NPS will work with the contractor to coordinate the application process by providing review and any needed signatures from the site owner.
4. The contractor shall have their own Professional Engineer licensed in Arizona to prepare the permit applications and provide close out information and inspections for the permit.
C. Contractor shall remove and dispose of sewage solids in lagoon pond 1.
1. The contractor shall remove and properly dispose of all solids in a licensed facility outside of the park boundaries.
2. Testing of the sewage sludge for disposal shall be the responsibility of the contractor.
3. No farming or burial of the removed sewage materials is allowed on park property.
4. The contractor is responsible for proper handling of the sewage solids either in a wet or dry state.
5. If the solids need to be processed for transportation and disposal, the dirt parking area to the north of the pond may be used.
6. The pond has been in service for about 20 years. The estimated depth of the sludge is 1 to 1.2 feet in depth in a wet state.
D. Contractor shall properly dispose of existing liner material that is removed from the lagoon.
Properly dispose of the material outside of the park boundaries. Other associated items shall be disposed of also.
1. The existing material is a single layer geomembrane system on a soil base. (see pictures)
2. The old barge mounted aerators are to be disposed of also. There are 3 abandoned aerators and 1 float mounted bird cage to be removed. Items are located on the plans.
See pictures.
E. The existing powerlines, power disconnects and transformers on sites shall not be damaged. Any damage to the utilities shall be repaired by the contractor at no expense to the NPS.
F. The existing anchor points for the aerators shall be maintained. Any needed relocation of the anchors due to the installation of the liner system shall be the responsivity of the contractor. Any damage to the anchors resulting from construction activities shall be repaired by the contractor at no expense to the NPS.
G. The soil area north of the lagoon shall be used as the temporary storage and lay down area.
1. Spoils from the grading operations of the lagoon surfaces may be disposed in this parking area by evenly spreading out the spoils outside of the existing vehicular driving paths.
H. Design and Construction of Lagoon Liners: Work includes design and installation of a liner system as shown in the concept drawings and details. Construction includes installation of multi-layer liner system and leak detection sump manholes
1. The lagoon shall have a properly prepared, graded and compacted base beneath the liner material per industry standard.
2. The system shall be a dual liner system with a leak detection manhole.
3. The minimum liner system shall be a 40-mil base layer, 200 mil geogrid layer and a 60 mil top layer. This system has been used in the park and approved by ADEQ.
4. The lagoon bottom shall be graded to a central point for the installation of a collection pipe leading to a leak detection manhole. PVC or HDPE is an acceptable piping material connecting to the manhole. The manhole shall have a standard ductile iron manhole lid. Upon operation of the system, the manhole shall be dry indicating that there are no leaks in the newly installed system.
5. The location of the leak detection manhole shall be by the contractor. The contractor shall meet with the COR or through submittals to obtain approval of the proposed location.
6. Leak detection manhole shall be a standard concrete manhole. The height of the manhole shall be from an elevation base graded for a pipe to flow from the liner to the lid that shall be flush with the surface.
7. Pipe penetrations through the newly installed liner shall be properly sealed per the details. Pipe boots with stainless steel bands shall be installed per industry standard.
Revisions to the details or method shall be reviewed and approved by the COR and
USB.
8. The preferred method of installation and anchoring of the liner material is the use of an anchor trench. See details. The contractor shall be responsible for the excavation and installation of the anchor materials. Storage of the excavated materials along the trench is acceptable as long as the spoil piles do not block any other site access.
Alternate installation methods shall be submitted by transmittal for review and approval.
9. In areas where the liner and anchor trench disturbs the gravel drives around the lagoon, the gravel drives shall be restored and resurfaced to a gravel surface to match existing.
I. The lagoon currently has water in it. The pond has been taken offline. There are valves to drain the water to adjoining ponds. Depending on environmental conditions (evaporation and rainfall), there may be water in the pond. The contractor will be responsible for the draining or pumping out of any water that remains in the pond before starting on construction activities.
J. Refurbishment of the staff gauge shall be included in the project. Staff components used shall be resistant to the harsh environment in the lagoons once returned to service. The existing staff gauges are anchored with a block of concrete. Placement of the staff gauge on the new liner surface shall have additional layers of material separating the concrete from the liner surface. See details. There is 1 staff gauge in the lagoon to be refurbished.
K. The existing ductile iron pipes penetrating into the lagoon shall be removed and replaced.
See plans.
1. There are 4 ductile iron pipes penetrating though the liner above and below the water surface. 2 overflow pipe structures,1 underwater drain pipe and the inlet pipe. See plans and pictures.
