This document is a Request for Information (RFI) #006 for contract FODO 253278, addressing multiple clarification questions from previous RFI responses. The document systematically reviews inconsistent or unclear responses from prior RFIs, focusing on seven key areas of clarification. The primary themes include: (1) confirming that no previous contract documents, RFIs, submittals, or ASIs will be furnished, (2) seeking specifics about panel board manufacturer information, (3) clarifying requirements for propane tank specifications, (4) addressing mobile storage unit details, and (5) confirming the scope of foundation excavation work, which is specifically limited to foundation walls at a new ramp.

The RFI responses consistently emphasize that previously submitted documents from the prior contract will not be provided, with responses superseding earlier contradictory statements. Specific technical clarifications include referencing specific specification sections for propane tank requirements (E0.4 Special Note 6, Spec Sections 26 23 13.16, 2.5B and 23 20 00), confirming that existing storage units are not to be demolished, and specifying that excavation work is confined to foundation walls at the new ramp, as detailed in foundation civil, architectural, and structural documents.

View the file

Other files

File Type Posted
B09_SF30_Amendment_0005_140P2025R0054_0005.pdf PDF
Sol_140P2025R0054_Amd_0005.pdf PDF
B09_SF30_Amendment_0004_140P2025R0054_0004.pdf PDF
Sol_140P2025R0054_Amd_0004.pdf PDF
B09_Amendment_0004_FODO_253278_RFI_05_Responses_0004.pdf PDF
B09_SF30_Amendment_0003_140P2025R0054_0003.pdf PDF
B09_FODO253278_2nd_Site_Visit_Attendance_11192025_0003.pdf PDF
B09_Amendment_0003_FODO_253278_RFI_04_Responses_0003.pdf PDF
B09_Amendment_0003_FODO_253278_RFI_03_Responses_0003.pdf PDF
Sol_140P2025R0054_Amd_0003.pdf PDF
B09_Amendment_0002_FODO_253278_RFI_01_Responses_0002.pdf PDF
B09_SF30_Amendment_0002_140P2025R0054_0002.pdf PDF
Sol_140P2025R0054_Amd_0002.pdf PDF
B09_Amendment_0002_FODO_253278_RFI_02_Responses_0002.pdf PDF
B09_SF30_Amendment_0001_140P2025R0054_0001.pdf PDF
Sol_140P2025R0054_Amd_0001.pdf PDF
B09_PreBid_Signin_Sheet_Oct282025_0001.pdf PDF
B09_PreBid_Agenda_Oct282025_0001.pdf PDF
B08_Attach_9-_Site_Condition_Survey_Report.pdf PDF
B08_Attach_5_-_Past_Performance_Q_FODO_253278.docx DOCX document
B08_Attach_8_-_General_References_FODO_253278.doc DOC document
B08_Attach_6_-_SF-24_Bid_Bond.pdf PDF
Sol_140P2025R0054.pdf PDF
B08_Attach_2-Drawings_FODO_253278_Final.pdf PDF
B08_Attach_1-Specifications_FODO_253278_Final.pdf PDF
B08_Attach_4_-_Project_Experience_Q_FODO_253278.docx DOCX document
B08_Attach_7_SubKPlan_FODO_253278.docx DOCX document
B08_Attach_3-WD_TN20250170.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FODO 253278

RFI #006

Item Question Response Per the received RFI responses on 11/13/2025, please see below list of questions that are same but have a opposite answer:

a. Question-9 under RFI-01 says that NPS will provide all RFI Q/A from previous contract but Question-2 under RFI-02 denied to provide the same information. Please provide confirmation on the question.

Previously submited pre-bid RFI's for the prior contract will not be furnished. Previous response(s) indicating otherwise are superseded via the response(s) provided by this amendment.

b. Question-8 under RFI-01 says that NPS will provide all submittals but Question-1 under RFI- 02 denied to provide the same information. Please provide confirmation on the question.

Previously submitted Submittals for the prior contract will not be furnished. Previous response(s) indicating otherwise are superseded via the response(s) provided by this amendment.

Under RFI-01, Question-11 depicts that NPS will not provide any previous ASI’s. Question-12 (h), the response refers to checking the ASI-001 to ASI-005; however, we have not received the attachment with the RFI’s. Please provide all the ASI’s for clarification.

Previously submitted RFI's and Submittals for the prior contract will not be furnished. Previous response(s) indicating otherwise are superseded via the response(s) provided by this amendment.

Under RFI-01, Question-12 (k) and (o), the response refers to check RFI-006, RFI-060 and RFI-

189. But we have not received any of theses RFI’s. Please provide all the RFI’s for clarification.

Previously submitted RFI's for the prior contract will not be furnished. Previous response(s) indicating otherwise are superseded via the response(s) provided by this amendment.

We need information about the Panel Board manufacturer, but RFI response denies to provide any submittal about this. Please provide information for clarification.

Submittals from the previous contract will not be furnished.

Under RFI-01, Question-12 (cc) response reflects to provide a Propane Tank. Please provide a specification on the propane tank for the clarification.

See sheet E0.4 Special Note 6. See Spec Section 26 23 13.16, 2.5B and 23 20 00.

Under RFI-01, Question-12 (m) depicts to provide specification for all (6) mobile storage. Should the existing (2) storage units be demolished, as it says to provide new instead refurbished. Please provide clarification.

They are not to be demolished

Under RFI-02, Question-10, the response states to excavate to expose the bottom of the foundation and allow for the complete removal of the existing waterproofing system. Please confirm that this scope of work is only applicable to the foundation walls at the new ramp and does not apply to the entire building foundation

Excavation only applies to the foundation walls at the new ramp. See foundation civil, architectural and structural details.