This document is a Request for Information (RFI) #005 for FODO 253278, containing five key clarification questions and responses related to a potential contract opportunity. The RFI addresses proposal formatting, past performance documentation, base bid line items, and equipment reuse guidelines. Key details include: no specified font requirements for proposals (refer to Sections L and M), confirmation that projects nearing completion can be used for past performance, validation that base bid line items are mutually inclusive and will be awarded together, and guidance on reusing previously installed equipment and materials, with the contractor responsible for proper reinstallation and workmanship warranty while not warranting reused materials. The final question confirms that the awarded contractor will determine the viability of reusing existing materials, with no predefined list of reusable or non-reusable items available from the owner.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FODO 253278
RFI #005
Item Question Response
1 What is the required font size and type for the proposal format?
No specified font size and type. Please ensure your submitted proposal complies with the instructions delineated in Sections L and M of the solicitation.
Can we use a project that is nearing completion, and expected to be finished before the award, as past performance? Yes
The base bid lists two line items; It is assumed the line items are mutually inclusive, will not be considered as options, and will be awarded together. Please confirm.
Yes
There exist equipment and materials with approved submittals which were previously installed but installed in the wrong location. It is assumed the contractor will dismantle, reuse the existing equipment and materials, and reinstall properly. The contractor will then warranty the workmanship of his installation, but such reused materials and equipment will not be warrantied by the contractor. Please confirm
Yes
If there is any existing, previously installed materials, equipment, or gear which the owner does not want reused, can a list of such items be provided?
The awarded Contractor will need to make the determination on if reused materials, equipment or gear can be utilized. There is no list available.