2. The piping is 8” ductile iron pipe. The approximate lengths and locations are shown on the plans.
3. Tie to the existing pipe behind the liner material.
4. The overflow structures have stainless shields attached. The shields may be reused.
5. The overflow structures have concrete supports anchoring them in place. These supports shall be replaced. See pictures. The concrete supports shall have a layer separating it from the top surface of the lagoon liner system.
L. The discharge pipe coming into the lagoon shall be removed and replaced. See plans. See pictures.
1. The discharge pipe is on 3 concrete supports. The 3 concrete supports shall be replaced with new. The concrete supports shall have a layer separating it from the top surface of the lagoon liner system.
2. The piping is 8” ductile iron pipe. The approximate lengths and locations are shown on the plans.
M. Work includes the instillation of new valves pertaining to the flow of wastewater to and from pond 1, to adjoining lagoons in the treatment process.
1. There are 3 new valves to be installed. See plans and photos for locations.
2. The existing valves are 8” CLOW Full Flow Geared Flange Hand Wheel Plug Valve
JPM12. Lay length is 11.5 inches.
3. The new valves shall match the existing in type and service. Approved equal submittals shall be reviewed and approved.
N. The 3 aerators installed in the ponds shall be removed and stored.
1. The aerators shall be disconnected from the anchors and power supply.
2. Aerators shall be safely removed and stored on site.
3. Upon completion of the liner project, the aerators shall be reinstalled into the lagoon.
4. With the lack of water in the newly finished pond, the aerators shall be placed in the lagoons on a temporary protective layer. Protective layer may be extra geomembrane layers from the project. Upon filling of the lagoon by the NPS, the NPS will remove these temporary protective layers.
O. 2 safety non-slip access points shall be installed to the top liner surface. Due to the slipperiness of the material surface and the need for the park staff to access the waters edge, 2 sections of non-slip material shall be applied to the surface of the top liner.
Locations shall be identified by the contractor and approved by the COR and USB. Surface shall be approximately 5 feet wide starting at the top edge of the liner and progressing to below the water surface elevation. Coordination with the COR and USB is needed for the location and length of the non-slip section of material
P. Materials and Equipment: The Contractor shall provide all materials, equipment, and labor required to perform the work described in this specification. All materials and equipment shall be new and Contractor-furnished from outside the park.
Q. Contractor shall clean up the site up upon completion of the project.
1.4 LOCATION
A. Project Location: Katherine Landing, Outside Bullhead City AZ, Mohave County, AZ; within Lake Mead National Recreation Area (LAKE NRA).
1.5 PERFORMANCE PERIOD: The project schedule is based on calendar days from the "Notice to Proceed" (NTP) date.
The total performance period for this project is 180 calendar days. On Site Construction work to be started within 60 days of the NTP.
1.6 FIELD VERIFICATION
A. The Contractor shall field verify all new and existing dimensions affecting the work in this contract before ordering any materials, equipment or parts.
1.7 CONTRACTOR'S USE OF PREMISES
A. The site is located in a secure gated Maintenance area of the park. Security of the site shall be maintained during construction.
1. The security fence around the ponds may be temporary removed during construction work on the lagoon.
2. The contractor shall maintain employee access along the road during construction when the fence is removed.
3. The contractor is responsible for safe removal, storage and reinstallation of any and all fence components that have been relocated during construction.
B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the recreation area visitors and employees.
C. Contractor shall at all times maintain function of the existing water supply line, lift stations and water treatment plant. Coordination with the NPS to maintain operation will be required.
D. Preservation of Natural Features: Confine all operations to work limits of the project.
Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
E. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for interruption of existing utility service, if appropriate.
1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair of the utility at no additional expense to the Government.
2. If damage occurs to an unknown utility, the utility shall be repaired. An equitable adjustment will be made in accordance with the Changes clause of the General Provisions.
F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent.
G. Work Limits: The Contractor shall be confined to conduct his work to job site area and work limits as shown on drawings or approved by the Contracting Officer. Contractor shall be responsible to pay for rehabilitation work for any resource damage outside authorized work limits.
H. Care shall be taken to ensure that fuel, oil and other spills do not occur. If spills occur, cleanup will be completed at no additional expense to the Government.
1.8 HOURS OF OPERATION
A. Hours of operation shall be Monday through Friday between the hours of 7:00 AM and 5:00 PM unless alternate hours are approved by the Contracting Officer and the Contracting Officers Representative (COR). Requests for changes shall be submitted to the COR and approved by the CO.
1.9 SPECIAL PROVISIONS
A. Permitting and Fees:
1. The Contractor is responsible for obtaining and paying for all fees and costs for necessary permits and approvals for all activities associated with this Project.
2. Permits from the Arizona Department of Environmental Quality (ADEQ) are expected to be needed and must be conveyed to the NPS upon procurement by the contractor.
3. The Contractor is responsible for obtaining and paying for all fees and costs for necessary permits and approvals for all construction activities associated with this Project.
4. Scott Bell, Environmental Protection Specialist shall be listed as the owner/operator for all ADEQ applications and permits.
5. Prior to beginning site construction, apply for and receive any needed permits and approvals from ADEQ. No work shall commence prior to receiving permits and approvals. A copy of the permits and approvals shall be forwarded to the NPS for review.
6. Contractor shall provide all needed Professional Engineering services for inspections, signatures and closures needed to approve or close out any permit.
B. Time Constraints:
1. Quiet Hours in the park are from 10:00 PM until 6:00 AM. The Contractor shall not operate equipment or make loud noise between these hours.
2. No work will be performed on weekends or on federal holidays without the advanced, written authorization of the CO.
3. Any request to work outside of normal working days and hours shall be submitted to the CO and COR at least 3 business days before the requested event for authorization.
C. Park Entry:
1. The contractor shall furnish a list of personnel with phone contact information.
Vehicles associated with the contractor shall be waived entrance fee upon entering in a marked company vehicle or by providing the names of employees entering in personal vehicles. The entrance fee is waived only for the purpose of reporting directly to a specific work location. Any deviation for recreational purposes is subject to payment of required entrance fees.
D. Park Regulations:
1. Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.
E. Emergency Medical and Accident Reporting:
1. All accidents and incidents shall be reported to the CO and COR.
a. The Contractor or subcontractor shall contact Park Dispatch for any medical emergency or traffic accident occurring within the Park.
Emergency number: Dial 911 as needed.
Park Dispatch: 702-293-8932 EMERGENCY Park Dispatch is called so that the entrance station will be prepared should any emergency vehicles (e.g. ambulance) need to enter the Park and so that any available Emergency Medical Services personnel in the Park might respond until such time as the ambulance arrives.
b. The Contractor or subcontractor is required to report ANY personal injury and / or property damage incident occurring within the park. This report must be made to a Law Enforcement Ranger at the first available opportunity before leaving the park:
Park Dispatch: 702-293-8998 NON-EMERGENCY
F. Logistics:
1. NPS Employee access should be maintained to all facilities during construction.
2. The Contractor shall be responsible for the security of all materials staged/stored on LAKE NRA property.
3. The water treatment plant roads and sewer lagoons are behind locked security gates and fences. The NPS will work with the contractor to provide access to these areas.
G. Environmental Compliance Requirements:
1. The Contractor and all employees working on the Project will be required to take “Desert Tortoise Awareness Training” which will be provided by the Government at no cost to the Contractor. This training will take approximately 30 minutes or less.
2. The Contractor’s employees shall never handle a desert tortoise.
3. The Contractor and employees shall immediately report the presence of any desert tortoise to the COR.
4. Herbicides shall not be used in or around the Project site.
5. The environmental compliance contact for this project is Toshi Yoshida. For questions or additional information, contact Toshi at: 702-293-8849.
H. Equipment Washing:
1. Equipment washing is required to preclude the introduction and spread of non-native species into the Park. Therefore, all equipment shall be cleaned outside of the Park before entering the Park. Equipment leaving the park for any reason must be re-washed before returning to the job site. Equipment that is moved from the job site, but remains within the original developed area, need not be re-washed prior to returning to the job site. It is also known that there are areas inside the Park that have non-native plants and weed species infestation. Therefore, before equipment can be moved from one developed area to another, it must be washed at the location identified on the Site Plan (see attached site plan and mileage table) to ensure weeds are not spread from one developed area to another and inspected outside of park boundaries in advance of the equipment’s arrival to Lake mead National recreation area site, for further information contact Toshi Yoshida at: 702-293-8849.
2. The Contractor shall clean all equipment prior to the equipment entering Lake Mead National Recreation Area. It is recommended that cleaning be accomplished by hot water, pressure washing, using water only. All equipment surfaces shall be cleaned, with special emphasis given to the undercarriage. This includes, but is not limited to:
wheel wells, bumpers, radiator grills, springs, shock absorbers, wire harnesses, skid plates, oil pans, axles, frame ledges, buckets, tracks, belly pans, etc. Cleaning shall also include all dirt and debris inside the cab, or operator area. A Shop-Vac or commercial car wash vacuum system may be used for operator compartments, provided the method used effectively removes all visible debris. Equipment cleaning is for the purpose of removing any seed and soil accumulations to prevent the potential spread of non-native plant and weed species from outside the park to locations inside the park. Cleaning shall be performed in a manner that will reasonably remove all visible soil, plant and other foreign material. All equipment that requires washing shall be inspected by government personnel, or contractors/partners assigned to this duty, to ensure compliance.
3. Equipment that requires washing is generally defined as track or rubber-tired machinery intended for use primarily off-road. Examples include backhoes, loaders, earthmovers, graders, rollers, bulldozers, water trucks, etc; or four wheel drive or passenger vehicles that are driven in off road areas. Equipment may also be stationary, such as a material screening plant, conex storage containers, or a mobile office (mobile offices may be cleaned in the same manner as operator compartments as outlined in paragraph 2). The equipment is generally under the direct control of the contractor or sub-contractors, is likely to remain on the construction site for an extended period of time, and may contain adhered soil and seed from other project sites.
4. Equipment/Vehicles that do not require washing are defined as those normally used for highway driving only, and travel primarily on paved surfaces and well maintained service roads and parking areas (this includes approved staging areas). Examples include semi-tractor trailers, dump trucks, concrete trucks, pickup trucks, fuel trucks, service trucks, etc. These delivery and passenger vehicles are generally not under the direct control of the contractor, have no earth-moving function, and do not remain on the project site. These vehicles have a low probability of carrying adhered soil and seed from other projects. However, every vehicle and piece of equipment is subject to rejection from entering the park if there are obvious signs (covered in mud, plant material adhered to it, etc.) that it could be transporting non-native species into the Park.
I. Post Equipment Washing Inspections:
1. All equipment subject to inspection will be inspected by government, or other authorized personnel prior to leaving the paved surface or designated washing area identified on the Site Plan. Equipment determined to be free of soil or mud based on visual examination by government personnel will be cleared to enter the project area, or proceed to other areas of the park as appropriate. The Contractor shall arrange for needed inspections by contacting the NPS inspection office no less than 5 working days prior to the inspection. Such contact shall provide sufficient time to accommodate scheduling and travel to the site. Equipment not passing initial inspection must be rewashed outside the park at no additional expense to the government.
2. A list of government Inspectors for this project will be provided by:
Kelly Wallace Cell Phone: 702-371-9673
Toshi Yoshida Office Phone: 702-293-8849 Cell Phone: 702-279-9262
1.10 DESIGNATED OFFICIALS
A. The NPS Project Manager (PM) and Contracting Officer's Representative (COR) will be:
Carl Bush PE, Lake Mead NRA Telephone: 702-293-8735 (w) 702-859-0194 (cell) E-mail: carl_bush@nps.gov
B. The Contracting Officer (CO) will be:
TBD
END OF SECTION 01010
LAKE MEAD NATIONAL RECREATION AREA
FIGURE 1
Project Site
Lake Mead Maintenance Building
LAKE MEAD NRA DISTANCE CHART
FIGURE 2
KATHERINE LANDING LAGOON SITE MAP
FIGURE 3
SECTION 01270 DEFINITION OF BID ITEMS
1.1 DESCRIPTION
A. The intent of this section is to explain, in general, what is and what is not included in a bid item, and the limits or cut-off points where one bid item ends and another begins.
B. If no bid item exists for a portion of the work, include the costs in a related bid item.
1.2 LIST OF ANTICIPATED BID ITEMS
A. BID ITEM No. 01 – Install the Lagoon Liner, as specified.
1. UNIT – lump sum
2. DEFINITION – Unit price includes all necessary labor, materials, and equipment to demo the existing liner, pipes and equipment. Unit price also included installation of a new liner and all associated items. The Work includes, but is not limited to: Site visit, disposal of items, surveying, liner installation, permitting, pipe replacement and meetings.
B. BID ITEM No. 02 – Replacement of associated valving to and from lagoon 1 and associate lagoons.
1. UNIT – Lump Sum
2. DEFINITION – Unit price includes all necessary labor, materials, and equipment to install the valving. The Work includes, but is not limited to: Removal, delivery of product and installation of product.
END OF SECTION 01270
SECTION 01310 PROJECT MANAGEMENT AND COORDINATION
1.1 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on this project including, but not limited to the following:
1. Supervisory and administrative personnel.
2. Project meetings.
3. Coordination procedures.
1.2 SUPERVISORY AND ADMINISTRATIVE PERSONNEL
A. General: In addition to the project superintendent, the Contractor shall provide other supervisory and administrative personnel as required for proper work performance. This may include special personnel required for coordination of operations with subcontractors and material suppliers.
B. Staff roster:
1. Within 14 days after the NTP, the Contractor shall submit a list of staff assignments, including subcontractor personnel (if applicable), working at the job site. Identify each individual and their duties and responsibilities.
1.3 PROJECT MEETINGS
A. Submittals required prior to the Preconstruction Conference.
1. Letter designating the Project Superintendent.
2. Proposed construction schedule.
3. Schedule of values.
4. Accident prevention plan.
5. Site health & safety plan.
6. A list of Subcontractors for this project.
7. Written statements from subcontractors certifying compliance with applicable labor standard clauses.
8. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.
9. Waste and recycling plan.
B. Preconstruction Conference: Once the contract is awarded, an initial orientation meeting will be scheduled for a time and date that is agreeable to the Government and Contractor and will be conducted in the Lake Mead Maintenance Building (“Safety First” Building) Lake Mead personnel will be present to go over park specific requirements of the project with the Contractor and the Contractor’s supervisory and administrative team. The Notice to Proceed date will also be established at the Preconstruction Conference.
1. Agenda: Items to be discussed will include but not be limited to:
1. Park Rules and Regulations.
2. General correspondence procedures.
3. Labor standards provisions.
4. Payroll reports.
5. Payments to the Contractor.
6. Acceptance/rejection of work.
7. Progress Meetings.
8. Subcontractors.
9. Documents required under contract.
10. Local emergency phone number.
11. Specifications and drawings.
2. Once the Notice to Proceed date has been established, the Contractor shall submit the proposed work schedule to the Government for approval.
1.4 COORDINATION PROCEDURES
A. Coordination: Coordinate the construction operations identified in the various Sections of this Specification to ensure the efficient installation of all materials and equipment.
1. Schedule construction operations in the proper sequence required to obtain the best results where installation of one part of the Work depends on installation of other components before or after its own installation.
2. Coordinate installation of different components with subcontractors and Government personnel to ensure maximum accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
1.5 SCHEDULE OF VALUES
A. Submit a schedule of dollar values based on the Contract Bid Schedule. Include bond costs, mobilization, general condition costs, overhead, and profit in the total dollar value of unit price items and in the component parts of work for each lump-sum item as described below. Do not include mobilization, general condition costs, overhead, or profit as separate items; however, payment for bond premiums can be made based upon evidence of payment to the surety. Bond premiums may be shown as a separate item.
B. Break down each lump sum Bid Item into component parts of work for which progress payments may be requested. The total costs for the component parts of work shall equal the bid amount for the lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values.
C. The total cost of all items shall equal the contract total, or 100%. The Schedule of Values will form the basis for progress payments. Each progress payment request shall include the overall percentage complete to that date.
END OF SECTION 01310
SECTION 01330 SUBMITTALS
1.1 DESCRIPTION
A. The intent of this section is to explain submittal requirements before and during construction.
B. This section also includes the requirements for properly handling "Substitutions" and
"Comparable Products" the Contractor submits as being "equal" to the product that has been specified.
1.2 SUBMITTAL AND APPROVAL PROCEEDURES
A. All submittals shall be transmitted to the COR, as original and three (3) copies, using National Park Service form CM-16, dated 4/00.
1. A copy of the form is included at the end of this Section.
2. No action will be taken on a submittal unless it is accompanied by a transmittal form.
3. All submittals shall be carefully reviewed by the Contractor prior to submission to the
Government to eliminate errors.
B. Manufactures' Catalog Sheets: Submit only pertinent pages and mark each copy of standard printed data to identify products proposed for use. Submittal forms with attached Manufactures' Catalog Sheets that are not marked to identify products proposed for use will be disapproved by the COR and shall be resubmitted by the Contractor.
C. Lake Mead personnel will review and approve, or disapprove and provide comment to submittals in as short a timeframe as possible, but not to exceed 7 calendar days.
1.3 REQUIREMENTS FOR APPROVED EQUALS
A. For each "Substitution" or "Comparable Product" the Contractor submits as being "equal" to the product that has been specified, the Contractor shall submit supporting documentation that includes:
1. Statement indicating why specified material or product cannot be provided.
2. Detailed comparison of the characteristics of the proposed item with that specified.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Product data, including drawings, descriptions, fabrication, and samples as appropriate.
6. Manufacturer's literature regarding installation, operation and maintenance, schematics for electrical systems, and parts lists.
a. Describe availability of maintenance service, and state a source of replacement parts and materials.
B. A request for approval constitutes a representation that the Contractor:
1. Has investigated the proposed item and determined that it is equal to or superior in all respects to that specified.
2. Shall provide the same warranties for the proposed item as for the item specified.
3. Has determined the proposed item is compatible with interfacing items.
4. Shall coordinate the installation of the alternate item and make all changes required in other elements of the work because of the substitution.
5. Wavier all claims for additional expenses the may be incurred as a result of the substitution.
C. If all of the requirements listed above are not met by the Contractor, the COR will disapprove the "Substitution" or "Comparable Product" request.
END OF SECTION 01330
LAkE 266532 Page 22 of 58
TRANSMITTAL - NATIONAL PARK SERVICE Transmittal No.:
Sheet: 1 of:
Park:
Project:
Contract No.:
Pkg. No.:
Date:
Contractor:
Subcontractor/Supplier:
NPS ACTION
It em N o
Specification Section No. P ar ag ra p h N
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Contractor Signature
Recommended By
Title
Date
Title
I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)
Review Comments
Action By
Contracting Officer's Representative
Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.
SUBMITTAL LOG DATES: From Contractor [__________], To Reviewer [__________], From Reviewer [__________], To Contractor [__________] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim
CM-16Rev. 4/00 (Formerly DSC-1)
LAkE 266532 Page 23 of 58
TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE Transmittal No.:
Sheet: 2 of:
Park:
Project:
Contract No.:
Pkg. No.:
Date:
Contractor:
Subcontractor/Supplier:
NPS ACTION
It em N
Specification Section No. P ar ag ra p h N
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Review Comments
CM-16Rev. 4/00 (Formerly DSC-1)
LAKE 266532 Page 24 of 58
SECTION 01360 ACCIDENT PREVENTION
A. The work consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.
1.2 SUBMITTALS
A. Accident Prevention Plan - The Plan shall be written to comply with OSHA and project requirements including but not limited to the following information/topics:
1. The name of the responsible supervisor who shall carry out the program.
2. Documentation of the personnel training program; both initial and continuing.
3. Weekly and monthly safety meetings.
4. First aid procedures.
5. Outline the work, associated hazards, protective measures, and the methods proposed to ensure property protection, safety of the public, National Park Service personnel, and Contractor's employees.
6. Planning and checklists for possible emergency situations.
7. A fire protection plan.
8. And a fall protection plan.
B. Daily Submittals: Submit Daily Quality Control Report showing all inspections and tests on the first workday following the date covered by the report.
C. Tests: Submit triplicate copies of complete test results not later than three calendar days after the test was performed. Submit failing test results and proposed remedial actions within four hours of noted deficiency.
D. Off Site Inspection Reports: Submit prior to shipment.
E. Progress Payments: If the CQC plan and Daily Quality Control Reports are not submitted in a timely manner, the Contracting Officer may retain an appropriate amount of the applicable progress payment.
1.3 QUALIFICATION OF EMPLOYEES
A. Ensure that employees are physically qualified to perform assigned duties in a safe manner.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
LAKE 266532 Page 25 of 58
C. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment.
1.4 ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, fires, and property damage by accident in excess of $100. Notify Contracting Officer immediately in the event of a reportable accident. Within 7 days of a reportable accident, fill out and forward to Contracting Officer an Accident/Property Damage Report (Form CM-22). Form may be obtained from the Contracting Officer.
B. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
1.5 PERSONNEL PROTECTIVE EQUIPMENT
A. Meet requirements of National Institute for Occupational Safety and Health (NIOSH) and
OSHA.
B. Inspect personal protective equipment daily and maintain in a serviceable condition.
Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
C. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
D. It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
1.6 EMERGENCY INSTRUCTIONS
A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
1.7 SAFETY MEETINGS
A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.
B. Conduct monthly safety meetings for all levels of supervision. Notify the COR of meeting dates and times. These meetings shall be used to review the effectiveness of the Contractor's safety effort, to resolve current health and safety problems, to provide a forum for planning safe construction activities, and for updating the accident prevention program.
1.8 Covid-19 Protocol
A. Site Specific Safety and Health Plan
LAKE 266532 Page 26 of 58
B. A site specific safety and health plan shall be prepared covering on-site work to be performed by the contractor and all subcontractors. The prime contractor shall be responsible for development, implementation, and oversight of the site specific plan. The site specific safety and health plan shall establish in detail, the protocols necessary for recognition, evaluation, and control of hazards associated with each task performed. The plan shall address site specific safety and health requirements and procedures based upon site specific conditions. The level of detail provided in the site specific safety and health plan shall be tailored to the type of work, complexity of operations to be performed, and hazards anticipated. The site specific safety and health plan shall address, in as much detail as possible, anticipated tasks, their related hazards, and anticipated control measures.
C. As work proceeds, the site specific safety and health plan shall be adapted to new situations and new conditions. Changes and modifications to the accepted site specific safety and health plan shall be made with the knowledge and concurrence of the safety office, site superintendent, and contracting office. Should any unforeseen hazard become evident during the performance of work, the contractor shall bring such hazard to the attention of the safety office and COR, both verbally and in writing for resolution as soon as possible. In the interim, necessary action shall be taken to re-establish and maintain safe working conditions in order to safeguard on-site personnel, visitors, the public, and the environment.
D. Prior to submittal to the COR, the site specific safety and health plan shall be signed and dated by the prime contractor's safety and health manager and site superintendent. The site specific safety and health plan shall be part of the contractor's safety and Health program. The contractor shall submit to the COR the contractor's site specific safety and health plan for review and approval by the safety office.
E. Work performed under this contract shall comply with applicable federal, state, and local safety and occupational health laws and regulation, including adherence to any local government health orders in effect to reduce the rate of transmission of Novel Coronavirus Disease 2019 (“Covid-19”). This includes, but is not limited to, Occupational Safety and Health Administration (OSHA) standards, 29 CFR, Part 1910 and Part 1926. Where the requirements of applicable laws, criteria, ordinances, regulations, and referenced documents vary the most stringent requirements shall apply.
END OF SECTION 01360
LAKE 266532 Page 27 of 58
SECTION 01400 QUALITY REQUIREMENTS
A. The intent of this section is to explain the requirements for preparing and executing a Quality Control Program.
1.2 SUBMITTALS
A. Quality Control Plan: At the time of the Pre-Construction Conference the Contractor shall submit for approval a written Contractor Quality Control (CQC) plan to the Government. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days. The Government reserves the right to require changes to the plan during the contract period as necessary to obtain the quality specified. No change in the approved plan may be made without written concurrence by the Contracting Officer. The plan shall include:
1. A list of personnel responsible for quality control. Include each person's qualifications.
2. A copy of a letter of direction to the Contractor's quality control supervisor outlining assigned duties.
3. Names and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.
4. Methods of monitoring and controlling environmental pollution and contamination as required by regulations and laws.
5. Methods of performing, documenting, and enforcing quality control of all work.
B. Daily Submittals: Submit Daily Quality Control Report showing all inspections and tests on the first workday following the date covered by the report.
C. Tests: Submit triplicate copies of complete test results not later than three calendar days after the test was performed. Submit failing test results and proposed remedial actions within four hours of noted deficiency.
D. Off Site Inspection Reports: Submit prior to shipment.
E. Progress Payments: If the CQC plan and Daily Quality Control Reports are not submitted in a timely manner, the Contracting Officer may retain an appropriate amount of the applicable progress payment.
1.3 QUALITY ASSURANCE
A. General: Except for tests or other items of work specified to be performed by the Government, the quality of all work shall be the responsibility of the Contractor. Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.
LAKE 266532 Page 28 of 58
B. Quality Control Staff: The Contractor's job supervisory staff may be used for quality control, supplemented as necessary by additional technicians. The Contractor's designated Quality Control Supervisor shall be employed full time at the project site whenever contract work is in progress.
C. Testing Laboratory and Equipment: Employ certified independent laboratory to perform sampling and testing.
1. All measuring devices, laboratory equipment, and instruments shall be calibrated at established intervals against certified standards in accordance with NBS/NIST requirements. Upon request, measuring and testing devices shall be made available for use by the Government for verification tests.
2. The testing laboratory organization shall be experienced in the type of testing work to be done.
1.4 OFF-SITE CONTROL
A. Items that are fabricated or assembled off-site shall be inspected for quality control at the place of fabrication.
1.5 ON-SITE CONTROL
A. Notify the COR at least 24 hours in advance of the initial and follow-up phases.
B. Preparatory: Perform before beginning each feature of work.
1. Review control submittal requirements with personnel directly responsible for the quality control work.
2. Ensure that provisions have been made for field control testing.
3. Examine the work area to ensure that all preliminary work has been completed.
4. Verify all field dimensions and advise the COR of discrepancies.
5. Ensure that necessary equipment and materials are at the project site and that they comply with approved shop drawings and submittals.
C. Initial: As soon as work begins, inspect and test a representative portion of a particular feature of work for quality of workmanship. Review control testing procedures to ensure compliance with contract requirements.
D. Follow-Up: Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.
1.6 DOCUMENTATION
A. Maintain Daily Quality Control Reports (sample attached) of quality control activities and tests. Daily Quality Control Reports may not be substituted for other written reports required under the General Provisions, such as Disputes, Differing Site Conditions, or Changes.
LAKE 266532 Page 29 of 58
1.7 ENFORCEMENT
A. The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the COR. Construction shall not proceed on any feature of work containing uncorrected work.
END OF SECTION 01400
LAKE 266532 Page 30 of 58
SECTION 01510 TEMPORARY SERVICES
A. The work of this section consists of providing temporary services required for Contractor's performance of the work of this contract.
1.2 GENERAL REQUIREMENTS
A. Temporary materials may be new or used, but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.
1.3 SANITARY FACILITES
A. Provide and maintain temporary toilet facilities in accordance with State Health Department and National Park Service requirements.
B. Sufficiently lighted and ventilated toilet facilities in weatherproof, sight-proof, handicap accessible, sturdy enclosures with privacy locks.
1.4 FIRE PROTECTION EQUIPMENT
A. Extinguisher shall have a minimum UL rating of 2-A: 10-B:C.
1.5 ELECTRICITY AND LIGHTING
A. Make arrangements with utility company for metered connection to existing utility and pay all costs.
B. Temporary Electrical: Temporary electrical work shall meet requirements of NFPA 70- 1996 (NEC), Article 305.
C. When temporary connections are removed, restore existing utility services to their original condition.
1.6 HEATING AND VENTILATING
A. Provide and maintain adequate approved facilities, as required for safety and construction requirements, during the progress of the work. Provide ample clearance around stoves and heaters, and all chimneys and vent connections to prevent ignition of combustible material.
1.7 TELEPHONE
A. No telephone service is available on site for Contractor's use. Make arrangements with Telephone Company and pay all costs.
LAKE 266532 Page 31 of 58
1.8 WATER
A. Non-potable water for construction activity is available at no charge to the Contractor from Lake Mead and/or Lake Mohave. The Contractor shall provide all equipment and personnel required to draw water from the lake and transport it to the work site as part of the basic bid, at the Contractors expense. The Contractor shall coordinate the access point to the lake with the COR.
B. The Contractor may also request access to construction water from a park fire hydrant or yard hydrant. All such requests must be approved by the COR and comply with the following requirements/restrictions:
1. Only an approved spanner wrench shall be used to operate any fire hydrant. Any other type of wrench is strictly forbidden. Hydrants must be opened and closed slowly with an approved fire hydrant wrench. The Contractor shall be responsible for any damage to a fire hydrant caused by contractor personnel operating the hydrant, and shall be responsible for the cost of all repairs.
2. When filling any/all water trucks from a park fire hydrant, the Contractor shall ensure there is an air gap between the hose attached to the hydrant and the tank on the water truck. The air gap separation can be achieved by a metallic pipe permanently installed on the water transporting vehicle which will serve as the fill line or an air gap between the end of the fill line from the hydrant and the water transporting vehicle.
3. If the Contractor chooses not to use an air gap then a reduced pressure principle backflow assembly shall be required. The backflow unit shall be tested by a Licensed Tester and provided at the Contractors expense.
C. The Contractor shall furnish cool, potable water for construction personnel in locations convenient to work site.
1.9 SANITARY FACILITIES
A. Place portable toilets in approved locations secluded from public observation and convenient to the work site. Relocate as work progress requires.
B. Maintain and clean toilet facilities at least weekly.
C. Completely remove sanitary facilities on completion of work.
1.10 FIRE PREVENTION AND PROTECTION
A. Responsible person: A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding procedures.
B. Hazard Control: Take all necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in existing buildings. Provide adequate ventilation during use of volatile or noxious substances.
LAKE 266532 Page 32 of 58
C. Spark Arresters:
1. Written determinations of periods and areas of potential fire hazard will be issued by Contracting Officer.
2. Equip all gasoline or diesel powered equipment used during periods of potential fire hazards or in potential forest and grass fire locations with spark arresters approved by the U. S. Forest Service.
D. Service and Refueling Areas: Locate areas a minimum of 50 feet from buildings. Shut down equipment before refueling.
E. Smoking: Smoking within buildings or temporary storage sheds is prohibited.
F. Welding: Cutting by torch or welding shall be performed only when adequate fire protection is provided.
1.11 PROTECTION EQUIPMENT REQUIRED
A. Buildings:
1. Furnish a minimum of one…
This is the start of the file's text. The full file is on GovTribe.